Middle Potomac Watershed Plan Implementation
Dead Run Stream Restoration Project
Public Meeting
McLean Community Center
February 18, 2015
Stormwater Planning Division
Department of Public Works and Environmental Services
![Page 2: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/2.jpg)
Meeting Outline
• Fairfax County DPWES and StormwaterManagement
• Countywide Watershed Plan Implementation
• Project Introduction and Objectives
• Natural Channel Design Principles
• Existing Conditions
• Proposed Improvements
• Next Steps
• Questions?
![Page 3: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/3.jpg)
Fairfax County Department of Public Works
and Environmental Services (DPWES)Department of Public Works and
Environmental Services
Land Development
Services
CapitalFacilities
Solid Waste Stormwater
Stormwater Planning Division
Maintenance and Stormwater
Management Division
Wastewater
![Page 4: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/4.jpg)
Stormwater Infrastructure
• Conveyance System
– 1,600 miles pipe and
paved channel
– 43,000 structures
– 6,800 outfalls
• Management Facilities
– 1,540 County Maintained
– 3,720 Privately Maintained
• State Regulated Dams
![Page 5: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/5.jpg)
Service Drivers
In response to The Clean Water Act of 1972…
National Pollutant Discharge Elimination System (NPDES)
Virginia Stormwater Management Program (VSMP)
Regulations
Municipal Separate Storm Sewer Permit (MS4)
Total Maximum Daily Loads (TMDLs)
Chesapeake Bay
Local Streams
![Page 6: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/6.jpg)
Countywide Watershed Planning
“Healthy Watersheds,
Healthy Communities”
• 30 Designated
Watersheds
• All 15 watershed plans
have been adopted by
Fairfax County
http://www.fairfaxcounty.gov/dpwes/watersheds/
![Page 7: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/7.jpg)
Middle Potomac Watershed Plan
• Watershed
Characterization
– Water Quality Monitoring
– Land Use Change
– Pollutant Loading
• Structural Project
– 25 year plan
• Non-Structural Practices
– Policy and Regulationshttp://www.fairfaxcounty.gov/dpwes/watersheds/
![Page 8: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/8.jpg)
Dead Run Watershed Plan
• Dead Run has a drainage
area just over 3 mi2
• 24 priority projects identified
in the watershed
management plan
• Pond retrofits
• LID Stormwater Enhancements
• Stream Restoration
• Neighborhood Stormwater
Improvements
http://www.fairfaxcounty.gov/dpwes/stormwater
/projects/project_list.htm
![Page 9: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/9.jpg)
Approximately 1/3 of the roof is covered in vegetation. The benefits of a “living roof” include:• Reduces the amount of stormwater runoff
• Absorbs air pollution and carbon dioxide
• Reduces the energy needed to cool the building in summer
Partnership: LID Stormwater EnhancementsDolley Madison Library
Vegetated Roof- Delosperma and Allium plants in bloom
![Page 10: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/10.jpg)
Partnership: LID Stormwater EnhancementsDolley Madison Library
Sustainable Site Design
![Page 11: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/11.jpg)
Dead Run – Before & After
Drainage Area
(acres)
Phosphorous Removal
(lbs/yr)
Nitrogen Removal
(lbs/yr)
Sediment Removal
(tons/yr)
415 15 283 3
Stream Restoration
![Page 12: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/12.jpg)
Dead Run – Stream Restoration
![Page 13: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/13.jpg)
Stream Monitoring Program
Study Objectives1. Generate long-term monitoring
data.
2. Evaluate relations between observed conditions/trends and BMP implementation.
3. Transfer the understanding gained to other less-intensively monitored watersheds.
http://va.water.usgs.g
ov/projects/ffx_co_m
onitoring.htm
![Page 14: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/14.jpg)
Dead Run Stream Restoration
![Page 15: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/15.jpg)
Dead Run Stream Restoration
Segment 1 – Dominican Retreat• 2,000 Linear Feet
• Extends to Old Dominion
Drive
• Residential lots along
Merrimac Drive and Van
Ness Court
![Page 16: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/16.jpg)
Dead Run Stream Restoration
Segment 2 – McLean Central Park
• 800 Linear Feet
• Completely in Park
• Starts below
previously restored
section near library
![Page 17: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/17.jpg)
Dead Run Stream Restoration
Segment 3 – Dead Run Stream Valley Park
• 1,500 Linear Feet
• Extends to Churchill Road
• Residential lots along
Elizabeth Drive and Carol
Rayes Street
![Page 18: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/18.jpg)
Natural Channel Design
Background and Design Approach
![Page 19: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/19.jpg)
Geomorphic Assessment of Stream Channel.
Dead Run Stream is between Stage III and V.
Understanding channel evolution informs the design process.
![Page 20: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/20.jpg)
Dead Run Watershed Assessment
• Drainage area at upstream of Segment 2 is 380-acres
• Drainage area at downstream end of Segment 2 is 492-acres
• Drainage area at downstream end of Segment 3 is 685-acres
Evaluate Bankfull Channel design parameters and 100 year floodplain
![Page 21: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/21.jpg)
Assessment of Channel Conditions using BANCS method, Bank Erosion Hazard Index (BEHI) and Near Bank Stress (NBS)
![Page 22: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/22.jpg)
Representative photograph of Dead Run Stream channel conditions. Note tree impacts due to soil loss.
![Page 23: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/23.jpg)
Representative photograph of Dead Run Stream channel conditions. This is tributary going up to tennis courts.
![Page 24: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/24.jpg)
Representative photograph of Dead Run Stream channel conditions. This is within Segment 3.
![Page 25: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/25.jpg)
Representative photograph of Dead Run Stream channel conditions. This is within Segment 3.
![Page 26: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/26.jpg)
Representative photograph of Dead Run Stream channel conditions. Bottom of Segment 3 at Churchill Road.
![Page 27: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/27.jpg)
What benefit does stream restoration provide? • Reduces soil loss, phosphorus and nitrogen nutrients. • TP reduction credits up to 2.6x the CBPO interim value and TN
reduction credits up to 5x the CBPO interim value.
![Page 28: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/28.jpg)
• Evaluate tree conditions.• Inform design and decision
making.• Trees 12” and larger
located.• Significant effort has been
made to re-design channel to save and protect trees.
![Page 29: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/29.jpg)
Concept Design
Dead Run Stream Restoration
Segment 2 and 3
![Page 30: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/30.jpg)
Representative Design Strategies• Dead Run Restoration will primarily include
a combination of Priority 3 and 4.
Priority 4Stabilize Channel In-Place
![Page 31: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/31.jpg)
Concept DesignSegment 2 Upper
![Page 32: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/32.jpg)
Concept Design Segment 2 Lower
![Page 33: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/33.jpg)
Segment 3: Existing Conditions Analysis, Floodplain Areas
![Page 34: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/34.jpg)
Segment 3: Existing Conditions AnalysisEasements, Utilities, Trails, Bridges, Properties
Ex. Sanitary Sewer
![Page 35: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/35.jpg)
Segment 3: Concept Channel Layout
Proposed Channel
![Page 36: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/36.jpg)
Segment 3: Evaluate Trees and Channel Design
Proposed Channel
Potential Tree Removal
![Page 37: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/37.jpg)
Segment 3: Proposed In-Stream Structures Analysis
Proposed Channel
Potential Tree Removal
Proposed Structures
![Page 38: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/38.jpg)
Modified Cross Vane
![Page 39: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/39.jpg)
Looking upstream at boulder rock toe and constructed riffle
Looking upstream at boulder rock toe – 2 and 3 courses
![Page 40: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/40.jpg)
Infill mix comprised of cobbles, gravels, sand, silt, topsoil
Larger material, usually cobble
Constructed Riffle
(aka Reinforced Streambed)
![Page 41: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/41.jpg)
Constructed Riffle
![Page 42: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/42.jpg)
Segment 3: Evaluate the project limits and the area necessary to restore the stream* Save trees and minimize disturbance
Proposed Limits of Work
![Page 43: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/43.jpg)
Segment 3: Evaluate Access Routes and StagingBenefits: Save trees, reduce trail closures, opportunities to re-landscape.
EntranceAccess
![Page 44: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/44.jpg)
Next Steps
• Complete Preliminary Design including access
options
• Public Meeting
• Final Design
• Project Construction
• FY2017/FY2018 - dependent on available funding
• Community Coordination: Pardon our Dust
• Maintenance and Operation
![Page 45: Dead Run Stream Restoration Project Meeting: Feb. 18, 2015](https://reader034.fdocuments.net/reader034/viewer/2022051414/55a562fc1a28ab6d4e8b46f3/html5/thumbnails/45.jpg)
Dipmani Kumar, [email protected]
Matt Meyers, [email protected]
Stormwater Planning Division
Department of Public Works and Environmental Services
Fairfax County12000 Government Center Parkway, Suite 449
Fairfax, Virginia 22035
(703)-324-5500
www.fairfaxcounty.gov/dpwes/stormwater
Questions ?
• Contact Information
A Fairfax County Publication, February 18, 2015
To request this information in an alternate format call 703-324-5500, TTY 711