    Mohamad syafiq bin rahim 01dka11f2133

    Muhamad kamarul nizam 01dka11f2166

    Norfasira binti salleh udin 01dka11f2096

    Mohamad fadzly bin kutty abba 01dka11f2125

    MR KHAIRUL AZMAN BIN MD YUSUF

  • 7/29/2019 Deep Foundation geothecnic 2

    2/15

    A deep foundation is a type

    of foundation distinguished from shallowfoundations by the depth they are embedded

    into the ground

  • 7/29/2019 Deep Foundation geothecnic 2

    3/15

    Displacement piles

    Piles which are driven are termedDisplacement Piles because their installation

    methods displace laterally the soils throughwhich they are introduced.

    Replacement piles

    Piles that are formed by creating a borehole

    into which the pile is then cast or placed, arereferred to as Replacement Piles becauseexisting material, usually soil is removed aspart of the process.

  • 7/29/2019 Deep Foundation geothecnic 2

    4/15

    Displacement

    Larger

    Preformed

    Solid concrete ortimber

    Hollow tubeClosed steel or

    concrete

    Formed In-situ

    Tube formerwithdraw void

    filled withconcrete

    Small

    Hollow tube, orH-section steel

    Screw

  • 7/29/2019 Deep Foundation geothecnic 2

    5/15

    A driven pile is a deep foundation that is constructed by

    driving a concrete, steel or timber pile.

    To support the anticipated load in competentsubsurface material.

    Prefabricated concrete piles are driven using a pile

    driver equipped with a hydraulic free fall hammer.

    Prefabricated concrete piles are primarily used in loosesoils.

  • 7/29/2019 Deep Foundation geothecnic 2

    6/15

  • 7/29/2019 Deep Foundation geothecnic 2

    7/15

  • 7/29/2019 Deep Foundation geothecnic 2

    8/15

    Bore piles

    Unsupportedduring

    construction

    Supportedduring

    construction

    Steel casing

    Void filled withreinforcedconcrete

    Drilling mud

  • 7/29/2019 Deep Foundation geothecnic 2

    9/15

    A bored pile is a deep foundation that isconstruction by removing the soil in the pilelocation by an excavating tool (bucket- auger-

    core barrel- etc..) to correct depth When the drill has arrived at the correct depth,

    the pile is concreted using a tremmie pipe orpumped through the end of the centre pipe

    (CFA)

  • 7/29/2019 Deep Foundation geothecnic 2

    10/15

    A monopile foundation utilizes a single,generally large-diameter, foundation structural

    element to support all the loads (weight, wind,etc.) of a large above-surface structure.

  • 7/29/2019 Deep Foundation geothecnic 2

    11/15

  • 7/29/2019 Deep Foundation geothecnic 2

    12/15

    Micropiles

    Tripod piles

    Sheet piles

    Soldier piles

    Suction Piles

    Adfreeze Piles

    Vibrated Stone Columns

    Bored Piles

  • 7/29/2019 Deep Foundation geothecnic 2

    13/15

    Friction piles(cohesion piles) Qs

    End bearing piles (point bearing piles) Qb

    Combination of friction and cohesion piles

    P + W = Qs + Qb

  • 7/29/2019 Deep Foundation geothecnic 2

    14/15

    END BEARING PILES FRICTION PILES

  • 7/29/2019 Deep Foundation geothecnic 2

    15/15

    Qult = Qs + Qb= Ab Qult + As fs

    Qult = bearing pressure at the bottom

    Qult = Cu Nc

    fs = friction between the surface of the piles

    fs =