Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy...

12
Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP ICAO ACP 5 July 2006 5 July 2006 José Roca José Roca CASCADE Deputy Programme CASCADE Deputy Programme Manager Manager [email protected] [email protected]

Transcript of Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy...

Page 1: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

Data Link Convergence ICAO DLSG and ADG Activities

ICAO ACPICAO ACP

5 July 20065 July 2006

José RocaJosé Roca

CASCADE Deputy Programme ManagerCASCADE Deputy Programme Manager

[email protected]@eurocontrol.int

Page 2: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

Contents

Data LinkConvergence

Data LinkConvergence

ProblemProblem SolutionSolution

StrategyStrategy GroupsGroups IssuesIssues

ADS-CADS-C

Page 3: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

The Problem

Aircraft?Aircraft?

CurrentTrials and

Implementation

CurrentTrials and

Implementation

NATData LinkMandate

NATData LinkMandate

EURData LinkMandate

EURData LinkMandate

ConvergenceProblem

ConvergenceProblem

Page 4: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

Step 3Step 3Converged Single Converged Single

SystemSystem

Step 3Step 3Converged Single Converged Single

SystemSystem

Step 2Step 2ATN AccomodationATN Accomodation

Step 2Step 2ATN AccomodationATN Accomodation

Step 1Step 1FANS-1/A AccomodationFANS-1/A Accomodation

Step 1Step 1FANS-1/A AccomodationFANS-1/A Accomodation

Solution : 3 Step Strategy

Page 5: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

ICAO Groups

NAT FIGNAT FIGNAT FIGNAT FIG ADGADGADGADG

DLSGDLSGDLSGDLSG

ICAOICAOConvergenceConvergence

GroupsGroups

ICAOICAOConvergenceConvergence

GroupsGroups

Page 6: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

EUR/NAT Data Link Steering GroupDLSG

ICAO DLSG created Under ICAO EUR/NAT Office Wide representation (UK, FR, PT, US, IS, Airbus, Boeing,…) Tasked to develop a harmonised data link service

First meeting March 2005 Workshop Action Plan:

Consistent with 3 steps strategy Second meeting October 2005

Creation of the ATN accommodation Drafting Group

Work on future systems (Step 3)

Page 7: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

ATN accommodation Drafting GroupADG

Purpose: to study the accommodation of ATN aircraft (i.e. ED110A compliant)

in the FANS-1/A environment

Tasks To agree a list of technical and operational issues which could prevent

accommodation of ATN aircraft in FANS-1/A airspace, and develop a set of potential resolutions to those issues.

To develop a specification for a trial in a FANS-1/A environment (e.g. NAT) in order to validate the potential resolutions identified in the previous task.

Develop a draft interoperability specification for the accommodation of ATN aircraft in FANS-1/A airspace for input into RTCA SC189/Eurocae WG53.

Page 8: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

ADG Progress

First Meeting April 2006 IRRF Approach Accepted Main Outcome:

Identification of all known issues that could potentially prevent an ATS Provider from accommodating ATN equipped aircraft

Second meeting June 2006 Main outcome:

Formulation of potential resolutions to the issues identified Several issues identified to be reported to the DLSG

Page 9: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

ADS-C Application Issue

Current ADS-C SARPs version Meets most requirements but has shortcomings Airlines do not support it Improvement proposals available

ADG Proposed Solution Improve ADS-C application if it is done by June 2007 Working Arrangements to be defined and accepted by DLSG

ACP Coordination key element

Page 10: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

Proposed ACP coordination

Chairman of SG-N2 of the ACP WG-W joins the ADG.

ADG material fed back to ACP for approval.

Page 11: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

ADG Statement

The ADG supports the publication of the ADS-C SARPS in their current from at this moment.

Page 12: Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int.

Thank You