DANG, GUJARATSaputara and the other on a tributary of Khapri river at Bhisia. There are surface...
Transcript of DANG, GUJARATSaputara and the other on a tributary of Khapri river at Bhisia. There are surface...
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
District Irrigation Plan (2016-2020)DANG, GUJARAT
DANG
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
District Irrigation Plan (2016-2020)DANG, GUJARAT
DANG
1 | P a g e
CONTENTS
Executive summary ............................................................................................................. 5
INTRODUCTION ............................................................................................................................................. 9
Background ............................................................................................................................................... 9
Vision ....................................................................................................................................................... 15
Objective ................................................................................................................................................. 15
Strategy/approach .................................................................................................................................. 16
Programme Components ........................................................................................................................ 17
Rationale/ Justification ........................................................................................................................... 19
Methodology ........................................................................................................................................... 19
Chapter 1 General Information of the District ........................................................................................ 21
1.1 District Profile ................................................................................................................................... 21
1.2 Demography ...................................................................................................................................... 22
1.3 Biomass & Livestock .......................................................................................................................... 23
1.4 Agro-Ecology, Climate, Hydrology and Topography: ........................................................................ 24
1.5 Soil Profile ......................................................................................................................................... 25
1.6 Soil Erosion and Runoff Status .......................................................................................................... 27
1.7 Land Use Pattern: .............................................................................................................................. 27
Chapter 2 District Water Profile .............................................................................................................. 29
2.1 Area Wise, Crop Wise Irrigation Status ............................................................................................. 29
2.2 Production and Productivity of Major Crops .................................................................................... 30
2.3 Irrigation bases Classification ........................................................................................................... 31
Chapter 3 Water Availability in The Dangs .............................................................................................. 32
3.1 Status of water availability ................................................................................................................ 32
3.2 Status of Ground Water Availability ................................................................................................. 33
3.3 Status of Command Area .................................................................................................................. 36
3.4 Existing Type of Irrigation ................................................................................................................. 37
Chapter 4 Water Requirement /Demand ................................................................................................ 38
4.1 Domestic Water Demand .................................................................................................................. 38
4.2 Crop Water Requirement .................................................................................................................. 38
4.3 Livestock ............................................................................................................................................ 39
2 | P a g e
4.4 Industrial Water Requirement .......................................................................................................... 40
4.5 Water Demand for Power Generation .............................................................................................. 40
4.6 Total Water Demand of the district for various sectors ................................................................... 40
4.7 Water Budget .................................................................................................................................... 40
Chapter 5 Strategic Action Plan for Irrigation in District under PMKSY .................................................. 42
5.1 Strategic Plan for irrigation in PMKSY ............................................................................................... 42
5.2 Department wise plan ....................................................................................................................... 42
5.3 Component wise plan ....................................................................................................................... 43
5.4 Block wise- year wise plan ................................................................................................................ 44
5.5 Expected Output and Outcome: ....................................................................................................... 49
Annexure 1: GSWMA- Strategic Action Plan for Irrigation in District under PMKSY: 2016-2020 (ALL
Batches-I to V) ......................................................................................................................................... 50
Annexure 2: GGRC ................................................................................................................................... 63
Annexure 3: GWRDC ............................................................................................................................... 64
Annexure 4: GLDC ................................................................................................................................... 64
Annexure 5: WRD (SI & PI) ...................................................................................................................... 64
Annexure 6: Forest Department ............................................................................................................. 66
Annexure 7: ATMA .................................................................................................................................. 67
Annexure-8: Proposal of Agriculture Department .................................................................................. 69
3 | P a g e
LIST OF TABLES
Table 1.1: District Profile of The Dangs ....................................................................................................... 22
Table 1.2: Demographic features of the Dangs .......................................................................................... 22
Table 1.3: Demographic features ................................................................................................................ 22
Table 1.4: Livestock Census ........................................................................................................................ 23
Table 1.5: Livestock population as per PMKSY Format ............................................................................... 23
Table 1.6: Weather of Dang district (Available normal) ............................................................................. 25
Table 1.7: Taluka wise monthly rainfall data .............................................................................................. 25
Table 1.8: Weather of Dang district as per PMKSY Format ........................................................................ 25
Table 1.9: Soil type in the Dangs ................................................................................................................. 26
Table 1.10: Agro ecological situations of South Gujarat Heavy Rainfall Zone–I ........................................ 26
Table 1.11: Land use Pattern in The Dangs ................................................................................................. 27
Table 1.12: Land use Pattern in the Taluka Ahwa (the Dangs) PMKSY format ........................................... 28
Table 2.1: Area Wise, Crop Wise irrigation Status ...................................................................................... 29
Table 2.2: Area wise – Crop wise Irrigation ................................................................................................ 30
Table 2.3: Area wise – Crop wise Irrigation (Horticulture) ......................................................................... 31
Table 2.4: Irrigation based classification ..................................................................................................... 31
Table 3.1: Status of Irrigation...................................................................................................................... 32
Table 3.3: Status of ground water availability ............................................................................................ 36
Table 3.4: Status of command area (in Ha)................................................................................................. 36
Table 3.5: Existing type of Irrigation (Surface and Ground) ........................................................................ 37
Table 3.6: Existing type of irrigation (Water extraction devices) ............................................................... 37
Table 4.1: Domestic Water Demand (MCM)............................................................................................... 38
Table 4.2: Crop Water Requirement in Million Cubic Meter ...................................................................... 39
Table 4.3: Animal wise livestock water requirement (in MCM) ................................................................. 39
Table 4.4: Present Water Demand of the district for various sectors ........................................................ 40
Table 4.5: Total Water Demand of the district for various sectors (Projected for 2020) ........................... 40
Table 4.6: Water Budget (Volume in MCM) ............................................................................................... 41
Table 5.1: Department-wise year-wise proposal under PMKSY ................................................................. 42
Table 5.2: Component wise plan ................................................................................................................ 44
Table 5.3: Block wise, year wise plan .......................................................................................................... 45
4 | P a g e
LIST OF FIGURES & MAPS
Figure 1.1: District map of The Dangs ......................................................................................................... 21
Figure 5.1: Department wise proposal under PMKSY ................................................................................. 43
Figure 5.2: Component wise Plan ............................................................................................................... 44
Figure 5.3: Block wise proposal under PMKSY ............................................................................................ 45
Map 1: Hydrogeology of Dangs ................................................................................................................... 34
Map 2: Pre Monsoon depth to ground water ............................................................................................. 36
Map 3: Post Monsoon depth to ground water ........................................................................................... 36
5 | P a g e
Executive summary
In an agrarian economy like India, agriculture utilizes the major share of country‟s exploitable
water resources. Though the sector utilizes the maximum share of exploitable water resources,
availability of the same at different locations to different extent makes it vital to adopt effective
utilization of water through storage, channelizing and judicial use. At some places like Punjab
and Haryana, the environmental and socio-economic rationale for this capture by the sector is
now being questioned. Accordingly, it is needed to challenge and change the fundamentals of the
prevailing view of water resources exploitation. A new and more suitable approach to water
resources allocation is necessary if the population is to be adequately fed, without further
degradation and destruction of the critical ecosystem services. Water productivity needs to be
enhanced considerably, and economic cost-benefit analysis and pricing regimes can play a
significant role in such a process. However, these economic measures will not be sufficient on
their own. They will need to be buttressed by technological innovation and institutional changes
in order to encourage a more equitable distribution of resources and to mitigate potential
international conflicts across 'shared' water basins.
Water has unique characteristics that determine both its allocation and use as a resource by
agriculture. Agricultural use of water for irrigation is itself contingent on land resources. In a
situation of growing water scarcity and rising demands for non-agricultural (household and
industrial) use of water, reassessment of sectoral allocations of water are inevitable. In
developing countries, irrigated agriculture plays a vital role in contributing towards domestic
food security and poverty alleviation. Therefore, achievement of these objectives is dependent on
adequate allocations of water to agriculture. Justification of such allocations requires that
irrigated agriculture be a cost-effective means of achieving stated political or social objectives,
such as food security or poverty alleviation, and that all externalities be taken into account in the
pricing mechanism. Improved allocation of irrigation water is required within the agriculture
sectors in order to achieve greater efficiency in the use of irrigation water and existing irrigation
infrastructure. Reallocation is also required in order to reduce waterlogging and salinization of
irrigated land, to decrease the negative environmental impacts and other externalities of
6 | P a g e
irrigation (caused by over extraction of groundwater and depletion and pollution of surface
water).
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address
the constraints in providing assured irrigation as well as increasing efficiency and productivity of
current water use to bring more prosperity to the rural areas. Priorities of Government of India
were reflected in the Hon‟ble President‟s address to the joint Session of the Parliament of 16th
Lok Sabha where he indicated that “Each drop of water is precious. Government is committed to
giving high priority to water security. It will complete the long pending irrigation projects on
priority and launch the „Pradhan Mantri Krishi Sinchayee Yojana‟ with the motto of „Har Khet
Ko Pani‟. There is a need for seriously considering all options including linking of rivers, where
feasible; for ensuring optimal use of our water resources to prevent the recurrence of floods and
drought. By harnessing rain water through „Jal Sanchay‟ and „Jal Sinchan‟, we will nurture water
conservation and ground water recharge. Micro irrigation will be popularised to ensure „Per
drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five
years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of
Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of
Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,
CADWM, MI, SWMA, Watershed & Convergence with MGNREGA were brought together
under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme like
Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya Krishi
Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification
programmes (JLNNSM&REP), Rural Infrastructure Development Fund (RIDF), Members of
Parliament Local Area Development Scheme (MPLAD), Members of Legislative Assembly
Local Area Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State
Forest Department (WPSFD) etc. The PMKSY will be implemented in an area development
mode only by adopting a decentralized state level planning and projectised execution structure
that will allow the state to draw up their own irrigation development plans based on DIPs and
SIPs with a horizon of 5-7 years. The program will be supervised and coordinated utilizing the
existing mechanism and structure available under Rashtriya Krishi Vikas Yojana (RKVY)
7 | P a g e
program with state agriculture department acting as the State Nodal Agency for implementation
of PMKSY. However, the implementing departments for the four components like AIBP,
PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop) and PMKSY (watershed
development) will be decided by the respective program ministry/department.
The 05 chapters along with introduction chapter, explains the profile of district, its water
requirement for agriculture and allied sector, water availability, assessment of water requirement
for various sectors and strategic action plan for augmentation and effective management of
available water resources.
District Water Profile: The major source of the surface water is the perennial flows in Ambika,
Khapri and Purana rivers. There are two major irrigation projects, one on River Sharpa Ganga at
Saputara and the other on a tributary of Khapri river at Bhisia. There are surface water storage
tanks at Chikhli (Capacity 817.20 m3) and Sulia Barda (408.60 m
3). Many more storage tanks are
constructed in the area. Apart from Storage tanks Lift Irrigation scheme have been tried at
Ambapara (command 60 ha.) and Kudkas (command 50 ha.). Numerous springs scattered all
over the district have been reported in the past. These were reported having the discharges from
five to less than half litre per minute. Some of the important locations reported earlier are near
Wagai, Sati, Chinhana, Sonda etc.
Demand for water and the gap: The present water demand of the district has been assessed at
388.3 MCM annually, with agriculture being the component with maximum water requirement
(376.87 MCM). During 2020, total water requirement of the district has been assessed at 389.1
MCM. The total water gap for the district has been estimated at 278.8 MCM during 2020 which
has to be met by augmenting the water availability. The major gap is due to non-availability of
surface water resources.
PMKSY Financial Proposal: Total plan of Dangs district for four years works out to be Rs.
34442.9 lakh. Maximum share of Rs. 16332.8 lakh (47.42%) is for Forest Department followed
by DWDU/ GSWMA with Rs. 7028.6 lakh (20.41%). Share of PI, GGRC, GWRDC, WRD,
GLDC and ATMA are Rs. 5888 lakh, Rs. 1718.7 lakh, Rs. 1183.7 lakh, Rs. 1380 lakh, Rs. 574.0
lakh and Rs. 117.70 lakh respectively.
8 | P a g e
Expected Outcome: District Watershed Development Unit (DWDU) has proposed to create
water storage capacity of 934041.8 cum, 180198 cum, 48350 cum and 27320 cum during the 1st,
2nd, 3rd and 4th year respectively. The irrigation potential which is likely to be created by
DWDU is 3216.5 ha, 83.3 ha, 56.9 ha and 22.9 ha during the 1st, 2nd, 3rd and 4th year
respectively. Similarly, there will be generation of additional employment in the district which
will be to the tune of 122881 mandays, 15333 mandays, 10791 mandays and 1950 mandays
during the four continuous years respectively (2016-20).
The proposal of GGRC aims at intervening in an area of 3836.42 hectare and similarly GWRDC
aims at extending irrigation to 1028 hectare of land. With the proposal of GLDC, the area which
is likely to be irrigated is 610 hectare. In case of Agriculture Department‟s proposal, the total
area which will be irrigated is 600 hectare and the number of expected beneficiary will also be
600 farmers.
9 | P a g e
INTRODUCTION
Background
Preparation of decentralized area specific district planning process visualized in various plans
took concrete shape through the years and initiatives like specific guidelines on methodologies
and processes for preparation of district plans; framework for preparation of perspective plan,
medium term and annual plans by then planning commission in 1969 and the 73rd
and 74th
constitutional amendments conferring constitutional status to Panchayats at district and sub
district level; local self-government in urban areas; constitution of district planning committee to
consolidate the plans prepared at Panchayats and municipalities and prepare a draft development
plan for the whole district.
The decentralized planning process was further strengthened through emphasis by planning
commission on preparation of district level plans and making it an integral part of the process of
preparation of the states 11th
five year plan. The Planning commission issued guidelines in
August 2006 for preparation of the district plans. The guidelines define the District Planning as
„the process of preparing an integrated plan for the local government sector in a district taking
into account the resources (natural, human and financial) available and covering the sectoral
activities and schemes assigned to the district level and below and those implemented through
local governments in a state. The document that embodies this statement of resources and their
allocation for various purposes is known as the District Plan”.
Government of India through a resolution in National Development Council on 29th
May 2007
conceived a special Additional Central Assistance Scheme (ACAS) to address the slow growth
of agriculture and allied sectors by incentivizing states to draw up plans for their agriculture
sectors more comprehensively. The NDC resolution states "GoI will introduce a new Additional
Central Assistance Scheme to incentivize states to draw up plans for their agriculture sector more
comprehensively, taking agro-climatic conditions, natural resource issues and technology into
account, and integrating livestock, poultry and fisheries, etc. This will involve a new scheme for
Additional Central Assistance (ACA) to State Plans, administered by the Union Ministry of
Agriculture over and above its existing Centrally Sponsored Schemes, to supplement the State-
10 | P a g e
specific strategies including special schemes for beneficiaries of land reforms. The newly created
National Rainfed Area Authority will, on request, assist States in planning for rainfed areas".
The NDC in its resolution advised the states to prepare a comprehensive district agriculture plans
(C-DAP) that will fully utilize available resources and will include allied agriculture sectors.
Further, GOI issued a manual on preparation of comprehensive district agriculture plans to help
the states prepare C-DAP. As per these guidelines, the objective of district planning is „to design
an integrated and participatory action plan for the development of local area in general and
agriculture and allied sectors in particular‟. The objectives of Comprehensive District
Agriculture Plan (C-DAP) are:
To prepare a Comprehensive District Agriculture Plan (C-DAP) through participatory
process involving various organisations and stakeholders.
To enable optimum utilisation of scarce natural, physical & financial resources.
To assess and plan for the infrastructure required to support the agriculture
development.
To establish linkages with the required institutional support services, like credit,
technology transfer, ICT, research etc.
To evolve an action plan for achieving sustainable agricultural growth with food
security and cropping system that will improve farmers‟ income.
The guidelines required the state/district authorities to (i) ensure that the agricultural plans are
prepared for the district and then integrated into the agricultural plans of the State based on the
agro-climatic conditions, availability of technology, trained manpower and natural resources; (ii)
local needs / crops / feed and fodder / animal husbandry / dairying / fisheries / priorities are
reflected in the plan; (iii) productivity gaps for important crops and livestock and fisheries are
reduced; and (iv) the returns to the farmers from these are maximized.
The latest move in the process of strengthening of decentralized planning process was the
Government of India guidelines issued in 2015 in the form of a template for the preparation of
District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri Krishi
Sinchayee Yojana (PMKSY) program and made the preparation of DIP and SIP mandatory for
the states to receive funds from the program. The present report is a product of these long drawn
11 | P a g e
efforts of Government of India to strengthen the decentralized planning process in the country
focusing on the vital resource i.e., water.
Water is of vital importance for human & animal life, maintenance of ecological balance and
promotion of developmental activities. Considering its vital importance and ever increasing
demand for water, in the face of population growth, urbanization & industrialization and
considerations of climatic change, making water, an increasingly a scarce resource, available to
multiple uses, planning and management of this vital resources, utilization of water
economically, optimally and equitably assumes greater importance.
According to the 12th
Five year Plan the water budget estimates of India by Ministry of Water
Resources suggests an availability of 1123 billion cubic meters (BCM) against a current
estimated demand of 710 BCM. The Standing Committee of the Ministry of Water Resources
estimates that this water demand will rise to 1093 BCM by 2025. Though the existing water
availability in the immediate future seems to be adequate, with the near constant supply of water
resources in the face of increasing demand on account of population growth, urbanisation and
industrialization will strain the water supply-demand balance.
The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced to 1820
cubic meters in 2001 while the international prescribed limit is 1800 cubic meters. The projected
per capita availability of water is 1341 cubic meters in 2025 and 1140 cubic meters in 2050
suggesting shortage of water in the medium term1. Further, the all India water balance estimates
does not reflect the variations in water balance across time and space- certain areas having a
positive water balance and the others facing acute shortage. The problem is further accentuated
by water quality related issues.
With the abundant surface and ground water supply in the first five decades since independence,
more than 80 percent of the total available water resources were allocated for irrigation purposes
and the rest meeting the domestic and industrial demands. In a recent study2 on the demand for
1 Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India, New
Delhi. 2 Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-2050:
Business-as-usual scenario and deviations. Research Report 123, International Water Management
Institute, Colombo.
12 | P a g e
water from agriculture, domestic and industrial uses in 2000, 2025 and 2050 seems to suggest
that domestic demand (34 BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial
demand (42 BCM in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the
total balance water available while agriculture demand for water will be (605 BCM in 2000, 675
BCM in 2025 and 637 BCM in 2050). This change is partly because of the changing sectoral
contributions of India‟s GDP and also partly because of dynamics of irrigation development in
the country where the initial expansion in area under irrigation is propelled by the availability of
abundant water resources and availability of good quality land. This is no longer the case in
many of the states where the availability of land and water are serious constraints for further
expansion of irrigation. Further, as per the erstwhile planning commission up to March 2012 out
of 141 million hectares of net sown area in the country 114 (or 81%) million hectares is
Irrigation Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation Potential
Utilised (IPU) leaving almost 20% of irrigated potential unutilized. This leaves 40 percent of the
net sown area in the country dependent on rainfall which makes farming a high risk and less
productive.
The competing demands for water resources and the emerging issues and concerns were to be
addressed through certain basic principles and commonality in approaches in dealing with
planning, development and management of water resources3 under an Integrated Water Resource
Management framework. The main objectives of water resource management as delineated in
National Water Policy 2012 are:
a) Planning, development and management of water resources need to be governed by
common integrated perspective considering local, regional, State and national context,
having an environmentally sound basis, keeping in view the human, social and economic
needs.
b) Principle of equity and social justice must inform use and allocation of water.
c) Good governance through transparent informed decision making is crucial to the
objectives of equity, social justice and sustainability. Meaningful intensive participation,
transparency and accountability should guide decision making and regulation of water
resources.
3 Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.
13 | P a g e
d) Water needs to be managed as a common pool community resource held, by the state,
under public trust doctrine to achieve food security, support livelihood, and ensure
equitable and sustainable development for all.
e) Water is essential for sustenance of eco-system, and therefore, minimum ecological needs
should be given due consideration.
f) Safe Water for drinking and sanitation should be considered as pre-emptive needs,
followed by high priority allocation for other basic domestic needs (including needs of
animals), achieving food security, supporting sustenance agriculture and minimum eco-
system needs. Available water, after meeting the above needs, should be allocated in a
manner to promote its conservation and efficient use.
g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff, river,
lakes, soil moisture, and ground water, sea, etc., are interdependent and the basic
hydrological unit is the river basin, which should be considered as the basic hydrological
unit for planning.
h) Given the limits on enhancing the availability of utilizable water resources and increased
variability in supplies due to climate change, meeting the future needs will depend more
on demand management, and hence, this needs to be given priority, especially through (a)
evolving an agricultural system which economizes on water use and maximizes value
from water, and (b) bringing in maximum efficiency in use of water and avoiding
wastages.
i) Water quality and quantity are interlinked and need to be managed in an integrated
manner, consistent with broader environmental management approaches inter-alia
including the use of economic incentives and penalties to reduce pollution and wastage.
j) The impact of climate change on water resources availability must be factored into water
management related decisions. Water using activities need to be regulated keeping in
mind the local geo climatic and hydrological situation.
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address
the constraints in providing assured irrigation as well as increasing efficiency and productivity of
current water use to bring more prosperity to the rural areas. Priorities of Government of India
were reflected in the Hon‟ble President‟s address to the joint Session of the Parliament of 16th
Lok Sabha where he indicated that “Each drop of water is precious. Government is committed
14 | P a g e
to giving high priority to water security. It will complete the long pending irrigation projects
on priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har
Khet Ko Pani’. There is a need for seriously considering all options including linking of
rivers, where feasible; for ensuring optimal use of our water resources to prevent the
recurrence of floods and drought. By harnessing rain water through ‘Jal Sanchay’ and ‘Jal
Sinchan’, we will nurture water conservation and ground water recharge. Micro irrigation
will be popularised to ensure ‘Per drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five
years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of
Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of
Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,
CADWM, MI, SWMA, Watershed & Convergence with MGNREGA were brought together
under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme like
Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya Krishi
Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification
programmes (JLNNSM&REP), Rural Infrastructure Development Fund (RIDF), Members of
Parliament Local Area Development Scheme (MPLAD), Members of Legislative Assembly
Local Area Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State
Forest Department (WPSFD) etc. The PMKSY will be implemented in an area development
mode only by adopting a decentralized state level planning and projectised execution structure
that will allow the state to draw up their own irrigation development plans based on DIPs and
SIPs with a horizon of 5-7 years. The program will be implemented as part of Rashtriya Krishi
Vikas Yojana (RKVY) with state agriculture department acting as the State Nodal Agency.
However, the implementing departments for the four components like AIBP, PMKSY (Har Khet
Ko Pani), PMKSY (Per drop more crop) and PMKSY (watershed development) will be decided
by the respective program ministry/department.
The funds under this program would be provided to the states as per the pattern of assistance of
Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance and NITI Aayog.
During 2015-16 the existing pattern of assistance of ongoing scheme was continued. An outlay
of Rs. 50,000 crore has been approved for 2015-20. The financial assistance provided to the state
15 | P a g e
governments from this centrally sponsored scheme is subject to fulfillment of certain conditions.
Firstly, a state will become eligible to access PMKSY fund only if it has prepared the District
Irrigation Plans (DIP) and State Irrigation Plan (SIP), excepting for the initial year, and the
expenditure in water resource development for agriculture sector in the year under consideration
is not less than the baseline expenditure, which is defined as the average of the expenditure in
irrigation sector irrespective of the department in the state plan in three years prior to the year
under consideration. Secondly, States will be given additional weightage for levying charges on
water and electricity for irrigation purposes, so as to ensure sustainability of the programme.
Thirdly, interstate allocation of PMKSY fund will be decided based on
Share of percentage of unirrigated area in the state vis-à-vis national average including
prominence of areas classified under Desert Development Programme (DDP) and
Drought Prone Area Development Programme (DPAP)
Increase in percentage share of expenditure on water resource development for
agriculture sector in State Plan expenditure in the previous year over three years prior to
it and
Improvement in irrigation efficiency in the state.
Vision
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to ensure
access to some means of protective irrigation to all agricultural farms in the country, to produce
„per drop more crop‟, thus bringing much desired rural prosperity.
Objective
The objectives of the PMKSY are to:
a) Achieve convergence of investments in irrigation at the field level (preparation of district
level and, if required, sub district level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area under
assured irrigation (Har Khet ko Pani),
c) Integration of water source, distribution and its efficient use, to make best use of water
through appropriate technologies and practices.
16 | P a g e
d) Improve on-farm water use efficiency to reduce wastage and increase availability both in
duration and extent,
e) Enhance the adoption of precision-irrigation and other water saving technologies (More
crop per drop).
f) Enhance recharge of aquifers and introduce sustainable water conservation practices
g) Ensure the integrated development of rainfed areas using the watershed approach towards
soil and water conservation, regeneration of ground water, arresting runoff, providing
livelihood options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management and crop
alignment for farmers and grass root level field functionaries.
i) Explore the feasibility of reusing treated municipal waste water for peri-urban
agriculture, and
j) Attract greater private investments in irrigation.
Strategy/approach
To achieve these objectives PMKSY adopted strategies that include
a) Creation of new water sources; repair, restoration and renovation of defunct water
sources; construction of water harvesting structures, secondary & micro storage,
groundwater development, enhancing potentials of traditional water bodies at village
level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis
(T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.) etc.
b) Developing/augmenting distribution network where irrigation sources (both assured and
protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to improve
ground water recharge so as to create opportunities for farmers to access recharged water
through shallow tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the farm viz,
underground piping system, Drip & Sprinklers, pivots, rain-guns and other application
devices etc.;
e) Encouraging community irrigation through registered user groups/farmer producers‟
organisations/ NGOs; and
17 | P a g e
f) Farmer oriented activities like capacity building, training and exposure visits,
demonstrations, farm schools, skill development in efficient water and crop management
practices (crop alignment) including large scale awareness on more crop per drop of
water through mass media campaign, exhibitions, field days, and extension activities
through short animation films etc.
Programme Components
PMKSY has following four components:
1. Accelerated Irrigation Benefit Programme (AIBP) to focus on faster completion of
ongoing Major and Medium Irrigation including National Projects.
2. PMKSY (Har Khet ko Pani): This component focuses on-
a) Creation of new water sources through Minor Irrigation (both surface and ground water)
b) Repair, restoration and renovation of water bodies; strengthening carrying capacity of
traditional water sources, construction rain water harvesting structures (Jal Sanchay);
c) Command area development, strengthening and creation of distribution network from
source to the farm;
d) Ground water development in the areas where it is abundant, so that sink is created to
store runoff/ flood water during peak rainy season.
e) Improvement in water management and distribution system for water bodies to take
advantage of the available source which is not tapped to its fullest capacity (deriving
benefits from low hanging fruits). At least 10% of the command area to be covered under
micro/precision irrigation.
f) Diversion of water from source of different location where it is plenty to nearby water
scarce areas, lift irrigation from water bodies/rivers at lower elevation to supplement
requirements beyond IWMP and MGNREGS irrespective of irrigation command.
g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc. at
feasible locations.
3. PMKSY (Per Drop More Crop)
18 | P a g e
a) Programme management, preparation of State/District Irrigation Plan, approval of annual
action plan, Monitoring etc.
b) Promoting efficient water conveyance and precision water application devices like drips,
sprinklers, pivots, rain-guns in the farm (Jal Sinchan);
c) Topping up of input cost particularly under civil construction beyond permissible limit
(40%), under MGNREGS for activities like lining inlet, outlet, silt traps, distribution
system etc.
d) Construction of micro irrigation structures to supplement source creation activities
including tube wells and dug wells (in areas where ground water is available and not
under semi critical/ critical/ over exploited category of development) which are not
supported under AIBP, PMKSY (Har Khet ko Pani), PMKSY (Watershed) and
MGNREGS as per Taluka/district irrigation plan.
e) Secondary storage structures at tail end of canal system to store water when available in
abundance (rainy season) or from perennial sources like streams for use during dry
periods through effective on-farm water management;
f) Water lifting devices like diesel/ electric/ solar pumpsets including water carriage pipes,
underground piping system.
g) Extension activities for promotion of scientific moisture conservation and agronomic
measures including cropping alignment to maximise use of available water including
rainfall and minimise irrigation requirement (Jal Sarankchan);
h) Capacity building, training and awareness campaign including low cost publications, use
of pico projectors and low cost films for encouraging potential use water source through
technological, agronomic and management practices including community irrigation.
i) The extension workers will be empowered to disseminate relevant technologies under
PMKSY only after requisite training is provided to them especially in the area of
promotion of scientific moisture conservation and agronomic measures, improved/
innovative distribution system like pipe and box outlet system, etc. Appropriate Domain
Experts will act as Master Trainers.
j) Information Communication Technology (ICT) interventions through NeGP-A to be
made use in the field of water use efficiency, precision irrigation technologies, on farm
19 | P a g e
water management, crop alignment etc. and also to do intensive monitoring of the
Scheme.
4. PMKSY (Watershed Development)
a) Effective management of runoff water and improved soil & moisture conservation
activities such as ridge area treatment, drainage line treatment, rain water harvesting, in-
situ moisture conservation and other allied activities on watershed basis.
b) Converging with MGNREGS for creation of water source to full potential in identified
backward rainfed Talukas including renovation of traditional water bodies
Rationale/ Justification
In reference to the status and need of irrigation, the water resource management including
irrigation related priorities was identified for Dangs district by the peoples‟ representatives of
district with support from administration and technical experts. For instance the reports of
Strategic Research and Extension Plan (SREP) prepared under ATMA program, Comprehensive
District Agriculture Plan (C-DAP) prepared as part of Rashtriya Krishi Vikas Yojana (RKVY),
Potential Linked Credit Plans (PLP) of NABARD and the Integrated District Development Plan
etc. identified number of irrigation related issues for Dangs district including (i) promoting water
use efficiency through sprinkler and drip irrigation; (iii) promoting protected polyhouse
cultivation to minimize risk factors and enhance quality and productivity; (iv) Improvement of
on-farm water delivery and efficiency of existing irrigation systems; (v) promotion of soil
conservation of arable & non-arable land through engineering measures; (vi) creation of new
water harvesting structures, check dams, ponds, tanks, etc (vii) increase the forest cover in the
district and (viii) land improvement measures.
Methodology
During the course of preparation of District Irrigation Plan (DIP) the team visited Dangs district
to collect data and have interaction with all the stakeholders. Methodology adopted to prepare
DIP is outlined in brief as under:
20 | P a g e
a) Collection of primary and secondary data from field from various sources including
published documents and websites.
b) Various meetings were held to obtain ground level realities and data from key
personnel/stakeholders through structured, unstructured interviews, focused group
discussions etc.
c) Meetings with various State Government departments and related institutions were
held
d) Meeting was also held with State Level authorities.
e) GIS maps of the areas/ clusters were studied to understand the land morphology,
topography of the district.
f) Focused group discussions and interaction with agriculture officers, horticulture
officers, soil conservation officers, extension officers, rural development department,
animal husbandry department, irrigation officers both at Talukas and district level for
identifying the key issues and focus areas of the region.
g) Discussion with NABARD officer of the district was also held during the visit.
On the basis of detailed discussion and analysis of data, the team arrived at the projections of
various components of PMKSY and Department wise plan for four years from 2016-17 to 2019-
20 as detailed in the plan.
21 | P a g e
Chapter 1 General Information of the District
1.1 District Profile
The Dangs is the smallest district of the Gujarat State is situated between the parallels of latitude
20 33' 40" to 21'.50' and the meridians of longitude 73 27' 58" and 73 56' 36". It has total
geographical area of 1, 72,366 hectare (i.e. 1736 sq km). Out of which the forest area is about
59.74% i.e. 1062sq km (850 sq km Reserved Forest and 212 sq km of protected forests) and only
33.80% of land comes under cultivated and cultivable fallow. It has range of elevation of 105 to
1317 meters above MSL.
Figure 1.1: District map of The Dangs
The Dangs is situated in southeast parts of the Gujarat. The district bordered by districts Navsari
and Valsad in the West, Tapi district in the North and Maharashtra state in the South and East
covered with high hills and rich forest. The Dang consists of a series of foothills between the flat
alluvial plains of south Gujarat and the high mountains of Sahyadris. The district has remote
forest area and characterized mainly by tribal. The Dangs is known for its floral diversity (550
species of plants). Many plant species are endemic to the Dangs. The district comes under South
Gujarat Heavy Rainfall Zone–I Agro Ecological Situation-I.
22 | P a g e
Table 1.1: District Profile of The Dangs
Name of the
District
District
Code Latitude Longitude
The Dangs 489 200 33‟50” to 210 04‟
52” N
730 27‟58” to 730
56‟38” E
1.2 Demography
The district comprises of 311 villages, 70 Panchayats and one taluka. The total population of the
Dangs is 226769 as per 2011 census, out of which number of males and females were 112976
and 113793, respectively. There were 129 persons per square kilometer of area. The villages are
small in size. The average population of the villages is 600 persons and the village consists on an
average of 117 households. The Dangs is the most backward districts of Gujarat and is 100%
rural. The overall literacy rate of the district was 76.80%. The following table gives the
population details.
Table 1.2: Demographic features of the Dangs
Total Rural Urban
Population M 112790 101710 11080
F 112533 101894 10639
CH* (1-14 yrs) 40462 37988 2474
Total 225323 203604 21719
SC No. of household 206 39 167
No. of Member 946 151 795
ST No. of household 41,797 39,148 2,649
No. of Member 213649 200138 13511
General No. of household 2,285 702 1,583
No. of Member 10728 3315 7413
Total No. of household 44288 39889 4399
No. of Member 225323 203604 21719
Table 1.3: Demographic features
Description Census 2011
Population 2,26,769
Male 1,12,976
Female 1,13,793
Population Growth 21.44%
Area Sq. Km 1,764
Density/km2 129
Proportion to Gujarat Population 0.38%
Sex Ratio (Per 1000) 1007
Child Sex Ratio (0-6 Age) 963
Average Literacy 76.80
Male Literacy 84.98
Female Literacy 68.75
23 | P a g e
Total Child Population (0-6 Age) 39,387
Male Population (0-6 Age) 20,065
Female Population (0-6 Age) 19,322
Literates 143,908
Male Literates 78,957
Female Literates 64,951
Child Proportion (0-6 Age) 17.37%
Boys Proportion (0-6 Age) 17.76%
Girls Proportion (0-6 Age) 16.98%
Source: Census 2011
1.3 Biomass & Livestock
Animal Husbandry and Dairying have played a vital role in the development of Gujarat‟s rural
economy. The district has a total livestock population of 1.21 lakh excluding pigs, poultry, etc..
The Kankrej and Gir breeds of cattle are predominant in the district. The Gir breed is a milch
breed, whereas Kankrej is a dual purpose breed.
Table 1.4: Livestock Census
Category Male Population
Female
Total Production Productivity
Cattle --- ---
Crossbred 1923 7937 9860 Milk 2-5lit/ Animal
Indigenous 37646 22428 60074 Draft purpose ---
Buffalo 15747 4980 20727 Milk &Draft purpose 2-3lit/Animal
Goats 8409 21907 30316 Milk &Meat --
Poultry 63475 91429 154904 --- ---
Desi poultry 62874 90315 153189 Egg & Table Backyard
Improved
poultry
601 1114 1715 Egg 270 Egg/Annum
Ducks 319 219 538 Egg 250 Egg/Annum
Table 1.5: Livestock population as per PMKSY Format
Name of the Blocks Ahwa
Small Animals Poultry (No.) 154904
Ducks (No.) 538
Pigs (Nos.) 148
Goats (Nos.) 30316
Sheep (Nos.) 6
Large Animal Indigenous Cow (Nos.) 60074
Hybrid Cow (Nos.) 9860
In Descriptive Buffalo (Nos.) 20727
Hybrid Buffalo (Nos.)
24 | P a g e
In The Dangs district, the climatic conditions are conducive for dairy activity. As per the latest
census, the district has a total of 9860 crossbred cows, 60074 indigenous cows and 20727
buffaloes.
Among small animals, only goat and poultry have significant population. The district has 30316
goats. The other small animals in the district are Sheep and Pig which are negligible number. The
details of the population of animals mentioned in the above table.
1.4 Agro-Ecology, Climate, Hydrology and Topography:
The Dangs district bordering Maharastra state covered with high hills and rich forest. Dangs is
southern most districts in Gujarat, which starts from the rugged mountain chains of the Sahyadri
range of Western Ghats in the southwest and descends on the western side of extending
undulating tract. The name Dangs is also associated with mythology. It is related to the
Dandakaranya of Ramayan period.
The Dangs consists of a series of foothills between the flat alluvial plains of south Gujarat and
the high mountains of Sahyadris, the range which divides the costal belt from the rugged plateau
of Maharastrian Deccan.
CLIMATE AND RAINFALL
The district has semi-arid climate with three distinguished seasons i.e. kharif (June to
September), winter (October to January) and summer (February to May). The district receives
the rainfall through South-West monsoon which normally starts from middle of June. July and
August are the months of heavy rainfall. Temperature ranges from 13.7 to 38.60 Celsius. April,
May and June are the driest months. Annual rainfall ranges from 2000-2500 mm, but is erratic in
nature. The humidity ranges from 25-90 per cent. On an average, there are 50-55 rainy days in a
year. The rainy period accounts for 90% SW monsoon, 05 % post monsoon rainfall. Soils have
pH ranging from 6.5 to 7.5. Status of N (organic carbon basis) and phosphorus range from low to
medium, whereas availability of potassium is high.
25 | P a g e
Table 1.6: Weather of Dang district (Available normal)
Taluka No. of
weather
station
Rainfall Temperature Humidity (%)
No. of
rainy days
Average
rainfall
(mm)
Min. 0C Max.
0C Min Max
Ahwa 2 50 2000-2500 13.7 38.6 25 90
Source: Meteorological Observatory, KVK Farm, Rajendrapur, Waghai
Table 1.7: Taluka wise monthly rainfall data
Taluka June July Aug Sept Oct Nov / Dec
Ahwa 82 622 960 510 86 175
Source: Meteorological Observatory, KVK Farm, Rajendrapur, Waghai Table 1.8: Weather of Dang district as per PMKSY Format
Block : AHWA Area (Ha) 172366
Normal Annual Rainfall (mm) 3825
Average Monthly Rainfall (mm) 1635
No of Rainy Days 77
Maximum Rainfall
Intensity (mm)
Up to 15 min
Beyond 15 but upto 30 min
Beyond 30 but upto 60 min
Average Weekly
Temperature (0C)
Period Summer (Apr-May) Min 20
Max 37 Mean 28.5
Winter (Oct- Mar) Min 12.9 Max 33.9
Mean 22.2
Rainy (Jun-Sep) Min 25.6
Max 29.2
Mean 27.8
Potential Evapo-
Transpiration (PET)
Period Summer
Winter
Rainy
Cumulative total
Elevation Min 111.55 m
Max 1055.52 m
Mean -
1.5 Soil Profile
On the basis of physiography, the Dangs district is characterized as undulating topography with
hilly slope, valley and plain river beds. Soils of the Dangs district can be broadly classified as
Loamy mixed. Soils of the region are highly permeable and eroded due to slopes. Due to heavy
erosion of upper soil stratum, moisture holding capacity is poor. The major soil related problems
are erosion susceptible, sallow depth, poor soil organic content, heavy slope, high gravel/stone
26 | P a g e
per cent and small holding. There are three types of agriculture land in the Dangs: black cotton,
laterite and rocky. Red soil is found on the upper parts of the valley and black soil is found in the
plains of western Dangs. In some parts medium loam to sandy loam type is found The plane
lands with black cotton and laterite soil are scarce but conducive for agriculture. The soils of the
district are of the residual type.
Table 1.9: Soil type in the Dangs
Soil Type
Major Soil Classes Area (Ha)
Very good cultivable land Class - I (0-1) 5500
Good cultivable land Class- II (1-3) 6785
Moderately good cultivable land Class- III (3-8) 8500
Fairly good land, suited for occasional cultivation Class- IV 10523
Nearly level land not suitable for cultivation because of stoniness, wetness, etc. Class- V 12540
Steep slopes, highly erosion prone with shallow soils Class- VI 15590
Steep slope with sever soil erosion resulting in eroded stony and rough soil surfaces with shallow
soil depth Class- VII (8-15)
9085
Table 1.10: Agro ecological situations of South Gujarat Heavy Rainfall Zone–I
Agro-
Ecological
situation
Rainfall
(mm)
Soil texture Principal
crops
Special features Talukas
coverage
Agro
Ecological
Situation-I.
2000-
2500
Loamy soil Paddy,
Ragi, Vari,
Sorghum,
Pulses
Hilly with Undulating topography
having slope of ranging from 1 to
50 per cent, shallow to medium in
depth
Ahwa
Major soils of the Dangs fall in the order Inceptisols with sub group of Haplustept, Ustochrept
and Eutrochrepts. At some places due to severe erosion, weathered materials and rocks are
exposed and soils are very sallow which come under Entisol order with Ustorthents sub group. A
small area under red soils on upper parts may be classified as Alfisol. Soils of the valley plains
are somewhat deeper. They are medium in texture (gravelly silty clay), low in water holding
capacity and non-calcareous with slightly acidic reaction, mixed in clay minerals, well drained
and highly permeable. Though at
many places soils are fertile, they are
not productive due to shallowness
and erodibility problems. The
rainfall received is 2000-2500 mm
with average rainy days of 50-55.
27 | P a g e
The river passes through the Dangs are Ambica, Khapri, Purna and Gira. The rivers have a high
density of drainage and steeper gradient resulting into quick run off during monsoon. This causes
a higher rate of land erosion and the transport of silt land.
1.6 Soil Erosion and Runoff Status
The rivers have a high density of drainage and steeper gradient resulting into quick run off
during monsoon. This causes a higher rate of land erosion and the transport of silt load. It is
famously said that the flood of the Dangs is the blood of the Dangs as it carries the all-important
topsoil used for agriculture. The gradient is generally the major limiting factor for deposition of
silt on the riverbanks and check dams. Special feature of the Dangs is the fact that the watershed
limits coincide with the administrative boundaries. There is hardly any rainfall runoff entering
from any adjoining areas to the Dangs. Further there is no transfer possible for groundwater from
one basin to another.
1.7 Land Use Pattern:
In the Dangs there is high pressure on the land, since the majority of the land is forestland (59%)
and only a limited amount of land is available
for agriculture to support a growing population.
Another limiting factor is the fact that 68% of
the land is situated on a slope. The forestland is
predominantly reserve forest, with restricted
access and rights for the local population and
some protected forest. The total forest area of
the district is about.1062 Sq.km (850 Sq.km
Reserved Forest and 212 Sq.km of protected
forests). The second category in land use is cultivable land: 36.5% of the total area of the Dangs.
This is mostly protected forest but the rights of cultivation have been given to the people. In
comparison to these two main categories, the land used for grazing (0.15%) and the non-
cultivable waste land (0.88%) is very limited. There is literally little space for infrastructural
development or expansion of agricultural lands.
Table 1.11: Land use Pattern in The Dangs
Sl. No. Land use Types Area in Ha.
28 | P a g e
1. Total Geographical Area 172,536
2. Forest Area 101,329
3. Cultivable Land 57,843
4. Agricultural Land 53,949
5. Uncultivable area 3894
6. Total area under irrigation 21330
7. Permanent Pasture and oth. Grazing land 262
8. Waste land 1524
In the Dangs there is high pressure on the land, since the majority of the land is forestland (59%)
and only a limited amount of land is available for agriculture to support a growing population.
Another limiting factor is the fact that 68% of the land is situated on a slope. The forestland is
predominantly reserve forest, with restricted access and rights for the local population and some
protected forest. The total forest area of the district is about.1062 Sq.km (850 Sq.km Reserved
Forest and 212 Sq.km of protected forests).
Table 1.12: Land use Pattern in the Taluka Ahwa (the Dangs) PMKSY format
Name of the Block:
Ahwa
Indicators Value
Number of the Gram Panchayat 70
Number of the villages covered 308
Total Geographical Area 172366
Area under Agriculture Gross Cropped Area (1) 53949
Net Sown Area (2) 45538
Area sown more than once
(1-2)
8411
Cropping intensity (%) 118.4637726
Area under forest 101690
Area under wasteland 9852
Area under other uses 12540
Forest Area46%
Cultivable Land26%
Agricultural Land24%
Total area under irrigation
3%
Waste land 1%
Land use Pattern in the Dangs
29 | P a g e
Chapter 2 District Water Profile
Dangs is one among the tribal districts of Gujarat. The economy of district is predominantly
based upon agriculture and allied activities such as dairy, fisheries, horticulture and plantation.
Approximately 52% of the population of the district is engaged in agriculture while remaining 48
per cent is engaged in other activities.
2.1 Area Wise, Crop Wise Irrigation Status
The geographical area reported in the district is 172536 ha. The major crops grown in Kharif are
Paddy, black gram, groundnut, soyabean etc. and that in Rabi are pearl millet, wheat and
sugarcane. During summer, Groundnut and green gram are the main crops. The district has a net
sown area of 45538 ha against Gross Cropped Area of 53949 with cropping intensity of 118%.
The net irrigated area (21330 ha) constitute 46.84% of the net sown area (45538 ha).
Table 2.1: Area Wise, Crop Wise irrigation Status
Crop
Type
kharif (Area in ha.) Rabi (Area in ha.) Summer (Area in ha.)
Taluka Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
Ahava 0 45538 45538 8411 0 8411 1332 0 1332
Horticulture & Plantation crops (Area in ha.)
Irrigated Rainfed Total
11587 0 11587
From the above table it is observed that all the crops grown were under rain-fed conditions and
during rabi, all the crops were grown in irrigated fields. It is apparent from the table that the
district has a major area under horticulture crops. Mango is a principal crop with considerable
proportion of area under horticulture.
30 | P a g e
2.2 Production and Productivity of Major Crops
Cropping pattern in the Dangs is mostly paddy-green gram, paddy-wheat, finger millet-gram and
horticulture based under irrigated conditions. During Kharif, the significant area falls under
paddy (42%) followed by finger millet (18%), while in Rabi 86% of the area cultivated is
occupied by green gram. 17391 Ha. land under paddy is grown under rain-fed system and 1524
has area under paddy is grown in the irrigated area. The details of production and productivity of
major crops are shown in the table below.
Table 2.2: Area wise – Crop wise Irrigation
Season Rainfed Irrigated Total
kharif Crops Area (ha) Production
(Qtn/Yr)
Area (ha)
Production
(Qtn/Yr)
Area
(ha)
Production
(Qtn/Yr)
Paddy 17391 265038.84 1524 0 18915 265038.84
Jowar 1448 17926.24 1238 0 2686 17926.24
Bajri 0 0 0 0 0 0
Maize 2617 40720.52 1556 0 4173 40720.52
Ragi 7455 0 0 0 7455 0
Mung 0 0 0 0 0 0
Math 0 0 0 0 0 0
Udid 4823 33712.77 699 0 5522 33712.77
Tur 2826 39309.66 1391 0 4217 39309.66
Groundnut 2547 43222.59 1697 0 4244 43222.59
Castor 0 0 0 0 0 0
Sesamum 0 0 0 0 0 0
Cotton 0 0 0 0 0 0
Tobacco 0 0 0 0 0 0
Guar seed 0 0 0 0 0 0
Soyabean 2638 20444.5 775 0 3413 20444.5
Fennel 0 0 0 0 0 0
Rabi Wheat 0 0 0 2622 0 2622
Jowar 0 0 0 0 0 0
Maize 0 0 0 0 0 0
Gram 0 0 0 16420 0 16420
Rapeseed &
mustard 0 0 0 0 0 0
Sugarcane 0 0 0 147 0 147
Isabgul 0 0 0 0 0 0
Fennel 0 0 0 0 0 0
Tobacco 0 0 0 0 0 0
Summer Groundnut 0 0 0 450 0 450
Bajra 0 0 0 0 0 0
Paddy 0 0 0 0 0 0
Maize 0 0 0 0 0 0
Mung 0 0 0 240 0 240
Udid 0 0 0 0 0 0
Sesamum 0 0 0 0 0 0
31 | P a g e
Table 2.3: Area wise – Crop wise Irrigation (Horticulture)
Irrigated Rainfed Total
Bananas 20 0 20
Mango 4360 0 4360
Custard 90 0 90
Birch 21 0 21
Other fruits 47 0 47
H) Vegetables 3009 0 3009
Onions 395 0 395
Tomato 255 0 255
Okra 904 0 904
Cucumbers 20 0 20
Other vegetables 1435 0 1435
2.3 Irrigation bases Classification
The Gross Irrigated Area of the Dangs district is 29238 hectare which is around 33.7 % of the
86700 hectare of gross cropped area.
Table 2.4: Irrigation based classification
Name of
Block/
Taluka
Irrigated (Area in
ha) Rainfed (Area in ha)
Gross Irrigated Area
Partially Irrigated/
Protective
Irrigation
Un-lrrigated or
Totally Rainfed
total sowing
area Total Irrigated Area
Ahava 21330 32619 53949 21330
32 | P a g e
Chapter 3 Water Availability in The Dangs
3.1 Status of water availability
Irrigation is considered as one of the major factor contributing to the agriculture production and
it has been reckoned that better the irrigation management, better the agricultural production and
productivity. There are four rivers flowing through the district viz. Ambica, Khapri, Purna and
Gira. The rivers have a high density of drainage and steeper gradient resulting into quick run off
during monsoon. As a result, the ground water recharge is less. Entire area is of Dangs is part of
Deccan Trap country, and exhibits rugged and terraced topography with flat topped conical hills,
small plateau and steep sided narrow valleys. The highest elevation of the area is 1055.52 m
(Sanjan hill) and lowest 111.55 m near Dongarda village.
Purna, Ambica and Khapri, are the three major rivers draining the district of the Dang. The other
rivers are Gira and Ghoghal. Almost all the streams are ephemeral but they become perennial
before emerging out of Dangs on north-western side. All the rivers are flowing into the Arabian
Sea. Lateritic soils cover almost the whole district except for two pockets one in the west and the
other in the east, capped by deep black and red sandy soils. Basaltic lava flows are covered with
black clayey to loamy soil. It is in general about a meter in thickness. The colour of soil turns red
due to high iron content at some places.
Table 3.1: Status of Irrigation
Sources Kharif (MCM) Rabi (MCM) Summer(MCM) Total
Surface Irrigation
Ahwa -1 6.870 3.311 0.000 10.181 Waghai-2 3.450 1.575 0.000 5.025 Subir-3 4.530 2.175 0.000 6.705
Total 14.850 7.061 0.000 21.911
Lift Irrigation/Diversion
Ahwa -1 0.410 0.205 0.000 0.615 Waghai-2 0.340 0.170 0.000 0.510 Subir-3 0.410 0.205 0.000 0.615
Total 1.160 0.580 0.000 1.740
Others
33 | P a g e
Sources Kharif (MCM) Rabi (MCM) Summer(MCM) Total Ahwa -1 0.057 0.029 0.000 0.086 Waghai-2 0.031 0.015 0.000 0.046 Subir-3 0.026 0.013 0.000 0.039
Total 0.114 0.057 0.000 0.171
Grand Total 16.124 7.698 0.000 23.822
From various sources the total water available in The Dangs has been estimated at 23.822 MCM.
The major source of the surface water is the perennial flows in Ambika, Khapri and Purana
rivers. There are two major irrigation projects, one on River Sharpa Ganga at Saputara and the
other on a tributary of Khapri river at Bhisia.
There are surface water storage tanks at Chikhli (Capacity 817.20 m3) and Sulia Barda (408.60
m3). Many more storage tanks are constructed in the area. Apart from Storage tanks Lift
Irrigation scheme have been tried at Ambapara (command 60 ha.) and Kudkas (command 50 ha.)
Numerous springs scattered all over the district have been reported in the past. These were
reported having the discharges from five to less than half litre per minute. Some of the important
locations reported earlier are near Wagai, Sati, Chinhana, Sonda etc.
3.2 Status of Ground Water Availability
Hydrogeology
Ground water occurrence is governed and controlled by the contrasting water bearing properties
of different lithological units. In this area different units of basaltic lava flows form the major
aquifer system. Ground water occurs under phreatic condition. The unconfined aquifer is the
most extensive aquifer comprising of weathered and fractured volcanic rocks in the district. The
areal extent and thickness of weathered mantle is highly variable. Thickness of the weathered
mantle ranges from less than 1 m to about 8 m followed by very common spheroidal weathering.
In Basalts, the weathered zones, jointed and fractured units in the interflow junctions consisting
of vesicular horizons form the potential aquifers. Ground water occurs under water table
conditions in the weathered, fractured and vesicular horizons of traps. Depth of open wells range
between 18 to 20 m with water levels in the range of 2 to 12 mbgl. The southern portion of the
area is criss-crossed by dykes which control the movement of groundwater in the formation. The
34 | P a g e
specific yield of the wells tested varies from 0.0 – 26 percent in weathered basalt and 0.11 to
1.14 in semi weathered to massive basalt. Yield of the wells constructed in weathered and
amygdaloidal/zeolitic basalt varies from 15 to 1200 lpm and 20 to 165 lpm in semi weathered to
massive basalt. The specific capacity of the wells varies from less than 25 lpm/m to 250 lpm/m.
Optimum yield of the well ranges from 15 to 1200 lpm. Transmissivity of the basalt ranges from
15 m2/day to 152 m2/day. Hydrogeology of the Dang District is summarized in the figure below;
Map 1: Hydrogeology of Dangs
35 | P a g e
Legends for the Map
Depth to water levels
Since 1969, Central Ground Water Board, as a part of its national programme, has established a
network of observation wells in the state of Gujarat and UT of Daman and Diu for periodic
monitoring of water levels and the quality of groundwater. At present 1039 (dugwells-655 & 384
piezometers) Groundwater monitoring Stations including 21 open wells and 3 Piezometers are
available in the district.
Depth to Water Level map of pre monsoon period indicates that 47% area fall in the range of >2
to 5 m bgl, largely in the Eastern part of the district, 42% area have water levels in the range of 5
to 10 mbgl localized in central part and deeper water level of more than 10 m bgl are observed in
western part of the district in 11% of area. The shallowest water level of 2.89 m bgl was
observed at Jakhna and the deepest water level of 12.38 m bgl at Mheskatri.
During post monsoon period, 47% area has water level in the range of <= 2m bgl and 53% area
has water levels in the range of >2 to 5 m bgl. The shallow water level around 0.50m bgl was
observed at Jakhana/ChinchPada/Ghubita and the deepest water level of 9.55 m bgl at Meshkatri.
Pre-monsoon to post monsoon fluctuation in the water level ranges from 2.3 m at Jakhana to
about 9.55 m at Chikhli.
36 | P a g e
Map 2: Pre Monsoon depth to ground water Map 3: Post Monsoon depth to ground water
The ground water resources of the district for are presented in table below. As ground water
development is minimal in the district, the only taluka Ahwa is categorized as Safe.
Table 3.2: Status of ground water availability
Taluka
Status of Taluka as per central ground water board
notification Ground water (MCM)
OE Critical Semi-Critical Safe Saline Draft Recharge Gap
Ahwa
Safe
14.7 86.5 71.8
Source: GWRE 2011
3.3 Status of Command Area
Table 3.3: Status of command area (in Ha)
Taluka Information of Canal Command
Information on the Other
Services Command Total Area
TA DA UDA TA DA UDA DA UDA
Ahwa 0 0 0 8174 3269.6 4904.4 3269.6 4904.4
Subir 0 0 0 5614 2245.6 3368.4 2245.6 3368.4
Waghai 0 0 0 6078 2431.2 3646.8 2431.2 3646.8
Total 0 0 0 19866 7946.4 11919.6 7946.4 11919.6
Source: GWRDC TA- Total Area, DA- Developed Area, UDA- Undeveloped Area
37 | P a g e
A total of 7946.4 hectare is covered under other service command. Maximum area is covered in
Ahwa Taluka (3269.6 ha) followed by Waghai (2431.2 ha) and Subir (2245.6 ha)
3.4 Existing Type of Irrigation
In total, there are 2181 sources of irrigation in The Dangs district. Though the number of sources
is large but most of the sources are individual based and small units. The river channel covers a
command area of 2347 hectare while check dams and ponds have command area of 3615 ha and
4470 hectare respectively.
Table 3.4: Existing type of Irrigation (Surface and Ground) Source of
irrigation
Surface Irrigation (1) Ground Water (2)
Canal Based Tanks/ Ponds/ Reservoirs Tube
Wells
Open
Wells
Bore
Wells
Rivers/ Channels Check
Dams
Storage
Ponds
Village/ Community
Pond / Percolation Tank /
Farm Pond (Total No)
Units 2 630 299 140 160 950
Command
Area (Ha) 2347 3615 4470 592.6 665 1900 160
Among the ground water sources, Tube wells and open wells are most common and covers a
total command area of 2565 hectare from 1110 sources.
Table 3.5: Existing type of irrigation (Water extraction devices) Source of irrigation Water Extraction Devices/ Lift Total
Electricity Pump
(4) Others (6) Irrigation Sources
Water Extracting
units
Oil Engine
Units 450 1850 2181 2300
Command Area (Ha) 1108 13749.6
Source: GWRDC
In total, 2181 sources covers a command area of 13749.6 hectare with the help of 2300 water
extraction units.
38 | P a g e
Chapter 4 Water Requirement /Demand
The earlier Chapters deal with the general profile, water profile and water availability of The
Dangs district. The present chapter deals with the current (2016) and projected (2020) demand of
water for various sectors. The demand for water has been assessed on the basis of data obtained
from different departments.
4.1 Domestic Water Demand
Data of Census 2011 and 2001 has been considered to arrive at the growth rate of population of
the district. As per Census 2011, the district has shown an annual growth rate of 2.226%. Current
population (in 2016) has been calculated by assuming a growth of 11.13% (2.226% × 5 Years)
over a period of five years (from 2011-2016). Projected population has been calculated in similar
way by assuming a growth rate of 8.904% (2.226% × 4 Years) over the period of four years
(from 2016-2020).
It has been assumed that per capita daily water requirement of people residing in urban areas of
the district is 140 Litres and for population in rural areas, the daily per capita daily water
requirement is 100 Litres. Using the same norms domestic water supply demand has been
worked out and given in table below.
Table 4.1: Domestic Water Demand (MCM)
Talukas 2011
Population
Population in
2016
Present Water
Requirement
(2016)
Projected
Population in
2020
Annual Water
Requirement
in 2020
The Dangs (Rural) 203604 226,265 8.259 246412 8.994
The Dangs (Urban) 24687 27,435 1.001 29877 1.091
Total 228291 253699.79 9.2600423 276289.22 10.084556
It can be inferred from the table that considering the growth rate of population of the district, the
quantity of water required in 2020 for domestic consumption shall be approximately 10.08 MCM
which is 0.825 MCM more than the present water requirement.
4.2 Crop Water Requirement
The cropping pattern of the district is mostly single and under rainfed condition. The major crops
in kharif are Paddy, Finger millet, little millet, Sorghum, Black gram, pigeon pea, etc. The
39 | P a g e
normal way of irrigation in the district is by diverting small streams. In most of the areas, the
irrigation facility is availed from natural sources only during rainy months.
Taking into account, the water requirement of various crops, the water requirement has been
estimated for each crop groups such as cereals, coarse cereals, pulses, oil seeds, fibre crops and
Horticulture & Plantation.
Table 4.2: Crop Water Requirement in Million Cubic Meter Block
Area sown
(Ha)
Irrigated area
(ha)
Crop Water
Demand
Water
Potential
Required
Existing
Water
Potential
Water
Potential to be
created
The Dangs 53949 21330 376.87 376.87 146.19 230.68
It can be concluded from the table that The Dangs, a total water potential of 230.68 MCM is to
be created additionally to fulfill the requirement of crops.
4.3 Livestock
The requirement of water for livestock of the district has been derived from last two livestock
census (2001 & 2012). The table below represents the animal wise water requirement as well as
total water requirement of the district for livestocks.
Table 4.3: Animal wise livestock water requirement (in MCM)
Type of Animal
Existing
population of
Livestock
Present water
demand
(MCM)
Water
Demand in
2020 (MCM)
Existing
water
potential
(MCM)*
Water
potential to
be created
(MCM)
Cattle 69934 1.595 1.595 1.595 0.000
Buffalo 20727 0.473 0.473 0.473 0.000
Sheep & Goats 30322 0.055 0.055 0.055 0.000
Pigs 148 0.000 0.000 0.000 0.000
Birds (Poultry & Ducks) 155442 0.018 0.018 0.018 0.000
Total 276573 2.14 2.14 2.14 0.00
E- Estimated, P- Projected
There is no gap in water requirement of livestock in 2015 and also in 2020 as there is no growth
in livestock population in the district. Also, the current water requirement of livestock is being
met through existing sources.
40 | P a g e
4.4 Industrial Water Requirement
This is the only district where the Gujarat Industrial Development Corporation has yet to
establish its industrial estates. According to District Industrial Profile, no land has been acquired
by GIDC in Dang district.
4.5 Water Demand for Power Generation
The district does not have any thermal/ nuclear power plant where water is consumed. Hence
there is no demand for water from power sector.
4.6 Total Water Demand of the district for various sectors
This sections presents the total water demand of the district and has been calculated by summing
up all major sectors consuming water. The current water demand has been indicated in Table 4.4
and the projected water demand has been depicted in Table 4.5.
Table 4.4: Present Water Demand of the district for various sectors
Talukas
Demand from components (MCM)
Total Domestic Crop Livestock Industrial
Power
Generation
The Dangs 9.3 376.87 2.14 0.0 0 388.3
The present water demand of the district has been assessed at 388.3 MCM annually, with
agriculture being the component with maximum water requirement (376.87 MCM).
Table 4.5: Total Water Demand of the district for various sectors (Projected for 2020)
Talukas
Demand from components (MCM)
Total Domestic Crop Livestock Industrial
Power
Generation
The Dangs 10.1 376.87 2.14 0.000 0 389.1
During 2020, total water requirement of the district has been assessed at 389.1 MCM.
4.7 Water Budget
The total water gap for the district has been estimated at 278.8 MCM during 2020 which has to
be met by augmenting the water availability. The major gap is due to non-availability of surface
water resources.
41 | P a g e
Table 4.6: Water Budget (Volume in MCM)
Name of
Talukas
Existing water availability/
Usage (MCM) Total
(MCM)
Water Demand (MCM) Water Gap (MCM)
Surface
Water
Ground
Water Present
Projected
(2020) Present
Projected
(2020)
The Dangs 23.82 86.50 110.3 388.3 389.1 278.0 278.8
42 | P a g e
Chapter 5 Strategic Action Plan for Irrigation in District under PMKSY
5.1 Strategic Plan for irrigation in PMKSY
The Dangs district is the smallest district of Gujarat State. The elevation in the district ranges
from 105 to 1317 meters above MSL. The district is hiily, with a few high hills in the east and
south, and the rest of the district is occupied by a mass of flat topped low lying hills. It has four
main valleys formed by Gira, Purna, Khapri and Ambika rivers. These valleys has extensive
slope towards the western side and contains compact forest areas with luxuriant vegetation.
Purva and Ambica, are the two major rivers of the Dang. The other rivers are Khapri, Gira and
Ghoghal. All the rivers are flowing from east to west into the Arabian Sea.
5.2 Department wise plan
Total plan of Dangs district for four years works out to be Rs. 34442.9 lakh (Table 5-1).
Maximum share of Rs. 16332.8 lakh (47.42%) is for Forest Department followed by DWDU/
GSWMA with Rs. 7028.6 lakh (20.41%). Share of PI, GGRC, GWRDC, WRD, GLDC and
ATMA are Rs. 5888 lakh, Rs. 1718.7 lakh, Rs. 1183.7 lakh, Rs. 1380 lakh, Rs. 574.0 lakh and Rs.
117.70 lakh respectively. The total proposal for agriculture department is to the tune of Rs. 219.3
lakh. Fig.5-1 indicates department-wise year -wise share in PMKSY for four years from 2016-17
to 2019-20.
Table 5.1: Department-wise year-wise proposal under PMKSY
Department Year Total
2016-17 2017-18 2018-19 2019-20
DWDU/ GSWMA 5544.9 896.8 414.6 172.3 7028.6
GGRC 528.8 396.6 396.6 396.6 1718.7
GWRDC 295.9 295.9 295.9 295.9 1183.7
GLDC 139.8 139.8 149.8 144.8 574.0
WRD 480.0 420.0 360.0 120.0 1380.0
Forest Department 4083.2 4083.2 4083.2 4083.2 16332.8
ATMA 21.1 26.7 32.6 37.2 117.7
PI 1464.0 1414.0 1407.0 1603.0 5888.0
Agriculture Department 47.3 52.0 57.2 62.9 219.3
Total 12605.0 7725.0 7196.9 6915.9 34442.9
43 | P a g e
Figure 5.1: Department wise proposal under PMKSY
The total plan of four years worked out to be Rs. 34442.9 lakh of which 36.6% (Rs. 12605 lakh) pertains
to first year (2016-17). The funds proposed to second year is second biggest amount which is 22.43% of
the total outlay (Rs. 7725 lakh). The amount proposed for third and fourth year are Rs. 7196.9 lakh and
Rs. 6915.9 lakh.
5.3 Component wise plan
As discussed above about various components of PMKSY, the plan is prepared accordingly.
Table 5-2 shows component wise plan for 4 years starting from 2016-17 to 2019-20. Watershed
component has a total proposal of Rs. 29445.3 lakh which is 85.49% of the total PMKSY
proposal of the district. Per Drop More Crop components is Rs. 1836.4 lakh, which is to be
executed mainly by GGRC and ATMA departments. This component constitutes 5.33% of the
PMKSY Plan. AIBP component is of Rs. 1171.7 lakh (3.4%) will be executed by GWRDC. Har
Khet ko Pani component has a total share of Rs. 1834.3 lakh which is 5.33% of district‟s
PMKSY proposal. This component will be implemented by GLDC and PI departments.
20.41%
4.99%
3.44%1.67%
4.01%
47.42%
0.34%
17.09%0.64%
GSWMA
GGRC
GWRDC
GLDC
WRD
Forest Department
ATMA
PI
Agriculture Department
44 | P a g e
Convergence with MGNREGS is proposed by GSWMA for a total amount of Rs. 155.1 lakh i.e.
0.45% of districts proposal. All the stakeholders need to have coordination among themselves to
have the maximum irrigation efficiency and to avoid duplicity. Fig. 5-2 represents the graphical
representation of various components of PMKSY, year wise plan and share.
Table 5.2: Component wise plan
Component wise Year Total
2016-17 2017-18 2018-19 2019-20
AIBP 292.9 292.9 292.9 292.920 1171.7
HKKP 428.0 425.7 447.9 532.7 1834.3
PDMC 550.0 423.4 429.3 433.8 1836.4
Watershed 11246.6 6551.1 6003.9 5643.7 29445.3
Convergence 87.6 31.9 22.8 12.8 155.1
Total 12605.0 7725.0 7196.9 6915.9 34442.9
Figure 5.2: Component wise Plan
5.4 Block wise- year wise plan
Block wise, component wise plan as well as block wise, department wise plan are as shown in
tables below. Watershed component has the highest amount for all the blocks while convergence
has the lowest amount for all the blocks. Forest department has the highest amount proposed
under PMKSY for all the blocks while ATMA has the lowest amount proposed.
3.40%
5.33% 5.33%
85.5%
0.45%
AIBP
HKKP
PDMC
Watershed
Convergence
45 | P a g e
Table 5.3: Block wise, year wise plan
Block Year Total
2016-17 2017-18 2018-19 2019-20
Ahwa 5003.3 2259.5 2202.2 2156.7 11621.7
Subir 4911.9 3811.9 3287.4 3134.7 15146.0
Waghai 2689.8 1653.6 1707.3 1624.5 7675.2
Total 12605.0 7725.0 7196.9 6915.9 34442.9
Figure 5.3: Block wise proposal under PMKSY
34%
44%
22%
Ahwa
Subir
Waghai
46 | P a g e
5. Strategic Action plan for Irrigation in District under PMKSY Sr. No Name of the
Blocks/Sub Districts: Dangs
Concerned Ministry/
Department
Component Activity Total Number/ Capacity(cum )
Command Area/ lrrigation Potential (Ha)
Period of Implementation 5/ 7 yrs)
Estimated cost (in Rs.)
l
MoWR AIBP Major Irrigation
2 MoWR Medium Irrigation
3 MoWR Surface Minor Irrigation
3.1 MoWR Lift Irrigation 24 822.4 5 1183.7
4 MoWR Har khet ko pani Lift Irrigation 147 955.5 5 1029
5 MoWR Ground water development
6 MoWR RRR of Water Bodies
7 MoWR Construction of Field Channels
7.1 MoWR Lined Field Channels
7.2 MoWR Unlined Channels
7.3 MoWR Farm pond and WHS 392 516 5 574
7.4 Agriculture Department
Distribution of pump-sets with pipeline 600 5 219.33
8 MoWR Har khet ko pani Micro Irrigation
9
MoWR Per drop more crop (Micro Irrigation)
DPAP Drip
10 MoWR DPAP
Sprinkler
11 MoWR Non -DPAP Drip 2301.86 5 1546.83
12 MoWR Non -DPAP Sprinkler 1534.57 5 171.86
13
MOA &FW- DAC&FW
Per drop more crop (Supplementary water
management activities)
Topping up of
MGNREGA
14 MOA &FW- DAC&FW
Drought Proofing through check
Dams/Water Harvesting
Structures
15 MOA &FW- DAC&FW
Secondary Storage Structures
16 MOA &FW- DAC&FW
On Farm Development (distribution pipe / raised
bed and furrow system etc.)
47 | P a g e
17 DoLR-MoRD
PMKSY Watershed
Newly created WHS
17.1 DoLR-MoRD Farm Ponds
17.2 DoLR-MoRD Check Dams 208 2127.5 5 4780
17.3 DoLR-MoRD Nallah Bunds
17.4 DoLR-MoRD
Percolation
Tanks
17.5 DoLR-MoRD Other Ground Water Recharge Structure
17.6 DoLR-MoRD
Fishery
ponds/cattle
pond
18 DoLR-MoRD Renovated WHS
18.1 DoLR-MoRD Farm Ponds
18.2 DoLR-MoRD Check Dams & Desilting 275 318.75 5 1430
18.3 DoLR-MoRD Nallah Bunds
18.4 DoLR-MoRD
Percolation
Tanks
18.5 DoLR-MoRD Other Ground Water Recharge Structure
18.6 DoLR-MoRD
Fishery
ponds/cattle
pond
18.7 DoRD-MoRD GSWMA Activities 1189909.8 cum 3379.6 5 6873.5
18.8 DoRD-MoRD Forest Works 3224111 5 16332.8
19
DoRD-MoRD Convergence with MGNREGA
Newly Created
19.2 DoRD-MoRD
Water
Conservation:
19.1 DoRD-MoRD
Water
Harvesting:
19.3 DoRD-MoRD Creation of Irrigation
canals and Drains:
19.4 DoRD-MoRD Providing Infrastructure
for Irrigation:
19.5 DoRD-MoRD
Land
Development
19.6
DoRD-MoRD
GSWMA Activities 5 155.1
20 Renovation
20.1 DoRD-MoRd Renovation of water
bodies including desilting:
48 | P a g e
20.2 DoRD-MoRd
Renovation & Maintenance of Irrigation Canals &
Drains:
21
State Planned Scheme of Irrigation Topping up of
MGNREGA
21.1
State Drought Proofing through
check
Irrigation
Department Dams/Water Harvesting
Structures
21.2
State
Secondary Storage Structures
Irrigation Department
21.3
State On Farm Development (distribution pipe / raised
bed and furrow system etc.)
Irrigation Department
22
Irrigation Scheme of State
Name of the scheme
Agriculture
Department
23
Irrigation Scheme of other
Line Departments of
State Govt.
Name of the Scheme
24 Externally
aided projects Name of the Scheme
25
other loan projects like
NABARD
Name of the Scheme
26 ATMA Capacity Building 5 117.7
49 | P a g e
5.5 Expected Output and Outcome:
As stated earlier the gross irrigated area in the district is 10680 hectare which is around 15.58%
of 68523 hectare of the gross cropped area. Various departments of the district have proposed to
bring additional acreage of land under irrigated cultivation system.
District Watershed Development Unit (DWDU) has proposed to create water storage capacity of
934041.8 cum, 180198 cum, 48350 cum and 27320 cum during the 1st, 2
nd, 3
rd and 4
th year
respectively. The irrigation potential which is likely to be created by DWDU is 3216.5 ha, 83.3
ha, 56.9 ha and 22.9 ha during the 1st, 2
nd, 3
rd and 4
th year respectively. Similarly, there will be
generation of additional employment in the district which will be to the tune of 122881 mandays,
15333 mandays, 10791 mandays and 1950 mandays during the four continuous years
respectively (2016-20).
The proposal of GGRC aims at intervening in an area of 3836.42 hectare and similarly GWRDC
aims at extending irrigation to 1028 hectare of land. With the proposal of GLDC, the area which
is likely to be irrigated is 610 hectare. In case of Agriculture Department‟s proposal, the total
area which will be irrigated is 600 hectare and the number of expected beneficiary will also be
600 farmers.
Departments 2016-17 2017-18 2018-19 2019-20 Total
Water Resource Department 865.25 835.5 824 877 3401.75
GWRDC 205.6 205.6 205.6 205.6 822.4
GLDC 129 129 129 129 516
DWDU/ GSWMA 3216.5 83.3 56.9 22.9 3379.6
Total 4416.35 1253.4 1215.5 1234.5 8119.75
50 | P a g e
Annexure 1: DWDU/ GSWMA- Strategic Action Plan for Irrigation in District under PMKSY: 2016-2020 (ALL Batches-I to V)
Sr. No Activity Unit
Physical Target for FY (2016-17)
Unit Cost (In Lakhs) Storage Volumes
(Cubic Meter)
Command Area/
Irrigation Potential (Ha.)
Person days/
Mandays Planned
Convergence
Unit Amount (In
Lakhs)
Name of
Schemes
1 Animal camp No. 26 7.43583 0 0 0 0 0 0
2 Animal water trough (Havada) No. 8 6.32235 54 0 86 0 0 0
3 Causeway on connecting roads No. 1 3.44903 0 0 0 0 0 0
4 Check / Protection wall No. 2 3.179 0 0 0 0 0 0
5 Demonstration for Agricultural / Animal Husbandry
Productivity Enhancement No. 0 0 0 0 0 0 0 0
6 Drainage line correction (To prevent flooding of Gamtal) rmt 0 0 0 0 0 0 0 0
7 Drinking water facility No. 34 20.63178 0 0 590 0 0 0
8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 0
9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 0
10 Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 0
11 Panchayat Well Repair & Pump Room No. 0 0 0 0 0 0 0 0
12 Rain water harvesting system No. 0 0 0 0 0 0 0 0
13 Recharge / Repair of open wells No. 5 5.27473 0 0 320 0 0 0
14 Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 0
15 Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 0
16 Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 0
17 Use solar power for productive activities No. 0 0 0 0 0 0 0 0
18 Wind energy development No. 0 0 0 0 0 0 0 0
19 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
20 Libreary No. 0 0 0 0 0 0 0 0
21 Computer Training No. 0 0 0 0 0 0 0 0
22 Pipeline for Animal through Cattle No. 0 0 0 0 0 0 0 0
23 Tiffin Box School Student No. 0 0 0 0 0 0 0 0
24 Mango Plant Distribution No. 0 0 0 0 0 0 0 0
25
0 0 0 0 0 0 0 0
Land Development
0 0 0 0 0 0 0 0
1 Farm Bunding rmt. 0 0 0 0 0 0 0 0
2 Afforestation Ha. 111 69.33102 0 0 0 6 7 0
3 Agriculture Demo No. 0 0 0 0 0 0 0 0
4 Agro Forestry Ha. 1 1 0 0 0 1 0.3 0
5 Horticulture Ha. 16 3.97455 0 0 0 0 0 0
6 Land leveling Ha. 5586.59 818.233 0 899.5 0 0 0 0
7 Pasture Ha. 0 0 0 0 0 0 0 0
8 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9
0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
Soil & Moisture Conservation
0 0 0 0 0 0 0 0
1 Check wall No. 129 275.4501 33080.89 79.2 6834 0 0 0
2 Earthen bund No. 1 0.3 0 0 0 0 0 0
3 Protection Wall No. 0 0 0 0 0 0 0 0
4 Waste weir No. 3250 403.4463 0 578 13094 0 0 0
51 | P a g e
5 Bench Terracing cumec 0 0 0 0 0 0 0 0
6 Bori bandh No. 0 0 0 0 0 0 0 0
7 Brushwood Checks No. 0 0 0 0 0 0 0 0
8 Countour Bunding rmt. 5050 1.57 0 0 0 2650 0.8 0
9 Countour Trenches rmt. 13500 1.62 0 0 100 1 0.75 0
10 Earthern Dam rmt. 0 0 0 0 0 0 0 0
11 Field Outlet No. 0 0 0 0 0 0 0 0
12 Gabion structure No. 123 86.557 0 0 0 0 0 0
13 Graded Bunding rmt. 0 0 0 0 0 0 0 0
14 Gully plug No. 1848 743.0117 332380.5 922.8 51326 910 0 0
15 Loose Boulder Checks No. 0 0 0 0 0 0 0 0
16 Nala Plug No. 157 93.14662 0 0 0 0 0 0
17 Stone bunding rmt. 0 0 0 0 0 0 0 0
18 Straggred Contour trenching(Terrace Talavadi) 36169 43.10511 0 0 0 0 0 0
19 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
20
0 0 0 0 0 0 0 0
21
0 0 0 0 0 0 0 0
Water Harvesting Structure
0 0 0 0 0 0 0 0
1 Cause way cum Chek dam No. 0 0 0 0 0 0 0 0
2 Check dam No. 165 593.3142 272301.8 331 18372 0 0 0
3 Village/Community Pond No. 0 0 0 0 0 0 0 0
4 Farm Pond No. 288 290.1166 234624.6 351 25930 0 0 0
5 Percolation Tank No. 2 5 20000 10 0 0 0 0
6 Pond Inlet No. 0 0 0 0 0 0 0 0
7 Pond Outlet No. 0 0 0 0 0 0 0 0
8 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9 Forest Pond No. 21 38.56 10600 22 324 0 0 0
10
0 0 0 0 0 0 0 0
Existing/Old Water Harvesting Structure Maintance (Renovation &
Repair) 0 0 0 0 0 0 0 0
1 Deepening/Desiltation Of Pond No. 0 0 0 0 0 0 0 0
2 Deepening Of Percolation Tank No. 0 0 0 0 0 0 0 0
3 De-siltation of Checkdam No. 4 4.97 12600 4 0 0 0 0
4 Repairing of Checkdam No. 35 77.81295 18400 19 1797 0 0 0
Ground Water Recharging Structures
0 0 0 0 0 0 0 0
1 Dugwell Recharge No. 0 0 0 0 0 0 0 0
2 Farm Recharge Filter No. 0 0 0 0 0 0 0 0
3 Holiya in farm/Field No. 0 0 0 0 0 0 0 0
4 Pond Recharge structure No. 0 0 0 0 0 0 0 0
5 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
6
0 0 0 0 0 0 0 0
S.No Sub Activity Name
0 0 0 0 0 0 0 0
1 AGRICULTURE ACTIVITIES
0 0 0 0 0 0 0 0
1 Aggriculture Implements No. 1573 91.77698 0 0 0 495 9.1575 0
2 Crop Demonstration No. 97 27.8257 0 0 0 14 2.5 0
3 Floriculture Development No. 20 3.846 0 0 0 0 0 0
4 Green House No. 52 29.401 0 0 8 0 0 0
5 Horticulture Plantation Ha. 929 233.0425 0 0 1620 0 0 0
6 Kitchen Garden No. 1495 72.03236 0 0 0 10 0.5 0
52 | P a g e
7 Nursery raising Ha. 78 44.19373 0 0 0 11 2.75 0
8 Promoting Micro-Irrigation Systems like drip and Sprinkler
Irrigation No. 612 189.4738 0 0 2350 83 55.04 0
9 Vegetable Nursery Raising with drip irrigation No. 37 10.82801 0 0 130 14 3.11 0
10 Vermy Compost No. 210 66.9388 0 0 0 0 0 0
11 Cultivation of Tuver No. 18 8.06378 0 0 0 0 0 0
12 Group Garden No. 15 7.5 0 0 0 0 0 0
13 Mashrom No. 4 1.92799 0 0 0 0 0 0
14 Safed Musli No. 143 27.58442 0 0 0 8 0.4 0
15 Yam Cultivation No. 9 2.50252 0 0 0 0 0 0
16 SRI
381 11.3212 0 0 0 5 0.25 0
17 Turmik Development No. 35 14.1192 0 0 0 0 0 0
18 Farming Suran, Pottato, Kandmul No. 7 3.62 0 0 0 0 0 0
17 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
2 AGRO PROCESSING ACTIVITIES
0 0 0 0 0 0 0 0
1 Fodder Bank Development No. 9 4.1 0 0 0 0 0 0
2 Flour & Dal/Rice Processing unit No. 32 36.55814 0 0 0 0 0 0
3 Oil extraction mill No. 9 14.748 0 0 0 0 0 0
4 Agro Center No. 0 0 0 0 0 0 0 0
5 Garam Masala No. 0 0 0 0 0 0 0 0
6 Microenterprises based on Minor Forest Produce (MFP) No. 0 0 0 0 0 0 0 0
7 Package Food Products No. 0 0 0 0 0 0 0 0
8 Pulp making No. 0 0 0 0 0 0 0 0
9 Bamboo Pickle No. 1 0.5 0 0 0 0 0 0
10 Bee Keeping No. 6 1.4 0 0 0 0 0 0
11 Nahri No. 1 0.63276 0 0 0 0 0 0
12 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
3 Animal Husbandry
0 0 0 0 0 0 0 0
1 Animal Travis (Pinjaru) No. 5 1.2 0 0 0 0 0 0
2 Poultry Farming / Back yard poultry No. 82 99.10066 0 0 0 0 0 0
3 Cattle Feed and Nutrition Store No. 2 1.28 0 0 0 0 0 0
4 Cattle Shed No. 1251 302.0105 0 0 0 0 0 0
5 Pasture development No. 11 5 0 0 0 0 0 0
6 Livestock Development No. 2 3 0 0 0 0 0 0
7 Animal camp No. 125 34.58163 0 0 0 0 0 0
8 Apiculture No. 2 0.5 0 0 0 0 0 0
OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9
0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
4 Establishing linkages
0 0 0 0 0 0 0 0
1
0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
5 Local traditional handicraft
0 0 0 0 0 0 0 0
1 Bamboo based products, No. 0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
53 | P a g e
6 Minor Activities
0 0 0 0 0 0 0 0
1 Provision Store No. 1 1 0 0 0 0 0 0
2 Mandap Decoration No. 1 2 0 0 0 0 0 0
3 Up Gradation of centering materials (Mixer Machine) No. 2 2.06146 0 0 0 0 0 0
4 Baj Dadiya No. 1 0.54 0 0 0 0 0 0
5 Tee Center No. 0 0 0 0 0 0 0 0
6 Stiching machine No. 82 5.74 0 0 0 0 0 0
OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
7
0 0 0 0 0 0 0 0
8
0 0 0 0 0 0 0 0
10 Non-conventional Energy Sources No. 0 0 0 0 0 0 0 0
1
0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
Total
60102.67 4958.763 934041.8 3216.5 122881 4208 82.5575 0
1 Consolidation Phase
160.428
2 Admin
243.187
3 Capacity Building, Monitoring & Evaluation
100
Grand Total
60102.67 5462.378 934041.8 3216.5 122881 4208 82.5575 0
Sr. No Activity Unit
Physical Target for FY (2017-18)
Unit Cost (In Lakhs) Storage Volumes
(Cubic Meter)
Command Area/
Irrigation Potential (Ha.)
Person days/
Mandays Planned
Convergence
Unit Amount (In
Lakhs)
Name of
Schemes
1 Animal camp No. 0 0 0 0 0 0 0 0
2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 0
3 Causeway on connecting roads No. 0 0 0 0 0 0 0 0
4 Check / Protection wall No. 0 0 0 0 0 0 0 0
5 Demonstration for Agricultural / Animal Husbandry
Productivity Enhancement No.
0 0 0 0 0 0 0 0
6 Drainage line correction (To prevent flooding of Gamtal) rmt 0 0 0 0 0 0 0 0
7 Drinking water facility No. 0 0 0 0 0 0 0 0
8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 0
9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 0
10 Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 0
11 Panchayat Well Repair & Pump Room No. 0 0 0 0 0 0 0 0
12 Rain water harvesting system No. 0 0 0 0 0 0 0 0
13 Recharge / Repair of open wells No. 0 0 0 0 0 0 0 0
14 Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 0
15 Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 0
16 Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 0
17 Use solar power for productive activities No. 0 0 0 0 0 0 0 0
18 Wind energy development No. 0 0 0 0 0 0 0 0
19 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
20 Libreary No. 0 0 0 0 0 0 0 0
21 Computer Training No. 0 0 0 0 0 0 0 0
22 Pipeline for Animal through Cattle No. 0 0 0 0 0 0 0 0
23 Tiffin Box School Student No. 0 0 0 0 0 0 0 0
24 Mango Plant Distribution No. 0 0 0 0 0 0 0 0
25
0 0 0 0 0 0 0 0
54 | P a g e
Land Development
0 0 0 0 0 0 0 0
1 Farm Bunding rmt. 0 0 0 0 0 0 0 0
2 Afforestation Ha. 1 0 0 0 0 1 1.3 0
3 Agriculture Demo No. 0 0 0 0 0 0 0 0
4 Agro Forestry Ha. 0 0 0 0 0 0 0 0
5 Horticulture Ha. 0 0 0 0 0 0 0 0
6 Land leveling Ha. 837.2 112.82 0 0 0 0 0 0
7 Pasture Ha. 0 0 0 0 0 0 0 0
8 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9
0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
Soil & Moisture Conservation
0 0 0 0 0 0 0 0
1 Check wall No. 12 28.75 0 0 2250 0 0 0
2 Earthen bund No. 0 0 0 0 0 0 0 0
3 Protection Wall No. 0 0 0 0 0 0 0 0
4 Waste weir No. 313 58.71061 0 0 990 0 0 0
5 Bench Terracing cumec 0 0 0 0 0 0 0 0
6 Bori bandh No. 0 0 0 0 0 0 0 0
7 Brushwood Checks No. 0 0 0 0 0 0 0 0
8 Countour Bunding rmt. 0 0 0 0 0 0 0 0
9 Countour Trenches rmt. 0 0 0 0 200 3202 2.25 0
10 Earthern Dam rmt. 0 0 0 0 0 0 0 0
11 Field Outlet No. 0 0 0 0 0 0 0 0
12 Gabion structure No. 0 0 0 0 0 0 0 0
13 Graded Bunding rmt. 0 0 0 0 0 0 0 0
14 Gully plug No. 169 76.46022 598 4.8 4185 0 0 0
15 Loose Boulder Checks No. 0 0 0 0 0 0 0 0
16 Nala Plug No. 0 0 0 0 0 0 0 0
17 Stone bunding rmt. 0 0 0 0 0 0 0 0
18 Straggred Contour trenching(Terrace Talavadi) 36169 0 0 0 0 0 0 0
19 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
20
0 0 0 0 0 0 0 0
21
0 0 0 0 0 0 0 0
Water Harvesting Structure
0 0 0 0 0 0 0 0
1 Cause way cum Chek dam No. 0 0 0 0 0 0 0 0
2 Check dam No. 12 46.91 48100 39 3970 0 0 0
3 Village/Community Pond No. 0 0 0 0 0 0 0 0
4 Farm Pond No. 27 28.0171 131500 39.5 1370 6 4.5171 0
5 Percolation Tank No. 0 0 0 0 0 0 0 0
6 Pond Inlet No. 0 0 0 0 0 0 0 0
7 Pond Outlet No. 0 0 0 0 0 0 0 0
8 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9 Forest Pond No. 0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
Existing/Old Water Harvesting Structure Maintance (Renovation &
Repair) 0
0 0 0 0 0 0 0
1 Deepening/Desiltation Of Pond No. 0 0 0 0 0 0 0 0
2 Deepening Of Percolation Tank No. 0 0 0 0 0 0 0 0
3 De-siltation of Checkdam No. 0 0 0 0 0 0 0 0
55 | P a g e
4 Repairing of Checkdam No. 0 0 0 0 0 0 0 0
Ground Water Recharging Structures
0 0 0 0 0 0 0 0
1 Dugwell Recharge No. 0 0 0 0 0 0 0 0
2 Farm Recharge Filter No. 0 0 0 0 0 0 0 0
3 Holiya in farm/Field No. 0 0 0 0 0 0 0 0
4 Pond Recharge structure No. 0 0 0 0 0 0 0 0
5 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
6
0 0 0 0 0 0 0 0
S.No Sub Activity Name
0 0 0 0 0 0 0 0
1 AGRICULTURE ACTIVITIES
0 0 0 0 0 0 0 0
1 Aggriculture Implements No. 431 12.88356 0 0 0 431 7.9735 0
2 Crop Demonstration No. 7 0.483 0 0 0 0 0 0
3 Floriculture Development No. 0 0 0 0 0 0 0 0
4 Green House No. 28 5.81044 0 0 38 0 0 0
5 Horticulture Plantation Ha. 34 7.92 0 0 620 0 0 0
6 Kitchen Garden No. 140 5.88 0 0 0 10 0.5 0
7 Nursery raising Ha. 1 0.5 0 0 150 0 0 0
8 Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation
No. 15 4.168 0 0 0 12 2.63 0
9 Vegetable Nursery Raising with drip irrigation No. 13 3.38 0 0 130 12 2.52 0
10 Vermy Compost No. 7 2.117 0 0 0 0 0 0
11 Cultivation of Tuver No. 0 0 0 0 0 0 0 0
12 Group Garden No. 0 0 0 0 0 0 0 0
13 Mashrom No. 0 0 0 0 0 0 0 0
14 Safed Musli No. 3 0.333 0 0 0 3 0.15 0
15 Yam Cultivation No. 0 0 0 0 0 0 0 0
16 SRI
0 0 0 0 0 0 0 0
17 Turmik Development No. 0 0 0 0 0 0 0 0
18 Farming Suran, Pottato, Kandmul No. 0 0 0 0 0 0 0 0
17 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
2 AGRO PROCESSING ACTIVITIES
0 0 0 0 0 0 0 0
1 Fodder Bank Development No. 0 0 0 0 0 0 0 0
2 Flour & Dal/Rice Processing unit No. 0 0 0 0 0 0 0 0
3 Oil extraction mill No. 3 3 0 0 0 0 0 0
4 Agro Center No. 0 0 0 0 0 0 0 0
5 Garam Masala No. 0 0 0 0 0 0 0 0
6 Microenterprises based on Minor Forest Produce (MFP) No. 0 0 0 0 0 0 0 0
7 Package Food Products No. 0 0 0 0 0 0 0 0
8 Pulp making No. 0 0 0 0 0 0 0 0
9 Bamboo Pickle No. 0 0 0 0 0 0 0 0
10 Bee Keeping No. 0 0 0 0 0 0 0 0
11 Nahri No. 0 0 0 0 0 0 0 0
12 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
3 Animal Husbandry
0 0 0 0 0 0 0 0
1 Animal Travis (Pinjaru) No. 0 0 0 0 0 0 0 0
56 | P a g e
2 Poultry Farming / Back yard poultry No. 5 5 0 0 150 0 0 0
3 Cattle Feed and Nutrition Store No. 0 0 0 0 0 0 0 0
4 Cattle Shed No. 200 47.194 0 0 1280 81 3.54456 0
5 Pasture development No. 0 0 0 0 0 0 0 0
6 Livestock Development No. 0 0 0 0 0 0 0 0
7 Animal camp No. 7 1.25 0 0 0 2 0.5 0
8 Apiculture No. 0 0 0 0 0 0 0 0
OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9
0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
4 Establishing linkages
0 0 0 0 0 0 0 0
1
0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
5 Local traditional handicraft
0 0 0 0 0 0 0 0
1 Bamboo based products, No. 0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
6 Minor Activities
0 0 0 0 0 0 0 0
1 Provision Store No. 0 0 0 0 0 0 0 0
2 Mandap Decoration No. 0 0 0 0 0 0 0 0
3 Up Gradation of centering materials (Mixer Machine) No. 0 0 0 0 0 0 0 0
4 Baj Dadiya No. 0 0 0 0 0 0 0 0
5 Tee Center No. 0 0 0 0 0 0 0 0
6 Stiching machine No. 0 0 0 0 0 0 0 0
OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
7
0 0 0 0 0 0 0 0
8
0 0 0 0 0 0 0 0
10 Non-conventional Energy Sources No. 0 0 0 0 0 0 0 0
1
0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
Total
2265.2 451.5869 180198 83.3 15333 3760 25.88516 0
1 Consolidation Phase
161.823
2 Admin
157.51
3 Capacity Building, Monitoring & Evaluation
100
Grand Total
2265.2 870.9199 180198 83.3 15333 3760 25.88516 0
Sr. No Activity Unit
Physical Target for FY (2018-19)
Unit Cost (In Lakhs) Storage Volumes
(Cubic Meter) Command Area/
Irrigation Potential (Ha.) Person days/
Mandays Planned
Convergence
Unit Amount (In
Lakhs)
Name of
Schemes
1 Animal camp No. 0 0 0 0 0 0 0 0
2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 0
3 Causeway on connecting roads No. 0 0 0 0 0 0 0 0
4 Check / Protection wall No. 0 0 0 0 0 0 0 0
5 Demonstration for Agricultural / Animal Husbandry
Productivity Enhancement No.
0 0 0 0 0 0 0 0
6 Drainage line correction (To prevent flooding of Gamtal) rmt 0 0 0 0 0 0 0 0
7 Drinking water facility No. 0 0 0 0 0 0 0 0
8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 0
9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 0
57 | P a g e
10 Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 0
11 Panchayat Well Repair & Pump Room No. 0 0 0 0 0 0 0 0
12 Rain water harvesting system No. 0 0 0 0 0 0 0 0
13 Recharge / Repair of open wells No. 0 0 0 0 0 0 0 0
14 Repair / development of artificial water bodies No. 3 0.69 0 0 0 3 0.13128 0
15 Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 0
16 Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 0
17 Use solar power for productive activities No. 1 0 0 0 0 1 0.25 0
18 Wind energy development No. 0 0 0 0 0 0 0 0
19 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
20 Libreary No. 0 0 0 0 0 0 0 0
21 Computer Training No. 0 0 0 0 0 0 0 0
22 Pipeline for Animal through Cattle No. 0 0 0 0 0 0 0 0
23 Tiffin Box School Student No. 0 0 0 0 0 0 0 0
24 Mango Plant Distribution No. 0 0 0 0 0 0 0 0
25
0 0 0 0 0 0 0 0
Land Development
0 0 0 0 0 0 0 0
1 Farm Bunding rmt. 0 0 0 0 0 0 0 0
2 Afforestation Ha. 0 0 0 0 0 0 0 0
3 Agriculture Demo No. 0 0 0 0 0 0 0 0
4 Agro Forestry Ha. 0 0 0 0 0 0 0 0
5 Horticulture Ha. 0 0 0 0 0 0 0 0
6 Land leveling Ha. 304 37.29 0 0 0 0 0 0
7 Pasture Ha. 0 0 0 0 0 0 0 0
8 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9
0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
Soil & Moisture Conservation
0 0 0 0 0 0 0 0
1 Check wall No. 7 16.39 2500 3 1860 1 1 1
2 Earthen bund No. 0 0 0 0 0 0 0 0
3 Protection Wall No. 0 0 0 0 0 0 0 0
4 Waste weir No. 18 1.8 0 0 240 0 0 0
5 Bench Terracing cumec 0 0 0 0 0 0 0 0
6 Bori bandh No. 0 0 0 0 0 0 0 0
7 Brushwood Checks No. 0 0 0 0 0 0 0 0
8 Countour Bunding rmt. 0 0 0 0 0 0 0 0
9 Countour Trenches rmt. 0 0 0 0 100 1 0.75 0
10 Earthern Dam rmt. 0 0 0 0 0 0 0 0
11 Field Outlet No. 0 0 0 0 0 0 0 0
12 Gabion structure No. 0 0 0 0 0 0 0 0
13 Graded Bunding rmt. 0 0 0 0 0 0 0 0
14 Gully plug No. 67 33.24205 0 0 1610 0 0 0
15 Loose Boulder Checks No. 0 0 0 0 0 0 0 0
16 Nala Plug No. 0 0 0 0 0 0 0 0
17 Stone bunding rmt. 0 0 0 0 0 0 0 0
18 Straggred Contour trenching(Terrace Talavadi) 36169 0 0 0 0 0 0 0
19 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
20
0 0 0 0 0 0 0 0
58 | P a g e
21
0 0 0 0 0 0 0 0
Water Harvesting Structure
0 0 0 0 0 0 0 0
1 Cause way cum Chek dam No. 0 0 0 0 0 0 0 0
2 Check dam No. 13 46.851 37400 34.4 3690 0 0 0
3 Village/Community Pond No. 0 0 0 0 0 0 0 0
4 Farm Pond No. 12 13.3342 8450 19.5 697 3 1.834 0
5 Percolation Tank No. 0 0 0 0 0 0 0 0
6 Pond Inlet No. 0 0 0 0 0 0 0 0
7 Pond Outlet No. 0 0 0 0 0 0 0 0
8 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9 Forest Pond No. 0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
Existing/Old Water Harvesting Structure Maintance (Renovation &
Repair) 0
0 0 0 0 0 0 0
1 Deepening/Desiltation Of Pond No. 0 0 0 0 0 0 0 0
2 Deepening Of Percolation Tank No. 0 0 0 0 0 0 0 0
3 De-siltation of Checkdam No. 0 0 0 0 0 0 0 0
4 Repairing of Checkdam No. 0 0 0 0 0 0 0 0
Ground Water Recharging Structures
0 0 0 0 0 0 0 0
1 Dugwell Recharge No. 0 0 0 0 0 0 0 0
2 Farm Recharge Filter No. 0 0 0 0 0 0 0 0
3 Holiya in farm/Field No. 0 0 0 0 0 0 0 0
4 Pond Recharge structure No. 0 0 0 0 0 0 0 0
5 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
6
0 0 0 0 0 0 0 0
S.No Sub Activity Name
0 0 0 0 0 0 0 0
1 AGRICULTURE ACTIVITIES
0 0 0 0 0 0 0 0
1 Aggriculture Implements No. 249 7.47 0 0 0 249 4.6065 0
2 Crop Demonstration No. 0 0 0 0 0 0 0 0
3 Floriculture Development No. 0 0 0 0 0 0 0 0
4 Green House No. 14 3.41654 0 0 24 0 0 0
5 Horticulture Plantation Ha. 13 3.12 0 0 200 0 0 0
6 Kitchen Garden No. 10 0.42 0 0 0 0 0 0
7 Nursery raising Ha. 3 1.529 0 0 300 0 0 0
8 Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation
No. 4 1.22 0 0 50 1 0.63 0
9 Vegetable Nursery Raising with drip irrigation No. 3 0.72 0 0 0 1 0.63 0
10 Vermy Compost No. 3 0.908 0 0 0 0 0 0
11 Cultivation of Tuver No. 0 0 0 0 0 0 0 0
12 Group Garden No. 0 0 0 0 0 0 0 0
13 Mashrom No. 0 0 0 0 0 0 0 0
14 Safed Musli No. 0 0 0 0 0 0 0 0
15 Yam Cultivation No. 0 0 0 0 0 0 0 0
16 SRI
0 0 0 0 0 0 0 0
17 Turmik Development No. 0 0 0 0 0 0 0 0
18 Farming Suran, Pottato, Kandmul No. 0 0 0 0 0 0 0 0
17 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
59 | P a g e
2 AGRO PROCESSING ACTIVITIES
0 0 0 0 0 0 0 0
1 Fodder Bank Development No. 0 0 0 0 0 0 0 0
2 Flour & Dal/Rice Processing unit No. 0 0 0 0 0 0 0 0
3 Oil extraction mill No. 1 1 0 0 0 0 0 0
4 Agro Center No. 0 0 0 0 0 0 0 0
5 Garam Masala No. 0 0 0 0 0 0 0 0
6 Microenterprises based on Minor Forest Produce (MFP) No. 0 0 0 0 0 0 0 0
7 Package Food Products No. 0 0 0 0 0 0 0 0
8 Pulp making No. 0 0 0 0 0 0 0 0
9 Bamboo Pickle No. 0 0 0 0 0 0 0 0
10 Bee Keeping No. 0 0 0 0 0 0 0 0
11 Nahri No. 0 0 0 0 0 0 0 0
12 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
3 Animal Husbandry
0 0 0 0 0 0 0 0
1 Animal Travis (Pinjaru) No. 0 0 0 0 0 0 0 0
2 Poultry Farming / Back yard poultry No. 8 8.669 0 0 740 1 0.131 0
3 Cattle Feed and Nutrition Store No. 0 0 0 0 0 0 0 0
4 Cattle Shed No. 93 21.55 0 0 1280 77 3.36944 0
5 Pasture development No. 0 0 0 0 0 0 0 0
6 Livestock Development No. 0 0 0 0 0 0 0 0
7 Animal camp No. 11 1.25 0 0 0 6 1.5 0
8 Apiculture No. 0 0 0 0 0 0 0 0
OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9
0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
4 Establishing linkages
0 0 0 0 0 0 0 0
1
0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
5 Local traditional handicraft
0 0 0 0 0 0 0 0
1 Bamboo based products, No. 0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
6 Minor Activities
0 0 0 0 0 0 0 0
1 Provision Store No. 0 0 0 0 0 0 0 0
2 Mandap Decoration No. 3 3.706 0 0 0 0 0 0
3 Up Gradation of centering materials (Mixer Machine) No. 0 0 0 0 0 0 0 0
4 Baj Dadiya No. 0 0 0 0 0 0 0 0
5 Tee Center No. 0 0 0 0 0 0 0 0
6 Stiching machine No. 0 0 0 0 0 0 0 0
OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
7
0 0 0 0 0 0 0 0
8
0 0 0 0 0 0 0 0
10 Non-conventional Energy Sources No. 0 0 0 0 0 0 0 0
1
0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
Total
840 204.5758 48350 56.9 10791 344 14.83222 1
1 Consolidation Phase
34.87566
60 | P a g e
2 Admin
60.28
3 Capacity Building, Monitoring & Evaluation
100
Grand Total
840 399.7315 48350 56.9 10791 344 14.83222 1
Sr. No Activity Unit
Physical Target for FY (2019-20)
Unit Cost (In Lakhs) Storage Volumes
(Cubic Meter)
Command Area/
Irrigation Potential (Ha.)
Person days/
Mandays Planned
Convergence
Unit Amount (In
Lakhs) Name of Schemes
1 Animal camp No. 0 0 0 0 0 0 0 0
2 Animal water trough (Havada) No. 0 0 0 0 0 0 0 0
3 Causeway on connecting roads No. 0 0 0 0 0 0 0 0
4 Check / Protection wall No. 0 0 0 0 0 0 0 0
5 Demonstration for Agricultural / Animal Husbandry Productivity Enhancement
No. 0 0 0 0 0 0 0 0
6 Drainage line correction (To prevent flooding of Gamtal) rmt 0 0 0 0 0 0 0 0
7 Drinking water facility No. 0 0 0 0 0 0 0 0
8 Fencing for protection from wild animals rmt. 0 0 0 0 0 0 0 0
9 Grassland/Gauchar Development Ha. 0 0 0 0 0 0 0 0
10 Improvised and energy efficient smashan gruh (Cemetery ) No. 0 0 0 0 0 0 0 0
11 Panchayat Well Repair & Pump Room No. 0 0 0 0 0 0 0 0
12 Rain water harvesting system No. 0 0 0 0 0 0 0 0
13 Recharge / Repair of open wells No. 0 0 0 0 0 0 0 0
14 Repair / development of artificial water bodies No. 0 0 0 0 0 0 0 0
15 Revival of natural water bodies with recharge activities No. 0 0 0 0 0 0 0 0
16 Sanitation facilities/Sewerage line rmt 0 0 0 0 0 0 0 0
17 Use solar power for productive activities No. 0 0 0 0 0 0 0 0
18 Wind energy development No. 0 0 0 0 0 0 0 0
19 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
20 Libreary No. 0 0 0 0 0 0 0 0
21 Computer Training No. 0 0 0 0 0 0 0 0
22 Pipeline for Animal through Cattle No. 0 0 0 0 0 0 0 0
23 Tiffin Box School Student No. 0 0 0 0 0 0 0 0
24 Mango Plant Distribution No. 0 0 0 0 0 0 0 0
25
0 0 0 0 0 0 0 0
Land Development
0 0 0 0 0 0 0 0
1 Farm Bunding rmt. 0 0 0 0 0 0 0 0
2 Afforestation Ha. 0 0 0 0 0 0 0 0
3 Agriculture Demo No. 0 0 0 0 0 0 0 0
4 Agro Forestry Ha. 0 0 0 0 0 0 0 0
5 Horticulture Ha. 0 0 0 0 0 0 0 0
6 Land leveling Ha. 0 0 0 0 0 0 0 0
7 Pasture Ha. 0 0 0 0 0 0 0 0
8 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9
0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
Soil & Moisture Conservation
0 0 0 0 0 0 0 0
1 Check wall No. 0 0 0 0 0 0 0 0
2 Earthen bund No. 0 0 0 0 0 0 0 0
3 Protection Wall No. 0 0 0 0 0 0 0 0
61 | P a g e
4 Waste weir No. 0 0 0 0 0 0 0 0
5 Bench Terracing cumec 0 0 0 0 0 0 0 0
6 Bori bandh No. 0 0 0 0 0 0 0 0
7 Brushwood Checks No. 0 0 0 0 0 0 0 0
8 Countour Bunding rmt. 0 0 0 0 0 0 0 0
9 Countour Trenches rmt. 0 0 0 0 0 0 0 0
10 Earthern Dam rmt. 0 0 0 0 0 0 0 0
11 Field Outlet No. 0 0 0 0 0 0 0 0
12 Gabion structure No. 0 0 0 0 0 0 0 0
13 Graded Bunding rmt. 0 0 0 0 0 0 0 0
14 Gully plug No. 18 9.616 0 0 520 0 0 0
15 Loose Boulder Checks No. 0 0 0 0 0 0 0 0
16 Nala Plug No. 0 0 0 0 0 0 0 0
17 Stone bunding rmt. 0 0 0 0 0 0 0 0
18 Straggred Contour trenching(Terrace Talavadi) 36169 0 0 0 0 0 0 0
19 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
20
0 0 0 0 0 0 0 0
21
0 0 0 0 0 0 0 0
Water Harvesting Structure
0 0 0 0 0 0 0 0
1 Cause way cum Chek dam No. 0 0 0 0 0 0 0 0
2 Check dam No. 9 28.18393 26560 19.9 660 0 0 0
3 Village/Community Pond No. 0 0 0 0 0 0 0 0
4 Farm Pond No. 3 2.1171 760 3 300 3 2.1171 0
5 Percolation Tank No. 0 0 0 0 0 0 0 0
6 Pond Inlet No. 0 0 0 0 0 0 0 0
7 Pond Outlet No. 0 0 0 0 0 0 0 0
8 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9 Forest Pond No. 0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
Existing/Old Water Harvesting Structure Maintance (Renovation &
Repair) 0
0 0 0 0 0 0 0
1 Deepening/Desiltation Of Pond No. 0 0 0 0 0 0 0 0
2 Deepening Of Percolation Tank No. 0 0 0 0 0 0 0 0
3 De-siltation of Checkdam No. 0 0 0 0 0 0 0 0
4 Repairing of Checkdam No. 0 0 0 0 0 0 0 0
Ground Water Recharging Structures
0 0 0 0 0 0 0 0
1 Dugwell Recharge No. 0 0 0 0 0 0 0 0
2 Farm Recharge Filter No. 0 0 0 0 0 0 0 0
3 Holiya in farm/Field No. 0 0 0 0 0 0 0 0
4 Pond Recharge structure No. 0 0 0 0 0 0 0 0
5 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
6
0 0 0 0 0 0 0 0
S.No Sub Activity Name
0 0 0 0 0 0 0 0
1 AGRICULTURE ACTIVITIES
0 0 0 0 0 0 0 0
1 Aggriculture Implements No. 0 0 0 0 0 0 0 0
2 Crop Demonstration No. 0 0 0 0 0 0 0 0
3 Floriculture Development No. 0 0 0 0 0 0 0 0
4 Green House No. 0 0 0 0 0 0 0 0
5 Horticulture Plantation Ha. 0 0 0 0 0 0 0 0
62 | P a g e
6 Kitchen Garden No. 0 0 0 0 0 0 0 0
7 Nursery raising Ha. 0 0 0 0 0 0 0 0
8 Promoting Micro-Irrigation Systems like drip and Sprinkler
Irrigation No.
0 0 0 0 0 0 0 0
9 Vegetable Nursery Raising with drip irrigation No. 0 0 0 0 0 0 0 0
10 Vermy Compost No. 0 0 0 0 0 0 0 0
11 Cultivation of Tuver No. 0 0 0 0 0 0 0 0
12 Group Garden No. 0 0 0 0 0 0 0 0
13 Mashrom No. 0 0 0 0 0 0 0 0
14 Safed Musli No. 0 0 0 0 0 0 0 0
15 Yam Cultivation No. 0 0 0 0 0 0 0 0
16 SRI
0 0 0 0 0 0 0 0
17 Turmik Development No. 0 0 0 0 0 0 0 0
18 Farming Suran, Pottato, Kandmul No. 0 0 0 0 0 0 0 0
17 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
2 AGRO PROCESSING ACTIVITIES
0 0 0 0 0 0 0 0
1 Fodder Bank Development No. 0 0 0 0 0 0 0 0
2 Flour & Dal/Rice Processing unit No. 3 3.13 0 0 0 1 0.07 0
3 Oil extraction mill No. 0 0 0 0 0 0 0 0
4 Agro Center No. 0 0 0 0 0 0 0 0
5 Garam Masala No. 0 0 0 0 0 0 0 0
6 Microenterprises based on Minor Forest Produce (MFP) No. 0 0 0 0 0 0 0 0
7 Package Food Products No. 0 0 0 0 0 0 0 0
8 Pulp making No. 0 0 0 0 0 0 0 0
9 Bamboo Pickle No. 0 0 0 0 0 0 0 0
10 Bee Keeping No. 0 0 0 0 0 0 0 0
11 Nahri No. 0 0 0 0 0 0 0 0
12 OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
3 Animal Husbandry
0 0 0 0 0 0 0 0
1 Animal Travis (Pinjaru) No. 0 0 0 0 0 0 0 0
2 Poultry Farming / Back yard poultry No. 3 2.85 0 0 190 0 0 0
3 Cattle Feed and Nutrition Store No. 0 0 0 0 0 0 0 0
4 Cattle Shed No. 14 3.22 0 0 280 14 0.61264 0
5 Pasture development No. 0 0 0 0 0 0 0 0
6 Livestock Development No. 0 0 0 0 0 0 0 0
7 Animal camp No. 0 0 0 0 0 0 0 0
8 Apiculture No. 0 0 0 0 0 0 0 0
OTHERS (Specifiy activities )
0 0 0 0 0 0 0 0
9
0 0 0 0 0 0 0 0
10
0 0 0 0 0 0 0 0
4 Establishing linkages
0 0 0 0 0 0 0 0
1
0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
5 Local traditional handicraft
0 0 0 0 0 0 0 0
1 Bamboo based products, No. 0 0 0 0 0 0 0 0
63 | P a g e
2
0 0 0 0 0 0 0 0
6 Minor Activities
0 0 0 0 0 0 0 0
1 Provision Store No. 0 0 0 0 0 0 0 0
2 Mandap Decoration No. 0 0 0 0 0 0 0 0
3 Up Gradation of centering materials (Mixer Machine) No. 0 0 0 0 0 0 0 0
4 Baj Dadiya No. 0 0 0 0 0 0 0 0
5 Tee Center No. 0 0 0 0 0 0 0 0
6 Stiching machine No. 0 0 0 0 0 0 0 0
OTHERS (Specifiy activities ) No. 0 0 0 0 0 0 0 0
7
0 0 0 0 0 0 0 0
8
0 0 0 0 0 0 0 0
10 Non-conventional Energy Sources No. 0 0 0 0 0 0 0 0
1
0 0 0 0 0 0 0 0
2
0 0 0 0 0 0 0 0
Total
50 49.11703 27320 22.9 1950 18 2.79974 0
1 Consolidation Phase
18.963
2 Admin
19.012
3 Capacity Building, Monitoring & Evaluation
82.4224
Grand Total
50 169.5144 27320 22.9 1950 18 2.79974 0
Annexure 2: GGRC
District Taluka
Target for 2016-17
Total Drip Irrigation System (DIS) Sprinkler Irrigation System (SIS)
Total
Number
(Farmers)
Area
(Ha.)
Estimated
Total Cost
(Rs. in
lakh)
Estimated
Assistance
(Rs. in
lakh)
Total
Number
(Farmers)
Area
(Ha.)
Estimated
Total Cost
(Rs. in
lakh)
Estimated
Assistance
(Rs. in
lakh)
Total
Number
(Farmers)
Area
(Ha.)
Estimated
Total Cost
(Rs. in
lakh)
Estimated
Assistance
(Rs. in
lakh)
DANGS
Ahwa(Dang) 601 961.15 768.92 430.60 360 576.69 692.03 387.54 240 384.46 76.89 43.06
SUBIR 56 89.13 71.30 39.93 33 53.48 64.17 35.94 22 35.65 7.13 3.99
WAGHAI 81 130.16 104.13 58.31 49 78.09 93.71 52.48 33 52.06 10.41 5.83
TOTAL 738 1180.4 944.35 528.84 443 708.26 849.92 475.95 295 472.18 94.44 52.88
Target for 2017-18
DANGS
Ahwa(Dang) 451 720.86 576.69 322.95 270 432.52 519.02 290.65 180 288.35 57.67 32.29
SUBIR 42 66.85 53.48 29.95 25 40.11 48.13 26.95 17 26.74 5.35 2.99
WAGHAI 61 97.62 78.09 43.73 37 58.57 70.29 39.36 24 39.05 7.81 4.37
TOTAL 553 885.33 708.26 396.63 332 531.20 637.44 356.96 221 354.13 70.83 39.66
Target for 2018-19
DANGS
Ahwa(Dang) 451 720.86 576.69 322.95 270 432.52 519.02 290.65 180 288.35 57.67 32.29
SUBIR 42 66.85 53.48 29.95 25 40.11 48.13 26.95 17 26.74 5.35 2.99
WAGHAI 61 97.62 78.09 43.73 37 58.57 70.29 39.36 24 39.05 7.81 4.37
TOTAL 553 885.33 708.26 396.63 332 531.20 637.44 356.96 221 354.13 70.83 39.66
Target for 2019-20
DANGS
Ahwa(Dang) 451 720.86 576.69 322.95 270 432.52 519.02 290.65 180 288.35 57.67 32.29
SUBIR 42 66.85 53.48 29.95 25 40.11 48.13 26.95 17 26.74 5.35 2.99
WAGHAI 61 97.62 78.09 43.73 37 58.57 70.29 39.36 24 39.05 7.81 4.37
TOTAL 553 885.33 708.26 396.63 332 531.20 637.44 356.96 221 354.13 70.83 39.66
64 | P a g e
Annexure 3: GWRDC
District Taluka
Concerned
Ministry/
Department
Component Activity
Period of
Implementation 5 / 7
yrs)
Sum of Total Number/
Capacity(cum )
Sum of
Command
Area/
irrigation
Potential (Ha)
Sum of
Estimated
cost (in Rs.
LacS)
Dang Ahwa MoWR AIBP Lift Irrigation Scheme 5 years 9 370 529.1
Har Khet ko Pani Exploratory Tubewell 5 years 2 4 15
Waghai MoWR AIBP Lift Irrigation Scheme 5 years 15 654 935.22
Dang Total 26 1028 1479.32
Annexure 4: GLDC
Sr. No. Name of the blocks/ sub
districts
Concerned Ministry/
Department
Component
Activity
Total Number/
Capacity (cum)
Command area/irrigation
potential (Ha.)
Period of implemented
year 2016-17 to 2020-
21
Estimated cost (in
Rs. lakh)
1 Dang Ahwa Agriculture &
Co-operation
Har Khet ko Pani Farm pond
105 128.4 4 yrs 117.20
WHS 10 50.00 " 50.00
2 Dang Vaghai Agriculture &
Co-operation
Har Khet ko Pani Farm pond
125 157.2 " 139.6
WHS 10.0 50.0 50.0
3 Dang Suber Agriculture &
Co-operation
Har Khet ko Pani Farm pond
127.0 149.4 " 142.20
WHS 15.0 75.0 " 75.0
TOTAL Farm pond 357.0 435.0 399.0
WHS 35.0 175.0 175.0
Annexure 5: WRD (SI & PI)
Name of the Block: AHWA-1(PANCHAYAT IRRIGATION)
Sr.
No
Name of the
Blocks/Sub
Districts
Concerned Ministry/
Department
Component Activity Total
Number/Capacity(cum )
Total Command
Area
(hac.)
Existing irrigation
Area
(hac.)
2016-17 2017-18 2018-19 2019-20
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
4
DANGS
MoWR Har Khet ko
Pani
Lift
Irrigation 52 4600 1064 78.00 84.00 65.00 70 78.00 84 117.00 126
17 MoWR Other Irri. Works
Checkdam Newly Created WHS
17.2 MoWR 65 9300 2708 127.50 300 127.50 300 127.50 300 170 400
20 MoWR Other Irri.
Works Desilting
Renovation WHS
20.1 MoWR 40 9300 2708 7.50 30 7.50 30 7.50 30 7.50 30
65 | P a g e
18 MoWR Other
Works Checkdam
Renovation WHS
18.2 45 9300 2708 22.5 105 15 60 15 60 15 60
TOTAL 162 13900 3772 228 489 207.5 430 220.5 444 302 586
Name of the Block: WAGHAI-2
2016-17 2017-18 2018-19 2019-20
Sr.
No
Name of
the
Blocks/Sub Districts
Concerned Ministry/
Department
Component Activity Total
Number/Capacity(cum )
Total
Command
Area (hac.)
Existing
irrigation
Area (hac.)
Additional irrigation
Area (hac.)
Fund
(lacs.)
Additional irrigation
Area (hac.)
Fund
(lacs.)
Additional irrigation
Area (hac.)
Fund
(lacs.)
Additional irrigation
Area (hac.)
Fund
(lacs.)
4
DANGS
MoWR Har Khet ko
Pani
Lift
Irrigation 45 3700 801 65.00 70.00 65.00 70.00 65.00 70.00 97.50 105
17 MoWR Other Irri.
Works Checkdam
Newly Created WHS
17.2 MoWR 60 8400 2044 127.50 225 127.50 225 127.50 225 127.50 225
Other Irri. Works
Desilting Renovation WHS
45 9300 2708 11.25 45 7.50 30 7.50 30 7.50 30
18 MoWR Other
Works Checkdam
Renovation WHS
18.2 MoWR 50 8400 2044 18 96 21 112 18 96 18 96
TOTAL 155 12100 2845 210.5 391 213.5 407 210.5 391 243 426
Name of the Block: SUBIR-3
2016-17 2017-18 2018-19 2019-20
Sr.
No
Name of
the
Blocks/Sub Districts
Concerned Ministry/
Department
Component Activity Total
Number/Capacity(cum )
Total
Command
Area (hac.)
Existing
irrigation
Area (hac.)
Additional irrigation
Area (hac.)
Fund
(lacs.)
Additional irrigation
Area (hac.)
Fund
(lacs.)
Additional irrigation
Area (hac.)
Fund
(lacs.)
Additional irrigation
Area (hac.)
Fund
(lacs.)
4
DANGS
MoWR Har Khet ko
Pani Lift
Irrigation 50 3200 798.00 78.00 84.00 84.50 91 78.00 84.00 84.50 91
17 MoWR Other Irri.
Works Checkdam
Newly Created WHS
17.2 MoWR 60 7800 1388 180.00 300 180.00 300 180.00 300 180.00 300
MoWR Other Irri.
Works Desilting
Renovation WHS
MoWR 40 7800 1388 7.50 30 7.50 30 7.50 30 7.50 30
18 MoWR Other
Works Checkdam
Renovation WHS
18.2 MoWR 55 7800 1388 22.5 90 22.5 90 22.5 90 15 100
TOTAL 165 11000 2186 280.5 474 287 481 280.5 474 279.5 491
Name of the Block: AHWA-1, WAGHAI-2, SUBIR-3(STATE IRRIGATION)
2016-17 2017-18 2018-19 2019-20
Sr.
No
Name of the
Blocks/Sub
Districts
Concerned
Ministry/ Department
Component Activity Total
Number/Capacity(cum )
Total Command
Area
(hac.)
Existing irrigation
Area
(hac.)
Additional
irrigation Area (hac.)
Fund
(lacs.)
Additional
irrigation Area (hac.)
Fund
(lacs.)
Additional
irrigation Area (hac.)
Fund
(lacs.)
Additional
irrigation Area (hac.)
Fund
(lacs.)
21 AHWA-1
STATE IRRI.
DEPARTMENT
Other Irri.
Works Checkdam
Newly Created WHS
21.3
5 8900 2471 15 60 30 120 30 120 0 0
WAGHAI-
2 5 5750 1928 30 120 15 60 30 120 0 0
SUBIR-3 13 6100 1850 75 300 60 240 30 120 30 120
TOTAL 23 20750 6249 120 480 105 420 90 360 30 120
66 | P a g e
Annexure 6: Forest Department Strategic Action Plan for DIP under PMKSY by South Dang Forest Department
S. No. Activity Unit Total Unit Rate Total Requirement (In Rs.)
1 Water Recharge Pits of 20x20 mts. 7 851 75000 63825000
R.F. No. 145 5 725 75000 54375000
P.F. No. 63 2 126 75000 9450000
2 Contour Stretcher in sloppy areas 5000 643000 30 19290000
R.F. No. 145 4000 580000 30 17400000
P.F. No. 63 1000 63000 30 1890000
3 Nala bunding 5000 643000 170 109310000
R.F. No. 145 4000 580000 170 98600000
P.F. No. 63 1000 63000 170 10710000
4 Gabion work 600 70600 3500 247100000
R.F. No. 145 400 58000 3500 203000000
P.F. No. 63 200 12600 3500 44100000
5 Small Checkwall 7 851 250000 212750000
R.F. No. 145 5 725 250000 181250000
P.F. No. 63 2 126 250000 31500000
6 Gali Plug 7 851 35000 29785000
R.F. No. 145 5 725 35000 25375000
P.F. No. 63 2 126 35000 4410000
Total 682060000
Strategic Action Plan for DIP under PMKSY by North Dang Forest Department
1 Water Recharge Pits of 20x20 mts. 7 1186 75000 88950000
R.F. No. 192 5 960 75000 72000000
P.F. No. 113 2 226 75000 16950000
2 Contour Stretcher in sloppy areas 5000 881000 30 26430000
R.F. No. 192 4000 768000 30 23040000
P.F. No. 113 1000 113000 30 3390000
3 Nala bunding 5000 881000 170 149770000
R.F. No. 192 4000 768000 170 130560000
P.F. No. 113 1000 113000 170 19210000
4 Gabion work 600 99400 3500 347900000
R.F. No. 192 400 76800 3500 268800000
P.F. No. 113 200 22600 3500 79100000
5 Small Checkwall 7 1186 250000 296500000
R.F. No. 192 5 960 250000 240000000
P.F. No. 113 2 226 250000 56500000
6 Gali Plug 7 1186 35000 41510000
R.F. No. 192 5 960 35000 33600000
P.F. No. 113 2 226 35000 7910000
Total 951060000
67 | P a g e
Annexure 7: ATMA Proposed Planning For District Irrigation Plan of ATMA Dang for year 2016-17
Sr.no Component Ahwa Subir Waghai TOTAL
Phy Fin Phy Fin Phy Fin Phy Fin
B1 DEEVELOPING SREPS
B2 Training Farmer
b) Inter state 48 0.60 48 0.60 48 0.60 144 1.80
b) within state 48 0.48 48 0.48 48 0.48 144 1.44
c) Within District 80 0.20 80 0.20 80 0.20 240 0.60
Organizing Demonstration
0 0.00
B3 No. of Demonstration (Agri ) 12 0.48 12 0.48 12 0.48 36 1.44
No. of Demonstration (Allied ) 8 0.32 8 0.32 8 0.32 24 0.96
B4 Exposure Visit ( EV )
0 0.00
a) inter state 63 0.504 63 0.504 63 0.504 189 1.51
b) within state 75 0.30 75 0.30 75 0.30 225 0.90
c) Within District 100 0.3 100 0.3 100 0.3 300 0.90
B8 District level exhibitions, Kisan meles, fruits / vegetable shows. 1 3.5
1 3.50
Information dissemination through Printed leaflets etc.
0 0.00
B12 Organization of filed days and kisan goshthies 1 0.15 1 0.15 1 0.15 3 0.45
B15 Farm Schools 1 0.294 1 0.294 1 0.294 3 0.88
TOTAL 437 7.128 436 3.628 436 3.628 1309 14.38
ADDITIONAL PLAN FOR ABROAD EX.VISIT
Inter COUNTRY Exposure Visit 14 2.1 14 2.1 14 2.1 42 6.3
0 0
GRANT TOTAL 451 9.228 450 5.728 450 5.728 1351 20.684
Proposed Planning For District Irrigation Plan of ATMA Dang for year 2017-18
Sr.no Component Ahwa Subir Waghai TOTAL
Phy Fin Phy Fin Phy Fin Phy Fin
B1 DEEVELOPING SREPS
B2 Training Farmer
b) Inter state 60 0.75 60 0.75 60 0.75 180 2.25
b) within state 60 0.6 60 0.6 60 0.6 180 1.80
c) Within District 100 0.25 100 0.25 100 0.25 300 0.75
Organizing Demonstration 0 0.00
B3 No. of Demonstration (Agri ) 15 0.60 15 0.60 15 0.60 45 1.80
No. of Demonstration (Allied ) 10 0.40 10 0.40 10 0.40 30 1.20
B4 Exposure Visit ( EV ) 0 0.00
a) inter state 77 0.616 77 0.616 77 0.616 231 1.85
b) within state 100 0.40 100 0.40 100 0.40 300 1.20
c) Within District 120 0.36 120 0.36 120 0.36 360 1.08
B8 District level exhibitions, Kisan meles, fruits / vegetable shows. 1 3.5 1 3.50
68 | P a g e
Information dissemination through Printed leaflets etc. 0 0.00
B12 Organization of filed days and kisan goshthies 1 0.15 1 0.15 1 0.15 3 0.45
B15 Farm Schools 1 0.294 1 0.294 1 0.294 3 0.88
TOTAL 545 7.92 544 4.42 544 4.42 1633 16.76
ADDITIONAL PLAN FOR ABROAD EX.VISIT
Inter COUNTRY Exposure Visit 21 3.15 21 3.15 21 3.15 63 9.45
GRANT TOTAL 566 11.07 565 7.57 565 7.57 1696 26.21
Proposed Planning For District Irrigation Plan of ATMA Dang for year 2018-19
Sr.no Component Ahwa Subir Waghai TOTAL
Phy Fin Phy Fin Phy Fin Phy Fin
B1 DEEVELOPING SREPS
B2 Training Farmer
b) Inter state 72 0.90 72 0.90 72 0.90 216 2.70
b) within state 72 0.72 72 0.72 72 0.72 216 2.16
c) Within District 120 0.30 120 0.30 120 0.30 360 0.90
Organizing Demonstration 0 0.00
B3 No. of Demonstration (Agri ) 18 0.72 18 0.72 18 0.72 54 2.16
No. of Demonstration (Allied ) 15 0.60 15 0.60 15 0.60 45 1.80
B4 Exposure Visit ( EV ) 0 0.00
a) inter state 90 0.72 90 0.72 90 0.72 270 2.16
b) within state 110 0.44 110 0.44 110 0.44 330 1.32
c) Within District 135 0.405 135 0.405 135 0.405 405 1.22
B8 District level exhibitions, Kisan meles, fruits / vegetable shows. 1 3.5 1 3.50
Information dissemination through Printed leaflets etc. 0 0.00
B12 Organization of filed days and kisan goshthies 1 0.15 1 0.15 1 0.15 3 0.45
B15 Farm Schools 1 0.294 1 0.294 1 0.294 3 0.88
TOTAL 635 8.749 634 5.249 634 5.249 1903 19.25
ADDITIONAL PLAN FOR ABROAD EX.VISIT
Inter COUNTRY Exposure Visit 28 4.2 28 4.2 28 4.2 84 12.6
GRANT TOTAL 663 12.949 662 9.449 662 9.449 1987 31.847
Proposed Planning For District Irrigation Plan of ATMA Dang for year 2019-20
Sr.no Component Ahwa Subir Waghai TOTAL
Phy Fin Phy Fin Phy Fin Phy Fin
B1 DEEVELOPING SREPS
B2 Training Farmer
b) Inter state 80 1.00 80 1.00 80 1.00 240 3.00
b) within state 90 0.9 90 0.9 90 0.9 270 2.70
c) Within District 140 0.35 140 0.35 140 0.35 420 1.05
69 | P a g e
Organizing Demonstration
B3 No. of Demonstration (Agri ) 21 0.84 21 0.84 21 0.84 63 2.52
No. of Demonstration (Allied ) 18 0.72 18 0.72 18 0.72 54 2.16
B4 Exposure Visit ( EV )
a) inter state 100 0.8 100 0.8 100 0.8 300 2.40
b) within state 120 0.48 120 0.48 120 0.48 360 1.44
c) Within District 150 0.45 150 0.45 150 0.45 450 1.35
B8 District level exhibitions, Kisan meles, fruits / vegetable shows. 1 3.5 0 0 0 0 1 3.50
Information dissemination through Printed leaflets etc. 0 0.00
B12 Organization of filed days and kisan goshthies 1 0.15 1 0.15 1 0.15 3 0.45
B15 Farm Schools 1 0.294 1 0.294 1 0.294 3 0.88
TOTAL 722 9.484 721 5.984 721 5.984 2164 21.45
ADDITIONAL PLAN FOR ABROAD EX.VISIT
Inter COUNTRY Exposure Visit 35 5.25 35 5.25 35 5.25 105 15.75
0 0
GRANT TOTAL 757 14.734 756 11.234 756 11.234 2269 37.202
Annexure-8: Proposal of Agriculture Department
Sl. Year Block Component Activity Estimated Cost
(Rs. Lakh)
Irrigation
Potential (Ha) No. of beneficiaries
1 2016-17
Vaghai
Har Khet ko Pani Distribution of pump-sets with pipeline
15.75 50 50
Ahwa 15.75 50 50
Subir 15.75 50 50
Total 47.25 150 150
2 2017-18
Vaghai 17.33 50 50
Ahwa 17.33 50 50
Subir 17.33 50 50
Total 51.99 150 150
3 2018-19
Vaghai 19.06 50 50
Ahwa 19.06 50 50
Subir 19.06 50 50
Total 57.18 150 150
4 2019-20
Vaghai 20.97 50 50
Ahwa 20.97 50 50
Subir 20.97 50 50
Total 62.91 150 150
Grand Total 219.33 600 600