Data for Costing Data for Parametric Costing
Mort AnvariDirector, Acquisition Costing
(SAFM-CEA)
2008 Cost Research WorkshopAcquisition Cost and Earned Value Reports:
Data Quality Issue
May 22, 2008
2 May 22, 2008
Data
Key Points
Recognize the DCARC Data Collection Enforcement through Defense Acquisition Executive Summary (DAES) and the Success in Collecting Data for Costing at DCARC, Services, and PMs.
We have Several Data Quality Issues and Potential for Type I (α) and II (β) Errors in our Cost Estimating.
Examples include: STRYKER, FCS, and GFEBS.
Opportunity for Cost Analysis Enterprise Resource Planning (CA-ERP) and Data for Costing Architecture.
Need Data for Costing:Future Technologies; Processes; Performances; Products; Services; Personnel; and Schedule.
3 May 22, 2008
Data
Army DAES Group A CSDR Issues & Actions May 2008
Program Status Issues (as of May 7, 2008) Actions (as of May 21, 2008)
ATIRCM/CMWS G N/A N/A
FMTV G N/A N/A
Patriot PAC-3 Missile Segment
G N/A N/A
JLENS Y1. DASG60-98-C-0001, plan A-04-I-C1-S2 R; Preliminary Design Review cost report submitted May 7, 2008 was rejected.
1. Report will be resubmitted by June 7, 2008.
UH-60M Y
1. W58RGZ-08-C-0003, plans A-06-A-C1-S1,A-06-A-C1 S2 and A-06-A-C1S3 WBS dictionaries, due February 29, 2008, has not been received.
1. WBS dictionary for plan A-06-A-C1-S1 was submitted on May 20, 2008. WBS dictionaries for plans A-06-A-C1 S2 and A-06-A-C1S3 are complete but contractor is having uploading difficulties on the DCARC website and is working with DCARC to resolve.
LUH Y1. W58RGZ-06-C-0194, plan A-07-C-C1; initial report, resubmission 2, was rejected on March 20, 2008.
1. Report was resubmitted on April 21, 2008. DCARC is reviewing.
1. W58RGQ-04-G-0023: Subcontractors not providing CSDR for Lots 3 & 4.
1. Cost reporting was not place on contract for Lots 3&4. PM and Contractor legal offices are reviewing.
2. W58RGQ-04-G-0023; plan A-05-E-C1: Lot 3 completion reports resubmittal, due December 10, 2008 have not been submitted.
2. The Contractor cannot resubmit the reports until the PM has formally reject the initial Lot 3 completion reports. The PM will submit the rejection letter to the Contractor by May 23, 2008.
3. W58RGZ-04-C-0012; plan A-05-E-C2(R1): CWBS dictionary, due January, has not been submitted.
3. The CWBS dictionary cannot be submitted until the New Build CSDR Plan is approved. The Program Office is waiting for Boeing feedback on the Plan before they submit it for final approval.
Patriot MEADS CAP Fire Unit
R1. No CSDR plans have been received for the Surveillance Radar.
1. Army PEO M&S has requested a waiver from CSDR reporting. Decision package is at OSD for consideration.
CH-47F R
4 May 22, 2008
Data
DAES Status Army Programs
11
116
DAES Status as of May 2008.
Green: No or minor open compliance issues.
Yellow : Unresolved minor open compliance issues. . Red: Any major issue. CSDR requirements not included on contracts. Unaddressed previously identified compliance issues.
5 May 22, 2008
Data
Available Data for Costing
Cost and Software Data Reports (CSDRs)
Cost Performance Report (CPR)
Automated Cost Databases (ACDB) from CSDRs and CPRs
Contractor Logistic Support (CLS) Database
Cost Analysis Requirements Description (CARD) Database
Army Operating and Support Management Information System (OSMIS)
Army Capability Knowledge Base (CKB)
Additional data sources include: Army Cost Positions (ACP) Database ACE-IT Sessions; SAR; DAES; WSR; APB; P/R-Forms; and Contract Summaries.
6 May 22, 2008
Data
Data for Cost Estimating
Cost Models Historical Data: Cost and (Physical, Technical, Performance, Capability, Schedule).
Subject System Data: Physical, Technical, Performance, Capability, Schedule.
Information KnowledgeData
Performance
Cost Schedule
Estimates are only as good as the data that they are based on.
7 May 22, 2008
Data
Data Issues
Current Data Reporting and Usage Issues (CSDR CCDR, SRDR, and CPR).
Examples include: Stryker, FCS, and GFEBS (lack of clean data / no data). Family or System of Systems (Commonality Issue) LSI, JV, Prime, Sub (Contracting Issue) CPIF, FFP,. . Reporting Requirements (Contract Type Issue) Manufacturing, Services, SW, and ERP (Activity Type Issue) Mod, ECP, and Incremental Contracts (Completeness Issue) Competition and Business Base Issues (Quantity issue) Physical, Technical, TRL, Performance (Technology Issue)
KPP and Capability Data Issue
Allocation Issue: Mapping to Standard ReportsLabor – Material
Direct – Indirect
Recurring – Non-Recurring
8 May 22, 2008
Data
Data Quality Challenges
Lack of data. Physical, technical, performance, capability. S/W ERP FFP Contract. ACAT II and below programs.
Policies and procedures. DoDI 5000-2 dated May 2003.
Requires SRDR but not CSDR for some programs. Vague in some areas; CSDR “not required for procurement of commercial systems, or for non-commercial systems bought under competitively awarded, firm fixed-price contracts, as long as competitive conditions continue to exist”.
Army regulations do not require cost reporting.
Data collection process. Existing data is not readily available to the Cost Analysts; sometimes they are not even aware that data exists. (Data in Jail) Contractors required to map CSDR reports IAW DoD MIL-HDBK-881.
9 May 22, 2008
Data
Data Collection Process
Contractor
1
Contractor
1
Contractor 2
Contractor 2
Contractor3
Contractor3
Contractor Accounting Systems:
Contractor Accounting Systems:
S1
S3
S4
S2S5S6
S7
S8
S10
S9
Contractor Data / Reports:
Contractor Data / Reports:
R1
R3
R4
R2
R5
R6
R7R8
R10
R9
R11
R12
R13
R14
R15
R16
R17
R18
Labor vs. MaterialDirect vs. IndirectRec. vs. Non Rec.
Unique vs. CommonContractor allocation
Contracting
Labor vs. MaterialDirect vs. IndirectRec. vs. Non Rec.
Unique vs. CommonContractor allocation
ContractingG1
G2
G3
Co
ntr
ac
tor
All
oc
ati
on
Data Quality?
Process affects data quality. Increases probability for data errors. Results in mapping / allocation inconsistencies.
Process vs. Quality.
COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188
1a. PROGRAM 2a. WEAPON SYSTEM TYPE 3. SUBMISSION TYPE 4. DATE AS OF (MM/DD/YY) 5. REPORT DATE (MM/DD/YY)
X INITIAL SUBMISSION
1b. MILESTONE A B X C: LRIP C: PROD CHANGE
6. POINT OF CONTACT (POC) INFORMATION 7. W BS 8. PREPARING ORGANIZATIONa. POC AND ADDRESS (Include ZIP Code) X PROGRAM
CONTRACT 9. REVIEW AND REFERENCE NUMBER
12. 13.CONTRACTOR CONTRACT d. DD 2630
a. PROGRAM b. CONTRACT (DUNS Code) NUMBER REQUIRED
DD FORM 2794, Oct 2003 PREVIOUS EDITION IS OBSOLETE
6d. E-MAIL ADDRESS:
REQUIREDWBS
REPORTING ELEMENTS
14. REPORT FREQUENCYa. DD 1921 b. DD 1921-1 (Part 1) c. DD 1921-1 (Part 2)
Public reporting burden for this collection of information is estimated to average 15 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204 Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provisions of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
REQUIRED
6b. TELEPHONE NUMBER
6c. FAX NUMBER
10.WBS ELEMENT CODE
11.
REQUIRED
CSDR
10 May 22, 2008
Data
Data Collection Process
Contractor’s map data for CSDR reports to IAW DoD MIL-HDBK-881. CSDR data is then mapped into Army ACDB IAW Army Cost Element Structure (CES).
Contractor Data Input
Form
ContractorDatabase
Current Data Collection Process.
DCARCDatabase
ACDBDatabase
Contractor Allocation
Army CES Allocation
…
HDBK Element3
HDBK Element2
HDBK Element1
DCARC / DoD MIL-HDBK-
881
…
Sys3
Sys2
Sys1
Contractor Accounting System
ACDB / Army CES
CES Element1
CES Element2
…
CES Element3
COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188
1a. PROGRAM 2a. WEAPON SYSTEM TYPE 3. SUBMISSION TYPE 4. DATE AS OF (MM/DD/YY) 5. REPORT DATE (MM/DD/YY)
X INITIAL SUBMISSION
1b. MILESTONE A B X C: LRIP C: PROD CHANGE
6. POINT OF CONTACT (POC) INFORMATION 7. WBS 8. PREPARING ORGANIZATIONa. POC AND ADDRESS (Include ZIP Code) X PROGRAM
CONTRACT 9. REVIEW AND REFERENCE NUMBER
12. 13.CONTRACTOR CONTRACT d. DD 2630
a. PROGRAM b. CONTRACT (DUNS Code) NUMBER REQUIRED
DD FORM 2794, Oct 2003 PREVIOUS EDITION IS OBSOLETE
6d. E-MAIL ADDRESS:
REQUIREDWBS
REPORTING ELEMENTS
14. REPORT FREQUENCYa. DD 1921 b. DD 1921-1 (Part 1) c. DD 1921-1 (Part 2)
Public reporting burden for this collection of information is estimated to average 15 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204 Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provisions of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
REQUIRED
6b. TELEPHONE NUMBER
6c. FAX NUMBER
10.WBS ELEMENT CODE
11.
REQUIRED
CSDR
11 May 22, 2008
Data
Automated Cost Database (ACDB)
Army Automated Cost Database (ACDB)
Cost Methodology Development
ACDB.
DCARC Database Collect Data of Historical
Programs
Normalize / Standardize Data
Input Data into ACDB Database
Structure
Query ACDB for Cost and
Technical Data
Relate Technical and Program
Parameters to Cost
Perform Regression
Analysis
Develop Cost Models
as appropriate
Army C
ES
Allocatio
n
Contractor data mapped twice.
12 May 22, 2008
Data
STRYKER
Engineering Support Vehicle (ESV)
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
Hull /
Structu
re
Suspe
nsion
/ Ste
ering
Power
Pac
kage
/ Driv
e Tra
in
Auxilia
ry A
utom
otive
Turre
t Ass
embly
Fire C
ontro
l
Armam
ent
Body /
Cab
Autom
atic
Load
ing
Autom
atic/
Remot
e Pilo
ting
Nuclea
r, Biol
ogica
l, Che
mica
l
Specia
l Equ
ipmen
t
Naviga
tion
Comm
unica
tions
Inte
grat
ion, A
ssm
, Tes
t
DO2-ESV_(22)
DO10-ESV_(10)
DO19-ESV_(10)
DO21-ESV_(10)
Unit cost should not increase over time; suggests no learning.
FOUO
FOUO
13 May 22, 2008
Data
STRYKER
FOUO
FOUO
Hull/Structure
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
DO2-IC
V_(16
6)
DO2 M
C_(51
)
DO2-ATGM
_(52
)
DO2-RV_(
66)
DO2-FSV_(
27)
DO2-ESV_(
22)
DO2-CV_(
41)
DO2-M
EV_(27
)
DO3-M
GS_(8)
DO5-NBCRV_(
4)
DO10-IC
V_(12
0)
DO10-M
C_(36
)
DO10-A
TGM_(
36)
DO10-R
V_(57
)
DO10-F
SV_(12
)
DO10-E
SV_(10
)
DO10-C
V_(14
)
DO10-M
EV_(15
)
DO19-IC
V_(13
4)
DO19-M
C_(40
)
DO19-R
V_(51
)
DO19-F
SV_(14
)
DO19-E
SV_(10
)
DO19-M
EV_(18
)
DO21-IC
V_(13
1)
DO21-R
V_(11
6)
DO21-F
SV_(27
)
DO21-E
SV_(10
)
DO21-C
V_(25
)
DO21-M
EV_(19
)
Hull / Structure thought to be common but data does not support commonality. Percentage of common parts for all HW WBS elements range from 11- 39%.
14 May 22, 2008
Data
STRYKER
FOUO
FOUO
Large variation in the unit costs for delivery orders 2, 10, 19, and 21.
Full Vehicle
Lot Number
Uni
t C
ost
by V
aria
nt
DO #2 DO #10 DO #19 DO #21
Hull / Structure
Lot Number
Uni
t C
ost
by V
aria
nt
DO #2 DO #10 DO #19 DO #21
Suspension / Steering
Lot Number
Un
it C
ost
by
Va
ria
nt
DO #2 DO #10 DO #19 DO #21
Power Package / Drive Train
Lot Number
Un
it C
ost
by
Va
ria
nt
DO #2 DO #10 DO #19 DO #21
15 May 22, 2008
Data
STRYKER
TACOM review of Stryker CSDR. Large variations in platform material costs across delivery orders.
Data suggested no learning.
Many HW elements %'s differ greatly between RDTE and Procurement.; Ex: ICV; RDTE Hull/Structure ~9% of total HW cost; procurement ~37%.
Some cost elements were not in the category an analyst would expect; Ex: Tech pubs; operator manuals DO#17 and tech manuals DO#12.
Contractor’s accounting system collects data by delivery order. Contractor MI-HDBK-881reporting level did not provide insight into unique vs. common. (11-39% common)
To conform to MI-HDBK-881 contractor allocated labor and some material costs.
16 May 22, 2008
Data
STRYKER
CSDRs provide no insight into common versus unique. Contractor collects data by delivery order and allocates labor and some material costs.
Shows commonality for variants.
Commonality across all Stryker variants.
Notional Resource Distribution Table (RDT).
17 May 22, 2008
Data
Future Combat Systems – FCS
Common development may be included in LSI data. Examples include: SE/PM; data; etc.
Common versus unique.
Subcontractors have functional responsibilities across multiple platforms.
Prime Contractors (Lead System Integrators (LSI)
Typical Program
FCS
FCS Family of Systems (Systems of Systems Approach).
Boeing & SAIC
Prime Contractor
Sub-Contractors
Sub-Contractors
Sub Sub-Contractors
Sub Sub-Contractors
18 May 22, 2008
DataLead System Integrated
(LSI)
MGVs
MULE UGV
IntegratedComputers
Ground Sensor
UAV UGS
Aerial Sensor
ANS
FCS
Tier I systems with functional responsibilities for MULE UGV: LSI, Integrated Computers, Ground Sensor, and ANS.
Mule UGV Functional Responsibility.
Subsystems
SubsystemsSubsystemsSubsystems
Subsystems SubsystemsSubsystems
Tier I
Tier II
19 May 22, 2008
Data
FCS Software SLOC
FCS includes 14 Integrated Weapon Systems and the Network
• These Systems & Network could be a Separate Major Software Development Effort/Program
Current FCS SLOC
97.6 M
MicrosoftWindows Vista: 50
System of Systems Software Total kSLOC
C4ISR 41,672.2
System of Systems Common Operating Environment (SOSCOE)
29,866.0
NSIV 1,070.7
IS&T 7,889.7
MGV 3,649.0
Logistics 1,337.3
Training 2,201.1
UAV 658.2
UGV 9,245.8
Total FCS 97,590.1
SLOC on the Rise. Requirements too?
20 May 22, 2008
Data
Cost Data Flow
Need for Data Warehousing. Repository of electronically stored data.
Several databases typically supply data to the warehouse.
Improved ease of data retrieval and data quality.
Contractor Cost Accounting Systems
Government InformationalSystems / Databases
Contractor
Sys1
Contractor
Sys2
Contractor
Sys3
Contractor
Sys4
ACDB OSMIS CLS
Current Information Access Flow.
Cost Analysts
21 May 22, 2008
Data
Data Warehousing
Raw Data loaded directly from contractor accounting system into data warehouse.
Metadata: ‘Data about Data’.
Data visualization / data warehousing / intelligent data mining.
Global definitions that can be referenced by many different databases.
InformationInformationDelivery SystemDelivery System
Government InformationalSystems / Databases
DataWarehouse
ExternalData
ExternalUsers
Proposed Information Access Flow.
Contractor Cost Accounting Systems
Data Marts
22 May 22, 2008
Data
Cost Analysis ERP
Potential for Enterprise Resource Planning (ERP) of Cost Analysis Data and Models across the DoD.
Enable data and information sharing. Allow automation and integration of business processes.
Cost Analysts need to be more involved in the process.
Data for Costing – Vision: Collect raw data with more flexibility and focus on metadata development – XML. Data warehousing of raw and current data. Acquiring data mining and search tools to assist data analysis.
Why Data ERP for Costing? Check out http://www.anvari.net/E_Proc_Model.htm