DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei...

17
Fermilab: Wanwei Wu, Tingjun Yang, Linda Bagby, Shekhar Mishra SLAC: Mark R. Convery, Matt T. Graham, Patrick K. V. Tsang Test TPC Coordination Meeting Thursday, 9 August 2018 DAQ Update for DUNE Small TPC CE Test at Fermilab

Transcript of DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei...

Page 1: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

Fermilab: Wanwei Wu, Tingjun Yang, Linda Bagby, Shekhar MishraSLAC: Mark R. Convery, Matt T. Graham, Patrick K. V. TsangTest TPC Coordination MeetingThursday, 9 August 2018

DAQ Update for DUNE Small TPC CE Test at Fermilab

Page 2: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

Today’s Topic

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab2

• ORC Preparation• DAQ Status and Next• Electronics Layout/Timing/Trigger

Page 3: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

ORC Preparation—Overview

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab3

• SLAC team locates the COB etc.a. COB from JJ (James J. John, Russell), has 3 DPMs.b. SLAC will make sure the firmware is up to date when sending

it to Fermilab.c. Discussions are ongoing regarding previous safety review

findings on the COBd. DPM and RCEs will come along with COBe. Patrick has RTM at CERN and will send to Fermilab.f. An FPGA Carrier Board is needed for the timing system. One

may be available at CERN.

• SLAC team can send the COB etc. in the following weeks.• We are working on one ORC review for the whole DAQ system.

Page 4: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

ORC Preparation—Overview

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab4

Name Quantity StatusATCA shelf 1 YRTM 1 YPC 1 YCOB 1 YDPM 3 YCopper ethernet cable 1 YFiber/SFP+ 1 YTiming Board 1 YSpliter 1 ?WIB 3 YFiber/MPO 3 Y

• Core components for DAQ

4 FEMBs -> 1 WIB -> 2 RCEs4 DPM / COB2 RCEs / DPM

Page 5: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

ORC Preparation—Overview

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab5

https://docs.google.com/document/d/1XKaibq62KJuxdlmH11K7QEu0R63RbIWw4Bb74i237Mo

• ORC document (draft) is available:

Page 6: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

DAQ Status and Next—ATCA Shelf

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab6

• Need to connect to one of the servers

• Request remote login for setup, for Matt (mgraham), JJ (jrussell) and Sergio (username?)

• Matt has access to PAB server now

Page 7: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

DAQ Status and Next—COB and RCE

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab7

• Optical fiber connects (from) the WIB to RCEs. There is an IP on WIB and specific UDP ports on FEMB.

• IP addresses: SLAC assign them using DHCP but fix them in the dhcpd.conf. (Also, MAC addresses provided by JJ)

• A static IP address for the shelf manager that also needs to set up on the 1GbE network (may already works since we are using the same PCs).

• Get an IP to the shelf manager setup• Have access to the software• Use various commands to integrate the RCEs and COB• This is documented on a SLAC confluence page (but need a SLAC

computer account to access it)• Need to modify IP if taling to shelf manager

Page 8: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

DAQ Status and Next—Software

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab8

• A meeting has been scheduled with CD on coming Monday. We will

present our software request:a. What hardware is involved.b. What expertise we have and can bring to the table.c. What expertise and support we need from CD.d. Are there any quicker solution than full-blow artdaq

acceptable• Kurt and John are busy with protoDUNE. We’re contacting them to

find some time to setup the DAQ software.

Page 9: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

TPC Electronics—Layout

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab9

FPGA

COB

FEMB (x10)

WIB

RCE

PTC Crate

TimingCard

Splitter

LAr

Tx: 1310 nmRx: 1550 nm

• David Newbold showed us a layout of the electronics

Page 10: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

TPC Electronics—Timing System Components

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab10

Timing System Shopping List

Item Quantity Configuration Estimated Price ($) Links

Splitter 11x8, LC/UPC in, LC/UPC

out 25.3https://www.fs.com/products/48475.html

Patch cables 6

Simplex, OS2, LC/UPC to LC/UPC, choose the right length, 3/6 spare 10

https://www.fs.com/products/40435.html

Timing FMC SFP module 3 2/3 spare 36

https://www.fs.com/products/20141.html

Endpoint SFP module 3 2/3 spare 27

https://www.fs.com/products/20140.html

JTAG cable 1 60

https://www.digikey.com/product-detail/en/digilent,-inc./410-249/1286-1019-ND/3902812?WT.srch=1&gclid=Cj0KCQjw-o_bBRCOARIsAM5NbIOuhUzis6PGwH4MZoDRYX9mNpBgfu2Eql5oZpqpZUs_oOAy41llReQaAnaMEALw_wcB

Page 11: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

TPC Electronics—Trigger

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab11

• How will the trigger signal be

generated?

• David Newbold provided an

option: replicate the CERN setup

which uses the AIDA TLU - this unit is

specifically designed to make

coincidence triggers from scintillators,

and can connect directly to the timing

system�David Cussans, who is the

designer of the TLU�.

From David Newbold

To use four scintillators two on top and two on bottom to make a cosmic trigger, …

Page 12: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

Backup

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab12

Page 13: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

COB and RCE

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab13

• a dump of the power draw. (This is with the RCE doing basically nothing,

so the draw will depend somewhat on load. 35Watts is the what the

shelf manager has allocated to each DPM (2 RCEs). The DTM has a

smaller FPGA so is less. )

Page 14: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

COB and RCE

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab14

Page 15: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

DAQ Rack AC Distribution

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab15

2APulizzi I (12A) Pulizzi II (12A)

Server 02 (750W)

Server 01 (495W)

NIM BIN (140 W)

3.125A3.125A

2A

1.25AATCA (300W)

RPS1A

1.25A

1.17A

NIM FAN

NSW

1A

2A

PAB LS/PP-05 CKT# 17

PAB PP/PA-01 CKT# 11

Page 16: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

DAQ Rack AC Distribution

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab16

14AWG/SJT/300VPulizzi I (12A) Pulizzi II (12A)

Server 02 (750W)

Server 01 (495W)

NIM BIN (140 W)

18AWG/SJT/300V18AWG/SVT/300V ATCA (300W)

18AWG

14AWG

Cable along the NIM BIN

NIM FAN

NSW

Cable along the fan: 18/SJT

18AWG

RPS

PAB LS/PP-05 CKT# 17

PAB PP/PA-01 CKT# 11

14AWG/SJT/300V

14AWG

Page 17: DAQ Update for DUNE Small TPC CE Test at Fermilab...DAQ Status and Next—Software 8 8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab • A meeting has been scheduled

DAQ Power Supply Request

8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab17

Group A (building ground):• 120V-20A quad panel CKT X (NEMA 5-20)• 120V-20A quad panel CKT Y (NEMA 5-20)• 120V-20A quad panel CKT Z (NEMA 5-20)

Group B (building ground):• 120V-30A with twist lock (L5-30R)• 208V-3!-30A

Group C (Detector ground):• 480V-15KVA with twist lock (Linda’s ISOLATION XFMR)

Group A and Group B are for DAQ Rack system; Group C is for TPC and Cold Electronics.