DARJEELING PROJECT WEST BENGAL, INDIA PROGRESS REPORT, SEPTEMBER 2014

Transcript of DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 –...

Page 1: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014 Septembre 2010

DARJEELING PROJECT W E S T B E N G A L , I N D I A P R O G R E S S R E P O R T, S E P T E M B E R 2 0 1 4

Page 2: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014

3. NEXT STEPS 4. PICTURES

2

1. KEY INFORMATION

PROGRESS REPORT WEST BENGAL, INDIA

Page 3: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

DARJEELING AGROFORESTRY PROJECT

Context and objectives

MAIN THEMES

KEY INFORMATION SPECIFIC CONTEXT

Ensure the long-term quality and availability of Darjeeling tea by creating a biodynamic ecosystem that brings optimal agricultural conditions for tea production

Favor multi-crops and increase and diversify revenues for farmers

Empower local farmers’ organizations with trainings and field workshops

• Type: Agroforestry / regeneration

• Local partners: TPI cooperative and DLR Prerna NGO

• Participants: Fair trade and Organic tea farmers from Sanjukta Vikas Cooperative

• Status in Sept 2014: 7,500 trees planted

• Potential: 15,000 trees planted by 2015

• Products: Trees

The dense tea monoculture in Darjeeling has led to a declining tea production in the last decade as plantations have cleared hillsides of trees to maximize the acreage of tea bushes, causing the degradation of the ecosystem on which tea production depends. Small-scale tea farmers of Sanjukta Vikas Cooperative have decided to launch an agroforestry project mixing trees and tea in order to secure optimal conditions for long term culture of Darjeeling tea. They will be supported by TPI cooperative and DLR Prerna NGO.

012345

Climatemitigation

Self sufficiency

Culture

Communityempowerement

Economicdevelopment

Climateadaptation

Agroecology

BiodiversityDARJEELING PROJECT

Page 4: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

Darjeeling hills, India

LOCATION

4

Nestling in the foothills of the mighty Himalayas lies Darjeeling, the northern most district of the state of West Bengal, India.

Eastern Himalayas is among the world’s ten most critical centers for biodiversity and endemism. Darjeeling is one of the global Biodiversity-hotspots.

Today the green cover is only 41.2% due to rampant legal and illegal felling. Deforestation has led to serious problems of landslides, threatening tea plantations and agricultural yields.

Darjeeling hills

Page 5: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

SPECIFIC CONTEXT

History of land use

5

1864 – 1957: The area was a part of the

Harrison’s and Mineral Springs English Tea Estate, all villagers were workers. Land is a tea monoculture plantation.

60’s – 80’s: Protestation movements and destruction of the Mineral Spring tea factory. People survived selling tea to neighboring gardens, hand made tea, firewood, timber and charcoal from the garden reserve forest. The reserve forest depleting rapidly, the people started “grabbing the land” and started cultivating traditional food grains.

1996: Villagers got ownerships of the land. Creation of the small farmers cooperative MSSVS (Mineral Spring Sanjukta Vikas Sunstha) with the support of NGO DLR Prerna. Now MSSVS area is an organic and bio-dynamic agriculture

Workers in a monoculture tea plantation, Darjeeling

Page 6: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

SPECIFIC CONTEXT

Key figures

The area of Mineral Spring has a population of 12500 people with 11 villages in 3 sectors:

• Dabaipani : 6 villages • Yangkhoo : 2 villages • Harsing : 3 villages

The area is 16 km from Darjeeling city. This is a remote area, people live from the culture of tea, spicy and milk sales on the local market.

The Mineral Spring experience has a great importance for Darjeeling with its unique and fragile socio-ecological system in this Eastern Himalayas, a biodiversity hotspots.

Agricultural model is monoculture farming and damage for environment increase year after year.

Mineral Springs Sanjukta Vikash want to be a social-ecological model for all Darjeeling district. Meeting about plantation with Pur Projet - Board of coop Mineral Spring,

Darjeeling Thursday, August 29th 2014

Page 7: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

SPECIFIC CONTEXT

Two critical issues: Deforestation and overuse of chemicals

India exported 225.76 million kg of tea in 2013-14. India is the world's second-biggest tea producer. Among the teas grown in India, Darjeeling tea offers distinctive characteristics of quality and flavor, and also a strong reputation for more than a century.

But the dense tea monoculture in Darjeeling has led to a declining tea production in the last decade as plantations have cleared hillsides of trees to maximize the acreage of tea bushes, causing erosion and a more rapid soil degradation.

In the battle to cut costs, the fertility of the naturally thin soil has further been reduced by overuse of chemicals or washed away by landslides.

Deforestation for tea is destroying the habitat of iconic local species, like the jaguar, and degrade the ecosystem on which tea production depends.

Darjeeling tea plantation

Page 8: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

PROJECT OBJECTIVES

Improving environmental and economic living conditions in Mineral Spring

OBJECTIVES

Create a biodynamic ecosystem that brings back optimal agricultural conditions for tea production: soil enrichment, erosion reduction, beneficial biodiversity (pest control), shading, retaining humidity… Hence ensuring the long-term quality and availability of Darjeeling tea;

Favor multi-crops and increase and diversify revenues for farmers, with a better distribution over time through additional short-term revenues from timber, fruit sales on the local market and development of other natural products;

Empower local farmers’ organizations with trainings and field workshops;

Improve food sovereignty and family diet with fruit plantations.

Be a socio-ecological model for other communities and tea plantation in Darjeeling district. Tea Farmer

Yangkhoo Village – Mineral Spring

Page 9: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

TPI cooperative and DLR Prerna

LOCAL PARTNERS

9

TEA PROMOTERS OF INDIA (TPI) Darjeeling-based family operation that manages seven organic Fair Trade tea gardens. TPI has been a pioneer in bringing environmental and

social reform to the tea industry.

TPI is supporting small tea farmers by helping them gain access to international market and a fair price for their tea.

They promote holistic and sustainable farming practices restoring soil health, with trees, plants & animals reappearing in these areas.

DARJEELING LADENLA ROAD PRERNA (DLR PRERNA) Darjeeling based NGO created in 2001 Their mission is to build sustainable human communities in

the Darjeeling hills by promoting peoples participation, gender equality and living in harmony with the environment.

The team provides technical support on agroecological practices to tea farmers and great passion to work in the Hills.

Page 10: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

Small-scale tea farmers from Sanjukta Vikas Cooperative

PARTICIPANTS

10

The Sanjukta Vikas Cooperative, was one of the first small farming initiatives in the plantation controlled region of Darjeeling.

The land that cooperative members live on was a tea plantation in the early part of the century but abandoned in the 1950s. The community has since depended mostly upon subsistence farming of corn, millet, potatoes and vegetables.

Today, they are a dairy cooperative of 450 family farmers who also export high quality, organic Fair Trade tea with the technical assistance and training of DLR Prerna, and the processing and marketing assistance of TPI.

They further support the environment with their commitment to farming using biodynamic, organic and permaculture farming techniques.

© Eric Garnier Tea collect day for all farmers of cooperative Mineral Spring

Page 11: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014 11

1. KEY INFORMATION

PROGRESS REPORT WEST BENGAL, INDIA

2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014

3. NEXT STEPS 4. PICTURES

Page 12: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

Environmental context in Mineral Spring

PROJECT IDENTIFICATION

12

Climate: Continental temperate monsoon climate. The area of Mineral Spring is in a valley and temperature is between 8°in January and 25° in August. Farmers observe warming temperatures year after year. Monsoon is in July and august. Hydrology: There are 2 main rivers in Mineral Spring, Rung Dung Khola and Ghatte Khola. There are a lot of waterfalls on the hills. Soils: The area of Mineral Spring is approximately 600ha with approximately 370ha of tea farming. 370ha are polyculture farming, all grown by producers of the cooperative Mineral Spring. Tea cultivation in monoculture is on the other side of the hill but it’s not cultivated by the cooperative. Ecosystems: The region belongs to the Eastern Himalaya range. This mountainous area is located along the border of Darjeeling and Nepal. The altitude differs from 800m (Rung Dung Khola river) to 1200m (last village on the top of the hill). Biodiversity: In the fringe of Senchel wildlife sanctuary, the area of Mineral Spring is a bio diversity hotspot. A dense vegetation covers the ground and we can find leopards, bears, boars, monkeys, civets, porcupines and rabbits.

Page 13: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

PROJECT IDENTIFICATION

Environmental context in Mineral Spring

13

Deforestation issues Mineral Spring area Total forest area: actually approximately 150ha (250 ha

in 1960’ years) Part of land area: 30% Forest types: mainly Teak, Cedar, Pine

Current Land use in Mineral Spring villages Uncultivated forest and villages represent 40% Tea farming represent 25 - 29% Other culture (orange, different fruits, vegetables,

spicy): 30%

Tea plantation, Darjeeling hills

Mineral Spring area, Darjeeling hills

Page 14: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

PROJECT DEVELOPMENT

Activities

14

Project summary: 15 000 trees will be planted on the area of

Mineral Spring 11 villages and more than 250 producers

participate to this program The first wave of planting was done in august

2014 with 7500 trees. Total reforestation area: About 250ha (250 farmers participate to the program)

Actions: Planting fruit and timber trees to increase

villagers’ revenue Improving environmental practices in the

village with the establishment of an educational program delivered in the school of Mineral Spring.

Planting medicinal trees for villagers Roll-out: Planting trees: 2 waves of plantation. 1st in august 2014, 7500 trees 2nd in 2015, 7500 trees Training of agroforestry for Mineral Spring

farmers

Page 15: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

PROJECT DEVELOPMENT

2014 Activities

15

FINALIZING PROJECT STRUCTURE Recording of interested communities and beneficiary farmers Visit of tea farms to identify tea farming best-practices, possible plantation

models, soil and climate types Selection of species based on appropriate combination with tea. Selection

of fruit and timber trees (according to the producers’ interest) to increase additional revenues for families

Design of plantation models Seedlings order and production PREPARATION OF FIRST PLANTATIONS WAVE Finalizing the contract with tree nursery Continuous empowerment of project technician by Pur Projet MONITORING OF FIRST PLANTATION WAVE Plantation of the seedlings by the farmers: land preparation, holes digging,

planting according to the selected model GPS tracking verification Plantations follow-up

APRIL 2014 JUNE 2014

AUG 2014

JULY 2014

Page 16: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

PLANTATIONS EXPECTED

3 sectors, 11 villages, 2 waves of plantation

16

Project area

SL.NO Sector NAME OF THE HAMLET NO. OF PLANTS 1 HARSING HARSING, DARA GAON 860 2 HARSING HARSING, GAIREE GAON 320 3 YANGKHOO YANGKHOO 1835 4 YANGKHOO AEGHARA NUMBER 540 5 DABAIPANI KOTHI DHURA 660 6 HARSING SCHOOL DHURA 500 7 DABAIPANI BALBIR DHURA 720 8 DABAIPANI GODAWN DHURA 4220 9 DABAIPANI SAILA DHURA 2000 10 DABAIPANI AAP BOTAY 2020 11 DABAIPANI SUBAN DHURA/12 NUMBER 825 TOTAL 15000

Page 17: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

PLANTATIONS AUGUST 2014

Planted species

17

Species Local name Scientific name Typical height Growth speedJapanese Cedar Dhupi Cryptomeria

Japonica 5-10m

Crape Myrtal Jarul Lagerstroemia Speciosa 20m

Himalayan Cedar Kawlo Cedrus Deodara 5-10m

Teak 3-5m Yield after 3 years

Coffee 5m Yield after 3 years

White Cedar Melia azedarach

Pipal Tree Pipli Exbucklandia populnea 10-15m

2014

Wave of plantation 1

Number of farmers involved

240 families

Number of trees distributed

7 500

Number of sectors

3 sectors, 11 villages

The complete mapping of the planted species will be done by january 2015, at the end of the first monitoring.

Page 18: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

ENVIRONMENT SENSIBILISATION

DEE program

18

Development Environment Education in Mineral Spring school Environment issues are a common preoccupation for people in Darjeeling hills. In collaboration with several schools, NGO DLR Prerna with his program DEE (Development Environment Education) promotes responsibility, empathy and action on issues of development and environment. The focus of this program is on individual, family, community and institutional responsibilities towards a sustainable and equitable socio-ecological system. In the wild Mineral Spring area ecological subjects are important, solid waste management, biodiversity, deforestation, importance to keep agroforestry system model . ,Teachers of Mineral Spring school talk about these issues to farmer’s children. Pur Projet program is a new and additional way of environment awareness for small farmers. Seeing their father plant trees, children can see a real example of what they learn in school about environmental issues, about the importance to keep this fruitful biodiversity on their lands.

Page 19: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

MONITORING

GPS Mapping of 3 parcels

19

Page 20: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

MONITORING

GPS Mapping of Navin TAMANG’s parcel

20

Page 21: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

MONITORING

GPS Mapping of Dan KUMAR’s parcel

21

Page 22: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

EXPECTED RESULTS

Socio-economic benefits over time

22

• Carbon sequestration in trees

• Impact on climate change at

global and local level

• Increase and diversification of revenues

- Yield and quality increase

- Timber sales at maturity

• Less dependence on crop production

• Social cohesion

• Pride, Cultural value

• Food sovereignty

SOCIAL & ECONOMIC

BIODIVERSITY • Ecosystems preservation and regeneration

• Cycle of organic matter, pollination

Protection of threatened and endemic

species

WATER • Preservation of water resources

• Increase of water stocking capacity

• Regulation of rainfalls / avoiding droughts

• Filtering and limitation of water runoff

SOILS • Regeneration of unproductive

soils

• Erosion avoided

• Nitrate sequestration

CLIMATE

Page 23: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014 23

1. KEY INFORMATION

2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014

3. NEXT STEPS 4. PICTURES

PROGRESS REPORT WEST BENGAL, INDIA

Page 24: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

Continuation of activities after the first planting wave

NEXT STEPS

FIRST MONITORING OF PLANTATIONS Community trainings on plantations and maintenance techniques. First monitoring parcels registration, geomapping, entry in control system. First monitoring of plantations: control of mortality, maintenance, field

trainings. SECOND MONITORING OF PLANTATIONS Second monitoring of plantations: mortality, growth, maintenance. Update of control system.

PROJECT MATURITY Annual monitoring: monitoring of tree growth, assessment of environmental

and economic benefits. Annual progress and monitoring report.

SEPT 2014 DEC 2014

2016 AND AFTER

2015

Page 25: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014 25

1. KEY INFORMATION

PROGRESS REPORT WEST BENGAL, INDIA

2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014

3. NEXT STEPS 4. PICTURES

Page 26: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

D a r j e e l i n g c i t y Capital of Darjeeling District, State of West Bengal, India

Page 27: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 27

M o n o c u l t u r e t e a p l a n t a t i o n Darjeeling hills

Page 28: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 28

W o r k e r s i n a m o n o c u l t u r e t e a p l a n t a t i o n Darjeeling hills

Page 29: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 29

M i n e r a l S p r i n g h i l l s 17 km from Darjeeling city – The area of Mineral Spring tea cooperative

Page 30: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 30

A g r o f o r e s t r y t e a m o d e l Yangkhoo village, Mineral Spring (tea, cardamom, orange, turmeric, beans, ginger)

Page 31: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 31

M i n e r a l S p r i n g C o o p e r a t i v e Day of tea collect

Page 32: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 32

T e a p r o d u c t i o n India is the second world’s largest producer of tea

Page 33: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 33

P u r a n T A M A N G TPI Cooperative president

Page 34: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 34

D u r a j R A I Tea producer – School Dhura village

Page 35: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 35

A a p B o t a y v i l l a g e , M i n e r a l S p r i n g a r e a Navin Tamang House (tea farmer)

Page 36: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 36

A a p B o t a y v i l l a g e Tea farmer’s daughter

Page 37: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 37

T e a p r o d u c e r ’ s f a m i l y Aap Botay village

Page 38: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 38

V i c k e y R A I & P r e m r a j R A I Tea producers – Yangkhoo village

Page 39: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 39

M i n e r a l S p r i n g s c h o o l T e a c h e r w i t h h e r c l a s s , Y a n g k h o o v i l l a g e

Page 40: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 40

Page 41: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 41

S a i l e s h S h a r m a NGO DLR Prerna, Mineral Spring area

Page 42: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 42

M r s T a m a n g , Daragaon village, Mineral Spring area

Page 43: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – April 2014 43

S a n j u k t a V i k a s S u n s t a h c o o p e r a t i v e 456 family members

Page 44: DARJEELING PROJECT · Darjeeling project, India – Sept 2014 2. PROJECT ACTIVITIES OCT 2013 – AUGUST 2014 3. NEXT STEPS 4. PICTURES 2 1. KEY INFORMATION PROGRESS REPORT

Darjeeling project, India – Sept 2014

PUR PROJET

20 passage de la bonne graine 75011 Paris France

Tel: +33 9 81 30 91 43 [email protected]

www.purprojet.com

THANK YOU!