Data Center Lifecycle
Our Services
Assessing physical space assigned for data center
Designing data center to meet current and future business requirements
Deploying data center as per design specifications
Managing data centers
Complete audit of data center NCPI factors
Data center educational program
Our Services
Assessing physical space assigned for data center
Designing data center to meet current and future business requirements
Deploying data center as per design specifications
Managing data centers
Complete audit of data center NCPI factors
Data center educational program
Customer Challenge
Data centers are an increasingly complex mix of network-critical physical infrastructure (NCPI), IT infrastructure, and for a good measure disaster recovery/business continuity planning (DR/BCP). Any data center that is designed without a total lifecycle approach is bound to create a huge vacuum in terms of future expandability and the associated costs will definitely escalate. Ensuring return on investment (ROI) is crucial for the business sustainability of a data center.
Choice Value Proposition
Choice has expert data center design consultants who are certified by various data center institutions. Rest assured the complete data center lifecycle starting with the assessment all the way up to the management can be undertaken by this team of experts.
Customer Challenge
Data centers are an increasingly complex mix of network-critical physical infrastructure (NCPI), IT infrastructure, and for a good measure disaster recovery/business continuity planning (DR/BCP). Any data center that is designed without a total lifecycle approach is bound to create a huge vacuum in terms of future expandability and the associated costs will definitely escalate. Ensuring return on investment (ROI) is crucial for the business sustainability of a data center.
Choice Value Proposition
Choice has expert data center design consultants who are certified by various data center institutions. Rest assured the complete data center lifecycle starting with the assessment all the way up to the management can be undertaken by this team of experts.
DesignDesign
DeployDeployManageManage
AssessAssessConsulting/Implementation Services
Managed Services
Value-Add Services
What you are looking for?
Agility: The DC has to Agile. Adaptability: The DC should be Adaptable for most upcoming IT
Boxes. Scalable: the DC should be ready for Day “1” to day “X” as and
when required. Modular Equipments: The DC Equipments should be Modular and
should be easy for replacement/relocation. Manageable: ease to manage the Data Center’s each Active
Component.
Building the Modern Data Centre
Physical Infrastructure- The Physical Infrastructure determines the actual build out of the Data centre.
This can be broadly classified as -
Architectural(Design, Layout)
Power(Utility,
Backup)
Cooling(CRAC)
RackSystem
Monitoring and Management (SNMP/BMS based)
Cabling(Power,
Network)
EnvironmentalPhysicalSecurity
Fire Detection
Suppression
Architectural Design, Layout :
Based Upon Pre-Sales dialogs and feasibility with customer; our Solution Architects prepares few design layouts and solutions which materialized with BOM freeze by them.
This team also does customer’s need assessment, understands the essential requirement and budget.
The design, layout prepared as per best practices, Space optimization and highly agile.
Design consideration also takes care of complete DC lifecycle.
Design Tools Expatriation: Microsoft Visio, AutoCAD
Few designs which implemented by Choice are ……….
DRL HYD
P595
RC
RC
RC36U
Storage
36UStorage
P595(Cab-b)
RC
P595(Cab-a)
42U HP BladeRC
ISX PDUISX 40KW
(PS for IBM P595)
ISX 20KW for Storage and
other X series servers
ISX 20KW for HP Blade
FM PDU(SS for IBM P595
and IR RC)
CDU
CDU
42U X SERIES
RC
FM PDU (SS for HP Blade,
storage and IR RC)
RC
RC
12
00
mm
FM200 FM200
FM200 FM200
80
0m
m
RC
1200mm
300mm600mm
10
70
mm
10
00
mm
Front
Cold
785mm
16
81
mm
750mm
10
70
mm
Front
Cold
33
00
mm
83
00
mm
10600mm
90
0m
m
600mm
Front
H
H H
H
C
C
C
C
H
20
00
mm
Input Raw Power
Primary Source for P595Secondary Source for P595
Primary Source for HP BladeSecondary Source for HP Blade
Primary Source for Other RacksSecondary Source for Other Racks
Primary Source for RCSecondary Source for RC
H Fire Detection with suspension
Security CamarasC
Fire Resistance storage for HP
20
00
mm
FM200 FM 200 Gas Cylinders
1200mm
900mm
RC
Back
HotH
FM200
FM200
UPS Power from Silcon 2x80 KW
Raw Power input for ISX
UPS PowerFrom
SUVT20KvaFor IR-RC
Area for future expansion
Accenture BLR (Bang6)
Cold
Front
Cold
Front
Cold
Front
Hot
Back
PAC 9 TR PAC 9 TRPAC 9 TRPAC 9 TRPAC 9 TR
PAC 9 TRPAC 9 TRPAC 9 TR
Ele
ctri
cal
Pa
nel
Ele
ctri
cal
Pa
nel
1447.8mm
975mmX
762mm
1050mmX
1050mm
Ser
ver
Roo
m :
Ra
ise
d flo
orin
g a
nd
Rac
k la
you
t (to
tal 5
0 R
ack
s)
Fo
r Ac
cent
ure
Nor
th W
ing
- BLR
De
sign
ed b
y: M
r. M
ani
sh M
odi
App
rove
d by
: M
r. R
atn
aka
r K
onte
Ch
oice
So
lutio
ns L
imite
d
Hot
Back
Hot
Back
NetworkSwitch
Row 3 Rack 8
1000mmx800mm
PassiveNetwork
Row 3 Rack 9
1000mmx800mm
NetworkRow 3 Rack 6
1000mmx800mm
NetworkRow 3 Rack 7
1000mmx800mm
NetworkRow 3 Rack 4
1000mmx800mm
NetworkRow 3 Rack 5
1000mmx800mm
PassiveNetwork
Row 3 Rack 2
1000mmx800mm
NetworkSwitch
Row 3 Rack 3
1000mmx800mm
PassiveNetwork
Row 3 Rack 1
1000mmx800mm
Backup VTLRow 5 Rack 10
1000mmx600mm
Backup VTLRow 5 Rack 9
1000mmx600mm
Backup VTLRow 5 Rack 8
1000mmx600mm
Backup TapeRow 5 Rack 7
1000mmx600mm
Backup TapeRow 5 Rack 6
1000mmx600mm
Storage Exchange
Row 5 Rack 5 1000mmx600mm
Storage Exchange
Row 5 Rack 4 1000mmx600mm
Storage Exchange
Row 5 Rack 3 1000mmx600mm
Storage Exchange
Row 5 Rack 2 1000mmx600mm
Storage Exchange
Row 5 Rack 1 1000mmx600mm
Backup VTLRow 5 Rack 11
1000mmx600mm
Row 511 Racks
Row 110 Racks
Storage Future CIO
Row 1 Rack 10 1000mmx600mm
Storage Future CIO
Row 1 Rack 9 1000mmx600mm
Future CIORow 1 Rack 8
1000mmx600mm
Future CIORow 1 Rack 7
1000mmx600mm
Future CIORow 1 Rack 6
1000mmx600mm
Future CIORow 1 Rack 5
1000mmx600mm
Future CIORow 1 Rack 4
1000mmx600mm
OCSRow 1 Rack 2
1000mmx600mm
OCSRow 1 Rack 1
1000mmx600mm
OCSRow 1 Rack 3
1000mmx600mm
Row 211 Racks
Storage Exchange
Row 2 Rack 11 1000mmx600mm
Storage Exchange
Row 2 Rack 10 1000mmx600mm
Storage Exchange
Row 2 Rack 9 1000mmx600mm
ExchangeRow 2 Rack 8
1000mmx600mm
ExchangeRow 2 Rack 7
1000mmx600mm
ExchangeRow 2 Rack 6
1000mmx600mm
ExchangeRow 2 Rack 5
1000mmx600mm
ExchangeRow 2 Rack 4
1000mmx600mm
ExchangeRow 2 Rack 2
1000mmx600mm
Shared ServicesRow 2 Rack 1
1000mmx600mm
ExchangeRow 2 Rack 3
1000mmx600mm
Racks with IP KVM
Future Racks
Racks being ordered
1000mmx600mm
Row 310 Racks
PassiveNetwork
Row 3 Rack 10
1000mmx800mm
Row 49 Racks
Future RackRow 4 Rack 8
1000mmx600mm
NetworkRow 4 Rack 6
1000mmx600mm
Future RackRow 4 Rack 7
1000mmx600mm
NetworkRow 4 Rack 4
1000mmx600mm
NetworkRow 4 Rack 5
1000mmx600mm
StorageSwitch Active
Row 4 Rack 21000mmx800mm
NetworkRow 4 Rack 3
1000mmx600mm
StorageSwitchPassive
Row 4 Rack 11000mmx800mm
Future RackRow 4 Rack 9
1000mmx600mm
StorageSwitch ActiveRow 4 Rack 11
1000mmx800mm
StorageSwitchPassive
Row 4 Rack 101000mmx800mm
Racks being ordered
1000mmx800mm
Sapient GGN DC
COLD AISLEVM
Wal
kway
APC40
COLD AISLE
COLD AISLE
HOT AISLE
*Client server room with 15 Nos. 16 Amps and 6 Nos. of 6 Amps Power capacity APC server racks.
AP
C80
Lieb
ert
AC
Lieb
ert
AC
APC40
APC40
Bat
tB
att
Bat
t
SBP 2x80
Batt
Bat
t
SB
P
3x40
AP
C80
Tempered glass (10mm)
1.2m door
Open-top gypsum wall(for ventilation)
Walkway
Wal
kway
Liebert AC
Walkway
PBX
Floor to ceiling masonry wall
Raised floors(400mm)
DLF-CyberGreens 6th Floor Server Rooms Design(New design Dated 23rd December 2007)
Liebert AC
Liebert(future)
FMPDU60
HOT AISLE
ISX20
PBX
Walkway
2m ramp
1.5m door
1.5m door
Wal
kway
Wal
kway
path
path
Electrical Power Distribution boards
Z1R1
ISXPDU
ISX40
Z1R14
Z1R13
Z1R12
Z1R9
Z1R8
Z1R11
FM PDU60
ISXMCCB
FMPDUMCCB
Batt
AP
C80
Z2R19
Z2R17
Z2
R16
Z2
R15Z2
R18
ISX 20
32 Amps APC Server Rack
16 Amps APC Server Rack
16 Amps New APC Server Rack
Z2
R20
Server Room Layout (New)For Sapient GGNDesigned by: Manish ModiChoice Solutions Limited(Layout Not to scale)
Local Local
Z1R2
Z1R6
Z1R5
Z1R4
Z1R3
Z1R8
Z1R10
Z2R21
Z2R22
Local
Z2R23
Local
Z2R24HP
Wood Rack
01
Wood Rack
02
16 Amps Local Server Rack
Walkway
Walkway
Wal
kway
Z3R1Local
Z3R2Local Local
Z3R3LocalLocal
Local
Local
Rack System
Industry standard 42 U 19” : 600mm Server Rack. 23” : 750/800mm Network Rack with support of 19” equipment mountings.
Perforated Front and Back Doors for adequate cooling. Accessories i.e. : Caster wheels, Trays, Wire managers, Power
distribution systems ect. Partners with APC for “Netshelter SX” racks and our in-house
product “Cool-Data” racks
Cabling – Data and Electrical
Our experts have experience laying out cables of all types – Electrical, Data Networking, IP telephone Cabling, Voice (PBX) – which address the passive cabling needs.
In-house expatriation: Mr. Cyril (Electrical) Mr. Darshan/Mr. Kishore (Data-Passive)
Support available in allover India.
Backup Power – UPS/Power Array
As per the guidelines provided by the Uptime Institute and tear classification we provide Backup power with UPS/Power array for different configuration(s).
Partnering with APC-MGE, Active Power.
Cooling
Data centers need “Sensible” cooling called computer room Air Conditioner (CRAC) or Precision Air Conditioner (PAC) or comfort A/C for small size server rooms. Electronic equipment is extremely sensitive to environmental conditions.
Expert level precision and comfort A/C provisioning and deployment.
Partners with APC-MGE, Stulz.
Cooling Solutions with raised flooring
In-Row with Hot Aisle Containment
Rack Air Containment System (RACS)
Environment:
Round the clock monitoring for: Air Temperature. Air Flow. Relative Humidity. Air Filtering. Water Leak detection.
Partnering with Netbotz and APC for advanced monitoring. Basic Monitoring also available on demand.
Physical Security
Access to highly restricted areas like data centers/computer rooms require extra security considerations such as human factors, physical threat monitoring, access and security monitoring, environmental monitoring etc.
Partnering with: APC/Netbotz Products for IP Based Surveillance, motion detectors. CCTV with Dome cameras. ADT Tyco for Physical Security , Access Control (Proximity Card/Bio metric ext.)
Rodent Control. Smoke detectors. Vibration detector. Water Leak detector.
Physical Security
Fire Detection and Suppression system
Fire Detection: Photo electric type Smoke Detector Ionization type Smoke Detector Heat Detector Air Sampling type Smoke Detector VESDA Based Early stage Smoke detector
Fire Suppression System: Water less FM200 based Fire Suppression. Clean Agent Inergen based Fire Suppression.
Fire Detection and Suppression system
INER t GasNitro GEN
OO22 NN22 ArAr COCO22
Fire Detection and suppression System
Server Room LayoutFor LANCO – HYDDesigned by: Manish ModiApproved By: Ratnakar KonteChoice Solutions Limited
© 2007-08 Choice Solutions
DC management – Control and Monitoring
Management of all components and parameters is of utmost importance for the DC manager
Management design should be a single point of control and monitoring of all the equipments such as1. Servers
2. Active devices like switches, routers
3. UPS systems
4. Cooling Units
5. Fire protection system
6. Physical security systems
© 2007-08 Choice Solutions
Solution – KVM
KVM switches provides the single point of control and monitoring facility through usage of devices like
KVM/IP for servers KVM/Serial for Active devices, UPSs, PACs and all other
components having a RS 232 connectivity All the KVMs shall be monitored on a single console which have a
centralized software to manage all the above KVMs We offer Avocent KVM switches for the complete Remote
management setup
© 2007-08 Choice Solutions
Typical DC Component management
As determined by Uptime Institute
© 2007-08 Choice Solutions
Data CenterData Center