October 18, 2016 DEC 19 2018 REGjONAL FIELD OPERATIONS GULF OF MEXICO OCS REGION NEW ORLEANS. LA U.S. Department ofthe Interior Bureau of Safety and Environmental Enforcement 1201 Elmwood Park Boulevard New Orleans. Louisiana 70123-2394 Arena Offshore, Lf 4200 Kescarch Forcsl Dr. Suite 230 The Woodlands. TX 77381 281-681-9501 281-681-9502 Fax Attention: Angie Gobert Pipeline Unit RE: Actual Pipeline Riser Repair on 6-lneh Bulk Oil Right-of-Way Pipeline (ROW No. 029120/Segment No. 18543), Originating at 4-Inch Subsea Tie-in Point in Eugene Island Block 206 and Terminating al Eugene Island Block 215, B Platform, OCS Federal Waters, Gulf of Mexico, Offshore, Louisiana Dear Ms. Gobert: Effective October I , 2016, Arena Offshore, LP (Arena) notified the Bureau of Safety and Environmental Enforcement (BSEE) via e-mail of a seeping observed on the riser of the referenced pipeline segment al Eugene Island Block 215 Platform B. Thai same day BSEE granted verbal approval (enclosed) to Arena to make the emergency repairs. Attached is thc detailed proeedure and supporting documenlation of the actual pipeline riser repair operations performed at the termination point of the referenced pipeline segment, as well as, a copy of the verbal approval and Pay.Gov receipt. Should you have any questions regarding this matter or require additional information, please contact the undersigned at 281.210.3174 or i e n n i fe n ^ a r e n a o ffs h o r e. c o m aimec(</;arenaoffshore.com. Sincerely, Arena Offshore, LP Jennifer Johnson Regulatory Analyst :JLJ Enclosures or Aimee Deady at 281.210.3180 or Your reporl is hereby accepted pursuani to 30 CFR 250.1008 (e). Date: Bryan A/UcTmangue Acling(k(^ional Supervisor Bureau of Safely and Environmental Lnforcement

Transcript of DE C 19 2018

Page 1: DE C 19 2018

October 18, 2016

DEC 19 2018

REGjONAL FIELD OPERATIONS GULF OF MEXICO OCS REGION

NEW ORLEANS. LA

U.S. Department ofthe Interior Bureau of Safety and Environmental Enforcement 1201 Elmwood Park Boulevard New Orleans. Louisiana 70123-2394

Arena Offshore, Lf

4200 Kescarch Forcsl Dr.

Suite 230

The Woodlands. TX 77381

281-681-9501

281-681-9502 Fax

Attention: Angie Gobert Pipeline Unit

RE: Actual Pipeline Riser Repair on 6-lneh Bulk Oil Right-of-Way Pipeline (ROW No. 029120/Segment No. 18543), Originating at 4-Inch Subsea Tie-in Point in Eugene Island Block 206 and Terminating al Eugene Island Block 215, B Platform, OCS Federal Waters, Gulf of Mexico, Offshore, Louisiana

Dear Ms. Gobert:

Effective October I , 2016, Arena Offshore, LP (Arena) notified the Bureau of Safety and Environmental Enforcement (BSEE) via e-mail of a seeping observed on the riser of the referenced pipeline segment al Eugene Island Block 215 Platform B. Thai same day BSEE granted verbal approval (enclosed) to Arena to make the emergency repairs.

Attached is thc detailed proeedure and supporting documenlation of the actual pipeline riser repair operations performed at the termination point of the referenced pipeline segment, as well as, a copy of the verbal approval and Pay.Gov receipt.

Should you have any questions regarding this matter or require additional information, please contact the undersigned at 281.210.3174 or i e n n i fe n a r e n a o ffs h o r e. c o m aimec(</;arenaoffshore.com.

Sincerely,

Arena Offshore, LP

Jennifer Johnson Regulatory Analyst

:JLJ

Enclosures

or Aimee Deady at 281.210.3180 or

Your reporl is hereby accepted pursuani to 30 CFR 250.1008 (e). Date:

Bryan A/UcTmangue Acling(k(^ional Supervisor Bureau of Safely and Environmental Lnforcement

Page 2: DE C 19 2018

Arena OfTshore, LP EI215 B

Riser Repair Pipeline Segment No. 18543/ROW No. G29120

October 7. 2016: Arrived on location. Operators isolated Pipeline SN 17054 at EI 217 B Platform and SN 18543 at EI 215 B-PROD by locking close two block valves and installing a blind flange at EI 215 B Platform. Bled off pressure and verified pipelines were at 0 psig. Connected one end. of hose to tie-in point upstream of isolation point on the pipeline at EI 215 B and routed the other end to a stock tank.

October 8, 2016: Continued draining pipeline and removing the piping at/below the Cellar Deck.

October 9, 2016: Once pipeline linished draining, inserted hose into pipeline and pumped down approximately 336 gallons of liquid and allowed to stabilize. Removed piping above the flange and disconnected the flange at +15' elevation.

October 10, 2016: Secured top of riser from Main Deck and cold cut riser approximately 10' above waterline. Removed damaged section of riser. Inserted smart vent plug into riser approximately 8' above waterline, engaged smart vent plug, added two gallons of water on top of plug and checked riser for hydrocarbon presence. Piped smart vent piping/hose to safe location away from all hot work. Replaced damaged riser section with new riser and welded out. Note: new riser section was hydrotested onshore for 8 hrs at 2220 psig and 100% of welds were x-rayed onshore and offshore. Disengaged smart vent plug and removed from riser piping. Torqued upper flange connection.

October 11, 2016: Installed piping from +10 elevation to the top ofthe Cellar Deck.

October 12, 2016: Continued installing piping from +10 elevation to the top of the Cellar Deck.

October 13, 2016: Opened valves, at both ends of Pipeline SNs 18543/17054 and performed visual leak test for two hours with product above operating pressure (500 psig operating pressure, 587 psig actual test pressure); used calibrated crystal gauge with report. Placed Segment No. 18543 back in service.

Page 3: DE C 19 2018

Jennifer Johnson

From: [email protected] Sent: Monday, October 03. 2016 12:52 PM To: Jennifer Johnson Subject: Pay.gov Payment Confirmation: BSEE Pipeline Repair Notification - BX

Your payment has been submitted to Pay.gov and the details are below. If you have any questions regarding

this payment, please contact Brenda Dickerson at (703) 787-1617 or

[email protected].

Application Name: BSEE Pipeline Repair Notification - BX

Pay.gov Tracking ID: 25U82TL5

Agency Tracking ID: 75103311581

Transaction Type: Sale

Transaction Date: 10/03/2016 01:51:45 PM EDT

Account Holder Name: Jennifer Johnson

Transaction Amount: $388.00

Card Type: Visa Card Number: * * * * * * * * » * * * i 5 4 4

Region: Gulf of Mexico

Contact: Jennifer Johnson 2812103174

Company Name/No : Arena Offshore, LP, 02528

Pipeline Segment No: 18543

Lease Number(s):,

Originating Area/Block: Eugene Island El, 206

Terminating Area/Block: Eugene Island El, 215

THIS IS AN AUTOMATED MESSAGE. PLEASE DO NOT REPLY.

Page 4: DE C 19 2018

Aimee Deady

From: BSEE Pipelines Pipelines <[email protected]> Sent: Saturday, October 01, 2016 5:56 PM To: Aimee Deady Cc: angie.gobert@l)see.gov Subject: Re: Arena - EI 215, B-PROD- Segment No, 18543 - Emergency Riser Repair

Aimee:

I got your voice mail. You may start repair procedure according to the procedure stated. You should include pay.gov receipt with your application.

Sent from my iPhone

On Oct I, 2016, at 4:38 PM, Aimee Deady <ADctic v^arcnaoffbhore.com> wrote:

Good afternoon -

Arena noticed seeping on a riser at El 215 when at operating pressure, No sheen or actual leak of hydrocarbons occurred and the pipeline has been shut in. Attached is the repair procedure. My understanding is that we can start these emergency repairs now and submit the formal application after the repairs are complete. The pipeline wi I not be brought back on line until the required testing requirements (addressed in the procedure) are performed.

Arena plans on starting these operations at first light tomorrow morning (10/02/2016).

Per my conversation with Beau Boudreaux this afternoon, he will take a look at this procedure and pass it along to the Production Operations Supervisor for any comments.

*This is sort of confusing because the 6" for repair comes from El 2178 via a 4" departing line at El 217B.

El 217B -> 4" SN 17054 ->4"x6"SSTI in El 206 ->6" 5N 18543 •> El 215B-Prod

Feel free to contact me if you have any questions.

Thanks,

Aimee Deady Reguhituf} Supervisor Arena Offslmre, LP 4200 Resenn h Forest Drive, Suite JJO The Woodlands, Texas 77JSI 281-210-3180 (Direct) 832-702-6808 (Cell) ADeadvr/fnreiiaofrshoK. com

<EI 215 BProd - Riser Repair - SN 18543 Rev 0.pdr> i

Page 5: DE C 19 2018

• U J Arena Offshore, LP ' -2 Eugene Island 215 B

ARENA RISER REPAIR

ARENA SEGMENT NO. 18543 Arena (Jitshore LP

1)

2)

4)

PROPOSED RISER MODIFICATION

RESPONSIBLE PARTY

a Pipeline Operaior Name Arena Offshore, LF'

b Address 4200 Research Forest Drive

c Contact Person(s)

d. Shore Base

PIPELINE INFORMATION

a Segment Number:

b. Origin Structure Name Area/Block Coordinates

Latitude X

c Terminus Structure Name Area/Block Coordinates

Latitude X:

Install Date (Year)

Status

Product

Max Water Depth

3) PIPELINE DESCRIPTION

Configuration

Size Diameter Diameter

c Volume

d Buried

PURPOSE

a Description:

b Reason

Suite 230 The Woodlands, TX 77381

Aimee Doady w/Amna Justin Nelson w/Ai ena

EPS Dock, 24865 Hwy. 333. Abbeville. LA 70510

Telephone No (s) (281 210-3180, (832) 702-6808 ' m 210-3182.(281) 813-7456

18543 / Incoming pipeline from El 217 / 6.625" MAOP 1100 PSIG / KAQ-4000

Eugene Island 206 SSTI Eugene Island 206

28° 40' 42"

Complex ID No OCS Lease

Longitude: Y:

N/A G00806

91 '40 '15"

Eugene Island 215 "B-Prod" Complex ID No Eugene Island 215 OCS Lease

28° 38' 4" Longitude 1,950,033.5 Y,

1972

21448 G00578

91* 29' 2 r -11.700.44

Active

Bulk Oil

100 feet

4" from El 217B tc SSTI. 6M from SSTI to El 215 B-Prod Platform

4.5" 6.625"

Wall Thickness Wall Thickness

0.337" O ^ "

Length Length

12347 feet 42798 feet

1,557.00 bbls (inclusive of 50 feet of riser on each side)

Yes

Replace damagec riser section at El 215 "B-Prod" from the (•) 10 ft. elevation to the {*) 20 ft. elevation.

Seepage was discovered in riser above waterline. approximately •••13'. at El 215 "B-Prod". Operators noticed hydrocarbon seeping near the boarding valve of riser 9/30/16. shut-in, blead down, and solatcd pipeline. No leak or sheen was observed.

c Proposed Mod Date Oct. 2-4, 2016

Issue Date 10/01/16 Re/ision Page 1 of 2

Page 6: DE C 19 2018

\ Arena Offshore, LP

\ Eugene Island 215 B

ARENA RISER REPAIR

SEGMENT NO. 18543

Arena Offshore, LP

PROPOSED RISER MODIFICATION (Continued)

6) PROPOSED PROCEDURE

a Brief description of the method to be used Pipeline Segment 18543 / Bulk Oil Pipeline from El 217 " B " / 4" and 6" MAOP 1100 PSIG / KAQ-4000 Pipeline Segment 18543 normal operating pressure is 500 psig.

1) Operators to isolate pipeline segment No. 17054 at El 217 " B " and segment No. 18543 at

El 215 "B-Prod" by locking closed two block valves and/or installing skillets.

2) Operators to bledd of pressure and verify the pipelines are at zero psig.

3) Operators connect one end of hose to tie-in point upstream of isolation point on the pipeline, and route the other end to a stock tank.

4) Open up tle-ln valve and allow pipeline to drain to stock tank.

5) Once pipeline h.>s finished draining, insert hose into pipeline and pump down £Pi!roxlmately 100 gals of liquid (80ft.) and allow to stabliize, Monitor fluid level after pumping and repeat pump off if necessary until the level stabilizes.

7) Insert smart vert plug into riser to an elevation below the cut point (approximately ten feet above waterline), engage smart vent plug, add two gals of water on top of plug, and check riser for hydrocarbon presence. Repeat flush as necessary until hydrocarbon free.

8) Pipe smart vent piping/hose to a safe location away from all hot work.

9) Secure top of rUer from main deck, and cold cut riser approximately ten feet above

waterline and above smart plug.

10) Remove damaged section of riser.

11) Replace dama jed riser section with new riser and weld out. 'New riser sectior is 6.625"OD x .432" wt sch 80 Gr. X42 pipe and will be hydrotested for

4 hours (1.25xMAOP) and welds X-Ray tested prior to, and folllowing installation.

12) Disengage thc smart vent plug and remove from riser piping.

13) Torque upper flange connection to recommended Ib-ft.

14) Construction to open valves at both ends of pipeline segment No. 18543/17054 and perform visual lesk test for two hours with product at operating pressure (500pslg). A

calibrated digital feadweight gauge and chart recorder shall also be used during thc leak test­

i s ) Upon completion of a successful leak test recorded on chart recorder, pipeline segment No. 18543 shall be placed back into service.

b If using an anchored vessel, provide an anchor plat or maximum radius of anchors

Issue Date 10/01/16 [ Revision 1 | Page 2 of 2

Page 7: DE C 19 2018

1/912017 PARTMENT OF THE INTERIOR Mail - PSN 1854,'

Steele, Glenn <[email protected]>

PSN 18543 Repair 3 messages

Steele, Glenn <[email protected]> To: [email protected]

Jennifer,

Tue, Dec 20. 2016 at 10:57 AM

I emailed Aimee Deady earlier today hadn't heard back, so I was hoping maybe you could help with this. I'm processing the completion report for the repair that was done on PSN 18543, and I just want to verify the elevations of the replaced pipe. The plan submitted on 10/1/16 indicated the riser would be replaced from the +10" to the +20' elevation. In the actual repair procedure it states that pipe was replaced from the +10" to the top of the cellar deck. Is the top of the cellar deck at +20'? There is also mention of disconnecting a flange at the +15', so I just want to make sure we get it straight.

Thank you,

Glenn Steele Petroleum Engineering Technician - Student Trainee Pipeline Section Regional Field Operations Bureau of Safety and Environmental Enforcement (504)736-7597 [email protected]

Jennifer Johnson <[email protected]> To: "Steele, Glenn" <[email protected]> Cc: Aimee Deady <[email protected]>

Tue, Dec 20, 2016 at 11:07 AM

Glenn, Aimee forwarded me your email from earlier and I will touch base with the engineer to confirm. Unfortunately he is out of the office through the end of the year, but as soon as ie gets back I will confirm the depths and let you know.

Thanks,

Jennifer Johnson

Regulatory Specialist

Arena Offshore, LP

4200 Research Forest Drive, Suite 230

The Woodlands, Texas 77381

281.210.3174 (Direct)

281.744.9336 (Cell)

[email protected]

F r o m : Steele, Glenn [mailto:[email protected]] Sen t : Tuesday, December 20, 2016 10:58 AM

https://mai I .google.com/mai l / u / ^ 1/2

Page 8: DE C 19 2018

1/9/2017

To: Jennifer Johnson Sub jec t : PSN 18543 Repair

[Quoted text hidden]

HPARTMIiNT OF THE INTERIOR Mail - PSN 1854

Jennifer Johnson <[email protected]> To: "Steele, Glenn" <[email protected]> Cc: Venkata Nyshadham <[email protected]>, "Craig LeBlanc ([email protected])" <[email protected]>, Aimee Deady <[email protected]>

Wed, Jan 4, 2017 at 7:39 AM

Glenn, I confirmed with our engineer that we installed a new flange at the +12' elevation and replaced piping from the +12' elevation to the "Tee" at the +48' elevation on the cellar deck.

Please advise if you need any further clarification.

Thanks,

Jennifer Johnson

Regulatory Specialist

Arena Offshore, LP

4200 Research Forest Drive, Suite 230

The Woodlands, Texas 77381

281.210.3174 (Direct)

281.744.9336 (Cell)

[email protected]

F r o m : Steele, Glenn [mailto:[email protected]] Sen t : Tuesday, December 20, 2016 10:58 AM To : Jennifer Johnson Sub jec t : PSN 18543 Repair

Jennifer,

[Quoted text hidden]

https;//mail.gcx)gle.ccxTi/mail/u/0/?ui=2&ik=45978d0c81&view=pt&search=inbox&th=1591d2ac988e0fdc 2/2

Page 9: DE C 19 2018

A. i

Mark orr.

17 fo"- A O O ^ ' J ^ ' F/r r, (?T.T

• To" t - r L ^ O L R ^ t f *

1 H

Are oioe SUDDO^S reauired9 Yes No

CUSTOMER Sr? OQ L f Qi

PPHTPT. K A f ^ - W n n n " L ^ •••r-^ . A17-(S LOCATION: £ . 1 ' • B Pr r rJ

DAIL

SHT 0

Page 10: DE C 19 2018

\

v \ K^o&Mvi • •/ /;.ino,.\v. v. • /

/

^\ \ \ \ \ v / —

1 ooor

'oosr

Page 11: DE C 19 2018

r

/ / x FSC •• • i HI >

^ / j 1 1 ll s ML

\ \ \ \ \ v\:" / .:.:/n l ^ ^ V V / / /

Page 12: DE C 19 2018

BURNER FIRE CONTROL, INC.

BURNER FIRE CONTROL, INC. / j ; . r . , . ;

DATE: | o -6 -16 |DRAWING NO./S: ^ j / ^ ^ ;•; \ '

CUSTOMER: (V LQCA7ION: j - . | ^ i ') - K / /.

PAGE

O F /

ITEM DESCRIPTION BEING T E S T E D : ^ ^ . ^ 1,1, C/->N r V / 'I I PAGES TIME ACTIV PRGSSURE

•6 TEMPERTURH

qr

2^ c r 75 71

(TO 2££ 00 7

5 7

/Ji! 07 3'7 a ' (/;Sc T

Wh V l.^- ..i ri.,n to I 01

• TV] 1

7 5 fl ^ / 1 / vl.'

v 2212 6:/ J ^ 7

I'M 71 0 i 0

T7?

(

HYI>RO-TEST REPORT

Page 13: DE C 19 2018

BURNER FIRE CONTROL, INC.

; BURNER FIRE CONTROL, INC. ^ ^ c

DATE: / p g [/> [DRAWING NO./S: \){,\ t ^

LOCATION: P \ (> IS ~ fi P(\6D PAGE

OF

ITEM DESCRIPTION BEING TESTED:^yv - HOpn J ^ v ^ TIME I ACTIVITY ' "

PAGES TEMPERTURI.

1:3c rvj on .77 XT-7.7/

IP 7 •1 PC n5j

• r c

a o

a (< 0

• il

• ii lL

lew 0 !

(M* 2NL

•/6 22! -1 . •o

HYDRO-TEST REPORT

Page 14: DE C 19 2018

DOWN HOLE

PRESSURE INC. I N S T R U M E N T R E N T A I S & R E P A I R S

P.O B y * 497 4(18 S I ota Rrt ^foussavd. L A ?

Surface Gauges Dead Weight Testere

Barton Recorders Vaetrix Gauge 1

5. 10, & 20,000 PSI

Sub Surface Gauges Electronic & Mechanica l

0-25,000 PSI Ranges Tamperature Gauges

0-450 Degrees F.

i'f .'.CftlPUON

CALIBRATION CERTIFICATE

FULL SERVICE 1.5 DEG F

I^.MPfcRAlUKf- tDEG F) ARRIVING ON CALIBRATION TABl»

A^Pl tEO TEMPERATURE I f c M P b Y b l t M WAb

NO PHILJK Kt-Al>INCib

INDICATED TEMf-bAU iHt-Kh WAS

APPLIED TEMP

bU

I^U

IEMPERATUR' (UfcG f ) I AM IING CALIBRATION TABLE

DIFFERENCE INDICATED TEMP

bU yu 120 143

INSTRUMENT CALIBRATED IN THE VERTICAL POSITION ROOM TEMP 73 F

This instrument upon receiving on calibration table was found to be within manufacters tolerance This instrument upon receiving on calibration table was found to be out of manufacters tolerance

This is to certify that this Instrument has been inspected and tested against Digital Thermometer No 031913003 Calibrated (08/06/15). Using certified Yellow-Back Thermometer 35854-003 s/n 9004 Traceable to the National Institute of Standards & Technology (NIST) Referance # 94417 ,8802'.,82564,1428301 and 1470271 This calibration meets or exceeds all ANSI-NCSL-1 STD ,MII. STD.45682A calibration procedures Also let it be known that all calibrations are psrfomed by qualified Down Hole Prossure personel using instrumentation and methods which guarantee precise accuracy

XXXXXX

DATE OF CALIBRATION CALIBRATION DUE DATE

06/22/16 TECHNICIAN

06/22/17

NATHAftj HEBSRTj

Page 15: DE C 19 2018

DOWN HOLE

PRESSUHI INC.. INSTRUME N1 RENTALS & RF PAIRS 4')8 S t." o l t R j l

Surface Gauge* Dead Weight Tester*

Barton Recorders Vaetrix Gauge 1

5, 10, & 20.000 PSI

Sub Surface Gauges Electronic & Mechanica l

0-25,000 PSI Ranges Temperature Gauges

0-450 Degrees F

nt SI-HI*-1

CALIBRATION CERTIFICATE MIAL NUMBER

fJfSSURF RANGE 10000 ACCURAO FULL SERVICE *l- 10 P.S.I.

PRESP'JRE (PSI) ARRIVING ON CALIBRATION TABLE

APPi I'ID PRF.SSURF 0

^ UOU 4.UUU BOOO noi) »0000

I'KhSSURh (PSI) DEPARTING CALIBRATION TABL t

INDICATED PRESSURE DIFFERENCE

U

1.99B

/.yyb 3.99»i

U

-2

-S

4 -&

APPLIED PRESSURE

0 2,000 4,000 6,000 8000 10000

INSTRUMENT CALIBRATED IN THE VERTICAL POSITION

INDICATED PRESSURF [ Df I i , 0__ 0

1 998 -1 3.996 5.997 - j 7.996 -4 9.995

ROOM TEMP 74 F

This instrument upon receiving on calibration table was found to be within manufacters tolerance This instrument upon receiving on caiibratior table was found to be out of manufacters tolerance

This is to ceriify that this instrunent has been Inspected and tested against Pressure Standard Chandler Engineering Deiad Weighl Tester Model # 58-200H, Serial # 16210 traceable to the National institute of Standards and Technology, (NIST) Reference # R68113032501 , Calibrated (04/14/2016). Reference Standard Serial # 211H14150045 Certified Pressure Transducer ( 36000 PSI .01%) T h i calibration systems conforms to all ISO 9001:2008 and API Spec Q l requiremsnts. Also let it be known that all calibrations

are performed by qualified DHP personnel uulng instrumentation and methods which guarantee precise accuracy.

XXXX

DATE OF CALIBRATION CALIBRATION DUE DATE

06/21/16

mm TECHNICIAN REGGIE SAVC HI

!

'1 /.f

/

Page 16: DE C 19 2018

e.<N

Hydro Test 2220 psi / 8hrs X-Rav 100%

—05

Had 7 6 - feOO l i nO ^TvT

ft

Are DIDC suDoorts reauired? Yes No

CJSTOMtH: £[rCfJG\

PROJECT: * ^ a i S C r C T S O C X . ^ Q . L t ^ g

DRAWN BY DATE:

SHT, . J Of

Page 17: DE C 19 2018

fc'-O"

0

JlHk JUL PwcTlBtion

Oy"~(aOC?*rLJrO FIAJ^ ZT'S

Hydro Test 2220 psi / 8 hrs

X-Ray 100%

A^e pipe s joaorts reauired? Yes No

CUSTOMER: A Mh

PROJECT: a n 4c? 3 i 5 Crc^S o c y f O i l L i r ^ e

DRAWN BY: CEteeiaag I L^/oi-^

LOCATION:,

OATE: / Q - ^ ' l ^

/ SHT ! OF

Page 18: DE C 19 2018

m y

Page 19: DE C 19 2018

P.O M t , , 400 S ! v »"<tl

-

Surface Gauges Dead Weight Testers

Barton Recorders Vaetrix Gauge 1

5,10, & 20,000 PSI

Sub Surface Gauges Electronic & Mechanica l

0-25,000 PSI Ranges Temperature Gauges

0-450 Degrees F

DFSCHIPTION

CAUBRATION CERTIFICATE CHART RECORDER StRIAL NUMBER

PRESSHRF RANGE 6 000 ACCURACY' I- 1 % FULL SERVICE •/ 50 P.S.I

PRESSURE (PSI> ARRIVING ON CALIBRATION TABLE

APPLIED PRESSURE

0

1.000

2.000

3,000

4,000

a OUI'

INDICATED PRESSURE DIFFERENCE

0 0 1.000 0 2,000 0 3000 0 4 000 0 5,000 0

PHFSbUKk- (PSI) DEPARTING CALIBRATION TABLE

fcPPl \tV> PRESSURE

0 1.000

3,000 4 000

INSTRUMENT CALIBRATED IN THE VERTICAL POSITION

INDICATED PRESSURE DIFFERENCE

0 ' l i

1.000 a

2.000 U

3 000 0

4,000 0

ROOM TEMP 75 F

This instrument upon receiving on calibration table was found to be within manufacters tolerance This instrument upon receiving on calibration table was found to be out of manufacters tolerance.

This is to certtfy that this Instrument has been inspected and teated against Pressure Standard Chandler Engineering Oeid Weight Tester Model # 56-200H, Serial ff 16210 traceable to the National Institute of Slandards and Technology, (NIST) Reference # R68113032501 . Calibrated (04/14/2016) Reference Standard Serial # 211H14150045. Certified Pressure Transducer ( 36000 PSI .01%) This calibration systems conforms to all ISO 9001:2008 and API Spec, Q l requirements. Also let it be Known that all calibrations

are performed by qualified DHP personnel using instrumentation and methods which guarantee precise accuracy

XXXXXXX

DATE OF CALIBRATION CALIBRATION DUE DATE

06/22/16 TECHNICIAN

06/22/17 NAT I LRT

Page 20: DE C 19 2018

2 X

Page 21: DE C 19 2018

BURNER FIR€ CONTROL, INC. BURNER FIRE CONTROL INC. _ ^ ^

0 - / 6 [DRAWING NO. /S : g j g

CUSTOMBR:f\(i ^ ,

DATE:

LOCATION^ Q SIS P A G E

OF

ITEM DESCRIPTION BEING TESTED: +'7 )]''> PAGES TIME ACTIVITY f^KLSSURt FEMPBRTURE

TT 25S ~0

M Cm 4-0 ^7 53 +1 Z 1 T C. 2i

r r 13

2

mi w T l

2 1

as 7 2 2.

6 7m 225

HYDRO-TEST REPORT

Page 22: DE C 19 2018

DATE: j t -S ^

B U R N E R F I R E C O N T R O L , INC.

B U R N E R FIRE CONTROL, INC. \ \ l , { { U -

I D K A W I N G NO. /S: ' A o ^ / l ^ 1 A "

CUSTOMER LOCATION: 1 Q 1

P A G E

/ Q F ;

ITEM DESCRIPTION BEING TESTED; 917 1 PAGES TIME ACTIVITY PRESSURE IEMPERTURE

11 12 2 _ a. 32 T — ;—^ 1 — ^

/5 r

rr—^ 31 i£ll

m c

(^,,,.1 i,. 077 n

L

-V- \ \ .

5! u

4- 3

•n

HYCIRO-TEST REPORT

Page 23: DE C 19 2018

I RI mim\ INC. INSl RUMEN"! RENTALS & REPAIRS

Surface Gauges Dead Weight Testers

Barton Recorders Vaetrix Gauge 1

5, 10, & 20,000 PSI

Sub Surface Gauges Electronic & Mechanical

0-25,000 PSI Ranges Temperature Gauges

0-450 Degrees F

DESCRIPTION

CALIBRATION CERTIFICATE CRYSTAl. DIU' I Al (JAUCJL STRIAL Ni;Mf-;f K

PRESSURE RANGF lUOUU ACraiRACv FULL SERVICE •/• 10 P.S.I.

PRESSURE (FSI) ARRIVING ON CALIBRATIO

AIM-LlcD PRESSURE

U

2.000 4,000 8,000 KUUU 10000

PRESSURE (PSi) DEPARTING CALIBRATION TABLl

INDICATED PRESSURE DIFFERENCE

U 0

1.998 -Z

3.998 5,997 -3 /.yyb -4

APPLIED PRESSURE

0 2.000 4.000 6.000 8000 10000

INDICATED PRESSURE ntf r F. RENCE

0 O

1.998 -1 3.996 5,997 -3 7.996 -4 9 995

INSTRUMENT CALIBRATED IN THE VERTICAL POSITION ROOM TEMP 74 F

This instrument upon receiving on calibration table was found to be within manufacters tolerance This instrument upon receiving on calibration table was found to be out of manufacters tolerance

This is to certify that this instrument has been inspected and tested against Pressure Standard Chandler Engineering Dead Weight Tester Model # 58-200H, Serial # 18210 traceable to the National Institute of Srandards and Technology, (NIST) Reference # R6B113032501 . Calibrated (04/14/2016). Reference Standard Serial # 211H14150045.. Certified Pressure Transducer ( 36000 PSI .01%). Ths calibration systems conforms to all ISO 9001:2008 and API Spec. Ql requirements. Also let it be known that all calibrations

are performed by qualified DHP personnel using instrumentation and methods which guarantee precise accuracy.

XXXX

DATE OF CALIBRATION CALIBRATION DUE DATE

06/21/16 TECHNICIAN 06/21/17

y ) /

PEGGIE SAVCJlr

Page 24: DE C 19 2018

Dt )WN OLE

RESSURE INC. I N S T R U M E N T R E N T A L S & R E P A I R S

Surface Gauges Dead Wolght TeBters

Barton Recorders Vaetrix Gauge 1

5.10. A 20,000 PSI

Sub Surface G a u g e s Electronic & Mechan ica l

0-25,000 PSI Ranges Temperature Gauges

0-450 Degrees F

DtSCRIPTlON

CALIBRATION CERTIFICATE iMPf «A 11 fKl SCRIAL NUWDER

If VP RANGE U ISO F ACCURACY •/ FULL SERVICE •/• 15 DEO F

r i M P E f U T U P ^ (DEG F) ARRIVING ON CALIBRATION TABl E

AHPUED TtMPtRATURE : INDICATED TfcW | DIFECRENCF I bMH SYS I EM WAS i BAU I HEHh- WAS

NU PKIOH KfcAUINUS

TgMPEBA l URE (DEG I ) DEPARTING CALIBRATION TABLE

APPLIED TEMP INDICATED TEMP DIFFERENCE 32 bU 90 120 14.5

SZ BO 90 120 143

INSTRUMENT CALIBRATED IN THE VERTICAL POSITION ROOM TEMP 73 F

This instrument upon receiving on calibration table was found to be within manufacters tolerance This instrument upon receiving on calibration table was found to be out of manufacters tolerance

This Is to certify that this instrument has been inspected and tested against Digital Thermometer No 031913003. Calibraied (08/06/16). Using certified Yellow-Back Thermometer 35854-003 s/n 9004. Traceable to the National Institute of Standards & Technology (NIST) Referance # 94417'88024.82584,1428301 and 1470271. This calibration meets or exceeds all ANSI-NCSL-1 STD.,MIL.STD.45662A calibration procedures Also let It be known that all calibrations are pcirfomed by qualified Down Hole Pressure personel using instrumentation and methods which guarantee precise accuracy

x x x x x x

DATE OF CALIBRATION CALIBRATION DUE DATE

06/22/16 TECHNICIAN

Page 25: DE C 19 2018

I'hone 0 3 / ) B - rft

<J Box 49? 408 S. Ecta ;«t Broussard, t A 'o-.-Di

Surface Gauges Dead Weight Testers

Barton Recorders Vaetrix Gauge 1

5.10, & 20.000 PSI

Sub Surface Gauges Electronic & Mechanica l

0 25.000 PSI Ranges Temperature Gauges

0-450 Degrees F.

ASCRIPTION

CALIBRATION CERTIFICATE CHART RECORDER SERIAL NUMBER

PRESSURF. RANGE 5 000 ACCURACY"/- 1 % FULL SERVICE •/ 50 P.S.I.

PRESSURE (PSI)

ARRIVING ON CALIBRATION TABLE INDICATED PRESSURE DIFFERENC E

0 0

1.000 0

UUU 0

J.UUU 0

4.000 0 5,000 0

APPLIED PRESSURE 0

1.000 2,UUO 3.000 4 000 5,6lK.l

PRESSURE (PSI)

DEPARTING C A L I B R A T I O N T A B L E

APPI. INDICATED PRESSURE DIFFERENCE 0 0 O

1.000 1.000 0 2.000 2.000 O 3,000 3,000 o 4 000 4.000 o

... _ _

INSTRUMENT CALIBRATED IN THE VERTICAL POSITION ROOM TEMP 75 F

This instrument upon receiving on calibration table was found to be within manufacters tolerance. This Instrument upon receiving on calibration table was found to be out of manufacters tolerance.

This is to certify that this Instrument has been inspected and tested against Preasure Standard Chandler Engineering Dead Weight Tester Model # 58-200H, Serial # 16210 traceable to the National Institute of Standards and Technology, (NIST) Reference # R68113032501 . Calibrated (04/14/2016). Reference Standard Serial # 211H14150045.. Certified Preasure Transducer ( 36000 PSI .01%). Thu calibration systems conforms to all ISO 9001:2008 and API Spec Q l requirements. Also iet it be known that all calibrations

are performed by qualified DHP personnel using Instrumentation and methods which guarantee precise accuracy.

XXXXXXX

DATE OF CALIBRATION CALIBRATION DUE DATE

06/22/16 06/22/17

TECHNICIAN NAI I IAN HEBERT \N HEBE

Tfff,