LNG FPSOs - Competing Technologies are Making Progress David Wood 2 nd June 2009 Breakfast Presentation at Energy Institute, London

Transcript of David Wood 2nd June 2009 - David Wood International Oil ...

Page 1: David Wood 2nd June 2009 - David Wood International Oil ...

LNG FPSOs - Competing Technologies areMaking Progress

David Wood2nd June 2009

Breakfast Presentationat Energy Institute, London

Page 2: David Wood 2nd June 2009 - David Wood International Oil ...

There are a number of companies offering gas liquefaction technologies,some of these are focused on small-scale boil-off gas and onshore peakshaving plants. Several though have announced developments recentlythat target deployment on LNG FPSOs. These are:

Companies Offering Natural Gas LiquefactionTechnologies Focused on the LNG FPSO

APCI (Air Products Chemical Industries)

Black & Veatch

CB&I (Chicago Bridge & Iron) / Lummus

Kanfa Aragon

Linde

Mustang Engineering

2nd June 2009 2www.dwasolutions.com

Such technologies developments reflect the interest expressed by severalmajor IOCs, NOCs and independent oil and gas producing companies todeploy LNG FPSOs to develop stranded gas fields around the world.

Page 3: David Wood 2nd June 2009 - David Wood International Oil ...

Floating Gas Liquefaction PlantsFLEX LNG Producer

Four “LNG Producer” hulls, each with a 170,000 m3 capacity, are on order atSamsung Heavy Industries (SHI) in Korea. These orders were placed fromMarch 2007 to April 2008 for deliveries initially set for Dec 2010 to Mar2012. To be deployed offshore Nigeria and Papua New Guinea.

Source: Samsung Heavy Industries Delivery dates were pushedback 6 to 7 months inJanuary 2009.

pre-FEED and FEED workfor field-specific modulesapplicable to multiplelocations is ongoing.

Samsung Heavy IndustriesCo. Ltd. let a US$200million contract to KanfaAragon AS to develop theLNG topsides in January2009.

2nd June 2009 3www.dwasolutions.com

Page 4: David Wood 2nd June 2009 - David Wood International Oil ...

LNG FPSO – Topsides Process Requirements

The natural gas liquefaction process is only a small part of what is required

to deliver an FPSO.

Source: Samsung Heavy Industries

2nd June 2009 4www.dwasolutions.com

Source: Kanfa Aragon, March 2009

Page 5: David Wood 2nd June 2009 - David Wood International Oil ...

Choice of the liquefaction technology is likely to have implications forthe following issues:

Criteria Impacting LNG FPSO Design Agenda:Liquefaction Process Technology Issues

Simplicity of operation (high uptime)

Systems that would minimize weather-related downtime

Quick start and shutdown capability

Process efficiency (over a range of ambient temperature conditions)

High energy efficiency

Production rate flexibility

Capable of handling a wide range of feed gas compositions

Processing options to recover LPG and NGLs

Low requirements for handling potentially hazardous refrigerants

2nd June 2009 5www.dwasolutions.com

David Wood, E&P Magazine (Hart) May 2009

Page 6: David Wood 2nd June 2009 - David Wood International Oil ...

The capacity of an LNG FPSO, in addition to process technology, needsto incorporate the requirements for:

Criteria Impacting LNG FPSO Design Agenda:Marine / Project Engineering Issues

Process, storage, and offloading safety

Low weight

Compactness (to minimize deck area and overall vessel size)

Low equipment count

Small operating crew

Modular design

Stable decks (robust to vessel motions)

LNG storage tanks that are unaffected by cargo sloshing impacts

Facility security

2nd June 2009 6www.dwasolutions.com

David Wood, E&P Magazine (Hart) May 2009

Page 7: David Wood 2nd June 2009 - David Wood International Oil ...

Work-horse of Onshore Liquefaction: PropanePre-cooled Mixed Refrigerant (C3MR) Process

The pre-cooling cycle uses propane at three or four pressure levels and cancool the process gas down to -40°C. In the mixed-refrigerant cycle, thepartially liquefied refrigerant is separated into vapour and liquid streams,which are used to liquefy and sub-cool the process stream cooling fromtypically -35°C to between -150°C and -160°C.

Source:APCI

C3MR mixed refrigerantnatural gas and refrigerantcooling curves

2nd June 2009 7www.dwasolutions.com

Source:APCIMark Roberts, APCI Feb 2009

Page 8: David Wood 2nd June 2009 - David Wood International Oil ...

Dual Mixed Refrigerant (DMR) Process

APCI favour their dual mixed refrigerant (DMR) process for offshoredeployment , which provides the highest thermal efficiency, but also thegreatest equipment count, complexity and multiple refrigerant handling.APCI are also developing new designs which use non-flammableenvironmentally acceptable refrigerants such as HFC compounds to replaceflammable hydrocarbon gases.

Source:APCI

Dual mixed refrigerant(DMR) natural gas andrefrigerant cooling curves

2nd June 2009 8www.dwasolutions.com

Source:APCIMark Roberts, APCI Feb 2009

Page 9: David Wood 2nd June 2009 - David Wood International Oil ...

Single Mixed Refrigerant (SMR) GasLiquefaction Process

Single mixed refrigerant processes are less efficient over the entire coolingrange than dual mixed refrigerant (DMR) or C3MR processes. This meansthat they require more energy and gas feed to achieve liquefaction, butrequire less plant items, space and refrigerants, which should in many gasprojects lead to lower operating costs and manpower.

Source:APCI

C3MR mixed refrigerantnatural gas and refrigerantcooling curves

2nd June 2009 9www.dwasolutions.com

Source:APCIMark Roberts, APCI Feb 2009

Page 10: David Wood 2nd June 2009 - David Wood International Oil ...

Nitrogen-expander Liquefaction Process:Proposed for LNG FPSO Deployment

The first reported work on floating gas liquefaction in 1981 recommendedthe nitrogen-expander refrigeration cycle with aluminium plate-fin heatexchangers, as used extensively in small-scale, low-cost LNG peak-shavingapplications. This has been further developed by adding expander cycles.

2nd June 2009 10www.dwasolutions.com

Reverse-Brayton gas expander cycle

Page 11: David Wood 2nd June 2009 - David Wood International Oil ...

Nitrogen Recycle Expander Process

APCI have worked to develop the sub-cooling nitrogen refrigeration cycle atthe back end of their AP-X process to work as a standalone nitrogen recycleexpander process for offshore deployment.

Source:APCI

Better thermal efficiency can be achievedby adding two and three separateexpander levels and combining thesewith a spool wound MCHE to optimiseLNG stability and handling. This adds tocost, weight and space requirements.

2nd June 2009 11www.dwasolutions.com

Source:APCIMark Roberts, APCI Feb 2009

Page 12: David Wood 2nd June 2009 - David Wood International Oil ...

Recycle companders, where the work generated by the expanding fluidis recovered by compressing a process fluid in a compressor wheelmounted on the same shaft with the expander wheel, are used innitrogen recycle liquefaction processes.

Single-shaft Expander/Process Compressor(Compander) Units

2nd June 2009 12www.dwasolutions.com

Source:APCI

APCI High CapacityNitrogen Companderas installed onQatargas Trains 4-5-6-7 and RasGasTrains 6-7 base loadAP-X liquefactionplants. Up to 92%efficiency claimed.

Page 13: David Wood 2nd June 2009 - David Wood International Oil ...

Heat Exchanger Alternatives

Spool (or Coil) Wound Heat Exchangers (SWHE) are offered by APCI andLinde. The vacuum brazed aluminium plate-fin heat exchangers (BAHX orPFHE) are key components in many cryogenic process plants. They are thepreferred heat exchangers in small LNG plants.

2nd June 2009 13www.dwasolutions.com

Source: LindeSource: Linde

SWHEBAHX

Page 14: David Wood 2nd June 2009 - David Wood International Oil ...

Spool-wound heat exchangers - advantages:Efficient -providing a large cooling surface area per shellTolerant against thermal shocks due to its robustnessReliable in large capacity plantsSpool-wound heat exchangers -disadvantages:High cost and limited suppliersSize and weightLimited flexibility with respect to variable composition feed gas streams

Plate-fin heat exchangers - advantages:Compactness, which saves installation space and costMany process streams can be treated in only one unitLow equipment weightPlate-fin heat exchangers - disadvantages:Vulnerable to thermal shocks, motion and varying operating conditionsPotentially higher maintenanceSlightly lower efficiency

Heat Exchanger Trade Offs:SWHE versus BAHX

2nd June 2009 14www.dwasolutions.com

Page 15: David Wood 2nd June 2009 - David Wood International Oil ...

APCI claim that their DMR process offers flexibility in exchanger andcompressor design, and the process can be configured to minimizehydrocarbon inventories or eliminate specific components from themulti-component refrigerant (MCR) mix using HFCs.

MCR Cryogenic Heat ExchangerAPCI Development for an LNG FPSO

APCI conducted (2000) detailed studies of the structural integrity oftheir coil-wound heat exchanger shell and internal structures(Heriot-Watt University, Scotland). The tests were successful fromboth mechanical and process design standpoints under simulatedNorth Sea 100-year storm conditions.

APCI claim that these developments of their DMR liquefactionprocesses and heat exchanger applications should result in LNGFPSO plants with high thermodynamic cycle efficiency involving lowcost, simple construction, easy operation, and low maintenance.

2nd June 2009 15www.dwasolutions.com

Page 16: David Wood 2nd June 2009 - David Wood International Oil ...

LNG Storage Tank Options

There are four distinct storage tank (containment) system designs for LNGin marine vessels. Containment poses a problem for the FPSO because it isimportant to have tanks that facilitate a flat deck for the topsides modules.

Source: Samsung Heavy Industries

2nd June 2009 16www.dwasolutions.com

Source: Leo Festen CB&I Lummus Presentation, October 2008

Potentialdamaged bysloshing whenpartially filledand subjected tomarineturbulence rulesout membranesystems withoutsubstantialreinforcement.

IHI-SPB designsare beingfavoured.

Page 17: David Wood 2nd June 2009 - David Wood International Oil ...

Floating Gas LiquefactionSPB Storage Tanks

Wood & Mokhatab World Oil, October 2008

Vessel is a self-propelled FPSOcombining proven existingtechnologies:

sloshing resistant SPBcontainment systems retainingmaximum deck space.dual nitrogen turbo-expanderliquefaction technology.proven LNG transfer technology– marine loading arms.proven ship-to-ship mooringsystem.

[SPB = self-supporting, prismaticIMO type B tank]

2nd June 2009 17www.dwasolutions.com

SPB tank technology is planned for the LNG Producer because it offers asloshing resistant containment system and maximizes flat deck space fortopside equipment.

www.flexlng.com

Page 18: David Wood 2nd June 2009 - David Wood International Oil ...

SBM / Linde LNG FPSOSMR Large Single Train Concept

Secured an option with Samsung heavy Industries (SHI -South Korea) tobuild its first hull (to be confirmed in 2010 for a 2013 delivery date). SHIvalued the work at $660 million for design specifications including a 2.5mtpa capacity vessel with storage space of about 180,000 m3 for LNG and afurther 50,000 m3 storage to be allocated to LPG, condensate or LNGdepending upon the feed gas composition. FEED study planned for 2009.

Source: SBM /Linde LNG FPSO Brochure, 2008

2nd June 2009 18www.dwasolutions.com

SBM / Linde claim thattheir SMR process issome 15% more efficientthan a dual-cycle nitrogenexpander plants and 25%more efficient than asingle-cycle nitrogenexpander plant. On theother hand they concedethat their SMR process isup to 5% less efficientthan dual-cycle mixed-refrigerant plants.

Page 19: David Wood 2nd June 2009 - David Wood International Oil ...

SBM / Linde SMR Liquefaction ProcessLIMUM

The design can include two heat exchangers operating in sequence for thelarge capacity plants and compressor power drivers for the low pressure(LP) and high pressure (HP) mixed refrigerant cycles. The process involvesgaseous and liquid refrigerant components at various stages in the cycle.

Source: SBM /Linde

2nd June 2009 19www.dwasolutions.com

Each heat exchanger has fiveseparate refrigerant entry pointsand five separate refrigerant exitpoints.

Each cycle involves differentphases and different temperaturesand pressures.

Robust SWHE claimed to have ahigher tolerance against thermalstress than BAHX designs.

Page 20: David Wood 2nd June 2009 - David Wood International Oil ...

Linde’s comparisons highlight that SMR is substantially more efficient than

their single nitrogen cycle process, but less efficient than their DMR process.Exact SMR energy consumption depends on compressor configuration.

Source: SBM /Linde

2nd June 2009 20www.dwasolutions.com

Control of one SMRrefrigeration cycleinvolves 2 rotatingmachines.

SBM / Linde pointout that for acomparable capacitya dual nitrogen cyclewould likely involve 2trains with 6 to 8rotating machines (2or 4 compressorsplus 4 expander /booster units.

Linde Process Energy / Fuel ConsumptionComparisons for Three Processes

Page 21: David Wood 2nd June 2009 - David Wood International Oil ...

Black & Veatch:PRICO SMR Gas Liquefaction Process

This SMR system uses a plate-fin main heat exchanger in a cold boxconfiguration for a maximum 1 mtpa LNG capacity in a single-train plant(~130 mmscf/d). Main application to date has been for small-scale onshorepeak shaving plants.

Source: Samsung Heavy Industries

2nd June 2009 21www.dwasolutions.com

Source: Price et al, Hydrocarbon Processing, July 2008

Source: Black & Veatch

Page 22: David Wood 2nd June 2009 - David Wood International Oil ...

Natural Gas Liquid (NGL) and HeavyHydrocarbon (C5+) Recovery

Depending on the composition of the feed gas to be liquefied, heavyhydrocarbons are likely to need removing prior to gas liquefaction to preventplugging due to solidification at low temperature.

Source: Samsung Heavy Industries

2nd June 2009 22www.dwasolutions.com

Source: Price et al, Hydrocarbon Processing, July 2008Source: Black & Veatch

If the heavy liquid isof sufficient quantity,fractionation of theseNGLs into productssuch as ethane, LPG(propane andbutane), andgasoline may beeconomicallyattractive. A singleC5+ condensateproduct may be theonly liquid productthat is commerciallyviable in smallquantities.

NGL Recovery with Black & Veatch’s Prico System

Page 23: David Wood 2nd June 2009 - David Wood International Oil ...

CB&I Lummus with Höegh and Co:Niche LNG FPSO

Gas is liquefied in two independent cycles, using methane-rich feed-gas asrefrigerant for the first stage, and then moving to nitrogen, with both cyclesutilizing turbo-expanders. Refrigerants are always in the gaseous phase.

Source: Samsung Heavy Industries

2nd June 2009 23www.dwasolutions.com

Source: Leo Festen CB&I Lummus Presentation, October 2008

Höegh LNG FPSO designcaters for ~3.0 bcma (2trains~1.6 to 2.0 mtpa ofLNG plus ~0.4 mtpa ofLPG/condensate). It canbe expanded to 2.4 mtpaof LNG or reduced to 1.0mtpa. The LNG FPSO isdesigned to have storagecapacity of 190,000 m3 ofLNG and 30,000 m3

LPG/condensate. The firstdelivery of a vessel isplanned with Daewoo for~2012. Up to 2 mtpa canfit on a Q-flex-sized ship.

Page 24: David Wood 2nd June 2009 - David Wood International Oil ...

Höegh LNG FPSO – Design IncorporatesNiche LNG Liquefaction Technology

3000 tonnes maximum with base case of 14 modules distributed with safetygaps. Power generation drivers are placed in a hold below deck. LNGoffloading requires a side-by-side system.

Source: Samsung Heavy Industries

2nd June 2009 24www.dwasolutions.com

Source: Leo Festen CB&I Lummus Presentation, October 2008

Page 25: David Wood 2nd June 2009 - David Wood International Oil ...

Mustang (part of UK’s Wood Group) has developed a suite of proprietaryturbo expander-based LNG liquefaction processes that are suited for use onLNG FPSOs with capacities of 0.5 to more than 2.0 mtpa with a range of feedgas specifications.

Source: Mustang’sOCX-Angle Process

2nd June 2009 25www.dwasolutions.com

Several open-cycle (i.e.feed gas used asrefrigerant) processesare combined withpropane pre-cooling,LPG recovery and boil-off gas recoverymodules.

More recentlydeveloped into the dualnitrogen expanderprocess NDX-1.

Source: Susan Walther et al. LNG Industry, Winter 2008

Mustang Engineering: “Smart” Suite ofLiquefaction Processes Proposed

Page 26: David Wood 2nd June 2009 - David Wood International Oil ...

Mustang claim that their NDX-1 dual expander nitrogen process is simple,compact, energy-efficient, and flexible over a wide range of feed gascompositions, offering a thermal efficiency of between 91% and 93% (orhigher in optimal conditions).

Source: Mustang’sNDX-1 Process

2nd June 2009 26www.dwasolutions.com

Two streams of nitrogenat high pressure andambient temperature arecooled in the main platefin heat exchanger.

The first stream is cooledto an intermediatetemperature and is thendropped in pressure andtemperature across theexpander side of anexpander compressor.

Source: Susan Walther et al. LNG Industry, Winter 2008

Mustang Engineering: NDX-1 Process

Page 27: David Wood 2nd June 2009 - David Wood International Oil ...

A single NDX-1 liquefaction processing train can be sized up to about 0.75mtpa. For a plant of 1.5 to 2 mtpa it is likely that three trains would berequired, meaning a significant rotating equipment count. The optimizeddesign uses the LM2500 gas turbine driver rather than the LM6000, which isattractive but has never been used to drive compression offshore.

Source: Mustang

2nd June 2009 27www.dwasolutions.com

Source: Susan Walther et al. LNG Industry, Winter 2008

Mustang Engineering: Process EfficiencyComparisons – Optimized NDX-1

Page 28: David Wood 2nd June 2009 - David Wood International Oil ...

February 2009 Gasol (AIM listed oil and gas company) announced thatwith the assistance of Teekay Corporation (“Teekay”) it had developedthe concept of a Near-Shore LNG Production System (“NSPS™”) with aview to applying this concept to gas monetization projects in Nigeriaand elsewhere in the Gulf of Guinea region. The NSPS concept will beused on using floating modules on barges that are berthed and mooredto a fixed and protected jetty in benign waters in close proximity to theshore, to produce LNG, LPG, condensates and power.

May 2009 Petronas (60%), MISC (30%) and Mustang (10%) formed aKuala Lumpur – based joint-venture company to provide floatingliquefied natural gas (LNG) engineering solutions and servicesworldwide. Initially the new joint-venture will focus on accomplishing aFEED study for a project in Malaysia. The project has already progressedto achieve first gas production from a floating LNG facility in late 2013.

Mustang Engineering:LNG FPSO Alliances Announced in 2009

2nd June 2009 28www.dwasolutions.com

Page 29: David Wood 2nd June 2009 - David Wood International Oil ...

Flex LNG – Dual Nitrogen Turbo ExpansionRefrigeration Cycle

The nitrogen turbo expansion refrigeration cycle for the Flex LNG conceptprovides refrigeration by compression and expansion of a refrigerant that iskept in the gas phase throughout the entire system.

Wood & Mokhatab World Oil, October 2008

Source: Kanfa Aragon The cycled refrigerationgas is first pre-cooled inthe main heatexchanger with thereturning cold gas.

This temperatureexchange takes place inthe same heatexchanger that cools theprocess gas.

Exactly how KanfaAragon plans tooptimize its dual cycleprocess is not yetrevealed.

2nd June 2009 29www.dwasolutions.com

Page 30: David Wood 2nd June 2009 - David Wood International Oil ...

LNG Process Power Requirementsin Tropical Conditions

Apart from APCI in Qatar no technology provider has yet built large scalenitrogen expander cycles so power requirements and efficiency remainsuncertain. Costain is the process engineer involved in Kanfa Aragon design.

Source: Samsung Heavy Industries

2nd June 2009 30www.dwasolutions.com

Source: Kanfa Aragon, March 2009

Page 31: David Wood 2nd June 2009 - David Wood International Oil ...

Number of Trains is Critical for Capacity,Weight and Rotating Equipment Count

LNG process train designs depend upon whether the gas is coming from anon-associated (quite dry) gas reservoir or an associated (quite wet) gasfrom an oil reservoir. Many process providers are claiming technologyenhancements leading to larger single train sizes (e.g. Kanfa Aragon from0.9 mtpa in 2007 to 1.2 mtpa in 2009). A single pre-treatment train isusually proposed to supply several LNG trains in one vessel design.

2nd June 2009 31www.dwasolutions.com

Source: Kanfa Aragon, March 2009

Page 32: David Wood 2nd June 2009 - David Wood International Oil ...

Process Comparisons: Balancing EnergyEfficiency, Plant Capacity and Complexity

Four distinct generic process technologies are being proposed for LNG FPSOdeployment and it is useful to compare performance expectations.

David Wood, E&P Magazine (Hart) May 2009

Source: Kanfa Aragon

For the larger capacityvessels process efficiencyis likely to be a higherpriority than plantsimplicity and equipmentcount.

2nd June 2009 32www.dwasolutions.com

Page 33: David Wood 2nd June 2009 - David Wood International Oil ...

Conclusions

Floating natural gas liquefaction deployed on a LNG FPSO is nowrecognised as an economically and technically viable solution formonetizing remote gas resources (not just offshore resources).

Remote gas resources include large and small fields, wet and dryaccumulations, and clusters of reservoirs with variable feed gascompositions.

Gas liquefaction processes and facilities capable of developing a wide-range of gas reservoir types are therefore required.

DMR, SMR and multi-cycle nitrogen expander technologies are alllikely to offer viable solutions to specific reservoirs in certaingeographic conditions.

Whereas major IOCs are interested primarily in a few very largestranded offshore gas fields, the LNG technology providers are wise todevelop a suite of processes also suitable for small and mid-scaleprojects including associated gas developments under no-flaring rules.

2nd June 2009 33www.dwasolutions.com

Page 34: David Wood 2nd June 2009 - David Wood International Oil ...

Floating gas liquefaction: Competing technologies make progressDavid Wood, E&P Magazine (Hart) May 2009

Thank You!

This recent review article is available online at:

http://www.epmag.com/Magazine/2009/5/item37209.php

A draft is also available to download in .pdf format along with other

articles from my website: www.dwasolutions.com

David Wood can be contacted by e-mail: [email protected]

2nd June 2009 34www.dwasolutions.com