1 Data Center Lifecycle Our Services Assessing physical space assigned for data center Designing data center to meet current and future business requirements Deploying data center as per design specifications Managing data centers Complete audit of data center NCPI factors Data center educational program Customer Challenge Data centers are an increasingly complex mix of network-critical physical infrastructure (NCPI), IT infrastructure, and for a good measure disaster recovery/business continuity planning (DR/BCP). Any data center that is designed without a total lifecycle approach is bound to create a huge vacuum in terms of future expandability and the associated costs will definitely escalate. Ensuring return on investment (ROI) is crucial for the business sustainability of a data center. Choice Value Proposition Choice has expert data center design consultants who are certified by various data center institutions. Rest assured the complete data center lifecycle starting with the assessment all the way up to the management can be undertaken by this team of experts. Design Deploy Manage Assess Consulting/Implementation Services Managed Services Value-Add Services

Transcript of Dc

Page 1: Dc

1

Data Center Lifecycle

Our Services

Assessing physical space assigned for data center

Designing data center to meet current and future business requirements

Deploying data center as per design specifications

Managing data centers

Complete audit of data center NCPI factors

Data center educational program

Our Services

Assessing physical space assigned for data center

Designing data center to meet current and future business requirements

Deploying data center as per design specifications

Managing data centers

Complete audit of data center NCPI factors

Data center educational program

Customer Challenge

Data centers are an increasingly complex mix of network-critical physical infrastructure (NCPI), IT infrastructure, and for a good measure disaster recovery/business continuity planning (DR/BCP). Any data center that is designed without a total lifecycle approach is bound to create a huge vacuum in terms of future expandability and the associated costs will definitely escalate. Ensuring return on investment (ROI) is crucial for the business sustainability of a data center.

Choice Value Proposition

Choice has expert data center design consultants who are certified by various data center institutions. Rest assured the complete data center lifecycle starting with the assessment all the way up to the management can be undertaken by this team of experts.

Customer Challenge

Data centers are an increasingly complex mix of network-critical physical infrastructure (NCPI), IT infrastructure, and for a good measure disaster recovery/business continuity planning (DR/BCP). Any data center that is designed without a total lifecycle approach is bound to create a huge vacuum in terms of future expandability and the associated costs will definitely escalate. Ensuring return on investment (ROI) is crucial for the business sustainability of a data center.

Choice Value Proposition

Choice has expert data center design consultants who are certified by various data center institutions. Rest assured the complete data center lifecycle starting with the assessment all the way up to the management can be undertaken by this team of experts.

DesignDesign

DeployDeployManageManage

AssessAssessConsulting/Implementation Services

Managed Services

Value-Add Services

Page 2: Dc

What you are looking for?

Agility: The DC has to Agile. Adaptability: The DC should be Adaptable for most upcoming IT

Boxes. Scalable: the DC should be ready for Day “1” to day “X” as and

when required. Modular Equipments: The DC Equipments should be Modular and

should be easy for replacement/relocation. Manageable: ease to manage the Data Center’s each Active

Component.

Page 3: Dc

Building the Modern Data Centre

Physical Infrastructure- The Physical Infrastructure determines the actual build out of the Data centre.

This can be broadly classified as -

Architectural(Design, Layout)

Power(Utility,

Backup)

Cooling(CRAC)

RackSystem

Monitoring and Management (SNMP/BMS based)

Cabling(Power,

Network)

EnvironmentalPhysicalSecurity

Fire Detection

Suppression

Page 4: Dc

Architectural Design, Layout :

Based Upon Pre-Sales dialogs and feasibility with customer; our Solution Architects prepares few design layouts and solutions which materialized with BOM freeze by them.

This team also does customer’s need assessment, understands the essential requirement and budget.

The design, layout prepared as per best practices, Space optimization and highly agile.

Design consideration also takes care of complete DC lifecycle.

Design Tools Expatriation: Microsoft Visio, AutoCAD

Few designs which implemented by Choice are ……….

Page 5: Dc

DRL HYD

P595

RC

RC

RC36U

Storage

36UStorage

P595(Cab-b)

RC

P595(Cab-a)

42U HP BladeRC

ISX PDUISX 40KW

(PS for IBM P595)

ISX 20KW for Storage and

other X series servers

ISX 20KW for HP Blade

FM PDU(SS for IBM P595

and IR RC)

CDU

CDU

42U X SERIES

RC

FM PDU (SS for HP Blade,

storage and IR RC)

RC

RC

12

00

mm

FM200 FM200

FM200 FM200

80

0m

m

RC

1200mm

300mm600mm

10

70

mm

10

00

mm

Front

Cold

785mm

16

81

mm

750mm

10

70

mm

Front

Cold

33

00

mm

83

00

mm

10600mm

90

0m

m

600mm

Front

H

H H

H

C

C

C

C

H

20

00

mm

Input Raw Power

Primary Source for P595Secondary Source for P595

Primary Source for HP BladeSecondary Source for HP Blade

Primary Source for Other RacksSecondary Source for Other Racks

Primary Source for RCSecondary Source for RC

H Fire Detection with suspension

Security CamarasC

Fire Resistance storage for HP

20

00

mm

FM200 FM 200 Gas Cylinders

1200mm

900mm

RC

Back

HotH

FM200

FM200

UPS Power from Silcon 2x80 KW

Raw Power input for ISX

UPS PowerFrom

SUVT20KvaFor IR-RC

Area for future expansion

Page 6: Dc

Accenture BLR (Bang6)

Cold

Front

Cold

Front

Cold

Front

Hot

Back

PAC 9 TR PAC 9 TRPAC 9 TRPAC 9 TRPAC 9 TR

PAC 9 TRPAC 9 TRPAC 9 TR

Ele

ctri

cal

Pa

nel

Ele

ctri

cal

Pa

nel

1447.8mm

975mmX

762mm

1050mmX

1050mm

Ser

ver

Roo

m :

Ra

ise

d flo

orin

g a

nd

Rac

k la

you

t (to

tal 5

0 R

ack

s)

Fo

r Ac

cent

ure

Nor

th W

ing

- BLR

De

sign

ed b

y: M

r. M

ani

sh M

odi

App

rove

d by

: M

r. R

atn

aka

r K

onte

Ch

oice

So

lutio

ns L

imite

d

Hot

Back

Hot

Back

NetworkSwitch

Row 3 Rack 8

1000mmx800mm

PassiveNetwork

Row 3 Rack 9

1000mmx800mm

NetworkRow 3 Rack 6

1000mmx800mm

NetworkRow 3 Rack 7

1000mmx800mm

NetworkRow 3 Rack 4

1000mmx800mm

NetworkRow 3 Rack 5

1000mmx800mm

PassiveNetwork

Row 3 Rack 2

1000mmx800mm

NetworkSwitch

Row 3 Rack 3

1000mmx800mm

PassiveNetwork

Row 3 Rack 1

1000mmx800mm

Backup VTLRow 5 Rack 10

1000mmx600mm

Backup VTLRow 5 Rack 9

1000mmx600mm

Backup VTLRow 5 Rack 8

1000mmx600mm

Backup TapeRow 5 Rack 7

1000mmx600mm

Backup TapeRow 5 Rack 6

1000mmx600mm

Storage Exchange

Row 5 Rack 5 1000mmx600mm

Storage Exchange

Row 5 Rack 4 1000mmx600mm

Storage Exchange

Row 5 Rack 3 1000mmx600mm

Storage Exchange

Row 5 Rack 2 1000mmx600mm

Storage Exchange

Row 5 Rack 1 1000mmx600mm

Backup VTLRow 5 Rack 11

1000mmx600mm

Row 511 Racks

Row 110 Racks

Storage Future CIO

Row 1 Rack 10 1000mmx600mm

Storage Future CIO

Row 1 Rack 9 1000mmx600mm

Future CIORow 1 Rack 8

1000mmx600mm

Future CIORow 1 Rack 7

1000mmx600mm

Future CIORow 1 Rack 6

1000mmx600mm

Future CIORow 1 Rack 5

1000mmx600mm

Future CIORow 1 Rack 4

1000mmx600mm

OCSRow 1 Rack 2

1000mmx600mm

OCSRow 1 Rack 1

1000mmx600mm

OCSRow 1 Rack 3

1000mmx600mm

Row 211 Racks

Storage Exchange

Row 2 Rack 11 1000mmx600mm

Storage Exchange

Row 2 Rack 10 1000mmx600mm

Storage Exchange

Row 2 Rack 9 1000mmx600mm

ExchangeRow 2 Rack 8

1000mmx600mm

ExchangeRow 2 Rack 7

1000mmx600mm

ExchangeRow 2 Rack 6

1000mmx600mm

ExchangeRow 2 Rack 5

1000mmx600mm

ExchangeRow 2 Rack 4

1000mmx600mm

ExchangeRow 2 Rack 2

1000mmx600mm

Shared ServicesRow 2 Rack 1

1000mmx600mm

ExchangeRow 2 Rack 3

1000mmx600mm

Racks with IP KVM

Future Racks

Racks being ordered

1000mmx600mm

Row 310 Racks

PassiveNetwork

Row 3 Rack 10

1000mmx800mm

Row 49 Racks

Future RackRow 4 Rack 8

1000mmx600mm

NetworkRow 4 Rack 6

1000mmx600mm

Future RackRow 4 Rack 7

1000mmx600mm

NetworkRow 4 Rack 4

1000mmx600mm

NetworkRow 4 Rack 5

1000mmx600mm

StorageSwitch Active

Row 4 Rack 21000mmx800mm

NetworkRow 4 Rack 3

1000mmx600mm

StorageSwitchPassive

Row 4 Rack 11000mmx800mm

Future RackRow 4 Rack 9

1000mmx600mm

StorageSwitch ActiveRow 4 Rack 11

1000mmx800mm

StorageSwitchPassive

Row 4 Rack 101000mmx800mm

Racks being ordered

1000mmx800mm

Page 7: Dc

Sapient GGN DC

COLD AISLEVM

Wal

kway

APC40

COLD AISLE

COLD AISLE

HOT AISLE

*Client server room with 15 Nos. 16 Amps and 6 Nos. of 6 Amps Power capacity APC server racks.

AP

C80

Lieb

ert

AC

Lieb

ert

AC

APC40

APC40

Bat

tB

att

Bat

t

SBP 2x80

Batt

Bat

t

SB

P

3x40

AP

C80

Tempered glass (10mm)

1.2m door

Open-top gypsum wall(for ventilation)

Walkway

Wal

kway

Liebert AC

Walkway

PBX

Floor to ceiling masonry wall

Raised floors(400mm)

DLF-CyberGreens 6th Floor Server Rooms Design(New design Dated 23rd December 2007)

Liebert AC

Liebert(future)

FMPDU60

HOT AISLE

ISX20

PBX

Walkway

2m ramp

1.5m door

1.5m door

Wal

kway

Wal

kway

path

path

Electrical Power Distribution boards

Z1R1

ISXPDU

ISX40

Z1R14

Z1R13

Z1R12

Z1R9

Z1R8

Z1R11

FM PDU60

ISXMCCB

FMPDUMCCB

Batt

AP

C80

Z2R19

Z2R17

Z2

R16

Z2

R15Z2

R18

ISX 20

32 Amps APC Server Rack

16 Amps APC Server Rack

16 Amps New APC Server Rack

Z2

R20

Server Room Layout (New)For Sapient GGNDesigned by: Manish ModiChoice Solutions Limited(Layout Not to scale)

Local Local

Z1R2

Z1R6

Z1R5

Z1R4

Z1R3

Z1R8

Z1R10

Z2R21

Z2R22

Local

Z2R23

Local

Z2R24HP

Wood Rack

01

Wood Rack

02

16 Amps Local Server Rack

Walkway

Walkway

Wal

kway

Z3R1Local

Z3R2Local Local

Z3R3LocalLocal

Local

Local

Page 8: Dc

Rack System

Industry standard 42 U 19” : 600mm Server Rack. 23” : 750/800mm Network Rack with support of 19” equipment mountings.

Perforated Front and Back Doors for adequate cooling. Accessories i.e. : Caster wheels, Trays, Wire managers, Power

distribution systems ect. Partners with APC for “Netshelter SX” racks and our in-house

product “Cool-Data” racks

Page 9: Dc

Cabling – Data and Electrical

Our experts have experience laying out cables of all types – Electrical, Data Networking, IP telephone Cabling, Voice (PBX) – which address the passive cabling needs.

In-house expatriation: Mr. Cyril (Electrical) Mr. Darshan/Mr. Kishore (Data-Passive)

Support available in allover India.

Page 10: Dc

Backup Power – UPS/Power Array

As per the guidelines provided by the Uptime Institute and tear classification we provide Backup power with UPS/Power array for different configuration(s).

Partnering with APC-MGE, Active Power.

Page 11: Dc

Cooling

Data centers need “Sensible” cooling called computer room Air Conditioner (CRAC) or Precision Air Conditioner (PAC) or comfort A/C for small size server rooms. Electronic equipment is extremely sensitive to environmental conditions.

Expert level precision and comfort A/C provisioning and deployment.

Partners with APC-MGE, Stulz.

Page 12: Dc
Page 13: Dc

Cooling Solutions with raised flooring

Page 14: Dc

In-Row with Hot Aisle Containment

Page 15: Dc

Rack Air Containment System (RACS)

Page 16: Dc

Environment:

Round the clock monitoring for: Air Temperature. Air Flow. Relative Humidity. Air Filtering. Water Leak detection.

Partnering with Netbotz and APC for advanced monitoring. Basic Monitoring also available on demand.

Page 17: Dc

Physical Security

Access to highly restricted areas like data centers/computer rooms require extra security considerations such as human factors, physical threat monitoring, access and security monitoring, environmental monitoring etc.

Partnering with: APC/Netbotz Products for IP Based Surveillance, motion detectors. CCTV with Dome cameras. ADT Tyco for Physical Security , Access Control (Proximity Card/Bio metric ext.)

Rodent Control. Smoke detectors. Vibration detector. Water Leak detector.

Page 18: Dc

Physical Security

Page 19: Dc

Fire Detection and Suppression system

Fire Detection: Photo electric type Smoke Detector Ionization type Smoke Detector Heat Detector Air Sampling type Smoke Detector VESDA Based Early stage Smoke detector

Fire Suppression System: Water less FM200 based Fire Suppression. Clean Agent Inergen based Fire Suppression.

Page 20: Dc

Fire Detection and Suppression system

INER t GasNitro GEN

OO22 NN22 ArAr COCO22

Fire Detection and suppression System

Server Room LayoutFor LANCO – HYDDesigned by: Manish ModiApproved By: Ratnakar KonteChoice Solutions Limited

Page 21: Dc

© 2007-08 Choice Solutions

DC management – Control and Monitoring

Management of all components and parameters is of utmost importance for the DC manager

Management design should be a single point of control and monitoring of all the equipments such as1. Servers

2. Active devices like switches, routers

3. UPS systems

4. Cooling Units

5. Fire protection system

6. Physical security systems

Page 22: Dc

© 2007-08 Choice Solutions

Solution – KVM

KVM switches provides the single point of control and monitoring facility through usage of devices like

KVM/IP for servers KVM/Serial for Active devices, UPSs, PACs and all other

components having a RS 232 connectivity All the KVMs shall be monitored on a single console which have a

centralized software to manage all the above KVMs We offer Avocent KVM switches for the complete Remote

management setup

Page 23: Dc

© 2007-08 Choice Solutions

Typical DC Component management

Page 24: Dc

As determined by Uptime Institute

Page 25: Dc

© 2007-08 Choice Solutions

Data CenterData Center