Dassian Program Plans and Controls (PPC)

20
Project Planning and Earned Value Composite DP010 – Project Planning and Earned Value Composite Demonstration

description

Dassian’s Program Plans and Controls (PPC) provides a detailed overview of the products benefits and core features. Initial diagrams show a high level overview while explaining concepts and terms that will be covered further in the presentation. Subsequent slides show screen captures to give a look and feel of the tool while providing functionality overviews of key features. Finally, several reporting examples are included to highlight the change and graphical analytics. For a complete live demonstration please contact us: [email protected]

Transcript of Dassian Program Plans and Controls (PPC)

Page 1: Dassian Program Plans and Controls (PPC)

Project Planning and Earned Value Composite

• DP010 – Project Planning and Earned Value Composite Demonstration

Page 2: Dassian Program Plans and Controls (PPC)

Project Planning:

• Project Planning Workbench that allows simple time-phased cost planning

• MS Project Schedule integration (DP051)

• Maintain Control Accounts and Work Packages

• Allows multiple cost plans and labor plans on a single project object (NWA)

• Plan a “Claim” and trigger approval process to “Incorporate” the plans (Baseline and EAC)

• Workflow Change Management

• Detailed Baseline Change Log

• Baseline Integrated Master Schedule

• Government Cost Performance Reports

• Integrated Graphical Reporting

Estimate at Complete (EAC)

• Estimate At Complete (EAC) Workbench has similar planning functionality as the Project Planning Workbench

• The concept is to show the actual costs/commitments and allow PLANNING and updates on the EAC.

• Automatically or Manually create an Estimate to Complete (ETC)*

• Actual Costs/Commitments + ETC = EAC

• Use an existing plan and decrements the actual cost to derive the ETC

• Use an existing EAC version and decrements the actual cost to derive the ETC

• Manually plan an ETC in the EAC Workbench

DP010 Functional Benefits – Project Planning & EAC

Page 3: Dassian Program Plans and Controls (PPC)

Easy to Use Workbench

Flexible planning options

Extensive Project Management Functionality

Automatically create EAC’s (Forecasts) using several different options

Update the Remaining ETC within a workbench

Dassian’s Project Planning/EV – A Look and Feel

Unified Integration within the SAP

Namespace

Highly tailored to customize to your

firm’s needs

Exceptionally functional and

dynamic change control

Page 4: Dassian Program Plans and Controls (PPC)

Dassian Project Planning Functionality Overview – EVMS

EV Methods

• Start/Finish

• Level Of Effort

• Estimates

• Weighted Milestones – Includes assignment of many SAP objects as milestones (example: sales order, production order, purchase order). The manual milestones can be assigned a percent complete.

• Apportioned efforts

• EAC Proportional (PERT)

The earned value methods and calculations use the latest EVMS concepts and allow for simple or sophisticated EVMS processes.

The EVMS functionality will allow for integration with the whole SAP ERP suite of information.

Robust Milestone Functionality

EV Methods – Many options available

EV Integration with MS Project using Dassian DP051 Solution

Page 5: Dassian Program Plans and Controls (PPC)

Dassian Project Planning Functionality Overview – Reporting

Graphical Analytics

• S-Curves

• Trend

• Period values

• Bulls Eye

• Combo

• Variance

All CPR government forms are available with robust options

for display.

Export directly into HTML and Microsoft Excel formats.

Change Log Hierarchical Reporting

CAP and RAM Reporting

Page 6: Dassian Program Plans and Controls (PPC)

Functionality Overview - Easy to use workbenches for planning baseline or EAC versions

DP010 Project Planning

Page 7: Dassian Program Plans and Controls (PPC)

Functionality Overview– Detailed planning by hour, cost, or person

Flexible Planning Options

Page 8: Dassian Program Plans and Controls (PPC)

Functionality Overview - Manage Multiple Projects as a Portfolio

Create Portfolios and Assign

Multiple Projects to Manage the Grouping as a

Single Unit

Project Management – Portfolios

Page 9: Dassian Program Plans and Controls (PPC)

Plan and track changes to the project baseline

Plan changes in the PS claim transaction

Save change versions separately from the

baseline / EAC

Send requests & receive approvals using

workflow

Incorporate multiple change versions to the

baseline / EAC

Project Management - Change Control

Page 10: Dassian Program Plans and Controls (PPC)

Functionality Overview - Assign Control Accounts, Control Account Managers, Work Packages, Default EV Methods, and Attach Documents/Links

The Control Account is normally defined as the level

that you can aggregate BCWS, BCWP, and Actuals AND

is a level that is controlled by a single organization.

The Work Package is the level of the project that the

user plans at and maintains a default EV method.

Project Management – Control Accounts

Page 11: Dassian Program Plans and Controls (PPC)

Functionality Overview - Automatically create EAC (forecasts)

The concept of an EAC is Actual costs plus

remaining plan. The functionality allows for

automatically creating an EAC based on existing

information. The data for the EAC comes from

the snapshot data which allows creation of an

EAC based on data at any time in the past.

Building an Estimate at Completion (EAC)

Page 12: Dassian Program Plans and Controls (PPC)

Functionality Overview - Capture and store data at a fixed point in time

Capture and store data by time period

and snapshot actuals, specific versions,

or the project hierarchy.

Snapshot Project Data

Page 13: Dassian Program Plans and Controls (PPC)

Functionality Overview - Update forecast of Estimate to Complete (ETC) in EAC workbench

Functionality and appearance similar to PPC Workbench

Managing an Estimate at Complete (EAC)

Page 14: Dassian Program Plans and Controls (PPC)

Functionality Overview - Maintain EV Methods, Status, and Calculate BCWP

Update the project EV methods, manage the EV milestones,

status the progress for each planning object, calculate BCWP,

and view columns displaying the project metrics.

Earned Value Workbench

Page 15: Dassian Program Plans and Controls (PPC)

Dassian Change Log Hierarchy Tabular Report - /DSN/010L

Allows the user to view the changes

to the project baseline

Change Management Reporting

Page 16: Dassian Program Plans and Controls (PPC)

Functionality Overview - Graphical report of pending and approved baseline changes

Total count and value of approved changes shown

over a given period of time.

Pending changes with view of initial planning, complete

approval , and a user specified probability % .

Change Management Reporting

Page 17: Dassian Program Plans and Controls (PPC)

Dassian PPC Analytics – S-Curve Chart

Dassian PPC Analytics – Functional Overview

Page 18: Dassian Program Plans and Controls (PPC)

Dassian PPC Analytics – Functional Overview

Dassian PPC Analytics – Period Bar Graph

Page 19: Dassian Program Plans and Controls (PPC)

How is your project

performing?

What is the cost and schedule

variance?

Dassian PPC Analytics – Functional Overview

Dassian PPC Analytics – Project Variance Analysis

Page 20: Dassian Program Plans and Controls (PPC)

Questions?