DBS Company Information - February 2017
Transcript of DBS Company Information - February 2017
LASER SCANNING – REVIT AND CAD
MODELS – BIM SERVICES AND
COORDINATION – PROJECT
PHOTOGRAPHY – CONSTRUCTION
MONITORING
A MINORITY BUSINESS ENTERPRISE
Our Story
Jose Mesa, President of Digital Building Services, LLC
has been delivering successful laser scanning projects
since the infancy of scanning technology. Since 2005,
he has been focused primarily on complex MEP
projects in Aviation as well as Healthcare, and other
large facilities in need of accurate existing condition
documentation. After years of serving in executive
roles with companies in the Aviation industry and other
scanning firms, he has decided to fill a need in the
industry and create Digital Building Services, LLC (DBS)
as a minority owned business. The DBS home office is in
Miami, FL with a secondary location in Springfield, MO.
Contact Info
Digital Building Services, LLC
11290 SW 30TH Street
Miami, FL 33165
Office – 305-202-1208
Sales – 352-455-6140
2
Leadership
Jose S. Mesa – President
A graduate of Florida International University with a Masters in Construction Management and a
Bachelors in Design/Architectural Studies, Jose has been involved with scanning for over 15 years.
Jose has developed a niche in the aviation industry. In particular, he has deployed survey and laser
scanning practices to the installation of new baggage-handling systems in existing airport buildings.
Successful projects in Houston, Atlanta, Orlando, Anchorage, Pittsburgh, Philadelphia, Seattle, and
Minneapolis are a testament to the strength of the team that he has developed. With an average of
two hundred critical interferences per room, the analysis has saved general contractors and airport
agencies hundreds of thousands of dollars in delays and last minute changes.
In addition, Jose helped coordinate between design drawings, scan data, 3D models and
construction layout in order to provide the client with consolidated project solutions for survey control
and building information management. Mr. Mesa’s laser scanning and subsequent model generation
has been documented in two Airport Improvement Magazine Articles, “3D Modeling Prevents
Construction Conflicts at Orlando Intl” May/June 2009 and “Terminal Makeover Finally a Reality at
Anchorage International”.Jan/Feb 2010
Lance G. Olsen – Director of Business Development
Having 22 years of structural construction surveying experience at Walt Disney World, Universal
Studios and Sea World in Orlando, FL, Mr. Olsen has been involved with 3D laser scanning for 13 years
with a primary focus on aviation terminal renovation and BHS system upgrades for Architects and
General Contractors. His depth of knowledge regarding high-accuracy conventional surveying
experience has made him an integral part of merging critical field surveying practices with high
definition laser scanning. During Lance’s career, one of the more challenging projects the Terminal C
project in Houston, where Lance combined a full multi-level high-definition scan with the
establishment of survey control and providing the customer with control grid lines and vertical control
3
to ensure a smooth BHS installation. This project at IAH received the ABC Merit Award for National
Excellence in Construction. Lance also managed the laser scanning field operations on the Acronym
CAD Award winning ‘“Proof of Concept Lets FAA Share it’s Vision of a Lifecycle BIM Implementation-
Design through Decommissioning. Mr. Olsen is certified on all Leica Scanning and software
equipment.
Aviation Projects Completed by DBS Staff
Kansas City International Airport – Terminal C BHS– December 2016
San Francisco International Airport – International Terminal BHS - April 2016
Savannah Hilton Head International Airport In Line BHS ––June 2015
Boston Logan International Airport Terminal E Renovation and Enhancements –– May 2015
Cleveland Burke Lakefront Airport Terminal Renovation – April 2015
Ft Lauderdale Hollywood International Airport – Terminal 1 Modernization – December 2014
Ft Lauderdale Hollywood International Airport – Terminal 3 Jet Blue – August 2014
Orlando International Airport – BP-445 – June 2014
Toronto Pearson International Airport –Terminal One CATSA 3 Level Hold Baggage Screening Project - October 2013
Orlando International Airport – Airside 4 – October 2013
Orlando International Airport – W287 Ticket Lobby Modernization – October 2013
Anchorage International Airport TSAIA Checked Baggage Recapitalization/Optimization Screening Design - September 2013
Cleveland Hopkins International Airport In Line Baggage Screening Improvements - May 2013
Miami International Airport - Central and South Terminal BHS Upgrades - May 2013
McCarran International Airport - Terminal One BHS Upgrades - Las Vegas NV - April 2013
Seattle Tacoma International Airport - Concourse D - North Satellite Project - March 2013 – April 2013
Palm Beach International Airport BHS Improvements - October 2012 – May 2013
Ft. Lauderdale Hollywood International Airport Terminal 4 International Claims/CBP - September 2012 – October 2012
LAX - Tom Bradley International Terminal Phase B3 - August 2012 – October 2012
Orlando International Airport W-432 CBIS BHS - June 2012
Dallas Ft. Worth International Airport - TRIP -Terminal A - March 2012 – April 2012
LaGuardia Airport - C/D Connector - September 2011
San Francisco International Airport - Terminal One - April 2011
Orlando International Airport North Terminal Design Project - 2010
San Francisco International Airport Terminal 3 Boarding Area E - 2010
Ft. Lauderdale International Airport - Terminal 4 - 2010
San Diego International Airport - Terminal 2 - 2009
Ft. Lauderdale International Airport - Terminal One - 2009
Philadelphia International Airport D/E Connector - 2009
Love Field Modernization Project - Dallas, TX - 2009
Philadelphia International Airport Terminal B/C - 2009
Houston Bush (IAH) Terminal C 490K Project - 2008
DFW Terminal A BHS Obstruction Analysis - 2008
DFW Terminal E - 2008
San Jose International Terminal A BHS - 2008
Cincinnati International Airport BHS Obstruction Analysis – Delta Airlines - 2008
Ted Stevens Anchorage International Airport Concourses A/B) - 2008
Orlando International Airport - BP-X019 - 2007
Pittsburgh International Airport - PIT BHS Upgrades - 2007
Seattle Tacoma Alaska Airlines BHS Renovation - 2006
Hartsfield Jackson Atlanta International Airport - BHS Obstruction Analysis - 2006
Orlando International Airport BP-X013 - 2005
Minneapolis - St. Paul Intl (MSP) - 2020 Project - 2005