    DESIGN,LIABILITYANDINTERPRETINGSTRUCTURALWATERPROOFING

    PresentedbyIanMaclennan

    MainConsideraonsCoveredbyBS8102

    1. Hasthewaterproofingsystembeendesignedbyaspecialist

    2. Hasasiteinves:ga:ontakenplacebyageotechnicalspecialist

    3. Isitpossibletodesignoutthefaultsintheworkmanshipandmaterials

    4. Repairabilityshouldbetakenintoaccountandthefeasibilityofremedialmeasuresassessed

    To achieve the correct grade of waterproofing for your below ground structure the

    waterproofing design and installation is essential.

    There are 4 grades of waterproofing ranging from Grade 1 basic utility to Grade 4 Document

    storage.

    To achieve the correct grade of waterproofing for your below ground structure the

    waterproofing design and installation is essential.

    Grade 1

    Can be achieved simply by using waterproof concrete and detailing joints in

    concrete correctly (to BS8110 & BS8007) but can be easily upgraded to a full internal Cavity

    Drain System if necessary.

    Grade 2

    Can be achieved using correctly detailed concrete (to BS8110 & BS8007) and the installation

    of an internal Cavity Drain System.

    Grade 3

    Is easily achieved using a full Cavity Drain System.

    Grade 4

    Is only possible if the concrete is detailed correctly (to BS8110 & BS8007) and a full Cavity

    Drain System is installed. The environment also needs to be controlled using an air conditioning

    system.

  • 7/30/2019 Damp Proof Paper 101019

    2/13

    BS8102 (the British Standard for Waterproofing) recommends that in designing thewaterproofing system for your basement, you should expect that water pressure will cometo bear against the structure at some time in the future. This is because no matter how drythe excavation is now or has been in the past you are designing for the future and it is notpossible to predict future rainfall levels, changes in watercourses or even possible burstwater mains in the street adjoining the property.

    As a specialist waterproofing company we see many examples of basements / cellars thathave been built into dry drained chalk or stone excavations that suddenly fill with water.

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    2|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    3/13

    Types of waterproofing

    Type A

    A Type A waterproofing system can be applied in a Varity of ways to the structure. They can be

    used to waterproof walls, slabs and decks, some are sheet membranes some are cementitiousslurries and some are liquid membranes. A specialistwill only ever design and install a system

    that is fit for purpose. Type A systems must always have a suitable external land drain, to

    remove water pressure from the structure. If this cannot be accommodated, then we would notrecommend this type of system. All land drains must be fully serviceable

    Pre Applied Membranes;

    Grace Preprufe

    Cetco Voltex

    RIW Structureseal

    Fosroc Proofex Engage

    Post Applied Membranes;

    Grace Bituthene

    Cetco Swelltite

    RIW Sheetseal

    Fosroc Proofex 3000

    Cementitous Slurrys;

    Vandex BB75, BB75e, Super

    Triton TT55

    Liquid Spray Applied Membranes;

    MacLennan Polyprufe

    Grace Silcor

    DOW Hyperlast

    Newton Rubberflex

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    3|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    4/13

    Type B

    A Type B waterproofing is an integrally waterproof structure. This can be achieved with

    waterproof concrete admixtures, but these are limited and still rely on perfect workmanship to be

    of any benefit.

    PVC Water bars

    Are used to seal construction joints within concrete structures. They are largely considered the

    best form of construction joint sealing, but are particularly difficult to install. They work by

    forming a physical barrier to prevent water from ingressing past them.

    Hydrophilic Strips

    Are used to seal construction joints, in the same way as PVC water bars to. They are used morewidely than PVC water bars as they are mush easier to install. However because they swell in

    the presents of water and they take time to swell, they will always let an amount of water

    through before they form a stop. And because if there is no water present they shrink back, this

    amount of water will ingress through the structure ever time this cycle occurs.

    Resin Injection

    Resin injection can be used in two ways, either by installing an injection tube into a constructionjoint. Which can then be injected with resin after construction is complete. Or it can be used post

    construction to seal joints or cracks. The benefit of using resin injection for joint sealing when

    using the injection tube, is that if there is any honey combed concrete it will seal it. The resin

    injection system as a wide Varity of uses such as sealing leaking construction joints, cracks andexpansion joints and is one of the only systems that can be used for remedial actions for these

    problems.

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    4|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    5/13

    Type C

    Type C waterproofing systems work by allowing water that ingresses through the structure to

    move freely and unhindered to either a surface water drainage system or to a sump and pump

    system where it is pumped from the structure.

    The system is basically an internal lining which provides a cavity through which waster canpass. The system consists of a dimpled wall membrane, a drainage channel (sited at the wallfloor junction) and a dimpled floor membrane. Further to this sumps and pumps will also be

    required if natural drainage is not available.

    All membrane joints and fixings are sealed, using specialized sealing products to prevent any

    ingress of water or moisture. The system can also be used as protection against contaminants

    such as salts, carbon deposits, fertilizers, oil etc. Because it is not possible to determine theamount of potential water pressure surrounding the structure, BS8102 tells the designer to

    expect a head of water to the depth of the structure for a structure up to 4m below the

    ground, and for deeper structures, a head of water to 1m below the depth of the structure.

    The advantages of a Type C system are that they are easily repaired, easily maintained, quicklyinstalled (and largely unaffected by weather conditions), They do not impose any load onto the

    structure (particularly important when dealing with older structures).

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    5|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    6/13

    FINISHES

    A wide range of finishes can be adopted to walls, floors and soffits which also provides

    protection to the membrane system.

    Typical wall finishes include:

    A) Block work wall built in front of the system

    B) Independent timber framing and plasterboard

    C) Independent metal framing systems

    D) Conventional plasters and renders:

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    6|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    7/13

    Waterproof Concrete

    Installing waterproof concrete as a method of waterproofing, as classified under Type B

    waterproofing by BS8102, is very effective at making the concrete more waterproof. Howevercorrectly installed concrete is waterproof without any additives.

    Water proof additives do not protect the structure from water penetration through the

    construction joints. There are a great many methods of joint waterproofing available. However,they frequently fail and water will normally ingress through joints in the concrete.

    The system will conform to BS8102:1990 Protection of Structures Against Water from the

    Ground, and is termed as Type C Drained Protection. Our method ofwaterproofing is used

    on a daily basis to waterproof both new build and existing structures and is used extensively to

    waterproof structures where Tanking has failed.

    Because water will ingress at the weakest point in the structure, System 500 providesdepressurization air spaces to intercept the water that may leak into the structure through the

    junction between the wall and floor. Utilizing the wall-floor junction Drainage Channels then

    remove this water. It is a condition of insurance companies that the plastic Drainage Channels

    are used and for good reason. Water will almost certainly only ingress through defective joints inthe wall-floor junctions, floor slab joints or defects in existing masonry. Water should be picked

    up at these points by the Drainage Channels rather than across the concrete to a drainage

    point. Water running over new concrete picks up free lime and when it dries calcification can

    occur which eventually causes blockages. Drainage Channels should always be accessible and

    serviceable.

    Internal Waterproofing Vs External Waterproofing

    We are often asked by our customers to help in the design of an external waterproofing system

    and have found that in most occasions we recommend internal waterproofing as being the best

    option. This leaflet has been produced to clarify our reasons for specifying internal systems

    rather than external waterproofing systems.

    External waterproofing is only really an option in new build construction, and even then, a

    complete system to both the walls and floor should be used. However, in many cases the floorslab/raft has already been constructed making external waterproofing problematic.

    If external waterproofing is being considered, the removal of ground water by the use of French

    drains/land drains should be incorporated into the design of both tanking and cavity drainage

    waterproofing. Removal of water from the structure is a method of complying with BS 8102 thatstates that the designer should assume that less than adequate workmanship will been

    employed during the installation of the waterproofing.

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    7|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    8/13

    Removal of water to prevent a build up against structure means that the structure and itswaterproofing will not be tested. However, the lifespan of the water removal system is finite and

    can be problematic and asks too many unanswered questions.

    It is not possible to ascertain exactly how much water will need to be removed to prevent a build

    up of water pressure against the structure. In many cases watercourses are arriving at the

    structure from many miles around and it is possible to be in a scenario where you are trying toremove unlimited sources of water. This can create an enormous strain on the system,

    especially where pumps are used to remove the water.

    As well as being extremely costly, the life expectancy of the pumps is dramatically reduced. If

    the designer is asked how much water he expects to have to remove, the honest answer is that

    it is not possible to accurately determine the volume. Therefore, what size pumps do you need?

    Natural drainage is only a safe means of drainage providing it is impossible for the drainage to

    back up. Therefore unless the drainage or soak-away are below the level of the basement floor,

    pumps will be required. If natural drainage is available further down hill from the property, the

    question still has to be asked as to how much water is to be removed by the system, and thesame vague answers will result. Without knowing how much water is to be removed, it is difficultto determine the capacity of the drainage system that will be required.

    The potentially large volumes of water being removed by the system can bring relatively large

    amounts of fines from the ground into the system. External drainage systems utilize geotextile

    membranes as a filter to prevent the fines blocking the perforated pipe. However, like all filters

    they will eventually block up, and once the geotextile is completely blocked it will no longerremove water from around the structure. It is not possible to determine how long this process

    could take but evidence of complete blockage on external drainage systems within months has

    been documented.

    As well as having the potential to block the drainage system, the removal of fines canundermine surrounding structures. It is vitally important that a geological engineer assesses thedesign of an external system to determine that neighbouring structures will not be undermined

    by the system.

    It is difficult for any designer to guarantee that the external drainage system will remain in

    working operation for the whole of the life expectancy of the building and in our opinion it is not

    a viable option for these reasons.

    Internal waterproofing of new build structures is in our opinion a much safer option. It is possible

    to design the system that will outlive the life expectancy of the structure, without having the

    problems that are associated with external drainage systems.

    It is likely that the new structure will be built to BS 8110, or possibly to BS 8007. These

    structures are very strong and will only leak at joints within the construction. Measures toprevent leakage at the construction joints should be taken using hydrophobic or hydrophilic

    water stops, leaving a structure that should not leak. However, we should assume that the

    structure would leak if subjected to a head of water pressure because of the possibility of less

    than adequate workmanship.

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    8|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    9/13

    This may be a slightly leaking water stop at a construction joint, for example, but wherever theweakest point of the structure lies, the amount of water entering the structure will be minimal,

    and significantly less than the amount of water removed by the external waterproofing system.

    Therefore, the internal waterproofing system is only dealing with relatively small amounts of

    water, and so the system can work well within its designed performance.

    Water entering a strong structure is virtually crystal clear, as the structure filters out the fines.Because the movement of water through the structure is massively smaller than the amount of

    water potentially being moved by an external system, the volume of fines being removed from

    the ground is also much less. However, because the structure filters the fines they are not

    actually being removed at all and so in a worst-case scenario you have small volumes of fines

    being moved towards, but not removed from the structure.

    Internal drainage systems will still require pumps to remove any water that may enter the

    structure.

    However, the size of pumps is much easier to determine and these will be dramatically smaller

    and more efficient because of the smaller volume of water they will be expected to remove. Thepumps will be operating much less than in an external waterproofing system and so power

    consumption and pump replacement will be significantly less with an internal waterproofing

    system.

    BS8102 also states that the designer should consider the form and feasibility of remedial wordsin the event of failure of the waterproofing system. Repair of an external system is in many

    cases just not possible. Where it is possible to excavate to show the system, identification of the

    problem and repair is almost just as difficult, especially if the ground is, as is often the case, wet

    and muddy.

    Repair of an internal cavity drainage system is much less of a problem, as in the main, theproblem will be with the drainage system. Inspection ports make the identification and cleaning

    of the system quick and easy.

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    9|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    10/13

    Legal The Outwing Case

    HIGH COURT JUDGEMENT

    OUTWING CONSTRUCTION V- THOMAS WEATHERALD

    A recent ruling in the High Court of Justice, Queens Bench Division of the Technology andConstruction Court, is likely to have significant implications for the waterproofing industry.

    BACKGROUND

    Thomas Weatherald Ltd. was the main contractor responsible for the design and construction of

    a new nursing home at Bramley Hill in Croydon. The structure included the construction of a

    basement builtintothewell-drainedchalkonthesite.

    The floor was constructed in reinforced concrete. The walls were constructed out of two skins of

    concrete block, sandwiching a layer of concrete in between. The structure was waterproofed

    externally using Bitite, a bonded sheet membrane.

    A land drain was positioned approximately one third of the way up the wall, and discharged to a

    soak away a little distance from the building.

    The construction of the basement structure, waterproofing and land drain was subcontracted to

    Outwing Construction. Shortly after completion, leaks occurred internally after a period of

    prolonged and heavy rainfall. Thomas Weatherald withheld money from Outwing Construction,

    on the basis that they had incurred additional expense in applying Sika render internally.

    Outwing sued Thomas Weatherald for the balance of money owing, and Thomas Weatherald

    counterclaimed for the cost of the Sika installation together with other damages.

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    10|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    11/13

    THE OUTWING CLAIM

    Phil Hewitt, Expert Witness for Outwing Construction, argue that there was a significant fault

    with the design, for the following reasons:

    1. Clause 3.3 of BS 8102, Code of Practice for the Protection of Structures Against Water from

    the Ground, states that the designer should i) Consider the consequence of less than adequateworkmanship, ii) Consider the consequence of leaks and iii) Consider the form and feasibility of

    remedial work.

    2. By installing the land drain in the position shown, the designers created a head of water that

    would bear against the membrane. In these circumstances, any defect would constitute less

    than adequate workmanship, as the consequence of those defects would be flooding throughthe membrane into the basement.

    3. It is not realistic or reasonable to expect a bonded sheet membrane to be applied without any

    defects at all.

    4. Clause 3.1.1 of BS 8102, Pre-Design Considerations, recommends that basements should

    include provision for resisting a pressure equivalent of 1m head of water at least.

    5. The interpretation of the above was that a design team must anticipate that defects will occur

    in a membrane, and so must design a system in such a way that water pressure is removedbefore it comes to bear against the membrane. If they are unable to achieve this, it is implied

    that an alternative form of waterproofing must be used.

    6. Furthermore, a bonded sheet membrane is only one element within an overall waterproofing

    system. The membrane, together with the drainage and the structure, all

    form part of the system and must be considered together.

    No one element should be considered in isolation.

    THE THOMAS WEATHERALD DEFENCE AND COUNTERCLAIM

    John Mawditt, Expert Witness for Thomas Weatherald Ltd.,

    argued as follows:

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    11|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    12/13

    1. Clause 3.1.1 of BS 8102 says that the membrane alone must be capable of withstanding ahead of water of at least 1m without leaking.

    2. The installation of the land drain above the floor slab did not induce a water head in excess of

    1m, and so the design complied with BS 8102.

    3. In the absence of a design fault, the problem has to lie with the installation of the membrane,by default.

    Recorder Colin Reese QC found for Outwing Construction without any qualification. In his 25

    page judgement, the following exact extracts are pertinent:

    1. Having read their reports and heard their oral evidence, I unhesitatingly prefer Mr. Hewitts

    evidence and reject Mr. Mawditts views that a self-adhesive tanking system of waterproofingsuch as that which was installed could be expected to resist water penetration in the event of a

    build up of hydrostatic pressure.

    2. I agree with Mr. Hewitt that overlapping self-adhesive membranes cannot be expected to

    achieve a total or absolute watertight bond capable of resisting penetration by water pressure. Ifthis were thought to be something realistically achievable, then the guidance given, in relation to

    the use of tanked protection systems where high or perched water tables exist (permanently or

    from time to time), in publications such as BS 8102 and the Basement Waterproofing Design

    Guide (see in particular, the discussion under the heading Guide to Assessing Basement

    Designs beginning on page 17 of the document -page 84 of the trial bundle) would beunnecessary. Furthermore, if this were thought to be something realistically achievable, then it is

    difficult to understand why those responsible for the Standard and/or the Design Guide should

    so clearly and consistently contemplate the

    3. Provision of perimeter land drainage below the lowest level of the tanking system.

    4. In my judgment, as Mr. Hewitt said, the waterproofing system consisted of both the tankingmembrane and the subsoil drainage.

    5. For all the reasons put forward by Mr. Hewitt (with which I agree) this design did carry with it

    such a risk after periods of heavy rainfall when a perched water table or perched water

    tables might come into existence, and the factual evidence was that the water penetration

    problem only became apparent after heavy rain.

    This is a High Court judgment, and now sets a precedent for future similar cases. As a result,

    designers of waterproofing systems should now give serious consideration to:

    1. Ensuring that, where there is any risk of water pressure building up against a membrane,

    (whether it is permanent or temporary) the water is removed before it comes into contract

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    12|P a g e

  • 7/30/2019 Damp Proof Paper 101019

    13/13

    with the membrane.

    2. This could be done by incorporating drainage membranes leading down to land drains at the

    base of and running around the perimeter of the structure, from where the water is either

    drained or pumped away.

    3. If the above is not practical, then an alternative form of Waterproofing/Construction must be

    selected. A free copy of the judgment can be obtained from the Mechanical Recording, Royal

    Courts of Justice, by faxing 020-7936-6662 and quoting the following identifying information:

    Technology and Construction Court

    Outwing Construction v. Thomas Weatherald

    Date: 13 September 1999

    Recorder: Colin Reese.

    Ian Maclennan

    The Barn, Field Farm, Porton Rd., Porton, Salisbury, Wiltshire SP4 0NF

    0845 658 7777

    Email: - [email protected]

    www.maclennan-lse.co.uk

    DESIGN, LIABILITY AND INTERPRETING STRUCTURAL WATERPROOFING BY IAN MACLENNAN

    13|P a g e