Day3 12 Airbus APV
Transcript of Day3 12 Airbus APV
-
8/10/2019 Day3 12 Airbus APV
1/28
Airbus aircraft capacities to support APV
Edith PABON-ALQUIERAirbus Flight Operations Support & Services
Presented by:
ICAO LVP&APV workshop 9-11 June 2009
-
8/10/2019 Day3 12 Airbus APV
2/28
June 09ICAO LVP&APV workshop Page 2AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydoc
ument.
Content
LNAV/VNAV Baro VNAV
RNP AR APCH
Airbus FMS Landing System - FLS
SBAS Satellite Landing System
Conclusion
-
8/10/2019 Day3 12 Airbus APV
3/28
June 09ICAO LVP&APV workshop Page 3AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydoc
ument.
LNAV/VNAV Baro-VNAV
During LNAV/VNAV, Baro-VNAV, the aircraft system usesbarometric altitude to compare the vertical position of theaircraft with vertical flight path computed by the FMS, also
using baro-referenced altitudes.
The fly-by-wire Airbus aircraft are equipped with integratedLNAV/VNAV systems with accurate source of barometric
altitude.
Airbus fly-by-wire aircraft systems have been certified byEASA to conduct Baro-VNAV approaches down to a
MDA/H of minimum 250ft.
-
8/10/2019 Day3 12 Airbus APV
4/28
June 09ICAO LVP&APV workshop Page 4AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
Content
LNAV/VNAV RNP APCH
RNP AR APCH
Airbus FMS Landing System - FLS
SBAS Satellite Landing System
Conclusion
-
8/10/2019 Day3 12 Airbus APV
5/28
June 09ICAO LVP&APV workshop Page 5AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
Airbus Basic RNP Capabilities RNP APCH
Basic certification was demonstrated by reference to theMASPS DO-236 / ED-75
Achieved with AP or FD ON in GPS PRIMARY mode
Approach Terminal En-route
Airbus Certified Capability RNP 0.3 RNP 0.51 RNP 1(2)
Required Capability RNP 0.3 RNP 1 RNP 2(4)
RNP 0.3 applicable to straight in approaches designed under ICAOPANS OPS or FAA TERPS criteria.
All Airbus equipped with FMS and GPS are capable to fly RNP APCH as
per ICAO PBN manual.
DH as low as 250 ft with FINAL APP mode (LNAV/VNAV ) guidance.
Note: This certification was not intended for RNP AR (or SAAAR) operations,
including RNP AR APCH of ICAO PBN manual.
-
8/10/2019 Day3 12 Airbus APV
6/28
June 09ICAO LVP&APV workshop Page 6AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
A procedure is RNP AR if one of the followingcharacteristic is present:
2 x RNP2 x RNPVEBVEB
RNP AR Concept
RNP values lower than 0.3 in approach
RNP AR Concept
RNP AR Concept
Curved flight path below FAF (RF legs)
Reduced obstacle protections, at 2xRNP, without buffers
-
8/10/2019 Day3 12 Airbus APV
7/28
June 09ICAO LVP&APV workshop Page 7AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
RNP AR Certification standards
In some cases, obstacle may be as close as 2xRNP.
Need to demonstrate a
Target Level of Safety of 10-7/approach
Including the effect ofsystem failures
Existing airborne systems are not capable
to meet this objective alone
Operational mitigations are required to achieve
the overall safety objectives (FOSA)
-
8/10/2019 Day3 12 Airbus APV
8/28
June 09ICAO LVP&APV workshop Page 8AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
RNP AR Certification standards
FAA:Rely on Flight Operational Safety Assessment (FOSA)
Engine failure evaluation in ops context
A/C to be maintained within 2xRNP
EASA certification requirements: Engine failure or probable system failures (>10-5/procedure):
A/C to be maintained within 1xRNP
Remote system failures (10-5 to 10-7/procedure) :
A/C to be maintained within 2xRNP
Safe extraction for failures below 10-7
-
8/10/2019 Day3 12 Airbus APV
9/28
June 09ICAO LVP&APV workshop Page 9AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
RNP AR below 0.3 Certification
RNP AR
EASA
Certification
Requirements
Lateral Deviation scale
Automatic NAV re-engagement
at GA initiation
Triple click upon loss of
FINAL APP or NAV
EGPWS with GPS position
and peaks mode
-
8/10/2019 Day3 12 Airbus APV
10/28
June 09ICAO LVP&APV workshop Page 10AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydo
cument.
New Lateral Deviation Indication:
L/DEV displayed on PFD Position of the computed flight plan
Full scale: 2 dots = +/- 0.2 NM
Same symbol as the V/DEV
Improved XTK Error resolution on ND:
2 digits after the dot When 0.02 XTK 0.29
RNP AR below 0.3 CertificationLateral Deviation & Improved XTRK error resolution
V/DEV
SPEED FINAL APP
MDA 250
AP1
1FD2A/THR
L/DEV
RNP
ON
RNP Push Button enables the LATDEVdisplay.
With latest standards of equipment, the P/Bis no more required:
The L/DEV is automatically displayed when
needed
-
8/10/2019 Day3 12 Airbus APV
11/28
June 09ICAO LVP&APV workshop Page 11AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydo
cument.
Certification for RNP AR below 0.3
A318/A319/A320/A321 aircraftA318/A319/A320/A321 aircraft
RNP 0.1 (normal) and RNP 0.2 (non normal)
Departure
(AP on)
Missed Approach
(AP on)
Approach
(AP on)
!"#
Availability planned Q4 2009
Departure
(AP on)
Missed Approach
(AP on)
Approach
(AP on)
RNP 0.24 (non normal)
RNP 0.17 (normal)RNP 0.17 (normal)RNP 0.1 (normal)
Currently
Requires Specific Set of Equipment Package
-
8/10/2019 Day3 12 Airbus APV
12/28
June 09ICAO LVP&APV workshop Page 12AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydo
cument.
Certification for RNP AR below 0.3
A330-200/-300 aircraftA330-200/-300 aircraft
Departure
(AP on)
Missed Approach
(AP on)
Approach
(AP on)
RNP 0.3 (non normal)RNP 0.1 (normal)RNP 0.3 (normal)RNP 0.1 (normal)
Currently
Availability planned Q2 2010
RNP 0.1 (Normal) and RNP 0.2y (non normal)
Departure
(AP on)
Missed Approach
(AP on)
Approach
(AP on)!"#
Requires Specific Set of Equipment Package
-
8/10/2019 Day3 12 Airbus APV
13/28
June 09ICAO LVP&APV workshop Page 13AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydo
cument.
Certification for RNP AR below 0.3
A340-500/-600 aircraftA340-500/-600 aircraft
RNP 0.1 (normal)RNP 0.3 (normal)RNP 0.1 (normal)
Departure
(AP on)
Missed Approach
(AP on)
Approach
(AP on)
RNP 0.2(non normal)
RNP 0.3(non normal)
RNP 0.2(non normal)
Availability planned Q2 2009
Requires Specific Set of Equipment Package
-
8/10/2019 Day3 12 Airbus APV
14/28
June 09ICAO LVP&APV workshop Page 14AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydo
cument.
The RNP AR limited to 0.3.
Flight around obstaclesNoise abatement,
Track miles saving,
Traffic management,
.
RNP AR procedures are not all equivalent in terms of
exposure:
-
8/10/2019 Day3 12 Airbus APV
15/28
June 09ICAO LVP&APV workshop Page 15AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydo
cument.
The RNP AR limited to 0.3.
On A318/A319/A320/A321 & A330/A340-600/A340-500On A318/A319/A320/A321 & A330/A340-600/A340-500
RNP 0.3 (normal & non norm)
Departure
(AP on)
Missed Approach
(AP on)
Approach
(AP on)
New
Availability end of the year 2009, or early 2010,
No LAT DEV required.
reduced set of equipment
-
8/10/2019 Day3 12 Airbus APV
16/28
June 09ICAO LVP&APV workshop Page 16AIR
BUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydo
cument.
Content
LNAV/VNAV RNP APCH
RNP AR APCH
Airbus FMS Landing System - FLS
SBAS Satellite Landing System
Conclusion
-
8/10/2019 Day3 12 Airbus APV
17/28
June 09ICAO LVP&APV workshop Page 17AIRBUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydo
cument.
FMS Landing System (FLS)
FLS is a new way to fly NPA not a new type ofapproach
Airbus has decided to modify the current cockpit design for NonPrecision Approach operational procedures to provide similarinterface for Non Precision Approach as for Precision Approach (ILSLook alike)
This new design allows conducting existing non precision
approaches (VOR, VOR/DME, NDB, NDB/DME, GPS) in the samemanner as Precision Approach (ILS/GLS) with similar display,guidance & warnings.
This function is autonomous and does not require any additionalinformation from the ground.
Applies to straight in approach flight path.
-
8/10/2019 Day3 12 Airbus APV
18/28
June 09ICAO LVP&APV workshop Page 18AIRBUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydo
cument.
FLS Principle
Based on database stored data, an FLS
approach beam is defined. Then, lateraland vertical deviations between theFLS beam and the computed aircraftposition are computed by the MMR andused for guidance and display to thepilot.
Anchor point
FAF
FLS beam
Slope
Anchor Point
FLS beam FAF
Anchor Point
Course
The FLS virtualThe FLS virtual
beam is defined by:beam is defined by:
Anchor PointAnchor Point CourseCourse
SlopeSlope
-
8/10/2019 Day3 12 Airbus APV
19/28
June 09ICAO LVP&APV workshop Page 19AIRBUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydo
cument.
FLS display
1) Pseudo LOC scale & index
1
2
3
56
4
2) Pseudo G/S scale & index
3) Course pointer
4) FLS beam definitionAnchor Point identification
Slope
Distance to RWY threshold
5) Approach capability
6) AP/FD guidance modes
-
8/10/2019 Day3 12 Airbus APV
20/28
June 09ICAO LVP&APV workshop Page 20AIRBUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
FLS Benefits
Stabilized approachEnhanced safety operation:
80% of approach accidents occur on non stabilized approaches
FLS available all over the world:
non precision approaches published on any airport in the world
ILS Look alikeHMI close to precision approaches
Reuse of ILS pilot skills , reduction in training needs.
Use of ILS guidance laws in Flight Guidance: same behavioras precision approaches
Temperature compensated
-
8/10/2019 Day3 12 Airbus APV
21/28
June 09ICAO LVP&APV workshop Page 21AIRBUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
FLS policy and schedule
FLS is a Multi Programme Project Will be certified on allcurrent Airbus fly-by-wire aircraft
Basic on A380 and A350
Optional on SA and LR programs
Certification schedule:A380: At Entry into service
A320 family: end 09A330/A340 family: from 2010
-
8/10/2019 Day3 12 Airbus APV
22/28
June 09ICAO LVP&APV workshop Page 22AIRBUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
Content
LNAV/VNAV RNP APCH
RNP AR APCH
Airbus FMS Landing System - FLS
SBAS Satellite Landing System
Conclusion
-
8/10/2019 Day3 12 Airbus APV
23/28
June 09ICAO LVP&APV workshop Page 23AI
RBUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
Future steps:
Technical enablers: all new
GNSS means capable of LPV200
Coverage: worldwide
First step: A350XWB
Targeted procedures: RNAV GNSS
with LPV minima (down to 200)
Technical enabler: GPS+SBAS
Coverage: multi regional
Cockpit integration (HMI, NDB, ..)
Satellite Landing System
Allows to fly RNAV (GNSS) approaches with verticalguidance down to 200ft without any xLS ground station
2003 20232009 2013 2018
GPS L1WAAS L1
GPS L1WAAS/
EGNOS L1
GPS L1
SBAS L1GALILEO L1/E5
GPS L1/L5SBAS L1/L5
GALILEO SOL L1/L5
GPS L1/L1C/L5SBAS L1/L5
GALILEO SOL L1/L5
A350XWB
2011
GPS L1
W. / E. L1
GAGAN/
MSAS L1
-
8/10/2019 Day3 12 Airbus APV
24/28
June 09ICAO LVP&APV workshop Page 24AI
RBUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
Main benefits
No need forlocal ground station
Provide geometrical vertical guidance
Give access to RNAV GNSS with LPV
minima down to 200
SBAS
-
8/10/2019 Day3 12 Airbus APV
25/28
June 09ICAO LVP&APV workshop Page 25AIRBUSS.A.S.
Allrightsreserved.
Confidentialandproprietarydocument.
Experimental flight tests
SBAS flight tests performed on A380With a modified MMR,
In an experimental configuration with SBAS on one side and
GBAS on the other side
To mature function for A350 and collect SBAS data
Project launched for A350 to provide SBAS LandingSystem (SLS) with capability to perform LPV-200
approaches (where available)
Currently no plans to introduce SLS for existingprogrammes
-
8/10/2019 Day3 12 Airbus APV
26/28
June 09ICAO LVP&APV workshop Page 26AIRBUSS.A.S.
Allrightsreserved.
Confidentialandproprietaryd
ocument.
Content
LNAV/VNAV RNP APCH
RNP AR APCH
Airbus FMS Landing System - FLS
SBAS Satellite Landing System
Conclusion
-
8/10/2019 Day3 12 Airbus APV
27/28
June 09ICAO LVP&APV workshop Page 27AIRBUSS.A.S.
Allrightsreserved.
Confidentialandproprietaryd
ocument.
Conclusion
Satellite based systems and RNP operations foreseen asthe final successor to ground based aids.
Airbus supports the development of new landing systems
in line with operator requirements.
MLS, FLS, SBAS (SLS)
MMR is the key to enable all approaches (precision and non
precision) to be flown the same way.
RNP AR : most of the fly by wire a/c are RNP AR capable.
Airbus has already met more stringent EASA requirements
Reduced operational demonstration for airlines
Higher confidence from national authorities
-
8/10/2019 Day3 12 Airbus APV
28/28
Proprietary document.
By taking delivery of this Presentation (hereafter Presentation), you accept on behalf of your company to comply with the following. Noother property rights are granted by the delivery of this Presentation than the right to read it, for the sole purpose of information. ThisPresentation, its content, illustrations and photos shall not be modified nor reproduced without prior written consent of Airbus S.A.S. ThisPresentation and the materials it contains shall not, in whole or in part, be sold, rented, or licensed to any third party subject to payment or
not. This Presentation may contain market-sensitive or other information that is correct at the time of going to press. This informationinvolves a number of factors which could change over time, affecting the true public representation. Airbus assumes no obligation toupdate any information contained in this document or with respect to the information described herein. The statements made herein donot constitute an offer or form part of any contract. They are based on Airbus information and are expressed in good faith but no warrantyor representation is given as to their accuracy. When additional information is required, Airbus S.A.S can be contacted to provide furtherdetails. Airbus S.A.S shall assume no liability for any damage in connection with the use of this Presentation and the materials it contains,even if Airbus S.A.S has been advised of the likelihood of such damages. This licence is governed by French law and exclusive jurisdictionis given to the courts and tribunals of Toulouse (France) without prejudice to the right of Airbus to bring proceedings for infringement of
copyright or any other intellectual property right in any other court of competent jurisdiction.