David Theron - Portfolio-230117

10
THE PROJECT Incolabs noticed the need for better business integrated services (BIS). The project objective was to better the services to the customer and to gain vital real-time information to augment BIS systems by implementing a EDI system. Project tasks were as follows: To source a service provider that could offer electronic interfaces (EDI) services. To gain agreement with the customers to deliver and receive live electronic information. Make changes and Integrate system requirements into current business systems so as to implement EDI systems. Train and hand over to functional departments. SERVICES: Project Management PERIOD: October 2015 to September 2016 APPROXIMATE VALUE: ZAR 600 000 Client : IncoLabs Project Name: Electrionic Data Interchange (EDI) - Customers Location : IncoLabs – Johannesburg – South Africa ELECTRONIC DATA INTERCHANGE

Transcript of David Theron - Portfolio-230117

Page 1: David Theron - Portfolio-230117

THE PROJECT

Incolabs noticed the need for better business integrated services (BIS). The project objective was to better the services to the customer and to gain vital real-time information to augment BIS systems by implementing a EDI system. Project tasks were as follows:

• To source a service provider that could offer electronic interfaces (EDI) services.

• To gain agreement with the customers to deliver and receive live electronic information.

• Make changes and Integrate system requirements into current business systems so as to implement EDI systems.

• Train and hand over to functional departments.

SERVICES: Project Management

PERIOD: October 2015 to September 2016

APPROXIMATE VALUE: ZAR 600 000

Client : IncoLabs

Project Name: Electrionic Data Interchange (EDI) - Customers

Location : IncoLabs – Johannesburg – South Africa

ELECTRONIC DATA INTERCHANGE

Page 2: David Theron - Portfolio-230117

THE PROJECT

IncoLabs not only owned brands but also had distribution license for large international brands. In 2013 IncoLabs was awarded the distribution license for Canderel. Project tasks were as follows:

• Finalise the commercial agreements

• Integrate products and brands into the current management systems.

• Take on Stock into supply chain services.

• Ensure the smooth transition for customers orders from current supplier to IncoLabs supply chain.

• Ensure that there is no loss in market share and that market share targets meet the set-out guarantees in the commercial agreements.

SERVICES: Project Management

PERIOD: July 2013 to August 2013

APPROXIMATE VALUE: ZAR 150 Million

Client : IncoLabs

Project Name: Brand Take on – Canderel

Location : IncoLabs – Johannesburg – South Africa

BRAND TAKE ON – CANDEREL

Page 3: David Theron - Portfolio-230117

THE PROJECT

IncoLabs decided that Everysun and Tropitone brand needed a 100% overhaul. The Project included the following tasks.

•  Rationalization of the product offering, Everysun from 24 to 18, Tropitone 27 to 17 products.

•  Development and testing of revised formulations that gives the brands a better USP with the target markets.

•  Development of primary packaging and branding that made the brand stand out on the shelf and was cost effective.

SERVICES: Project Management

PERIOD: July 2012 to August 2013

APPROXIMATE VALUE: ZAR 2.8 Million

Client : IncoLabs

Project Name: Brand Relaunch – Everysun/Tropitone

Location : IncoLabs – Johannesburg – South Africa

BRAND RELAUNCH – EVERYSUN / TROPITONE

Page 4: David Theron - Portfolio-230117

THE PROJECT

To integrate and implement of SAGE VIP payroll system into 5 group companies with in CAVI Brands so that the migration to the new system is seamless.

The current system is antiquated and labour intensive. The system promised better management of all resource remuneration within the company.

SERVICES: Project Management

PERIOD: December 2011 to January 2012

APPROXIMATE VALUE: ZAR 400 000

Client : CAVI BRANDS

Project Name: SAGE VIP Payrole Systems Intergration

Location : CAVI Brands Head Office Campus – Johannesburg – South Africa

GROUP PAYROLL SYSTEMS

INTEGRATION

Page 5: David Theron - Portfolio-230117

THE PROJECT

The first commercial, four green star rated building project.

To design and fit out 50 000 sq meters of commercial office space as well as retail, 8 stories and 6 basement level to ensure the space is efficiently utilised and effective for business requirements.

SERVICES: Project Management and Design Services

PERIOD: May 2010 to January 2011

APPROXIMATE VALUE: ZAR 60 Million

Client : Various Nedbank Business Consolidation

Project Name: Nedbank Consolidation of Head Office Project

Location : Sandton Head Office Campus – Johannesburg – South Africa

SANDTON CAMPUS

Page 6: David Theron - Portfolio-230117

THE PROJECT

To consolidate the MFC business into two campuses (Meadowdale and Sunninghill Campuses).

To design and fit out 20 000 sq meters of commercial office space as well as to ensure the space is efficiently utilised and effective for business requirements.

SERVICES: Project Management and Design Services

PERIOD: January 2011 to June 2011

APPROXIMATE VALU: ZAR 8 million

Client : MFC Business Consolidation

Project Name: Nedbank MFC Consolidation Project

Location : Meadowdale Campus and Sunninghill Campus – Johannesburg – South Africa

MFC CONSOLIDATION

Page 7: David Theron - Portfolio-230117

AL JAZIRA STADIUM

Client: Urban Development Committee

Project Name: Mohamed Bin Zayed Stadium Phase II

ABU DHABI UNITED ARAB EMIRATES

THE PROJECT:

The Mohamed Bin Zayed Stadium, otherwise known as the Al Jazira Stadium, is located in Abu Dhabi. Phase I of the project was completed in 2003, ahead of the FIFA U20 world championships. Phase II requires that we extend three of the stands in order to increase the seating capacity by 20,000 seats.

This fast track project, requires the relocation of high spec score boards, installation of temporary flood lights, complete revamp of all the stadium seating, all closely coordinated with the Al Jazira Sports Club who are conitnuing with their normal schedule and will be hosting national sporting events during the construction activities.

SERVICES: Construction Project Management and Value Engineering

PERIOD: January 2008 – August 2008

APPROX VALUE: USD 150 Million

Page 8: David Theron - Portfolio-230117

CAPITAL CENTRE TOWER

Client: Sinogulf Investments

Project Name: Capital Centre Tower

ABU DHABI UNITED ARAB EMIRATES

PROJECT:

26 storey's, and 4 basements car parking level for a minimum of 700 cars. The gross floor area is 84486 m2 with a tower floor plate of 2,200 m2.

The master developers for this project are ADNEC (Abu Dhabi National Exhibitions Company).

SERVICES:

Construction Project Management and Value Engineering

PERIOD:

August 2007 – Dec 2010

APPROXIMATE VALUE:

USD 140 Million

Page 9: David Theron - Portfolio-230117

Client: Shongololo Express Investments

Project Name: Southern Cross Train Facilitie Carriages Upgrade

SOUTH AFRICA

PROJECT:

To upgrade two facilities carriages (Bar car, dinning carriage, kitchen carriage, generator coach). The carriages were existing E2 sleeper class shells and were striped and modified to create a period facilities that accommodate 44 seats in the dinning car and bar area. The kitchen car was upgraded to a state of the art kitchen and tandem generator system to supply facilities 120 passengers at meals times.

SERVICES:

Project Management and Value Engineering

PERIOD:

July 2005 – October 2005

APPROXIMATE VALUE:

R 3.4 Million

UPGRADE OF FACILITIES CARRIAGES

Page 10: David Theron - Portfolio-230117

Client: Shongololo Express Investments

Project Name: Commodore Class For Southern Cross Train

SOUTH AFRICA

PROJECT:

To modify 4 existing coaches in sleeper class with en-suite bathroom facilities. The carriages were existing E2 economy class shells that were purchased striped and modified to create accommodation for 40 passengers.

SERVICES:

Project Management and Value Engineering

PERIOD:

July 2006 – December 2006

APPROXIMATE VALUE:

Rand 5 Million

COMMODORE CLASS