Stormwater Treatment and Flow-Control Requirements
inPhase I and Phase II Municipal NPDES Permits Dan Cloak, PrincipalDan Cloak Environmental Consulting
Outline
20-year evolution of NPDES treatment and flow-control requirements
Requirements in a nutshell●Developers●Municipalities
Phase I/Phase II differences Current trends in California Current issues in stormwater
treatment and flow control
Comprehensive Program
The California Regional Water Quality Control Board issued a permit…
…requiring municipal governments to implement a comprehensive program to control stormwater pollutants.
Municipal Maintenance
Program Elements
Illicit Discharge Prohibition
Industrial InspectionsConstruction Site Inspections
Public Outreach
Permit Provision “C.3” requires municipalities to mandate runoff controls as part of their development review procedures.
Effects of New Development
1987-1994: The Early Years
1987 Clean Water Act Amendments
1990 Phase I Stormwater Regulations
1990 First California Municipal Stormwater NPDES Permits
1992-1993
Focus on impracticability of “end of pipe” treatment
1994 Start at the Source“Do what you can where you can”
1994-1999: Experimentation
The Importance of Imperviousness
Examining barriers to better site design
Engineering criteria for treatment systems
Specification of source control BMPs
Low Impact Development
2000-Now: Getting Serious
2000 Bellflower decision
2001 Santa Clara permit reissued
2003 California Phase II permit
2006 Beginning implementation of flow-control (HMP) facilities
2007 San Diego permit mandates Low Impact Development
In a nutshell
Project designs must: Minimize imperviousness Control potential pollutant sources Treat stormwater before discharge Match runoff peaks/durations to
pre-project conditions Maintain treatment and flow-control
facilities in perpetuity
Minimize Imperviousness
Control Pollutant Sources
Material and refuse storage●Cover●Berm●Drain to sanitary sewer
Restaurant mat wash areas Vehicle wash areas Spas, pools, and fountains Landscaping
Treat Stormwater
Match Pre-project flows
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Recurrence Interval (years)
Pea
k F
low
(cf
s)
IMP OutflowPervious Area Runoff0.5Q2Q10
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.00% 0.02% 0.04% 0.06% 0.08% 0.10% 0.12% 0.14% 0.16% 0.18% 0.20%
% Time Exceeded
Flo
w (
cfs
)
IMP OutflowPervious Area Runoff0.5Q2Q10
Maintain Facilities
Operation & Maintenance Plan●Responsibilities●Resources●Procedures
Conduct and document preventative & corrective maintenance
ReportsInspections
In a nutshell
All permitted municipalities must: Incorporate requirements into
development review process Review development projects for
compliance Report applicable projects
approved and measures required Verify on-site treatment devices
are maintained
Contra Costa’s Process
Stormwater Control Plan Accompanies application for planning
and zoning approval Exhibit (1 sheet)
● Site divided into drainage areas● Locations of stormwater facilities
Report (6-10 pp.)● Opportunities and constraints● Narrative explaining drainage areas and
facilities● Table of source controls● Maintenance requirements &
responsibility● Table of items to check at plan review
Stormwater C.3 Guidebook
Guidance in four formats:ChecklistStep-by-step instructionsExample outlineExample reports and
exhibitshttp://www.cccleanwater.org
Development Review
Pre-ApplicationMeeting
StormwaterControl PlanaccompaniesApplication
“DeemedComplete”
SectionReview
CEQAReview
Conditions ofApproval
Planning Planning CommissionCommission
DetailedDesign
Plan CheckPermits
toBuild
Staff Staff identifies identifies
general C.3 general C.3 requirementrequirement
ss
Staff Staff determinesdetermines
whether Plan whether Plan is adequateis adequate
Stormwater Stormwater Control Plan Control Plan attached to attached to ConditionsConditions Staff reviews Staff reviews
implementation implementation of items in Planof items in Plan
Operation & Maintenance
1. Determine ultimate ownership and maintenance responsibility
2. Identify maintenance requirements
3. Prepare a detailed Operation and Maintenance Plan
4. Operate and maintain facilities during construction
5. Formally transfer responsibilities6. Maintain facilities in perpetuity
Phase I and Phase II
Phase I—over 100,000 population● “…develop, implement and enforce
controls to reduce the discharge of pollutants… …from areas of new development and significant redevelopment.” (40 CFR 122.26)
● In California, municipalities must apply for an NPDES permit issued by Regional Board
Phase II—other urbanized areas.● “Develop and implement strategies which
include a combination of structural and/or non-structural best management practices.”
● In California, municipalities apply for coverage under a single statewide permit
Phase I/II--Requirements California Phase I permits
● Hydraulic criteria for treatment facilities● Control of peak flows and volumes● Enhanced source control measures ● Thresholds for treatment and flow-control
requirements vary from region to region California Phase II permit
● Hydraulic criteria for treatment facilities● Control of peak flows● “Design criteria” require source controls
and treatment facilities for specific land uses
Regulatory Trends
Project size thresholdsFlow control
(HMP) requirementsTreatment
Facility EffectivenessLow Impact DevelopmentExtending requirements to
smaller communities
Current issues
Consistent Implementation● Every applicable site● All impervious areas
Selecting Treatment Facilities● Targeting Pollutants● Treatment Effectiveness● Allowable loading rates for filters● Practicability on small or sloped sites
Details & Specifications● Inlet, underdrain, and overflow● Engineered soils for filtration
Facility Construction Inspection
Current issues
Operation and Maintenance●Who owns and maintains treatment
& flow-control facilities?●Financing the inspection program●Enforcing maintenance requirements●Remediation and cost-recovery●Reporting
Options●Maintenance agreements●Enforcement of stormwater
ordinance●Assign to homeowner or HOA●Benefit Assessment Districts
Current issues
Hydrograph Modification Management and:●Flood control requirements●Flood control assessments●Stream restoration programs