Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc...
Transcript of Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc...
1
Deconstruction – the end of
demolition
René Leblanc
Chemist, M.Sc., CSP, ROH
IOHA President
Deconstruction – the end of demolition
1
2
2
Why deconstruct?
• End of life
• Renovation
• End of operation
• Abandoned building
• New project for this site
Why deconstruction over demolition?
• Sustainable development
• Economical value of materials
• LEED project
• Environmental and H&S Management
DECONSTRUCTION
Health & Safety And / Or ENVIRONMENT
3
4
3
Deconstruction
Key Steps:
- Hazmat survey
- Specifications & Drawings for deconstruction
- Decontamination Surveillance
- Deconstruction Surveillance
- Final Report
Decontamination – H&S Aspect
HAZMAT SURVEY
Asbestos
Beryllium
Lead
Mercury
Silica
Hydrocarbons
Hazardous waste / tanks / barrels / piping
PCB’s
CFC’s
Mold
Pigeon Droppings
Surface contamination
5
6
4
Decontamination – H&S Aspect
LUNGS
DECONTAMINATION - ASBESTOS
7
8
5
Friable Non Friable
DECONTAMINATION - ASBESTOS
DECONTAMINATION - ASBESTOS
SPRAYED-ON INSULATION
9
10
6
DECONTAMINATION - ASBESTOS
BOILERS
DECONTAMINATION - ASBESTOS
PIPING INSULATION
11
12
7
DECONTAMINATION - ASBESTOS
PIPING ELBOWS
DECONTAMINATION - ASBESTOS
CEMENT-PLASTER WALLS
13
14
8
DECONTAMINATION - ASBESTOS
CEMENT-PLASTER CEILINGS
DECONTAMINATION - ASBESTOS
CEILING TILES AND MASTIC
15
16
9
FLOOR TILES and MASTIC
DECONTAMINATION - ASBESTOS
ASBESTOS-CEMENT PIPES
DECONTAMINATION - ASBESTOS
17
18
10
DECONTAMINATION - ASBESTOS
VERMICULITE
DECONTAMINATION - ASBESTOS
19
20
11
RISQUE FAIBLE
MODÉRÉ OU ÉLEVÉ
DECONTAMINATION - ASBESTOS
DECONTAMINATION - LEAD
Lead woolRadiologY
Lead plates
21
22
12
DECONTAMINATION – LEAD-PAINT
DECONTAMINATION – CFC
23
24
13
DECONTAMINATION – BPC (transformers)
DÉCONTAMINATION – BPC (ballasts)
25
26
14
DECONTAMINATION – Mercury
DECONTAMINATION – Molds/Droppings
27
28
15
Quokka!
DECONTAMINATION
Hazardous Wastes
29
30
16
DECONTAMINATION – Hydrocarbons
DECONTAMINATION – Surface contamination
POROUS NON-POROUS
31
32
17
Decontamination - Scarification or Power Wash
or CO2 Blasting
Decontamination - PPE
33
34
18
DECONTRUCTION
=
SEPARATION
OF WASTES
Achieved projects
Wood recycling St-Luc Hospital
Downtown Montreal
35
36
19
Montreal Hyppodrome Foamglas!! 10% CO / 4% H2S
10% = 100,000 ppm 4% = 40,000 ppm
Norme CO 35 ppm, H2S 10 ppm
Achieved projects
Redpath Sugar
Angus Locoshop
Achieved projects
37
38
20
Environnemental Monitoring
Noise Dust / NOx / CO (telemétry / wireless
2 action levels alerts by email warning/danger)
DÉCONSTRUCTION
SQUATTERS!!!
COPPER
39
40
21
Material Price Index– Recyc Quebec
www.ghd.com
Merci !
Questions?
René Leblanc
Chemiste, M.Sc., CRSP, ROH
Hygiéniste du travail et professionnel en sécurité certifié