------------------------------------- UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2.4.43 WARRENVillE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 December 9, 2011 Mr. Ramon Lugo, III, Director NASA Glenn Research Center at Lewis Field 21000 Brookpark Road M.S. 3-2 Cleveland, OH 44135 SUBJECT: NRC INSPECTION REPORT 05000030/12-001 (DNMS) AND 05000185/12-001 (DNMS) - NASA PLUM BROOK REACTOR FACILITY Dear Mr. Lugo: On November 22, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed inspection activities at the National Aeronautical and Space Administration (NASA) Plum Brook Reactor Facility, Sandusky, Ohio. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an on-site inspection on October 18 - 20,2011, and subsequent in-office review through November 22, 2011, the inspectors evaluated decommissioning performance and conducted independent confirmatory radiation surveys and sampling. An evaluation of the samples was performed by the Oak Ridge Institute for Science and Education (ORISE). At the conclusion of the on-site inspection, the inspectors discussed the interim inspection results with members of your staff. A final report from ORISE with the results of the sample analysis was provided to the NRC on November 10, 2011. At the conclusion of the in-office review, a final telephone exit meeting was conducted on November 22, 2011, to discuss the final results with members of your staff. This inspection consisted of an examination of decommissioning activities at the NASA Plum Brook Reactor Facility as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, and interviews with personnel. Based on the results of this inspection, no violations were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure wiff be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

Transcript of December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn...

Page 1: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

.----------------------------------------

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION III 2.4.43 WARRENVillE ROAD, SUITE 210

LISLE, ILLINOIS 60532-4352

December 9, 2011

Mr. Ramon Lugo, III, Director NASA Glenn Research Center at Lewis Field 21000 Brookpark Road M.S. 3-2 Cleveland, OH 44135

SUBJECT: NRC INSPECTION REPORT 05000030/12-001 (DNMS) AND 05000185/12-001 (DNMS) - NASA PLUM BROOK REACTOR FACILITY

Dear Mr. Lugo:

On November 22, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed inspection activities at the National Aeronautical and Space Administration (NASA) Plum Brook Reactor Facility, Sandusky, Ohio. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an on-site inspection on October 18 - 20,2011, and subsequent in-office review through November 22, 2011, the inspectors evaluated decommissioning performance and conducted independent confirmatory radiation surveys and sampling. An evaluation of the samples was performed by the Oak Ridge Institute for Science and Education (ORISE). At the conclusion of the on-site inspection, the inspectors discussed the interim inspection results with members of your staff. A final report from ORISE with the results of the sample analysis was provided to the NRC on November 10, 2011. At the conclusion of the in-office review, a final telephone exit meeting was conducted on November 22, 2011, to discuss the final results with members of your staff.

This inspection consisted of an examination of decommissioning activities at the NASA Plum Brook Reactor Facility as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, and interviews with personnel.

Based on the results of this inspection, no violations were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure wiff be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

Page 2: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

R. Lugo, III -2­

We will gladly discuss any questions you may have regarding this inspection.

~4 Christine A. Lipa, Chief Materials Control, ISFSI, and

Decommissioning Branch Division of Nuclear Materials Safety

Docket Nos. 050-00030 and 050-00185 License Nos. TR-3 and R-93

Enclosure: NRC Inspection Report Nos. 05000030/12-001(DNMS) and 05000185/12-001 (DNMS)

cc w/encl: Radiation Health Program Director, Ohio Department of Health (ODH) S. Helmer, ODH M. Rubadue, ODH Division of Planning, Ohio Environmental Protection Agency P. Kolb, NASA, Plum Brook Station

Page 3: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

U.S. NUCLEAR REGULATORY COMMISSION

Docket Nos.

License Nos.

Report Nos.

Licensee:

Facility:

Location:

Dates:

NRC Inspectors:

Approved by:

REGION III

050-00030 and 050-00185

TR-3 and R-93

05000030/12-001 (DNMS) and 05000185/12-001 (DNMS)

National Aeronautics and Space Administration (NASA)

Plum Brook Reactor Facility Test Reactor and Mockup Reactor

Sandusky, Ohio

October 18-20, 2011 (on-site) through November 22,2011 (in-office review)

Jeremy Tapp, Health Physicist Lionel Rodriguez, Reactor Engineer

Christine A. Lipa, Chief Materials Control, ISFSI, and

Decommissioning Branch Division of Nuclear Materials Safety

Enclosure

Page 4: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

EXECUTIVE SUMMARY NASA Plum Brook Reactor Facility

Inspection Reports 05000030/12-001(DNMS) and 05000185/12-001 (DNMS)

The National Aeronautical and Space Administration (NASA) Plum Brook Reactor Facility has completed performing all major remediation of the facility and is now completing the remainder of the final status surveys. These mainly consist of land areas within and bordering the facility fence line. This routine decommissioning inspection included a review of the licensee's current performance related to decommissioning activities by performing independent confirmatory radiation surveys and sampling. These surveys and the associated sampling were performed in the land areas referred to above.

Inspection of Remedial and Final Surveys at Permanently Shutdown Reactors

• For the areas where confirmatory surveys were performed by the inspectors, all results were consistent with the licensee's and well below the required cleanup levels, or derived concentration guideline levels (DCGLs). The DCGLs calculated for the areas surveyed by the inspectors were appropriate and in accordance with the requirements in the Final Status Survey Plan and followed Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance. The survey units where release records were reviewed were appropriate for release in accordance with the Final Status Survey Plan. (Section 1.0)

2 Enclosure

Page 5: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

Report Details

1.0 Inspection of Remedial and Final Surveys at Permanently Shutdown Reactors (83801)

1.1 Inspection Scope

The inspectors performed confirmatory final status surveys in open land areas within and bordering the site fence line. The inspectors chose land areas to survey where the licensee had already completed final status surveys and soil sampling and where a substantial potential existed for residual contamination. Specifically, the inspectors performed surveys in Survey Unit OL-1-56, OL-1-62, OL-1-68, OL-1-71, OL-1-72, OL-1­73, OL-1-74, OL-1-84, and OL-2-3. Walkover surveys were performed with Sodium Iodide (Nal) scintillation detectors and associated Global Positioning System (GPS) equipment to track and record the survey results. Eight soil samples were obtained in the survey units above by the inspectors at both random and biased locations. The biased sample locations where chosen by the inspectors based on the areas with the highest readings during the walkover surveys. The soil sample locations were also recorded with the GPS. In addition, a water sample was obtained from surface water within the site fence to verify elevated tritium levels were not present. All samples were sent to the Oak Ridge Institute for Science and Education (ORISE) for analysis.

The inspectors reviewed Survey Design #51, "Restricted Area Surface Soils," Revision 0, for areas within the fence line, and Survey Design #54, "Restricted Areas Buffer Zone Soils," Revision 0, for areas bordering the fence line, to determine if the licensee calculated appropriate required cleanup levels, or derived concentration guideline levels (DCGLs), for the areas that would be surveyed by the inspectors. The inspectors also verified whether the required DCGLs calculated were in accordance with the approved Final Status Survey Plan and followed Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance. The results of the inspectors' surveys and soil samples were compared to the licensee's calculated DCGLs to verify the results were below the required release criteria. In addition, the inspectors reviewed Survey Unit Release Record OL-2-3, Revision 0; OL-1-62, Revision 0; OL-1-71, Revision 0; and OL-1-72, Revision 0, to ensure the results from the inspectors' confirmatory surveys were consistent with those of the licensee and the survey units were appropriate for release.

1.2 Observations and Findings

The licensee continues to make progress towards completion of decommissioning activities. Now that building decontamination and survey activities are complete, final status surveys in outdoor land areas of the site have been the main activities occurring. The inspectors found that the calculations in Survey Design #51 and #54 that determined the DCGLs to be used for the survey units that the inspectors performed confirmatory final status surveys in were performed appropriately and in accordance with the approved Final Status Survey Plan and followed MARSSIM guidance.

The Nal detector walkover surveys that the inspectors performed in the survey units, listed in the scope section above, resulted in all readings being at or near background

. levels. No area with significantly elevated readings was found. All soil samples

3 Enclosure

Page 6: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

analyzed by ORISE were well below the required DCGLs. In addition, the inspectors noted all walkover survey and soil sample results were below the lower investigation level limits set in the applicable survey design, which ensure that areas with higher levels of potential contamination are bounded and fully characterized to adequately disposition. The results of the sample analysis were documented in a letter from ORISE to the NRC on November 10, 2011, with the subject, "Letter Report for Analytical Results for Eight Soil Samples and One Water Sample from NASA Plum Brook, Sandusky, Ohio" (ML 113210536). The inspectors also noted that the surface water sample analysis by ORISE resulted in no detectable tritium. For the areas where survey unit release records were reviewed, all walkover survey data and soil sample results were consistent with the licensee's. In addition, the inspectors found that for the release records reviewed, all survey unit walkover scans and soil sampling results were below the DCGLs and therefore, appropriate for release in accordance with the Final Status Survey Plan.

The results of the surveys performed by the inspectors are documented in Attachments 2 through 7 of this report as survey maps, which were developed using the GPS equipment data obtained during the walkover surveys. The readings are color coded and a legend relates the color to gross counts per minute (cpm), which includes the background radiation component. Background readings at the NASA Plum Brook facility ranged from approximately 4,000 to 12,000 cpm, depending on the area surveyed. In addition, soil sample locations are depicted on the survey maps with orange diamonds. The soil sample results are included in a table on the survey maps as well. For comparison sake, the most limiting DCGL release criterion for the areas surveyed was 11.4 pCi/g for Cs-137.

No findings of significance were identified.

1.3 Conclusions

For the areas where confirmatory surveys were performed by the inspectors, a/l results were consistent with the licensee's surveys and well below the required DCGLs. The DCGLs calculated for the areas surveyed by the inspectors were appropriate and determined in accordance with the requirements in the Final Status Survey Plan and followed MARSSIM guidance. The survey units where release records were reviewed were appropriate for release in accordance with the Final Status Survey Plan.

2.0 Exit Meeting Summary

The inspectors presented the interim inspection results to licensee management at the conclusion of the onsite inspection on October 20, 2011. After in-office review was completed on November 22, 2011, a final exit teleconference was held on

4 Enclosure

Page 7: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

November 22, 2011. The licensee acknowledged the results presented and did not identify any of the documents reviewed by the inspectors as proprietary.

ATIACHMENT 1: SUPPLEMENTAL INFORMATION ATIACHMENT 2: SURVEY UNIT OL-2-3 WALKOVER RADIATION SURVEY ATIACHMENT 3: SURVEY UNIT OL-1-56 WALKOVER RADIATION SURVEY ATIACHMENT 4: SURVEY UNIT OL-1-71 WALKOVER RADIATION SURVEY ATIACHMENT 5: SURVEY UNIT OL-1-84 WALKOVER RADIATION SURVEY ATIACHMENT 6: SURVEY UNITS OL-1-68 AND OL-1-62 WALKOVER RADIATION SURVEY ATIACHMENT 7: SURVEY UNITS OL-1-74 AND OL-1-75 WALKOVER RADIATION SURVEY

5 Enclosure

Page 8: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

SUPPLEMENTAL INFORMATION

PARTIAL LIST OF PERSONS CONTACTED

Licensee

2p. Kolb, Acting Program Manager 2W. Stoner, Radiation Safety Officer 1,2R. Case, Assistant Program Manager 1,2J. Thomas, Project QA & Licensing Manager

11ndicates presence at the interim exit meeting held on October 20, 2011. 21ndicates presence on the final exit teleconference held on November 22, 2011.

LIST OF PROCEDURES USED

IP 83801 Inspection of Remedial and Final Surveys at Permanently Shutdown Reactors

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened None

Closed None

Discussed None

LIST OF ACRONYMS USED

ADAMS Agencywide Documents Access and Management System CFR Code of Federal Regulations cpm counts per minute DCGL Derived Concentration Guideline Level DNMS Division of Nuclear Material Safety GPS Global Positioning System MARSSIM Multi-Agency Radiation Survey and Site Investigation Manual Nal Sodium Iodide NASA National Aeronautical and Space Administration NRC U. S. Nuclear Regulatory Commission ORISE Oak Ridge Institute for Science and Education

DOCUMENTS REVIEWED

Licensee documents used during the inspection were specifically identified in the Report Details above.

Attachment 1

Page 9: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

11-1-06

RC IIlI Colledlon Da~ CoiledionTIme CountRl~ (qlIIIl es.m c-ntrMlon (part) NP8-U-l-01 WW2011 l lBS EST 8.022 6.12 NP8-11-H12 W18/2011 10:55 EST to,242 ..; I'w4OC

NP8-11-1-m W18/2011 12:35 EST 10.100 ..; I'w4OC

NP8-11-1-ol W18/2011 11:45 EST to,lDl US NP8-11-1-05 W18/2011 16:05 EST 12.300 6.32

N P8-11-1-06 1"'19/2011 1O:1OES1 12.500 6. 13

NP8-11-1-07 W19I2011 12:15 EST 12.600 2.76

NP8-11-1-(J8 W2O,I2011 11:35 EST 8,.l00 6.13

Legend

o Sample locations

Gamma walkover Gross cpm

• 4143 - 6000

• 6001 - 8000

• 8001 - 10000

• 10001 - 12000

12001 - 14000

10 15 2D 25- - -- ­ - Meters

;:'{),S.NRC I • I ~ I· .. ~ No. I . ~ .. ( , . " ( 4" • ; • • ;, •

SURVEY U,.IT OL~ WAlKOVER RADiOlOGICAL S VEY HASA PLUM BROOK REACTOR SITE

U ,,.OUSKY, OHIO

Dates 101' 1812011 - 10/2Di21l 11

Kits it: 5N and 6J'J m~entiticn Me~: 224 1 ~

OetecIDrs: 44-10

Attachment 2

Page 10: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

••••••••

RC 101 COII~t'IIoll DItt COlli!C:tiOn ll.- CDliIlt Mil! l cpnl CH37 CDlicmntfCll'l (pClf&l

NPB-tl­ l -01 lCV1l\l2011 llkl5 5T 8.022 0,12 NPB-tl­ l-'02 lCVlJl/201l 1~S5 5T 10.2112 <to/IDe

NPB-tl­ l.03 1CV1l\I201l 12:15 5T 10.100 <Moe NPB-tl+04 1CV1l\I201l 12:"55T 10.800 1,7S

NPB-tl-l..05 lCV1l\l2011 16:05 5T 11..)00 0,32 NPB-U -1..06 1CV19/2011 10:10 5 T 11..500 11.:13

NPB-tl­ l.07 lCV19/2011 12:l5 5T 11..&lO 2.76

NPB-U -H18 lCV~2011 11:15 5T 8.100 11.:13

Legend

o Sample locations

Gamma Walkover Gross cpm

• • • •

5

4143 - 6000

6001 - 8000

8001 - 10000

10001 - 12000

12001 - 14000

10- - 20

t.4eten;--­::,'lIS.NR C

SURVEY O L-NiG WAlIKOVER RADIOLOGICAL S RVCY NASA PLUM BROOK ,REACTOR SlTE

SANDLJSKY, otlIO

oates lOi l Bf201 1 - l000i20 11

Kits #: oN and 6N mlnlmentllion Metef's: 22<11-3

OeteGtors: 44-10

Attachment 3

Page 11: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

Legend

o Sample locations

Gamma Walkover Grosscpm

• 4143 - 6000

• 6001 - 8000

NRC IDI CAlIledion Date Colectlon T1me Count ~ Iqwl a-m CGnCtNntion {pa/ll NPIH1-H ll 1QfW2011 10:35 EST 8.DZ2 0.22

NP&-11-1-i!2 1OIl!V2011 10:55 EST 10..242 "MOC

NP&-11-1-03 10fl1tl20U 12:35 EST lO.1oo " MOC

NPB-U-1-<04 lD/l!V2011 ~EST 10,801 1.75

NP&-11-HlS 1QfW2011 1&:a5 EST 12.300 o.D NPB-11-1~ 10/1912011 10:20 EST 12.500 0.13

NP&-11-1-D7 1OI1W2011 12:15 EST 11,600 2.76

NP&-11-1-a1 lll/2lV2011 11=35 EST 8.100 0.13

• 8001 - 10000

• 10001 - 12000

12001 - 14000

5 10 20

~- ~L1S.NRC I . ,,,I· .. .. No. 1.. !"( ' . " , ... ,' ; .. ;. ,

SURVt'Y OL-1-T1 WALKOVER RADIOLOGICAL S )lEY N.c..SA PLUM BROOK REACTOR SITE

SANDUSKY, OHO

Dates 1Di1B1201 1- 1000Q011

!GIs *= 5N and !IN Insln.menlation Metefs: 2241-3

De~!Dr5 : 44-10

Attachment 4

Page 12: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

• • •

• • • •

.­•

••••.­ ,e. •

••.' ....•

NIIC IDI 'CoIIKtioo illite CMledion Time COIMIt IRate 'qnl Cs-.m CUctnlt'ation {pale) NI'8-11-1-01 lQ/'1I\I20U l (k-3SEST 8,022 Ill2

NI'8-11-1-02 llV1I\I20U :mssEST 1Il.2A2 < MOC

NP8-11-1-m lQI'1I\I20U 12:35 EST 1Il.1OO < MOC

NI'8-11-1-04 1QI1I\I20U :1l:45EST 1Il.8IJO US

NI'8-11-1-05 lQ/'1I\I2011 lfi,:QS EST U.3OO Q.32

NI'8-11-H16 lQ/'l!),I20U lruIOEST U.5OO 0.13

1111'8-11-1-07 lQ/'l!),I2011 12:lSEST U.6OO 2.76 NP8-11-1-08 ~2011 11:3SEST 8,100 0.13

Legend

<> Sample locations

Gamma Walkover Grosscpm

• 4143 - 6000

• 6001 - 8000

• 8001 - 10000

• 10001 - 12000

12001 - 14000

5 10 2.5

-: l IS_NRC I . bl· p ~"", Ir !.. ( . . .. ( ... . ,; .. ;. ,

SURVEYUHIT OL-1-U WAlKOIIER RADIOLOGICAl.. S RVEY HA.M PlU.. BROOK REACTOR SITE

5AlfDUSKY, OHIO

Dates l Oi181201 1 - IIl1'2.Oi2O 11

Kits f: oN and !IN Inslrumen1a!ion Meter.; : 224 1-3

DeteOOrs: 44- 10

Attachment 5

Page 13: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

"!!CIDI COIlectivn Date COIlectivn n_ COijft'! '_ fCllml 'C$-m~CIn IpCl/1ll NPB-ll-1-01 11)/18/1011 10:35 EST 8,022 O.ll NPB-ll-I-Q2 10,118/1011 10:55 EST to.242 <MDC NPB-ll-1-03 10,118/1011 U:35EST to.l([I <Moe

NPB-ll-1-C14 10,118/1011 U ,4SEST to.BIlJ 1.75 NPB-11-1-OS 11)/18/1011 lIilClS EST 12.300 0.32 NPB-ll-1-C16 1G,1l9/1011 1O:20EST 12.500 o.ll NPIH1-1-C17 1G,1l9/1011 U:1SEST 12.&D 2.76

NPB-ll-1-IB 10,12Jl/1011 U:3SEST 8,100 0.13

Legend

o Sample Locations

Gamma Walkover Gross cpm

• 4143 - 6000

• 6001 - 8000

• 8001 - 10000

• 10001 -12000

12001 - 14000

10 :ro 30 4!l 51)

------ Meten;

,:·LT. S.NRC I , I. I. r ~ N-. I . !.. < • • " " ( •• , I ;··i , ,

SURVEY UNIT Ol­1 ," .ndOL-'~ WAlKOVER RADIOLOGICAL SURVEY N'A.:l-A PLUM BROOK REACTOR SITE

SANDUSKY. OHIO

Dates 101 181201 1- 10I20I2011

Kits #: 5N and 6N m llmlenlaticn Metef's: 2241-3

OetectDr5 : 44-10

Attachment 6

Page 14: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

- -- -

.- .• •-• Legend

o Sample locations

Gamma walkover Grosscpm

• _ 4143 - 6000

• 6001 - 8000

• 8001 - 10000

• 10001 - 12000 JlC IDII 0IIIec60t'1oate CGlledo" lime COIlnt bte (qwnl es-1J1 co.-nb'atIon CpCl/

NP1I-ll.-1-oJ. 10/18/ 1011 lO:35EST 8.021 (I.ll 12001 - 14000 NPlI-ll-1-W 10/18/1011 lQ55 EST 1Il.2A2 .. MOC

NPlI-ll·1-Ol 10/18/1011 12:.35EST 1.0,100 ... MOC o 2.5 5 10 15 NPII-11-1-4N 10/18/1011 12:6EST 1.0,800 1.75

NPlI-ll-H15 10/18/1011 16:060 EST 12.300 113.2 NPB-ll-l-C6 1O/19/1011:UklOEST 12.500 1113 (~~. LT.S.NR C NP1I-1l- 1-oJ 10/19/ 1011 12:15 EST 12.600 2.76

I , I~ I· .. ~ N.. I. :.. ( . . .. (~, I , ; • • ; "

NPII-ll-l~ 1O/2IlI2Il11 11:.35 EST 8.100 1113

SURVeY UNrT Ol'1-7' .nll Ol-t-75· WALKOVER RADIOLOGICAl SURVeY NASA PLUM BROOK REACTOR SITE

SANDUSKY. OHIO

Oortes 10i1Bf201 1 - 1000i2011

Kits fI: 5N and 6N nslNnenlalicn Meters: 2241.J

Dl!l:ec1Drs: 44-10

Attachment 7

Page 15: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

R. Lugo, III

We will gladly discuss any questions you may have regarding this inspection.

Sincerely,

IRA!

Christine A Lipa, Chief Materials Control, ISFSI, and

Decommissioning Branch Division of Nuclear Materials Safety

Docket Nos. 050-00030 and 050-00185 License Nos. TR-3 and R-93

Enclosure: NRC Inspection Report Nos. 05000030/12-001 (DNMS)

and 05000185/12-001 (DNMS)

cc w/encl: Radiation Health Program Director, Ohio Department of Health (ODH) S. Helmer, ODH M. Rubadue, ODH Division of Planning, Ohio Environmental Protection Agency P. Kolb, NASA, Plum Brook Station

Distribution w/encl: See next page

DOCUMENT NAME: g:\dnmsiii\work in progress\ir nasa plum brook 2012001 r1docx.docx X Publicly Available 0 Non-Publicly Available 0 Sensitive X Non-Sensitive To receive a co of this document, indicate in the concurrence bOl( "c" =Co

OFFICE NAME DATE

OFFICIAL RECORD COPY

Page 16: December 9, 2011 Mr. Ramon Lugo, III, Director · Mr. Ramon Lugo, III, Director . NASA Glenn Research Center at Lewis Field . 21000 Brookpark Road M.S. 3-2 . Cleveland, OH 44135 .

Letter to Mr. Ramon Lugo, III from Christine A. Lipa, dated December 9, 2011.

SUBJECT: NRC INSPECTION REPORT 05000030/12-001 (DNMS) AND 05000185/12-001(DNMS) - NASA PLUM BROOK REACTOR FACILITY

DISTRIBUTION w/encl: Keith McConnell Paul Michalak Chad Glenn Jennifer Uhle Anne Boland Patrick Louden Allan Barker Harral Logaras Carole Ariano Linda Linn MCID Branch