![Page 1: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/1.jpg)
Considerations for Deploying Open
Compute in a Colocation Facility
Mark Dansie
Technical Project Manager - Inflectiontech
@markdansie
Ludovic Juraver
Senior Business Development Manager - Aegis Data
1
DCD London November 2016 - Data Center Project Engineering Workshop
![Page 2: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/2.jpg)
Checklist Concept
• To be useful world wide
• Consider only the white space
• Simple and easy to use so that the older style Colo facilities can easily adopt Open Racks
• First step - create a ‘Minimum Viable Product’ checklist for one average Open Rack variant
2
![Page 3: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/3.jpg)
The Checklist will help to avoid this
3
![Page 4: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/4.jpg)
Open Rack Standard V2.0
4
Key Rack Features Include : -
• Base rack loading to 500Kg
• Heavy rack loading to 1400Kg
• 2 Power zones with optional kit to
convert to a single zone
• Dimensions
OpenU Height 48mm (1.89 inches)
Height 2210mm (87 inches)
Width 600mm (23.6 inches)
Depth1067mm (42 inches) Front Isometric View Rear Isometric View
![Page 5: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/5.jpg)
Rack and Packaging
5
Exploded view of Packing
Crate
Open Rack V2 Loaded Rack in
Crate ( Front / Rear Removed )
![Page 6: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/6.jpg)
6
Contained hot aisle
![Page 7: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/7.jpg)
facebook Open Rack Variant Type 1
7
![Page 8: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/8.jpg)
Open Rack Variant Considerations
Is a typical facility requirement for an Open Rack 12.5kW and
800Kg?
Could that typical Open Rack Variant be accommodated by 80% of
the world’s colocation facilities?
8
![Page 9: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/9.jpg)
The Colo Facility Challenges
• Structural
• Electrical System
• Cooling
• Pathways
• Network Architecture
9
![Page 10: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/10.jpg)
Delivery
10
![Page 11: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/11.jpg)
Ramps and Railings
11
11
![Page 12: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/12.jpg)
Ramps
12
600 mm 12 x 600 = 7,200 mm
• 1,800 mm minimum width
• Landings both ends of minimum 1,800 mm square for manoeuvring equipment
• No steeper than a 1 in 12 incline
![Page 13: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/13.jpg)
What are the Rack Delivery & Placement
Considerations?
Can a crated Open Rack be delivered and manoeuvred into the Data
Centre store room/ goods in using a fork lift via the loading dock
Is there sufficient clearance at access doors and in corridors between
the loading dock and white space
Is there an adequately sized turning landing at the top of any ramp
13
![Page 14: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/14.jpg)
Floor
14
Raised/ Access
Solid/ Slab
![Page 15: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/15.jpg)
What are the Floor Considerations?
Solid or raised access floor
Maximum rolling load that can be accommodated between the
loading dock and the white space
Maximum static load that the white space can support
15
![Page 16: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/16.jpg)
16
White Space slab to slab and ceiling heights
16
Ceiling slab
Floor slab
Min
4.5 m Min
3.1 m
Min
3.1 m
Notes :
1) Minimums of 3.1 m allows for a one metre minimum clearance above a 2.1 m tall rack.
Access floor
Access ceiling
Clearances
900 mm to
450 mm
![Page 17: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/17.jpg)
What are the Clearance Considerations?
Height and width of the access door at the loading dock
Height and width of the access door into the white space
17
![Page 18: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/18.jpg)
Power Transformation
From This
18 Thanks to Kushagra Vaid for graphics
![Page 19: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/19.jpg)
Power Transformation
To This
19 Thanks to Kushagra Vaid for graphics LES = Local Energy Store
![Page 20: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/20.jpg)
What are the Electrical Considerations?
Spare ways in electrical switch gear/ distribution board / PDU fed by
3 phase non UPS supplies
3 phase busbars within the whitespace with sufficient power capacity
20
![Page 21: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/21.jpg)
Cooling Transformation
From This
21
20
11
10
1
Contained front cold aisle
![Page 22: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/22.jpg)
Cooling Transformation
To This
22
20
11
10
1
Contained rear Hot aisle into ceiling air
plenum return
Thanks to John Laban for images
![Page 23: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/23.jpg)
What are the Cooling Considerations?
Can the white space be adapted to allow for a contained hot aisle
Is there sufficient clearance above the rack to install a ceiling air
plenum return
23
![Page 24: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/24.jpg)
Pathways
24
![Page 25: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/25.jpg)
OCP server cabling interfaces at the front
25
LAN on front
Thanks to John Laban for graphics
![Page 26: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/26.jpg)
What are the Pathway Considerations?
Can power and network connections be moved from the rear to the
front of the rack
Can network and power connections be routed from the access floor
to the top of the rack
26
![Page 27: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/27.jpg)
Lighting
27
![Page 28: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/28.jpg)
What are the Lighting Considerations?
Are light fixtures positioned at a minimum of 2.6 m (8.5 ft) above
finished floor (AFF) and positioned close to the rack
Is there a minimum of 500 Lux measured at the points of cable
termination and connectivity and 1.0 m (3.28 ft) AFF measured in the
middle of all aisles between cabinets
Is there 200 Lux available horizontally sideways and both at all points
in the white space
Should we consider light colour Open Racks
28
![Page 29: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/29.jpg)
Network Topology Transformation from This
29
Large Core Switch at
MDA
Aggregation Switch
at HDA Aggregation Switch
at HDA
Edge Switch
at EDA
Edge Switch
at EDA
Source JR
Laban
![Page 30: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/30.jpg)
Network Topology Transformation to This
30
![Page 31: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/31.jpg)
Leaf – Spine Network Topology
31
Source AFL Hyperscale
Server TOR Sw Leaf Sw Spine Sw Patch Panel
EDA EDA
EDA EDA EDA EDA
EDA EDA
MDA
HDA
HDA HDA
HDA
Thanks to John Laban for images
Thanks to Alan Keizer for image
![Page 32: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/32.jpg)
What are the Network Considerations?
What are the maximum transmission speeds supported by the
existing copper structured cabling e.g. 10Gb
What are the maximum transmission speeds supported by the
existing fibre structured cabling e.g. 10/40/100 Gb
Link distances between Spine to Leaf and Leaf to equipment
32
![Page 33: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/33.jpg)
Questions?
![Page 34: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/34.jpg)
Appendix
34
![Page 35: DCD London 2016 Open Compute Project data center project engineering workshop presentation 'Considerations for Deploying Open Compute in a Colocation Facility'](https://reader031.fdocuments.net/reader031/viewer/2022030215/588a4d781a28abd3088b64c9/html5/thumbnails/35.jpg)
Website - http://www.opencompute.org/
Wiki - http://www.opencompute.org/wiki
Data Centre Project Mailing List -
http://lists.opencompute.org/mailman/listinfo/opencomput
e-datacenter
OCP Web Links and more information
35
Ask
Mark Dansie