    Airbus aircraft capacities to support APV

    Edith PABON-ALQUIERAirbus Flight Operations Support & Services

    Presented by:

    ICAO LVP&APV workshop 9-11 June 2009

  • 8/10/2019 Day3 12 Airbus APV

    2/28

    June 09ICAO LVP&APV workshop Page 2AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydoc

    ument.

    Content

    LNAV/VNAV Baro VNAV

    RNP AR APCH

    Airbus FMS Landing System - FLS

    SBAS Satellite Landing System

    Conclusion

  • 8/10/2019 Day3 12 Airbus APV

    3/28

    June 09ICAO LVP&APV workshop Page 3AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydoc

    ument.

    LNAV/VNAV Baro-VNAV

    During LNAV/VNAV, Baro-VNAV, the aircraft system usesbarometric altitude to compare the vertical position of theaircraft with vertical flight path computed by the FMS, also

    using baro-referenced altitudes.

    The fly-by-wire Airbus aircraft are equipped with integratedLNAV/VNAV systems with accurate source of barometric

    altitude.

    Airbus fly-by-wire aircraft systems have been certified byEASA to conduct Baro-VNAV approaches down to a

    MDA/H of minimum 250ft.

  • 8/10/2019 Day3 12 Airbus APV

    4/28

    June 09ICAO LVP&APV workshop Page 4AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    Content

    LNAV/VNAV RNP APCH

    RNP AR APCH

    Airbus FMS Landing System - FLS

    SBAS Satellite Landing System

    Conclusion

  • 8/10/2019 Day3 12 Airbus APV

    5/28

    June 09ICAO LVP&APV workshop Page 5AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    Airbus Basic RNP Capabilities RNP APCH

    Basic certification was demonstrated by reference to theMASPS DO-236 / ED-75

    Achieved with AP or FD ON in GPS PRIMARY mode

    Approach Terminal En-route

    Airbus Certified Capability RNP 0.3 RNP 0.51 RNP 1(2)

    Required Capability RNP 0.3 RNP 1 RNP 2(4)

    RNP 0.3 applicable to straight in approaches designed under ICAOPANS OPS or FAA TERPS criteria.

    All Airbus equipped with FMS and GPS are capable to fly RNP APCH as

    per ICAO PBN manual.

    DH as low as 250 ft with FINAL APP mode (LNAV/VNAV ) guidance.

    Note: This certification was not intended for RNP AR (or SAAAR) operations,

    including RNP AR APCH of ICAO PBN manual.

  • 8/10/2019 Day3 12 Airbus APV

    6/28

    June 09ICAO LVP&APV workshop Page 6AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    A procedure is RNP AR if one of the followingcharacteristic is present:

    2 x RNP2 x RNPVEBVEB

    RNP AR Concept

    RNP values lower than 0.3 in approach

    RNP AR Concept

    RNP AR Concept

    Curved flight path below FAF (RF legs)

    Reduced obstacle protections, at 2xRNP, without buffers

  • 8/10/2019 Day3 12 Airbus APV

    7/28

    June 09ICAO LVP&APV workshop Page 7AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    RNP AR Certification standards

    In some cases, obstacle may be as close as 2xRNP.

    Need to demonstrate a

    Target Level of Safety of 10-7/approach

    Including the effect ofsystem failures

    Existing airborne systems are not capable

    to meet this objective alone

    Operational mitigations are required to achieve

    the overall safety objectives (FOSA)

  • 8/10/2019 Day3 12 Airbus APV

    8/28

    June 09ICAO LVP&APV workshop Page 8AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    RNP AR Certification standards

    FAA:Rely on Flight Operational Safety Assessment (FOSA)

    Engine failure evaluation in ops context

    A/C to be maintained within 2xRNP

    EASA certification requirements: Engine failure or probable system failures (>10-5/procedure):

    A/C to be maintained within 1xRNP

    Remote system failures (10-5 to 10-7/procedure) :

    A/C to be maintained within 2xRNP

    Safe extraction for failures below 10-7

  • 8/10/2019 Day3 12 Airbus APV

    9/28

    June 09ICAO LVP&APV workshop Page 9AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    RNP AR below 0.3 Certification

    RNP AR

    EASA

    Certification

    Requirements

    Lateral Deviation scale

    Automatic NAV re-engagement

    at GA initiation

    Triple click upon loss of

    FINAL APP or NAV

    EGPWS with GPS position

    and peaks mode

  • 8/10/2019 Day3 12 Airbus APV

    10/28

    June 09ICAO LVP&APV workshop Page 10AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydo

    cument.

    New Lateral Deviation Indication:

    L/DEV displayed on PFD Position of the computed flight plan

    Full scale: 2 dots = +/- 0.2 NM

    Same symbol as the V/DEV

    Improved XTK Error resolution on ND:

    2 digits after the dot When 0.02 XTK 0.29

    RNP AR below 0.3 CertificationLateral Deviation & Improved XTRK error resolution

    V/DEV

    SPEED FINAL APP

    MDA 250

    AP1

    1FD2A/THR

    L/DEV

    RNP

    ON

    RNP Push Button enables the LATDEVdisplay.

    With latest standards of equipment, the P/Bis no more required:

    The L/DEV is automatically displayed when

    needed

  • 8/10/2019 Day3 12 Airbus APV

    11/28

    June 09ICAO LVP&APV workshop Page 11AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydo

    cument.

    Certification for RNP AR below 0.3

    A318/A319/A320/A321 aircraftA318/A319/A320/A321 aircraft

    RNP 0.1 (normal) and RNP 0.2 (non normal)

    Departure

    (AP on)

    Missed Approach

    (AP on)

    Approach

    (AP on)

    !"#

    Availability planned Q4 2009

    Departure

    (AP on)

    Missed Approach

    (AP on)

    Approach

    (AP on)

    RNP 0.24 (non normal)

    RNP 0.17 (normal)RNP 0.17 (normal)RNP 0.1 (normal)

    Currently

    Requires Specific Set of Equipment Package

  • 8/10/2019 Day3 12 Airbus APV

    12/28

    June 09ICAO LVP&APV workshop Page 12AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydo

    cument.

    Certification for RNP AR below 0.3

    A330-200/-300 aircraftA330-200/-300 aircraft

    Departure

    (AP on)

    Missed Approach

    (AP on)

    Approach

    (AP on)

    RNP 0.3 (non normal)RNP 0.1 (normal)RNP 0.3 (normal)RNP 0.1 (normal)

    Currently

    Availability planned Q2 2010

    RNP 0.1 (Normal) and RNP 0.2y (non normal)

    Departure

    (AP on)

    Missed Approach

    (AP on)

    Approach

    (AP on)!"#

    Requires Specific Set of Equipment Package

  • 8/10/2019 Day3 12 Airbus APV

    13/28

    June 09ICAO LVP&APV workshop Page 13AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydo

    cument.

    Certification for RNP AR below 0.3

    A340-500/-600 aircraftA340-500/-600 aircraft

    RNP 0.1 (normal)RNP 0.3 (normal)RNP 0.1 (normal)

    Departure

    (AP on)

    Missed Approach

    (AP on)

    Approach

    (AP on)

    RNP 0.2(non normal)

    RNP 0.3(non normal)

    RNP 0.2(non normal)

    Availability planned Q2 2009

    Requires Specific Set of Equipment Package

  • 8/10/2019 Day3 12 Airbus APV

    14/28

    June 09ICAO LVP&APV workshop Page 14AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydo

    cument.

    The RNP AR limited to 0.3.

    Flight around obstaclesNoise abatement,

    Track miles saving,

    Traffic management,

    .

    RNP AR procedures are not all equivalent in terms of

    exposure:

  • 8/10/2019 Day3 12 Airbus APV

    15/28

    June 09ICAO LVP&APV workshop Page 15AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydo

    cument.

    The RNP AR limited to 0.3.

    On A318/A319/A320/A321 & A330/A340-600/A340-500On A318/A319/A320/A321 & A330/A340-600/A340-500

    RNP 0.3 (normal & non norm)

    Departure

    (AP on)

    Missed Approach

    (AP on)

    Approach

    (AP on)

    New

    Availability end of the year 2009, or early 2010,

    No LAT DEV required.

    reduced set of equipment

  • 8/10/2019 Day3 12 Airbus APV

    16/28

    June 09ICAO LVP&APV workshop Page 16AIR

    BUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydo

    cument.

    Content

    LNAV/VNAV RNP APCH

    RNP AR APCH

    Airbus FMS Landing System - FLS

    SBAS Satellite Landing System

    Conclusion

  • 8/10/2019 Day3 12 Airbus APV

    17/28

    June 09ICAO LVP&APV workshop Page 17AIRBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydo

    cument.

    FMS Landing System (FLS)

    FLS is a new way to fly NPA not a new type ofapproach

    Airbus has decided to modify the current cockpit design for NonPrecision Approach operational procedures to provide similarinterface for Non Precision Approach as for Precision Approach (ILSLook alike)

    This new design allows conducting existing non precision

    approaches (VOR, VOR/DME, NDB, NDB/DME, GPS) in the samemanner as Precision Approach (ILS/GLS) with similar display,guidance & warnings.

    This function is autonomous and does not require any additionalinformation from the ground.

    Applies to straight in approach flight path.

  • 8/10/2019 Day3 12 Airbus APV

    18/28

    June 09ICAO LVP&APV workshop Page 18AIRBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydo

    cument.

    FLS Principle

    Based on database stored data, an FLS

    approach beam is defined. Then, lateraland vertical deviations between theFLS beam and the computed aircraftposition are computed by the MMR andused for guidance and display to thepilot.

    Anchor point

    FAF

    FLS beam

    Slope

    Anchor Point

    FLS beam FAF

    Anchor Point

    Course

    The FLS virtualThe FLS virtual

    beam is defined by:beam is defined by:

    Anchor PointAnchor Point CourseCourse

    SlopeSlope

  • 8/10/2019 Day3 12 Airbus APV

    19/28

    June 09ICAO LVP&APV workshop Page 19AIRBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydo

    cument.

    FLS display

    1) Pseudo LOC scale & index

    1

    2

    3

    56

    4

    2) Pseudo G/S scale & index

    3) Course pointer

    4) FLS beam definitionAnchor Point identification

    Slope

    Distance to RWY threshold

    5) Approach capability

    6) AP/FD guidance modes

  • 8/10/2019 Day3 12 Airbus APV

    20/28

    June 09ICAO LVP&APV workshop Page 20AIRBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    FLS Benefits

    Stabilized approachEnhanced safety operation:

    80% of approach accidents occur on non stabilized approaches

    FLS available all over the world:

    non precision approaches published on any airport in the world

    ILS Look alikeHMI close to precision approaches

    Reuse of ILS pilot skills , reduction in training needs.

    Use of ILS guidance laws in Flight Guidance: same behavioras precision approaches

    Temperature compensated

  • 8/10/2019 Day3 12 Airbus APV

    21/28

    June 09ICAO LVP&APV workshop Page 21AIRBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    FLS policy and schedule

    FLS is a Multi Programme Project Will be certified on allcurrent Airbus fly-by-wire aircraft

    Basic on A380 and A350

    Optional on SA and LR programs

    Certification schedule:A380: At Entry into service

    A320 family: end 09A330/A340 family: from 2010

  • 8/10/2019 Day3 12 Airbus APV

    22/28

    June 09ICAO LVP&APV workshop Page 22AIRBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    Content

    LNAV/VNAV RNP APCH

    RNP AR APCH

    Airbus FMS Landing System - FLS

    SBAS Satellite Landing System

    Conclusion

  • 8/10/2019 Day3 12 Airbus APV

    23/28

    June 09ICAO LVP&APV workshop Page 23AI

    RBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    Future steps:

    Technical enablers: all new

    GNSS means capable of LPV200

    Coverage: worldwide

    First step: A350XWB

    Targeted procedures: RNAV GNSS

    with LPV minima (down to 200)

    Technical enabler: GPS+SBAS

    Coverage: multi regional

    Cockpit integration (HMI, NDB, ..)

    Satellite Landing System

    Allows to fly RNAV (GNSS) approaches with verticalguidance down to 200ft without any xLS ground station

    2003 20232009 2013 2018

    GPS L1WAAS L1

    GPS L1WAAS/

    EGNOS L1

    GPS L1

    SBAS L1GALILEO L1/E5

    GPS L1/L5SBAS L1/L5

    GALILEO SOL L1/L5

    GPS L1/L1C/L5SBAS L1/L5

    GALILEO SOL L1/L5

    A350XWB

    2011

    GPS L1

    W. / E. L1

    GAGAN/

    MSAS L1

  • 8/10/2019 Day3 12 Airbus APV

    24/28

    June 09ICAO LVP&APV workshop Page 24AI

    RBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    Main benefits

    No need forlocal ground station

    Provide geometrical vertical guidance

    Give access to RNAV GNSS with LPV

    minima down to 200

    SBAS

  • 8/10/2019 Day3 12 Airbus APV

    25/28

    June 09ICAO LVP&APV workshop Page 25AIRBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    Experimental flight tests

    SBAS flight tests performed on A380With a modified MMR,

    In an experimental configuration with SBAS on one side and

    GBAS on the other side

    To mature function for A350 and collect SBAS data

    Project launched for A350 to provide SBAS LandingSystem (SLS) with capability to perform LPV-200

    approaches (where available)

    Currently no plans to introduce SLS for existingprogrammes

  • 8/10/2019 Day3 12 Airbus APV

    26/28

    June 09ICAO LVP&APV workshop Page 26AIRBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietaryd

    ocument.

    Content

    LNAV/VNAV RNP APCH

    RNP AR APCH

    Airbus FMS Landing System - FLS

    SBAS Satellite Landing System

    Conclusion

  • 8/10/2019 Day3 12 Airbus APV

    27/28

    June 09ICAO LVP&APV workshop Page 27AIRBUSS.A.S.

    Allrightsreserved.

    Confidentialandproprietaryd

    ocument.

    Conclusion

    Satellite based systems and RNP operations foreseen asthe final successor to ground based aids.

    Airbus supports the development of new landing systems

    in line with operator requirements.

    MLS, FLS, SBAS (SLS)

    MMR is the key to enable all approaches (precision and non

    precision) to be flown the same way.

    RNP AR : most of the fly by wire a/c are RNP AR capable.

    Airbus has already met more stringent EASA requirements

    Reduced operational demonstration for airlines

    Higher confidence from national authorities

  • 8/10/2019 Day3 12 Airbus APV

    28/28

    Proprietary document.

    By taking delivery of this Presentation (hereafter Presentation), you accept on behalf of your company to comply with the following. Noother property rights are granted by the delivery of this Presentation than the right to read it, for the sole purpose of information. ThisPresentation, its content, illustrations and photos shall not be modified nor reproduced without prior written consent of Airbus S.A.S. ThisPresentation and the materials it contains shall not, in whole or in part, be sold, rented, or licensed to any third party subject to payment or

    not. This Presentation may contain market-sensitive or other information that is correct at the time of going to press. This informationinvolves a number of factors which could change over time, affecting the true public representation. Airbus assumes no obligation toupdate any information contained in this document or with respect to the information described herein. The statements made herein donot constitute an offer or form part of any contract. They are based on Airbus information and are expressed in good faith but no warrantyor representation is given as to their accuracy. When additional information is required, Airbus S.A.S can be contacted to provide furtherdetails. Airbus S.A.S shall assume no liability for any damage in connection with the use of this Presentation and the materials it contains,even if Airbus S.A.S has been advised of the likelihood of such damages. This licence is governed by French law and exclusive jurisdictionis given to the courts and tribunals of Toulouse (France) without prejudice to the right of Airbus to bring proceedings for infringement of

    copyright or any other intellectual property right in any other court of competent jurisdiction.