Dar Hady Hotel in Saudi Arabia
VRVVRV for Large Scale buildingLarge Scale building
![Page 2: Dar hady (saudi makka)](https://reader035.fdocuments.net/reader035/viewer/2022081502/55ce6601bb61eb321d8b46e0/html5/thumbnails/2.jpg)
Project Outline
Project Name
Location
Owner
Building shape
Height
Project Operation
VRV List
Dar Hady Hotel
Makka in Saudi Arabia
Bin Mahfouz Group
3 towers with common lobby
Total 15 floors
November 2007
441 ODU
I-Managers x 2
1442 FCU
Total 3,600RTby VRV
![Page 3: Dar hady (saudi makka)](https://reader035.fdocuments.net/reader035/viewer/2022081502/55ce6601bb61eb321d8b46e0/html5/thumbnails/3.jpg)
For Open Space
FXMQ250 8RT FXMQ125 4RT
Entrance & Lobby Corridor
Precise Control in every Small Area Central ControlIndividual Remote or
![Page 4: Dar hady (saudi makka)](https://reader035.fdocuments.net/reader035/viewer/2022081502/55ce6601bb61eb321d8b46e0/html5/thumbnails/4.jpg)
FXDQ50 1.5RT FXDQ63 2RT
Every Bed Room has 1 individual control
For Guest Room
Guest Rooms Guest Room (inside)
![Page 5: Dar hady (saudi makka)](https://reader035.fdocuments.net/reader035/viewer/2022081502/55ce6601bb61eb321d8b46e0/html5/thumbnails/5.jpg)
Installation
Flexible positioning of ODU
No Crane – Lift with elevator
No Water Pipes
No Water Pumps
No Water Valves
![Page 6: Dar hady (saudi makka)](https://reader035.fdocuments.net/reader035/viewer/2022081502/55ce6601bb61eb321d8b46e0/html5/thumbnails/6.jpg)
I-Manager control 1442 FCU individually from 2 PCs
Central Control
Temp setting
Air Flow control
Schedule Program
ON/OFF Restriction of individual control
Operation record
Web-Control
Calculate Power Consumption of all FCU
OptionMalfunctionEach 1442 FCU
Operate by 2 PCs
![Page 7: Dar hady (saudi makka)](https://reader035.fdocuments.net/reader035/viewer/2022081502/55ce6601bb61eb321d8b46e0/html5/thumbnails/7.jpg)
Owner’s Evaluation
Cost Saving of Installation
Cost Saving of Maintenance
Individual & Central control precisely
Why did you adopt VRV?Super Energy Saving for partial load
Single supplier can complete the project
Space Saving by flexible ODU positioning
![Page 8: Dar hady (saudi makka)](https://reader035.fdocuments.net/reader035/viewer/2022081502/55ce6601bb61eb321d8b46e0/html5/thumbnails/8.jpg)
Thank you for your attention
VRVVRV for Large Scale buildingLarge Scale building