REGjONAL FIELD OPERATIONS GULF OF MEXICO OCS REGION
NEW ORLEANS. LA
U.S. Department ofthe Interior Bureau of Safety and Environmental Enforcement 1201 Elmwood Park Boulevard New Orleans. Louisiana 70123-2394
Arena Offshore, Lf
4200 Kescarch Forcsl Dr.
Suite 230
The Woodlands. TX 77381
281-681-9501
281-681-9502 Fax
Attention: Angie Gobert Pipeline Unit
RE: Actual Pipeline Riser Repair on 6-lneh Bulk Oil Right-of-Way Pipeline (ROW No. 029120/Segment No. 18543), Originating at 4-Inch Subsea Tie-in Point in Eugene Island Block 206 and Terminating al Eugene Island Block 215, B Platform, OCS Federal Waters, Gulf of Mexico, Offshore, Louisiana
Dear Ms. Gobert:
Effective October I , 2016, Arena Offshore, LP (Arena) notified the Bureau of Safety and Environmental Enforcement (BSEE) via e-mail of a seeping observed on the riser of the referenced pipeline segment al Eugene Island Block 215 Platform B. Thai same day BSEE granted verbal approval (enclosed) to Arena to make the emergency repairs.
Attached is thc detailed proeedure and supporting documenlation of the actual pipeline riser repair operations performed at the termination point of the referenced pipeline segment, as well as, a copy of the verbal approval and Pay.Gov receipt.
Should you have any questions regarding this matter or require additional information, please contact the undersigned at 281.210.3174 or i e n n i fe n a r e n a o ffs h o r e. c o m aimec(</;arenaoffshore.com.
Sincerely,
Arena Offshore, LP
Jennifer Johnson Regulatory Analyst
:JLJ
Enclosures
or Aimee Deady at 281.210.3180 or
Your reporl is hereby accepted pursuani to 30 CFR 250.1008 (e). Date:
Bryan A/UcTmangue Acling(k(^ional Supervisor Bureau of Safely and Environmental Lnforcement
Arena OfTshore, LP EI215 B
Riser Repair Pipeline Segment No. 18543/ROW No. G29120
October 7. 2016: Arrived on location. Operators isolated Pipeline SN 17054 at EI 217 B Platform and SN 18543 at EI 215 B-PROD by locking close two block valves and installing a blind flange at EI 215 B Platform. Bled off pressure and verified pipelines were at 0 psig. Connected one end. of hose to tie-in point upstream of isolation point on the pipeline at EI 215 B and routed the other end to a stock tank.
October 8, 2016: Continued draining pipeline and removing the piping at/below the Cellar Deck.
October 9, 2016: Once pipeline linished draining, inserted hose into pipeline and pumped down approximately 336 gallons of liquid and allowed to stabilize. Removed piping above the flange and disconnected the flange at +15' elevation.
October 10, 2016: Secured top of riser from Main Deck and cold cut riser approximately 10' above waterline. Removed damaged section of riser. Inserted smart vent plug into riser approximately 8' above waterline, engaged smart vent plug, added two gallons of water on top of plug and checked riser for hydrocarbon presence. Piped smart vent piping/hose to safe location away from all hot work. Replaced damaged riser section with new riser and welded out. Note: new riser section was hydrotested onshore for 8 hrs at 2220 psig and 100% of welds were x-rayed onshore and offshore. Disengaged smart vent plug and removed from riser piping. Torqued upper flange connection.
October 11, 2016: Installed piping from +10 elevation to the top ofthe Cellar Deck.
October 12, 2016: Continued installing piping from +10 elevation to the top of the Cellar Deck.
October 13, 2016: Opened valves, at both ends of Pipeline SNs 18543/17054 and performed visual leak test for two hours with product above operating pressure (500 psig operating pressure, 587 psig actual test pressure); used calibrated crystal gauge with report. Placed Segment No. 18543 back in service.
Jennifer Johnson
From: [email protected] Sent: Monday, October 03. 2016 12:52 PM To: Jennifer Johnson Subject: Pay.gov Payment Confirmation: BSEE Pipeline Repair Notification - BX
Your payment has been submitted to Pay.gov and the details are below. If you have any questions regarding
this payment, please contact Brenda Dickerson at (703) 787-1617 or
Application Name: BSEE Pipeline Repair Notification - BX
Pay.gov Tracking ID: 25U82TL5
Agency Tracking ID: 75103311581
Transaction Type: Sale
Transaction Date: 10/03/2016 01:51:45 PM EDT
Account Holder Name: Jennifer Johnson
Transaction Amount: $388.00
Card Type: Visa Card Number: * * * * * * * * » * * * i 5 4 4
Region: Gulf of Mexico
Contact: Jennifer Johnson 2812103174
Company Name/No : Arena Offshore, LP, 02528
Pipeline Segment No: 18543
Lease Number(s):,
Originating Area/Block: Eugene Island El, 206
Terminating Area/Block: Eugene Island El, 215
THIS IS AN AUTOMATED MESSAGE. PLEASE DO NOT REPLY.
Aimee Deady
From: BSEE Pipelines Pipelines <[email protected]> Sent: Saturday, October 01, 2016 5:56 PM To: Aimee Deady Cc: angie.gobert@l)see.gov Subject: Re: Arena - EI 215, B-PROD- Segment No, 18543 - Emergency Riser Repair
Aimee:
I got your voice mail. You may start repair procedure according to the procedure stated. You should include pay.gov receipt with your application.
Sent from my iPhone
On Oct I, 2016, at 4:38 PM, Aimee Deady <ADctic v^arcnaoffbhore.com> wrote:
Good afternoon -
Arena noticed seeping on a riser at El 215 when at operating pressure, No sheen or actual leak of hydrocarbons occurred and the pipeline has been shut in. Attached is the repair procedure. My understanding is that we can start these emergency repairs now and submit the formal application after the repairs are complete. The pipeline wi I not be brought back on line until the required testing requirements (addressed in the procedure) are performed.
Arena plans on starting these operations at first light tomorrow morning (10/02/2016).
Per my conversation with Beau Boudreaux this afternoon, he will take a look at this procedure and pass it along to the Production Operations Supervisor for any comments.
*This is sort of confusing because the 6" for repair comes from El 2178 via a 4" departing line at El 217B.
El 217B -> 4" SN 17054 ->4"x6"SSTI in El 206 ->6" 5N 18543 •> El 215B-Prod
Feel free to contact me if you have any questions.
Thanks,
Aimee Deady Reguhituf} Supervisor Arena Offslmre, LP 4200 Resenn h Forest Drive, Suite JJO The Woodlands, Texas 77JSI 281-210-3180 (Direct) 832-702-6808 (Cell) ADeadvr/fnreiiaofrshoK. com
<EI 215 BProd - Riser Repair - SN 18543 Rev 0.pdr> i
• U J Arena Offshore, LP ' -2 Eugene Island 215 B
ARENA RISER REPAIR
ARENA SEGMENT NO. 18543 Arena (Jitshore LP
1)
2)
4)
PROPOSED RISER MODIFICATION
RESPONSIBLE PARTY
a Pipeline Operaior Name Arena Offshore, LF'
b Address 4200 Research Forest Drive
c Contact Person(s)
d. Shore Base
PIPELINE INFORMATION
a Segment Number:
b. Origin Structure Name Area/Block Coordinates
Latitude X
c Terminus Structure Name Area/Block Coordinates
Latitude X:
Install Date (Year)
Status
Product
Max Water Depth
3) PIPELINE DESCRIPTION
Configuration
Size Diameter Diameter
c Volume
d Buried
PURPOSE
a Description:
b Reason
Suite 230 The Woodlands, TX 77381
Aimee Doady w/Amna Justin Nelson w/Ai ena
EPS Dock, 24865 Hwy. 333. Abbeville. LA 70510
Telephone No (s) (281 210-3180, (832) 702-6808 ' m 210-3182.(281) 813-7456
18543 / Incoming pipeline from El 217 / 6.625" MAOP 1100 PSIG / KAQ-4000
Eugene Island 206 SSTI Eugene Island 206
28° 40' 42"
Complex ID No OCS Lease
Longitude: Y:
N/A G00806
91 '40 '15"
Eugene Island 215 "B-Prod" Complex ID No Eugene Island 215 OCS Lease
28° 38' 4" Longitude 1,950,033.5 Y,
1972
21448 G00578
91* 29' 2 r -11.700.44
Active
Bulk Oil
100 feet
4" from El 217B tc SSTI. 6M from SSTI to El 215 B-Prod Platform
4.5" 6.625"
Wall Thickness Wall Thickness
0.337" O ^ "
Length Length
12347 feet 42798 feet
1,557.00 bbls (inclusive of 50 feet of riser on each side)
Yes
Replace damagec riser section at El 215 "B-Prod" from the (•) 10 ft. elevation to the {*) 20 ft. elevation.
Seepage was discovered in riser above waterline. approximately •••13'. at El 215 "B-Prod". Operators noticed hydrocarbon seeping near the boarding valve of riser 9/30/16. shut-in, blead down, and solatcd pipeline. No leak or sheen was observed.
c Proposed Mod Date Oct. 2-4, 2016
Issue Date 10/01/16 Re/ision Page 1 of 2
\ Arena Offshore, LP
\ Eugene Island 215 B
ARENA RISER REPAIR
SEGMENT NO. 18543
Arena Offshore, LP
PROPOSED RISER MODIFICATION (Continued)
6) PROPOSED PROCEDURE
a Brief description of the method to be used Pipeline Segment 18543 / Bulk Oil Pipeline from El 217 " B " / 4" and 6" MAOP 1100 PSIG / KAQ-4000 Pipeline Segment 18543 normal operating pressure is 500 psig.
1) Operators to isolate pipeline segment No. 17054 at El 217 " B " and segment No. 18543 at
El 215 "B-Prod" by locking closed two block valves and/or installing skillets.
2) Operators to bledd of pressure and verify the pipelines are at zero psig.
3) Operators connect one end of hose to tie-in point upstream of isolation point on the pipeline, and route the other end to a stock tank.
4) Open up tle-ln valve and allow pipeline to drain to stock tank.
5) Once pipeline h.>s finished draining, insert hose into pipeline and pump down £Pi!roxlmately 100 gals of liquid (80ft.) and allow to stabliize, Monitor fluid level after pumping and repeat pump off if necessary until the level stabilizes.
7) Insert smart vert plug into riser to an elevation below the cut point (approximately ten feet above waterline), engage smart vent plug, add two gals of water on top of plug, and check riser for hydrocarbon presence. Repeat flush as necessary until hydrocarbon free.
8) Pipe smart vent piping/hose to a safe location away from all hot work.
9) Secure top of rUer from main deck, and cold cut riser approximately ten feet above
waterline and above smart plug.
10) Remove damaged section of riser.
11) Replace dama jed riser section with new riser and weld out. 'New riser sectior is 6.625"OD x .432" wt sch 80 Gr. X42 pipe and will be hydrotested for
4 hours (1.25xMAOP) and welds X-Ray tested prior to, and folllowing installation.
12) Disengage thc smart vent plug and remove from riser piping.
13) Torque upper flange connection to recommended Ib-ft.
14) Construction to open valves at both ends of pipeline segment No. 18543/17054 and perform visual lesk test for two hours with product at operating pressure (500pslg). A
calibrated digital feadweight gauge and chart recorder shall also be used during thc leak test
i s ) Upon completion of a successful leak test recorded on chart recorder, pipeline segment No. 18543 shall be placed back into service.
b If using an anchored vessel, provide an anchor plat or maximum radius of anchors
Issue Date 10/01/16 [ Revision 1 | Page 2 of 2
1/912017 PARTMENT OF THE INTERIOR Mail - PSN 1854,'
Steele, Glenn <[email protected]>
PSN 18543 Repair 3 messages
Steele, Glenn <[email protected]> To: [email protected]
Jennifer,
Tue, Dec 20. 2016 at 10:57 AM
I emailed Aimee Deady earlier today hadn't heard back, so I was hoping maybe you could help with this. I'm processing the completion report for the repair that was done on PSN 18543, and I just want to verify the elevations of the replaced pipe. The plan submitted on 10/1/16 indicated the riser would be replaced from the +10" to the +20' elevation. In the actual repair procedure it states that pipe was replaced from the +10" to the top of the cellar deck. Is the top of the cellar deck at +20'? There is also mention of disconnecting a flange at the +15', so I just want to make sure we get it straight.
Thank you,
Glenn Steele Petroleum Engineering Technician - Student Trainee Pipeline Section Regional Field Operations Bureau of Safety and Environmental Enforcement (504)736-7597 [email protected]
Jennifer Johnson <[email protected]> To: "Steele, Glenn" <[email protected]> Cc: Aimee Deady <[email protected]>
Tue, Dec 20, 2016 at 11:07 AM
Glenn, Aimee forwarded me your email from earlier and I will touch base with the engineer to confirm. Unfortunately he is out of the office through the end of the year, but as soon as ie gets back I will confirm the depths and let you know.
Thanks,
Jennifer Johnson
Regulatory Specialist
Arena Offshore, LP
4200 Research Forest Drive, Suite 230
The Woodlands, Texas 77381
281.210.3174 (Direct)
281.744.9336 (Cell)
F r o m : Steele, Glenn [mailto:[email protected]] Sen t : Tuesday, December 20, 2016 10:58 AM
https://mai I .google.com/mai l / u / ^ 1/2
1/9/2017
To: Jennifer Johnson Sub jec t : PSN 18543 Repair
[Quoted text hidden]
HPARTMIiNT OF THE INTERIOR Mail - PSN 1854
Jennifer Johnson <[email protected]> To: "Steele, Glenn" <[email protected]> Cc: Venkata Nyshadham <[email protected]>, "Craig LeBlanc ([email protected])" <[email protected]>, Aimee Deady <[email protected]>
Wed, Jan 4, 2017 at 7:39 AM
Glenn, I confirmed with our engineer that we installed a new flange at the +12' elevation and replaced piping from the +12' elevation to the "Tee" at the +48' elevation on the cellar deck.
Please advise if you need any further clarification.
Thanks,
Jennifer Johnson
Regulatory Specialist
Arena Offshore, LP
4200 Research Forest Drive, Suite 230
The Woodlands, Texas 77381
281.210.3174 (Direct)
281.744.9336 (Cell)
F r o m : Steele, Glenn [mailto:[email protected]] Sen t : Tuesday, December 20, 2016 10:58 AM To : Jennifer Johnson Sub jec t : PSN 18543 Repair
Jennifer,
[Quoted text hidden]
https;//mail.gcx)gle.ccxTi/mail/u/0/?ui=2&ik=45978d0c81&view=pt&search=inbox&th=1591d2ac988e0fdc 2/2
A. i
Mark orr.
17 fo"- A O O ^ ' J ^ ' F/r r, (?T.T
• To" t - r L ^ O L R ^ t f *
1 H
Are oioe SUDDO^S reauired9 Yes No
CUSTOMER Sr? OQ L f Qi
PPHTPT. K A f ^ - W n n n " L ^ •••r-^ . A17-(S LOCATION: £ . 1 ' • B Pr r rJ
DAIL
SHT 0
\
v \ K^o&Mvi • •/ /;.ino,.\v. v. • /
/
^\ \ \ \ \ v / —
1 ooor
'oosr
r
/ / x FSC •• • i HI >
^ / j 1 1 ll s ML
\ \ \ \ \ v\:" / .:.:/n l ^ ^ V V / / /
BURNER FIRE CONTROL, INC.
BURNER FIRE CONTROL, INC. / j ; . r . , . ;
DATE: | o -6 -16 |DRAWING NO./S: ^ j / ^ ^ ;•; \ '
CUSTOMER: (V LQCA7ION: j - . | ^ i ') - K / /.
PAGE
O F /
ITEM DESCRIPTION BEING T E S T E D : ^ ^ . ^ 1,1, C/->N r V / 'I I PAGES TIME ACTIV PRGSSURE
•6 TEMPERTURH
qr
2^ c r 75 71
(TO 2££ 00 7
5 7
/Ji! 07 3'7 a ' (/;Sc T
Wh V l.^- ..i ri.,n to I 01
• TV] 1
7 5 fl ^ / 1 / vl.'
v 2212 6:/ J ^ 7
I'M 71 0 i 0
T7?
(
HYI>RO-TEST REPORT
BURNER FIRE CONTROL, INC.
; BURNER FIRE CONTROL, INC. ^ ^ c
DATE: / p g [/> [DRAWING NO./S: \){,\ t ^
LOCATION: P \ (> IS ~ fi P(\6D PAGE
OF
ITEM DESCRIPTION BEING TESTED:^yv - HOpn J ^ v ^ TIME I ACTIVITY ' "
PAGES TEMPERTURI.
1:3c rvj on .77 XT-7.7/
IP 7 •1 PC n5j
• r c
a o
a (< 0
• il
• ii lL
lew 0 !
(M* 2NL
•/6 22! -1 . •o
HYDRO-TEST REPORT
DOWN HOLE
PRESSURE INC. I N S T R U M E N T R E N T A I S & R E P A I R S
P.O B y * 497 4(18 S I ota Rrt ^foussavd. L A ?
Surface Gauges Dead Weight Testere
Barton Recorders Vaetrix Gauge 1
5. 10, & 20,000 PSI
Sub Surface Gauges Electronic & Mechanica l
0-25,000 PSI Ranges Tamperature Gauges
0-450 Degrees F.
i'f .'.CftlPUON
CALIBRATION CERTIFICATE
FULL SERVICE 1.5 DEG F
I^.MPfcRAlUKf- tDEG F) ARRIVING ON CALIBRATION TABl»
A^Pl tEO TEMPERATURE I f c M P b Y b l t M WAb
NO PHILJK Kt-Al>INCib
INDICATED TEMf-bAU iHt-Kh WAS
APPLIED TEMP
bU
I^U
IEMPERATUR' (UfcG f ) I AM IING CALIBRATION TABLE
DIFFERENCE INDICATED TEMP
bU yu 120 143
INSTRUMENT CALIBRATED IN THE VERTICAL POSITION ROOM TEMP 73 F
This instrument upon receiving on calibration table was found to be within manufacters tolerance This instrument upon receiving on calibration table was found to be out of manufacters tolerance
This is to certify that this Instrument has been inspected and tested against Digital Thermometer No 031913003 Calibrated (08/06/15). Using certified Yellow-Back Thermometer 35854-003 s/n 9004 Traceable to the National Institute of Standards & Technology (NIST) Referance # 94417 ,8802'.,82564,1428301 and 1470271 This calibration meets or exceeds all ANSI-NCSL-1 STD ,MII. STD.45682A calibration procedures Also let it be known that all calibrations are psrfomed by qualified Down Hole Prossure personel using instrumentation and methods which guarantee precise accuracy
XXXXXX
DATE OF CALIBRATION CALIBRATION DUE DATE
06/22/16 TECHNICIAN
06/22/17
NATHAftj HEBSRTj
DOWN HOLE
PRESSUHI INC.. INSTRUME N1 RENTALS & RF PAIRS 4')8 S t." o l t R j l
Surface Gauge* Dead Weight Tester*
Barton Recorders Vaetrix Gauge 1
5, 10, & 20.000 PSI
Sub Surface Gauges Electronic & Mechanica l
0-25,000 PSI Ranges Temperature Gauges
0-450 Degrees F
nt SI-HI*-1
CALIBRATION CERTIFICATE MIAL NUMBER
fJfSSURF RANGE 10000 ACCURAO FULL SERVICE *l- 10 P.S.I.
PRESP'JRE (PSI) ARRIVING ON CALIBRATION TABLE
APPi I'ID PRF.SSURF 0
^ UOU 4.UUU BOOO noi) »0000
I'KhSSURh (PSI) DEPARTING CALIBRATION TABL t
INDICATED PRESSURE DIFFERENCE
U
1.99B
/.yyb 3.99»i
U
-2
-S
4 -&
APPLIED PRESSURE
0 2,000 4,000 6,000 8000 10000
INSTRUMENT CALIBRATED IN THE VERTICAL POSITION
INDICATED PRESSURF [ Df I i , 0__ 0
1 998 -1 3.996 5.997 - j 7.996 -4 9.995
ROOM TEMP 74 F
This instrument upon receiving on calibration table was found to be within manufacters tolerance This instrument upon receiving on caiibratior table was found to be out of manufacters tolerance
This is to ceriify that this instrunent has been Inspected and tested against Pressure Standard Chandler Engineering Deiad Weighl Tester Model # 58-200H, Serial # 16210 traceable to the National institute of Standards and Technology, (NIST) Reference # R68113032501 , Calibrated (04/14/2016). Reference Standard Serial # 211H14150045 Certified Pressure Transducer ( 36000 PSI .01%) T h i calibration systems conforms to all ISO 9001:2008 and API Spec Q l requiremsnts. Also let it be known that all calibrations
are performed by qualified DHP personnel uulng instrumentation and methods which guarantee precise accuracy.
XXXX
DATE OF CALIBRATION CALIBRATION DUE DATE
06/21/16
mm TECHNICIAN REGGIE SAVC HI
!
'1 /.f
/
e.<N
Hydro Test 2220 psi / 8hrs X-Rav 100%
—05
Had 7 6 - feOO l i nO ^TvT
ft
Are DIDC suDoorts reauired? Yes No
CJSTOMtH: £[rCfJG\
PROJECT: * ^ a i S C r C T S O C X . ^ Q . L t ^ g
DRAWN BY DATE:
SHT, . J Of
fc'-O"
0
JlHk JUL PwcTlBtion
Oy"~(aOC?*rLJrO FIAJ^ ZT'S
Hydro Test 2220 psi / 8 hrs
X-Ray 100%
A^e pipe s joaorts reauired? Yes No
CUSTOMER: A Mh
PROJECT: a n 4c? 3 i 5 Crc^S o c y f O i l L i r ^ e
DRAWN BY: CEteeiaag I L^/oi-^
LOCATION:,
OATE: / Q - ^ ' l ^
/ SHT ! OF
m y
P.O M t , , 400 S ! v »"<tl
-
Surface Gauges Dead Weight Testers
Barton Recorders Vaetrix Gauge 1
5,10, & 20,000 PSI
Sub Surface Gauges Electronic & Mechanica l
0-25,000 PSI Ranges Temperature Gauges
0-450 Degrees F
DFSCHIPTION
CAUBRATION CERTIFICATE CHART RECORDER StRIAL NUMBER
PRESSHRF RANGE 6 000 ACCURACY' I- 1 % FULL SERVICE •/ 50 P.S.I
PRESSURE (PSI> ARRIVING ON CALIBRATION TABLE
APPLIED PRESSURE
0
1.000
2.000
3,000
4,000
a OUI'
INDICATED PRESSURE DIFFERENCE
0 0 1.000 0 2,000 0 3000 0 4 000 0 5,000 0
PHFSbUKk- (PSI) DEPARTING CALIBRATION TABLE
fcPPl \tV> PRESSURE
0 1.000
3,000 4 000
INSTRUMENT CALIBRATED IN THE VERTICAL POSITION
INDICATED PRESSURE DIFFERENCE
0 ' l i
1.000 a
2.000 U
3 000 0
4,000 0
ROOM TEMP 75 F
This instrument upon receiving on calibration table was found to be within manufacters tolerance This instrument upon receiving on calibration table was found to be out of manufacters tolerance.
This is to certtfy that this Instrument has been inspected and teated against Pressure Standard Chandler Engineering Oeid Weight Tester Model # 56-200H, Serial ff 16210 traceable to the National Institute of Slandards and Technology, (NIST) Reference # R68113032501 . Calibrated (04/14/2016) Reference Standard Serial # 211H14150045. Certified Pressure Transducer ( 36000 PSI .01%) This calibration systems conforms to all ISO 9001:2008 and API Spec, Q l requirements. Also let it be Known that all calibrations
are performed by qualified DHP personnel using instrumentation and methods which guarantee precise accuracy
XXXXXXX
DATE OF CALIBRATION CALIBRATION DUE DATE
06/22/16 TECHNICIAN
06/22/17 NAT I LRT
2 X
BURNER FIR€ CONTROL, INC. BURNER FIRE CONTROL INC. _ ^ ^
0 - / 6 [DRAWING NO. /S : g j g
CUSTOMBR:f\(i ^ ,
DATE:
LOCATION^ Q SIS P A G E
OF
ITEM DESCRIPTION BEING TESTED: +'7 )]''> PAGES TIME ACTIVITY f^KLSSURt FEMPBRTURE
TT 25S ~0
M Cm 4-0 ^7 53 +1 Z 1 T C. 2i
r r 13
2
mi w T l
2 1
as 7 2 2.
6 7m 225
HYDRO-TEST REPORT
DATE: j t -S ^
B U R N E R F I R E C O N T R O L , INC.
B U R N E R FIRE CONTROL, INC. \ \ l , { { U -
I D K A W I N G NO. /S: ' A o ^ / l ^ 1 A "
CUSTOMER LOCATION: 1 Q 1
P A G E
/ Q F ;
ITEM DESCRIPTION BEING TESTED; 917 1 PAGES TIME ACTIVITY PRESSURE IEMPERTURE
11 12 2 _ a. 32 T — ;—^ 1 — ^
/5 r
rr—^ 31 i£ll
m c
(^,,,.1 i,. 077 n
L
-V- \ \ .
5! u
4- 3
•n
HYCIRO-TEST REPORT
I RI mim\ INC. INSl RUMEN"! RENTALS & REPAIRS
Surface Gauges Dead Weight Testers
Barton Recorders Vaetrix Gauge 1
5, 10, & 20,000 PSI
Sub Surface Gauges Electronic & Mechanical
0-25,000 PSI Ranges Temperature Gauges
0-450 Degrees F
DESCRIPTION
CALIBRATION CERTIFICATE CRYSTAl. DIU' I Al (JAUCJL STRIAL Ni;Mf-;f K
PRESSURE RANGF lUOUU ACraiRACv FULL SERVICE •/• 10 P.S.I.
PRESSURE (FSI) ARRIVING ON CALIBRATIO
AIM-LlcD PRESSURE
U
2.000 4,000 8,000 KUUU 10000
PRESSURE (PSi) DEPARTING CALIBRATION TABLl
INDICATED PRESSURE DIFFERENCE
U 0
1.998 -Z
3.998 5,997 -3 /.yyb -4
APPLIED PRESSURE
0 2.000 4.000 6.000 8000 10000
INDICATED PRESSURE ntf r F. RENCE
0 O
1.998 -1 3.996 5,997 -3 7.996 -4 9 995
INSTRUMENT CALIBRATED IN THE VERTICAL POSITION ROOM TEMP 74 F
This instrument upon receiving on calibration table was found to be within manufacters tolerance This instrument upon receiving on calibration table was found to be out of manufacters tolerance
This is to certify that this instrument has been inspected and tested against Pressure Standard Chandler Engineering Dead Weight Tester Model # 58-200H, Serial # 18210 traceable to the National Institute of Srandards and Technology, (NIST) Reference # R6B113032501 . Calibrated (04/14/2016). Reference Standard Serial # 211H14150045.. Certified Pressure Transducer ( 36000 PSI .01%). Ths calibration systems conforms to all ISO 9001:2008 and API Spec. Ql requirements. Also let it be known that all calibrations
are performed by qualified DHP personnel using instrumentation and methods which guarantee precise accuracy.
XXXX
DATE OF CALIBRATION CALIBRATION DUE DATE
06/21/16 TECHNICIAN 06/21/17
y ) /
PEGGIE SAVCJlr
Dt )WN OLE
RESSURE INC. I N S T R U M E N T R E N T A L S & R E P A I R S
Surface Gauges Dead Wolght TeBters
Barton Recorders Vaetrix Gauge 1
5.10. A 20,000 PSI
Sub Surface G a u g e s Electronic & Mechan ica l
0-25,000 PSI Ranges Temperature Gauges
0-450 Degrees F
DtSCRIPTlON
CALIBRATION CERTIFICATE iMPf «A 11 fKl SCRIAL NUWDER
If VP RANGE U ISO F ACCURACY •/ FULL SERVICE •/• 15 DEO F
r i M P E f U T U P ^ (DEG F) ARRIVING ON CALIBRATION TABl E
AHPUED TtMPtRATURE : INDICATED TfcW | DIFECRENCF I bMH SYS I EM WAS i BAU I HEHh- WAS
NU PKIOH KfcAUINUS
TgMPEBA l URE (DEG I ) DEPARTING CALIBRATION TABLE
APPLIED TEMP INDICATED TEMP DIFFERENCE 32 bU 90 120 14.5
SZ BO 90 120 143
INSTRUMENT CALIBRATED IN THE VERTICAL POSITION ROOM TEMP 73 F
This instrument upon receiving on calibration table was found to be within manufacters tolerance This instrument upon receiving on calibration table was found to be out of manufacters tolerance
This Is to certify that this instrument has been inspected and tested against Digital Thermometer No 031913003. Calibraied (08/06/16). Using certified Yellow-Back Thermometer 35854-003 s/n 9004. Traceable to the National Institute of Standards & Technology (NIST) Referance # 94417'88024.82584,1428301 and 1470271. This calibration meets or exceeds all ANSI-NCSL-1 STD.,MIL.STD.45662A calibration procedures Also let It be known that all calibrations are pcirfomed by qualified Down Hole Pressure personel using instrumentation and methods which guarantee precise accuracy
x x x x x x
DATE OF CALIBRATION CALIBRATION DUE DATE
06/22/16 TECHNICIAN
I'hone 0 3 / ) B - rft
<J Box 49? 408 S. Ecta ;«t Broussard, t A 'o-.-Di
Surface Gauges Dead Weight Testers
Barton Recorders Vaetrix Gauge 1
5.10, & 20.000 PSI
Sub Surface Gauges Electronic & Mechanica l
0 25.000 PSI Ranges Temperature Gauges
0-450 Degrees F.
ASCRIPTION
CALIBRATION CERTIFICATE CHART RECORDER SERIAL NUMBER
PRESSURF. RANGE 5 000 ACCURACY"/- 1 % FULL SERVICE •/ 50 P.S.I.
PRESSURE (PSI)
ARRIVING ON CALIBRATION TABLE INDICATED PRESSURE DIFFERENC E
0 0
1.000 0
UUU 0
J.UUU 0
4.000 0 5,000 0
APPLIED PRESSURE 0
1.000 2,UUO 3.000 4 000 5,6lK.l
PRESSURE (PSI)
DEPARTING C A L I B R A T I O N T A B L E
APPI. INDICATED PRESSURE DIFFERENCE 0 0 O
1.000 1.000 0 2.000 2.000 O 3,000 3,000 o 4 000 4.000 o
... _ _
INSTRUMENT CALIBRATED IN THE VERTICAL POSITION ROOM TEMP 75 F
This instrument upon receiving on calibration table was found to be within manufacters tolerance. This Instrument upon receiving on calibration table was found to be out of manufacters tolerance.
This is to certify that this Instrument has been inspected and tested against Preasure Standard Chandler Engineering Dead Weight Tester Model # 58-200H, Serial # 16210 traceable to the National Institute of Standards and Technology, (NIST) Reference # R68113032501 . Calibrated (04/14/2016). Reference Standard Serial # 211H14150045.. Certified Preasure Transducer ( 36000 PSI .01%). Thu calibration systems conforms to all ISO 9001:2008 and API Spec Q l requirements. Also iet it be known that all calibrations
are performed by qualified DHP personnel using Instrumentation and methods which guarantee precise accuracy.
XXXXXXX
DATE OF CALIBRATION CALIBRATION DUE DATE
06/22/16 06/22/17
TECHNICIAN NAI I IAN HEBERT \N HEBE
Tfff,