Project Planning and Earned Value Composite
• DP010 – Project Planning and Earned Value Composite Demonstration
Project Planning:
• Project Planning Workbench that allows simple time-phased cost planning
• MS Project Schedule integration (DP051)
• Maintain Control Accounts and Work Packages
• Allows multiple cost plans and labor plans on a single project object (NWA)
• Plan a “Claim” and trigger approval process to “Incorporate” the plans (Baseline and EAC)
• Workflow Change Management
• Detailed Baseline Change Log
• Baseline Integrated Master Schedule
• Government Cost Performance Reports
• Integrated Graphical Reporting
Estimate at Complete (EAC)
• Estimate At Complete (EAC) Workbench has similar planning functionality as the Project Planning Workbench
• The concept is to show the actual costs/commitments and allow PLANNING and updates on the EAC.
• Automatically or Manually create an Estimate to Complete (ETC)*
• Actual Costs/Commitments + ETC = EAC
• Use an existing plan and decrements the actual cost to derive the ETC
• Use an existing EAC version and decrements the actual cost to derive the ETC
• Manually plan an ETC in the EAC Workbench
DP010 Functional Benefits – Project Planning & EAC
Easy to Use Workbench
Flexible planning options
Extensive Project Management Functionality
Automatically create EAC’s (Forecasts) using several different options
Update the Remaining ETC within a workbench
Dassian’s Project Planning/EV – A Look and Feel
Unified Integration within the SAP
Namespace
Highly tailored to customize to your
firm’s needs
Exceptionally functional and
dynamic change control
Dassian Project Planning Functionality Overview – EVMS
EV Methods
• Start/Finish
• Level Of Effort
• Estimates
• Weighted Milestones – Includes assignment of many SAP objects as milestones (example: sales order, production order, purchase order). The manual milestones can be assigned a percent complete.
• Apportioned efforts
• EAC Proportional (PERT)
The earned value methods and calculations use the latest EVMS concepts and allow for simple or sophisticated EVMS processes.
The EVMS functionality will allow for integration with the whole SAP ERP suite of information.
Robust Milestone Functionality
EV Methods – Many options available
EV Integration with MS Project using Dassian DP051 Solution
Dassian Project Planning Functionality Overview – Reporting
Graphical Analytics
• S-Curves
• Trend
• Period values
• Bulls Eye
• Combo
• Variance
All CPR government forms are available with robust options
for display.
Export directly into HTML and Microsoft Excel formats.
Change Log Hierarchical Reporting
CAP and RAM Reporting
Functionality Overview - Easy to use workbenches for planning baseline or EAC versions
DP010 Project Planning
Functionality Overview– Detailed planning by hour, cost, or person
Flexible Planning Options
Functionality Overview - Manage Multiple Projects as a Portfolio
Create Portfolios and Assign
Multiple Projects to Manage the Grouping as a
Single Unit
Project Management – Portfolios
Plan and track changes to the project baseline
Plan changes in the PS claim transaction
Save change versions separately from the
baseline / EAC
Send requests & receive approvals using
workflow
Incorporate multiple change versions to the
baseline / EAC
Project Management - Change Control
Functionality Overview - Assign Control Accounts, Control Account Managers, Work Packages, Default EV Methods, and Attach Documents/Links
The Control Account is normally defined as the level
that you can aggregate BCWS, BCWP, and Actuals AND
is a level that is controlled by a single organization.
The Work Package is the level of the project that the
user plans at and maintains a default EV method.
Project Management – Control Accounts
Functionality Overview - Automatically create EAC (forecasts)
The concept of an EAC is Actual costs plus
remaining plan. The functionality allows for
automatically creating an EAC based on existing
information. The data for the EAC comes from
the snapshot data which allows creation of an
EAC based on data at any time in the past.
Building an Estimate at Completion (EAC)
Functionality Overview - Capture and store data at a fixed point in time
Capture and store data by time period
and snapshot actuals, specific versions,
or the project hierarchy.
Snapshot Project Data
Functionality Overview - Update forecast of Estimate to Complete (ETC) in EAC workbench
Functionality and appearance similar to PPC Workbench
Managing an Estimate at Complete (EAC)
Functionality Overview - Maintain EV Methods, Status, and Calculate BCWP
Update the project EV methods, manage the EV milestones,
status the progress for each planning object, calculate BCWP,
and view columns displaying the project metrics.
Earned Value Workbench
Dassian Change Log Hierarchy Tabular Report - /DSN/010L
Allows the user to view the changes
to the project baseline
Change Management Reporting
Functionality Overview - Graphical report of pending and approved baseline changes
Total count and value of approved changes shown
over a given period of time.
Pending changes with view of initial planning, complete
approval , and a user specified probability % .
Change Management Reporting
Dassian PPC Analytics – S-Curve Chart
Dassian PPC Analytics – Functional Overview
Dassian PPC Analytics – Functional Overview
Dassian PPC Analytics – Period Bar Graph
How is your project
performing?
What is the cost and schedule
variance?
Dassian PPC Analytics – Functional Overview
Dassian PPC Analytics – Project Variance Analysis