DECOM OFFSHORE 2014 SYNERGIES BETWEEN SALVAGE AND DECOMMISSIONING
![Page 3: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/3.jpg)
3
OUTLINE
• Introduction Salvage • Case Study Subsea Cutting • Case Study Smart Subsea Solutions • Synergies/Gaps Salvage & Decommissioning • Way forward
![Page 4: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/4.jpg)
4
MAMMOET
Worlds leading company in Heavy Lifting, Transport and Salvage Offices in 65 countries 5.500 employees US$ 1,5 billion annual turnover
![Page 5: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/5.jpg)
5
SALVAGE
Wreck removal
Salvage Industry
Environmental Cargo recovery
Emergency response Project work
Groundings Fire Failures
Hurricane damage
![Page 6: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/6.jpg)
6
![Page 7: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/7.jpg)
7
CASE STUDY SUBSEA CUTTING
![Page 8: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/8.jpg)
8
![Page 9: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/9.jpg)
9
![Page 10: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/10.jpg)
10
![Page 11: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/11.jpg)
11
![Page 12: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/12.jpg)
12
![Page 13: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/13.jpg)
13
![Page 14: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/14.jpg)
14
![Page 15: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/15.jpg)
15
![Page 16: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/16.jpg)
16
CASE STUDY SMART SOLUTIONS
![Page 17: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/17.jpg)
17
![Page 18: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/18.jpg)
18
![Page 19: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/19.jpg)
19
19
![Page 20: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/20.jpg)
20
Complex operations in offshore environment
Moving heavy structures at sea
Toolbox (diving,ROV,cutting tools)
Crafts such as floating cranes, AHT, barges, DSV’s
Ability to work alongside other skillsets
Safety Culture
SYNERGIES
![Page 21: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/21.jpg)
21
Decommissioning Salvage
Origin (nature of operation) Planned operation Accident/failure
Project emphasis Preparation Execution
Perception Conventional reversed installation How can it be moved anyway?
Assurance Standards/procedures Project specific assurance case
Commitment (contract) Service contracts (effort driven) No Cure No Pay
GAPS
![Page 22: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/22.jpg)
22
RISK ALLOCATION
lifting height
capacity
subsea diving
![Page 23: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/23.jpg)
23
RISK ALLOCATION
Heavy Lift Installation
Oil/Gas Services Offshore wind Marine salvage Civil Marine
Topsides
Jackets
Subsea installations
![Page 24: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/24.jpg)
24
RISK ALLOCATION
Heavy Lift Installation
Oil/Gas Services Offshore wind Marine salvage Civil Marine
Topsides Increased Risk Increased Risk
Jackets Increased Risk Increased Risk
Subsea installations
Increased Risk
Risk Allocation
![Page 25: DECOM OFFSHORE 2014](https://reader030.fdocuments.net/reader030/viewer/2022032402/6231d0293e33163b5128ddfa/html5/thumbnails/25.jpg)
25
WAY FORWARD
Risk Allocation: • Find contractors who are best to take risk • Direct cost saving
An optimal solution requires: • Planning/funneling • An open mind • Clarity on objectives