DCM International 2017 · Corporate Brochure Design & Construction Management ... Feasibility Study...
Transcript of DCM International 2017 · Corporate Brochure Design & Construction Management ... Feasibility Study...
Corporate Brochure Design & Construction Management Content
Services 3–5CurrentProjects 6–7CorporateOffices 8–16Oil&Gas 17–21Aviation 22Logistics 23–26DryCleaning 27Manufacturing 28–30Broadcasting 31–32Hospitality 33–34ManagementServices 35ClientList 36ContactInfo 37
Laboratories
Hotels
Oil & Gas
Offices
Landscaping
Corporate Brochure Design & Construction Management Services
Page3of37
ThisdiagramillustrateshowtheservicesprovidedbyDCMInternationalspanthecompleteprojectlifecycle: v
Client Needs and DCM Services
Client Needs
Identify Business
Requirement
Agree Business
Case
Establish Feasibility
Instruction to Proceed
Award Contracts
Occupation Satisfy Business
Needs
Pre Design Phase (Project Definition)
Implement Project
Design & Construction Phase (Project Implementation)
Handover Phase (Completion) Development Consultancy
Concept Design
Feasibility Study
Design Management
Project Management
Migration & Aftercare
Client Needs
Project Inception
Briefing Design and Cost
Management
Value Engineering
Procurement Site Management
Handover Activates
Project Aftercare
Corporate Brochure Design & Construction Management Services
Page4of37
DCMInternationalhasbeenservingclients formorethan30years.Fromouroriginalbase in theUnitedKingdom,wenowhaveoffices inEuropeandtheMiddleEast.Throughoutthistimewehavemaintainedouroriginalobjectiveofofferingourclientsacompletepropertydevelopmentservice.WeprovidehighqualitydesigncombinedwithtopInternationaldevelopmentandprojectmanagementservices.
Client satisfaction is thecornerstoneofDCM International.Ourmain focuswhenmanagingprojects; is toprovide thebestproperty solution;be itprojectmanagement;developmentmanagement;designservicesoracompletedesignandbuildservice.DCMInternationalwillprovideprofessionaland impartialadvicetoourclientsduringeachstageofthedevelopmentprocessinwhatevercapacityweareappointed.
ThefollowingaresomeofthebenefitsthatourclientsreceivebyutilisingtheservicesofDCMInternational:
• Excellentbusinessinvestment
• Developmentthatworksandmeetstheirneedsandrequirements.
• Totalmanagementofthedevelopment
• Builtinflexibilityforchangeinthefuture.
• Significantsavingsinconstructionachievedby:
• Accuratebriefingandinformativedecisionmaking
• Minimisingover-design
Spendinginareasofkeyimportance&savinginothers
• Fairandethicalprocurementmanagement
• Closereviewofthelifecyclecosts
Corporate Brochure Design & Construction Management Services
Design &Construction Management Consultant
Page5of37
ProjectManagementBydrawingonourextensivedesignandconstructionexperienceDCMInternationalwilleffectivelymanageyourprojectatallstages.Wecontinuallymonitorandcontrolthedevelopmentbudgetinordertoachievemaximumvalueforourclient.DCMInternational’sproactiveapproachtoprogrammingwilleffectivelyinformandguideallparticipants involvedintheprojectfromfeasibilitythroughconcepttofinalcompletion. Weutilizeastrict,butfair management style, which works well with both consultants and contractors and facilitates an efficientworkingenvironment.
DesignDCM International’s appreciation of what makes a completed development successful gives our team of talentedarchitects, designers and project managers the ability to combine the leading edge in current design with acomprehensionofwhatisofpracticalandfinancialimportancetothedevelopment.Ourextensive“handson”experienceofthepracticalitiesofconstructionallowsDCMtodesignsavingsintotheschemeatanearlystage,therebyproducingapositiveimpactonreducingconstructioncosts,tothelong-termbenefitoftheproject.
DevelopmentManagementAfterinitialinvestigations,DCMInternationalwillprogresssuitabledevelopmentopportunitiesthatmakessoundbusiness sense. We formulate the scheme to maximize the development return and achieve the optimumbusinesssolution.Usingexpertknowledgeofthedevelopmentmarket,DCMInternationalwillassistourclientsinsecuringbusinesspartnersandarrangingfinancewhererequired.
Design&BuildDCM’s clients benefit from the expertise of our internationally recognised design team coupled with the financialsecurityaffordedatanearlystageinthedevelopmentfromDesign&Build.Ourseniormanagementcontrolthedesignprocess to ensure compliancewith the developmentmaster plan and budget parameters. This allows our clients tobenefitfromauniquecombinationofhighqualityoriginaldesignandmanagementcontrol,whichproducesafinisheddevelopmentthatworkscommerciallyanddeliversthebestpossiblevalueformoneytoourclients.
Corporate Brochure Design & Construction Management Current Projects
Page6of37
NationalTrading&DevelopmentNTDECity
Location:Dubai-UAENTDE City is a multi faceted project, whichprovides grade “A” office buildings, labouraccommodation and state of the art automatedlogistics facility including cold store and climate-controlledzones.The project when complete will house NTDE’scomplete UAE operations and will undoubtedlybring themtoadifferent levelof service for theirclients.
Corporate Brochure Design & Construction Management Current Projects
Page7of37
TrilogiMegaDistributionCentre Location: Dubai - UAE Asoneofthe largestwarehousebuildings intheUAE;TrilogiMegadistributionCentre islocatedon fiveplotswithacombinedareaof124,000m2 in theheartof JabalAliSouthindustrialzone.WhencompletethisfacilitywillbeasthelargestMiddleEastdistributioncentre for Trilogi housing Nike, Under Armour, Columbia, etc. The project consists of70,000m2warehousebuiltupareawithaG+2AdminofficeandanotherG+1staffoffice.Theprojectwillalsoincludeservicesbuildingandamosque.
Corporate Brochure Design & Construction Management Corporate Offices
Page8of37
EMERSON(B) EmersonFisherValves–RegionalHeadOfficeLocation:Dubai–UAE
The Emerson Fisher building is a 14,000m2 facility consisting of a 4,500m2 ground plustwo,administrationofficeanda9,500m2groundplusmezzanineworkshop facility.Theworkshop contains eleven overhead cranes, three jib cranes and a compressed airdistributionnetwork. Thereare alsopaintbooths; shotblast zones andapressure testfacility.This project is the expansion for Emerson's regional head office building, which wasdesigned and projectmanaged by DCM in 2010. Together the three projects designedandprojectmanagedbyDCMforEmersonequateto15,000m2ofgrade“A”highqualityoffice,13,000m2oflogisticsfacilityand15,000m2ofworkshops.ThiscampusinJAFZAisconsideredoneofthebestfacilitieswithinEmerson’worldwideportfolio.
Corporate Brochure Design & Construction Management Corporate Offices
Design &Construction Management Consultant
Page9of37
EmersonClimaticTechnologies–RegionalHeadOffice
Location:Dubai–UAEEmersonClimateTechnologiesbuildingisa14,500m2logisticsfacilitylocatedwithintheJAFZASouthzone.Thebuildingconsistsofaground&mezzanineofficefacilityof 3,000m2 and a distribution facility of 11,500m2. This facility is designed toaccommodate Emerson’s Climate Technologies regional logistics requirements forthecomingtenyears.ThisprojectisthethirdundertakenbyDCMforEmerson.Onallthreeprojects,DCMhasdesignedandprojectmanagedtheentirefacility.
Corporate Brochure Design & Construction Management Corporate Offices
Page10of37
EmersonRegionalHeadOfficeLocation:Dubai–UAEAnAmericanCorporationwithayearlyturnoverinexcessofUS$25 Billion, Emerson is a global manufacturing andtechnologycompanyofferingawiderangeofproductsandservices in the areas of network power, processmanagement, industrial automation and climatetechnologies.Recognized widely for their engineeringcapabilitiesandmanagementexcellence,EmersonselectedDCM to design and project manage their new RegionalHeadquarters
DCMRole: -DCMprovidedacomplete turnkeyservice forEmerson. This included the design and full projectmanagement and site supervision for their 8,000m2 fullyfitted out office facility. This building is now the regionalheadoffice for Emerson,where theymanageMiddle East,AfricanandFarEastoperations.
Corporate Brochure Design & Construction Management Corporate Offices
Page11of37
Weatherford
Training&TechnologyCentreLocation:Abu-Dhabi-UAE
Weatherfordisoneoftheworlds’largestoil-fieldservicescompaniesandislistedontheNYSE. They operate inmore than 100 countriesand employmore than 50,000 peopleworldwide. DCM coordinatedwithWeatherford’s global trainingmanagement team toestablish the design for this very high specification training & technology center. Theproject encompasses a130-seat auditorium,which features the largestbackprojectionsysteminstalledwithintheMiddleEast.Theprojectalsoincludesareal-timeoperationscenter,rigsimulator,videoconference,electronicslaboratory,numerouslecturetheatersand training facilities. Thebuilding is equippedwitha fully functional restaurant and issetuptofacilitateWeatherford’sregionaldatacenter.
DCM ROLE: provided full design and project management services for both the basebuildingandfittingoutpackagesincludingtheprocurementofallAudioVisualandFF&Eitems.
Corporate Brochure Design & Construction Management Corporate Offices
Page12of37
WeatherfordManufacturingOffices
Location: Abu-Dhabi-UAEWeatherford’s manufacturing office HQ is adjacent to their main manufacturingfacilityandisconstructedover3storiesequatingtoapproximately4,500m2offullyfittedouthighspecofficefacility
DCM’s ROLE: on this project DCM provided full services, including design andprojectmanagement of both the base building and fitting out packages includingtheprocurementofallFF&Eitems.
Corporate Brochure Design & Construction Management Corporate Offices
Page13of37
Johnson&Johnson
RegionalHeadOffice
Location: Dubai - UAE Johnson& Johnson (J&J)employs inexcessof114,000 staffworldwide in the fieldof researchdevelopment,manufactureandsaleofproductsinthehealthcarefield.J&J’sregionalheadofficeissituatedina2B+G+3FbuildingwithinDubaiHealthcareCity,UAE.
DCM ROLE:Represented J&J and projectmanaged the construction of the base building thenprovidedfulldesignandprojectmanagementservicesfortheirofficefittingoutandprocurementmanagementofallFF&Eitems.
Corporate Brochure Design & Construction Management Corporate Offices
Page14of37
TetraPak
Corporate-RegionalHeadOffice
Location:-Dubai-UAE Operatinginmorethan170marketswithover20,000employeesTetraPakistrulyaworldleaderinfoodprocessingandpackaging.
DCM ROLE: DCM structured a development deal toundertake the Tetra Pak regional head office, wherebyTetra Pakwould only sign a long lease for their buildingand pay an annual rent calculated on the actualdevelopmentcostoftheproject.DCMalsodesignedandprojectmanagedthebasebuildingandfittingoutpackagefor the project. Upon project completionwe establishedand agreedwithbothparties the final rental costs to bepaidbyTetraPak.ThesenegotiationsresultedinTetraPakobtaining a building, which facilitated their entire futureoffice requirement at less than½ the annual rental costtheywerepreviouslypaying.
Corporate Brochure Design & Construction Management Corporate Offices
Page15of37
InfosysTechnologiesOfficeFacilityLocation:Bangalore-IndiaThe project includes offices, an auditorium with seating for six thousand, T.V. studios, restaurants,accommodation&extensivelandscapingworksallonanineteenacressiteDCM ROLE: to provide the master plan & concept Architectural designs for Infosys TechnologiesexpansionplansinBangalore.
PepsiCoRegionalHeadOffices
Location:Dubai–UAEDCM Designed and project managed the fitting out & migration ofPepsiCototheirregionalHQinDubai
Corporate Brochure Design & Construction Management Corporate Offices
Page16of37
WrigleyRegionalHeadOffice
Location:Dubai-UAE
Wrigley is a recognized leader in confectionary goodswith awide range of products includinggum,mints,hardandchewycandiesandchocolate.Thecompanyhasoperationsinmorethan40countriesanddistributesitsworld-famousbrandsinmorethan180countries,Generatingglobalrevenuesof$30billionannually.
DCMROLE:WrigleyappointedDCMtoprojectmanagetheirMENAregionalheadofficebuilding.
DubaiInternetCityOfficeDevelopment
Location:Dubai–UAEDubaiInternetCity(DIC)isaninformationtechnologyparkcreatedbytheGovernmentofDubaiasafreeeconomiczoneandastrategicbaseforcompaniestargetingregionalemergingmarkets.
DCMROLE:DCM’sCEO,MrAndrewFullerton,projectmanagedthisdevelopmentpersonally.Theprojectconsistedof40,000m²ofspeculativeofficespacesplitover4buildings,the complete infrastructure for an advanced data centre, which currentlyfacilitates the entire DIC. The project also contains significant externalinfrastructureincludingbothasaltwaterandsweetwaterlake,withelaboratehard and soft landscaping, incorporating numerous water features within alandareaofmorethan300,000m².
Corporate Brochure Design & Construction Management Oil & Gas
Page17of37
WeatherfordManufacturingFacility
Location:AbuDhabi-UAE
TheAbuDhabimanufacturingfacilityisthelargestplantownedandoperatedbyWeatherford.The project, in summary, consists of a 38,000m2 air-conditioned manufacturing facility andincludes pressure test zones, shot blast, paint booths, carbide shops, pipe reclamations andpipestorage.Thefacilityisservedby22overheadcranesand25jibcranes.Abussbarpowersystemandcompressedairlinesrunthroughouttheplantandprovidesversatilepowerandairconnectiontoallareasoftheplant.DCMROLE:DCMdesignedandprojectmanagedeveryaspectofthisprojectforWeatherford.We are pleased to report that the plant after its first year of operation is now surpassingWeatherford’s internal production forecasts and is the top producing plant within theirworldwideportfolio.
Corporate Brochure Design & Construction Management Oil & Gas
Page18of37
WeatherfordCityIraqOperationsBase
Location:Basra-Iraq
TheNorthRamallahbase,known,as“WeatherfordCity”islocatedinBasra,intheSouthof Iraq. This base is one of the largest operations undertaken by Weatherford. Thefacility can accommodate 1,250 personnel within 2/3* grade accommodation andprovide full onsite catering, laundry, medical centre, power generation, desalination,greywater treatmentanddiesel storage. Inaddition to theaccommodationaspectofthe base there will also be three operational workshops totalling 27,000m2. Theseinclude; machine shop, pipe reclamation, pressure test zone, shot blast and paintboothstofacilitateallWeatherford’sproduct-lines.DCMRole: fromouroffices inDubai& Iraq,DCM designed and project managed everyaspectofthisprojectforWeatherford.
Weatherford:
Corporate Brochure Design & Construction Management Oil & Gas
Design &Construction Management Consultant
Page19of37
PipeReclamation
Location:AbuDhabi–UAE&Iraq
The pipe reclamation operation is locatedwithin Weatherford’s facility in Abu DhabiandsouthernIraq.Thesefacilitiesincludeanautomated pipe reclamation facilitycompletewith EMI testing and internal andexternalpipecoatingstation.
DCMRole:designed&projectmanagedthebuildingcomponentof this facility,withWeatherfordundertakingthemechanicalautomationin-house.
Simulator&RealtimeOperationCentre Location:AbuDhabi-UAE
The simulator facility is located within Weatherford’s Training & TechnologyCentre;itisdesignedtoprovidereal-timesimulationofthedrillingprocessandisavitalpartofWeatherford’son-goingprogressanddevelopmentofboththeirin-house and client’s staff. Real-time operations are a key value added serviceofferedbyWeatherford.ItallowsseniorWeatherfordstafftheabilitytomonitorandoptimizethedrillingoperation forallrigs from a centralized control centrelocated in Abu Dhabi. This facility hasderived significant benefits to bothWeatherfordandtheirclientsalike.DCMRole:designedandprojectmanagedthebuildingcomponentofthisfacility.
Corporate Brochure Design & Construction Management Oil & Gas
Page20of37
WeatherfordLaboratoriesLocation:AbuDhabi-UAE
The facility is a cuttingedgegeochemical laboratory to facilitateall facetsofrock and fluid analysis for thepurposeof evaluatinghydrocarbon resources.This facility is considered the best facility in Weatherford’s portfolio oflaboratories.DCMRole:DCMdesignedandprojectmanagedeveryaspectofthisprojectforWeatherford.
Corporate Brochure Design & Construction Management Oil & Gas
Page21of37
WeatherfordPressureTestFacilityLocation:AbuDhabi-UAEThese facilities can accommodate the testing of multiplecomponentsuptopressuresof30,000psi.DCMRole:DCMdesignedandprojectmanagedWeatherford’spressuretestfacilitywithintheircomplexinAbuDhabi.
Corporate Brochure Design & Construction Management Aviation - Operations
Page22of37
ZodiacAerospaceLocation:Dubai-UAEZodiac Aerospace is a World leader in ‘aerospace equipmentand systems. Zodiac Aerospace Services Middle East (ZME)project istheconstructionofanewoffice&workshopfacility,locatedontwoadjacentplotswithinDubaiWorldCentral.Theproject isapproximately6,000m2ofhotrolledsteel frameand reinforced concrete construction. Thefunctional requirements of Zodiac’s operationsdictated ‘multi height’ workshop space. Thisrequirement allowed DCM’s architects theopportunity todevelopadesignconceptbasedonanaerospacetheme,whichyouseeintheattachedvisualization.DCM Role: DCM designed and project managedeveryaspectsoftheprojectforZodiac
Corporate Brochure Design & Construction Management Logistics
Page23of37
IntegratedNationalLogistics(INL) Location:Dubai-UAE INL is a joint venture between Integrated Logistics, a publicly traded company from Malaysia, and National Trading &DevelopmentEstablishment(NTDE)fromtheUAE.TheJointventurewasestablishedtoprovidethirdpartylogisticsservicesthroughout theMiddleEast.Their flagship facility isa70,000m2stateof theart logistics facility,consistingof45,000 fullyautomatedcoldstorepalletpositionsand35,000palletsofconventionalair-conditionedstorage.Theintroductionofafullyautomatedstoragesystemisa first foran independentcompanyin the region.DCMhas designed andprojectmanagedthecompletefacility.Now that the project has been successfullycompleted and the facility is operational thewaygoodsare stored inDubaiwill be totallytransformed. Logistics, will now bebroughttoanewlevelwithintheregion
Corporate Brochure Design & Construction Management Logistics
Page24of37
NationalTrading&DevelopmentEstablishment(NTDE)LogisticsFacilityLocation:Dubai-UAENTDEisoneoftheGulf’sleadingdistributionandlogisticsprovidersforinternationalconsumerbrandsintheregion.Their listofbrands includesCadburyChocolate,Davidoff,Haagen-Dazs,Pokka juices,Vitamin-CdrinkandAlRabiesjuices.
DCMRole:DCMProjectmanagedtheconstructionoftheirhigh-baywarehouselocatedatthecentreoftheirregionalheadquarterscomplexinDubai.
Corporate Brochure Design & Construction Management Logistics
Page25of37
EmersonClimaticTechnologies–RegionalLogisticsHub
Location:Dubai–UAE Thisbuilding ispartofEmerson’sDubaiCampus,allofwhichwasdesignedandProjectManagedbyDCM.Itisthe11,500m2centraldistributionfacilitydesignedtoaccommodateEmerson’sClimateTechnologiesregionallogisticsrequirementsforthecomingtenyears.
Corporate Brochure Design & Construction Management Logistics
Page26of37
Edgen Murray
LogisticsFacility Location:Dubai-UAE
Edgen Murray is a truly global company with operations in everycotenant; they specialize in the supply and distribution of highperformancesteelproducts.DCM Role: DCM designed and project managed the expansion oftheirregionaldistributionfacilitylocatedwithinJebelAliFreeZone.
Corporate Brochure Design & Construction Management Dry-cleaning
Page27of37
ChampionCleanersHeadOffice&DrycleaningLocation:Dubai–UAEChampionCleaners, development is a fully automated laundry facility locatedwithinDubai InvestmentParkwithacapacitytoprocesstwentythousandgarmentsperday.DCMdesignedandprojectmanagedthecompletefacility.
Corporate Brochure Design & Construction Management Manufacturing
Page28of37
EmersonManufacturingFacility
Location: Dubai- UAE
Emerson’sworkshopandmanufacturing facility is located in JebelAli free zoneand facilitates severalEmersondivisionswithinonelocation.
DCMRole:DCMdesignedandprojectmanagedeveryaspectofthisprojectforEmerson.
Corporate Brochure Design & Construction Management Manufacturing
Page29of37
EmersonManufacturingFacility–FisherValves
Location: Dubai- UAE
Emerson’smanufacturingfacilityfortheirFisherValvesdivisionislocatedwithintheirJAFZAcomplexandincludes11overheadcranes,paintbooths,pressuretestzonesandgritblastfacilitiesandislocatedinJebelAlifreezone
DCMRole:DCMdesignedandprojectmanagedeveryaspectofthisprojectfor
Corporate Brochure Design & Construction Management Manufacturing
Page30of37
WärtsiläManufacturingFacility Location:Dubai-UAE
Wärtsiläisagloballeaderincompletelifecyclepowersolutionsforthemarineandenergymarkets.Wärtsilä'snetsales totalledEUR4.6billionemploying17,500staff.Thecompanyhasoperationsin160locationsin70countriesaroundtheworld.
DCM Role: DCM designed and project managed their office andworkshop facility located within Dubai Investment Park. Theworkshopincorporates7overheadcranesranginginsizefrom20to30tonnes.
Corporate Brochure Design & Construction Management Broadcasting
Page31of37
MBCHeadOfficerelocation
Location:Dubai-UAE MBC (Middle-East Broadcasting Company) is the largest TV and radio broadcaster in theMiddle East. DCM’s CEOprojectmanagednumerousdevelopmentsforMBCoverafour-yearperiod.Themanagementoftherelocationofthecompanies’headoffice fromLondon toDubaiMediaCitywas the largestprojectundertakenbyMBC.Thisprojectincluded the construction of onemain production studio several smaller studios for TV and Radio, sound booths,control rooms and high quality office facility of approximately 8,000m2 to accommodate the owner and seniormanagement.
MBCBigBrother
Location:Manama-Bahrain
DCM’s CEO project managed the “Big Brother House” project for MBC. Thisproject was developed in conjunction with Endermol the world’s largestindependentproductioncompanyandtheownerof theBigBrother franchise.The project consisted of a large film set constructed in the shape of aconventional villa, however permitting secret filming from every area of thefacility. The project also contained control rooms sound booths and a largeproductionstudio,tohouseanaudienceofover100guests.
Corporate Brochure Design & Construction Management Broadcasting
Page32of37
Al-ArabiaNews-Studio Location:Dubai–UAE
Al-ArabianewsstudiowasthefirstopennewssetintheMiddleEastandhassetthestandardfornewssetseversince.DCMprojectmanagedthisdevelopmentforMBCtheparentcompanyofAl-Arabia.
AlAanTVHeadOffice&Studio
Location:Dubai-UAE
AlAan'isapan-ArabinfotainmentsatellitetelevisionstationbasedinDubaiMediaCity,UnitedArabEmirates.ItfocusesonnewscontentandentertainmentprogramsandtargetsArabfamilieswithaslighttilttowardsyoungfemaleaudience intheArabworld. DCMdesignedandprojectmanagedtheir facilitywithinMediaCity,whichincludedtheirmainnewsset,controlroom,transmissionroomandofficesfortheirseniorstaff.
DubaiTVSatelliteStudio
Location:Dubai-UAE
DCMdesignedthisproductionStudioforDubaiTV.Thisprojectconsistedof;twostudiosof1,000m2and500m2,controlroom,soundboothsandothersupportfunctions.
Corporate Brochure Design & Construction Management Hospitality
Design &Construction Management Consultant
Page33of37
ForteHotelGroup
Hotel Projects
Location: United Kingdom (various locations)
RolloutprogrammeofthreestarhotelsfortheForteGroupDCM was appointed to produce a concept design for Post House Hotels to be appliedthroughouttheUK.Weworkedwithvariouslocalarchitectsduringthedesignprocessandsupervisedonsiteinstallation.Ourbriefwastoproduceaconsistentcorporateimagethatwasattractive,practicalandcommerciallyviable. Duringthesubsequentrolloutprogramme,capitalexpenditurewasmonitoredandreducedthrougheconomyofscale.Onlyminorlocaladjustmentswereneededtothedesignofthisveryprofitableandsuccessfulconcept.
Corporate Brochure Design & Construction Management Hospitality
Design &Construction Management Consultant
Page34of37
LeJeddahMeridien
Hotel Development Location: Jeddah – Kingdom of Saudi Arabia Privatelyfundedthreehundredbedroomfivestarhotelwithextensivebanquetingandweddingfunctionfacilitiesafter construction of the building shell, DCM International was appointed as sole consultants and projectmanagers.
DCMRole:Weundertookextensiverevisionsofthedesignproposals,whichproducedbenefitsincost,timeandqualityofwork.DCMInternationalhelpednegotiatethecontracts,advisedourclientonappointments,controlledandsupervisedtheworkonsite.
This projectwas successfully completedat 40% less capital expenditure then comparabledevelopments in theregion.
Corporate Brochure Design & Construction Management Management Services
Page35of37
MANAGEMENTREVIEWDCMInternationalwasappointedbyMrSalimAlMoosatoundertakeanextensive management review of his construction company’s (Pioneer)performance on the City Bank project (pictured below). Pioneerwas themaincontractorforthis16-storyprestigiousofficedevelopmentprovidingmorethan70,000M²ofofficespaceforaconstructioncostof$45,000,000.During this assignment DCM International reported directly to Mr AlMoosa the president of the company. We advised and implementedsignificantefficiencyimprovementsandestablishedtheprincipleelementsbehindtheir largecontractualclaimforadditionalcostsandanextensionoftime.
DCMInternationalwasappointedbyatopinternational design consultancy practiceto review and upgrade their internalquality systemsandoperatingprocedures.The deliverables from this assignment was a complete revision to theirexisting quality system and several workshop-training seminars toimplement the new management and quality systems throughout theorganisation.
Corporate Brochure Design & Construction Management Client List
Page36of37
BritishEnergy CanonUK
DubaiInternetCityDubaiTVEdgenMurrayEmerson
ForteHotels GeneralElectric HolidayinCrownePlazaIntegratedNationalLogistics
Infosys Johnson&JohnsonJWalterThompson
LeMeridien MiltonBradleyMajidAlFuttaimMBC
Maritime&MercantileInt.NationalTradingNCP
PetroleosdeVenezuela ShellExploration SunlifePropertiesTetraPak
TowerMedia UniversityofHertfordshireWärtsiläWeatherford
Wrigley
-NuclearPowerStationRefurbishment-CorporateHQS-Europe
-CommercialDevelopment-Variousbroadcastproject-Dubai-LogisticsFacility-Dubai-RegionalHQ-Dubai
-NewBuild&Refurbishment’s-Watertreatmentfactory-Dubai-NewBuild&Refurbishment’s-3PLfacility-Dubai
-HeadOfficeDevelopment-RegionalHQ(Dubai)-UKHeadquarters
-HotelProject-KSA-CorporateHQ(UK)-MixedUseCommercial-BroadcastFacility
-CorporateHQ-Dubai-LogisticsFacilities-Dubai-DevelopmentProjects-Dubai
-HeadOffice-UK-SupportFacilities-DevelopmentProjects-RegionalHeadOffice-Dubai
-BroadcastFacility-EducationalFacilities-UK-Manufacturing&RegionalOffice-UAE-HQ(UAE)Manufacturing&Operationsbase
-Regionaloffice-Dubai
Corporate Brochure Design & Construction Management Contact Info
Page37of37
Design&Construction
ManagementConsultants
Dubai–UnitedArabEmiratesMediaCity–ConcordTower23rdFloor-Office23-06
Tel: +97144551080
Fax: +97144551081
Mob: +971504540733
Email: [email protected]
www.dcminternational.com
AndrewFullerton–CEO