1 Deconstruction – the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President [email protected] Deconstruction – the end of demolition 1 2

Transcript of Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc...

Page 1: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

1

Deconstruction – the end of

demolition

René Leblanc

Chemist, M.Sc., CSP, ROH

IOHA President

[email protected]

Deconstruction – the end of demolition

1

2

Page 2: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

2

Why deconstruct?

• End of life

• Renovation

• End of operation

• Abandoned building

• New project for this site

Why deconstruction over demolition?

• Sustainable development

• Economical value of materials

• LEED project

• Environmental and H&S Management

DECONSTRUCTION

Health & Safety And / Or ENVIRONMENT

3

4

Page 3: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

3

Deconstruction

Key Steps:

- Hazmat survey

- Specifications & Drawings for deconstruction

- Decontamination Surveillance

- Deconstruction Surveillance

- Final Report

Decontamination – H&S Aspect

HAZMAT SURVEY

Asbestos

Beryllium

Lead

Mercury

Silica

Hydrocarbons

Hazardous waste / tanks / barrels / piping

PCB’s

CFC’s

Mold

Pigeon Droppings

Surface contamination

5

6

Page 4: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

4

Decontamination – H&S Aspect

LUNGS

DECONTAMINATION - ASBESTOS

7

8

Page 5: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

5

Friable Non Friable

DECONTAMINATION - ASBESTOS

DECONTAMINATION - ASBESTOS

SPRAYED-ON INSULATION

9

10

Page 6: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

6

DECONTAMINATION - ASBESTOS

BOILERS

DECONTAMINATION - ASBESTOS

PIPING INSULATION

11

12

Page 7: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

7

DECONTAMINATION - ASBESTOS

PIPING ELBOWS

DECONTAMINATION - ASBESTOS

CEMENT-PLASTER WALLS

13

14

Page 8: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

8

DECONTAMINATION - ASBESTOS

CEMENT-PLASTER CEILINGS

DECONTAMINATION - ASBESTOS

CEILING TILES AND MASTIC

15

16

Page 9: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

9

FLOOR TILES and MASTIC

DECONTAMINATION - ASBESTOS

ASBESTOS-CEMENT PIPES

DECONTAMINATION - ASBESTOS

17

18

Page 10: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

10

DECONTAMINATION - ASBESTOS

VERMICULITE

DECONTAMINATION - ASBESTOS

19

20

Page 11: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

11

RISQUE FAIBLE

MODÉRÉ OU ÉLEVÉ

DECONTAMINATION - ASBESTOS

DECONTAMINATION - LEAD

Lead woolRadiologY

Lead plates

21

22

Page 12: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

12

DECONTAMINATION – LEAD-PAINT

DECONTAMINATION – CFC

23

24

Page 13: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

13

DECONTAMINATION – BPC (transformers)

DÉCONTAMINATION – BPC (ballasts)

25

26

Page 14: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

14

DECONTAMINATION – Mercury

DECONTAMINATION – Molds/Droppings

27

28

Page 15: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

15

Quokka!

DECONTAMINATION

Hazardous Wastes

29

30

Page 16: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

16

DECONTAMINATION – Hydrocarbons

DECONTAMINATION – Surface contamination

POROUS NON-POROUS

31

32

Page 17: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

17

Decontamination - Scarification or Power Wash

or CO2 Blasting

Decontamination - PPE

33

34

Page 18: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

18

DECONTRUCTION

=

SEPARATION

OF WASTES

Achieved projects

Wood recycling St-Luc Hospital

Downtown Montreal

35

36

Page 19: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

19

Montreal Hyppodrome Foamglas!! 10% CO / 4% H2S

10% = 100,000 ppm 4% = 40,000 ppm

Norme CO 35 ppm, H2S 10 ppm

Achieved projects

Redpath Sugar

Angus Locoshop

Achieved projects

37

38

Page 20: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

20

Environnemental Monitoring

Noise Dust / NOx / CO (telemétry / wireless

2 action levels alerts by email warning/danger)

DÉCONSTRUCTION

SQUATTERS!!!

COPPER

39

40

Page 21: Deconstruction the end of demolition · 1 Deconstruction –the end of demolition René Leblanc Chemist, M.Sc., CSP, ROH IOHA President Rene.leblanc@ghd.com Deconstruction –the

21

Material Price Index– Recyc Quebec