Transcript of Dale Harris, Gindalbie Metals Ltd - Karara, WA’s First Magnetite Project
2014 AJM Global Iron Ore & Steel Forecast
Dale Harris, Managing Director
March 2014
Disclaimer
Presentation of General Background
This document contains general background information about the activities of Gindalbie Metals Ltd ("Gindalbie", "Gindalbie Metals" or the "Company") current as at the date of
this presentation. It is information in a summary form only and does not contain all the information necessary to fully evaluate any transaction or investment. It should be read in
conjunction with Gindalbie's other periodic and continuous disclosure announcements to the ASX available at www.asx.com.au.
Competent Person Compliance Statement
The information in this presentation that relates to the Exploration results and data that was used to compile the Mineral Resource estimates is based upon information compiled
by Ian Shackleton. Ian Shackleton is a member of the Australasian Institute of Geoscientists (MAIG) and has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity to which he is undertaking to qualify as a competent person as defined in the 2004 edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ian Shackleton is a full-time employee of Gindalbie Metals Limited. Ian Shackleton consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this presentation that relates to the Mineral Resources is based upon information compiled by John Graindorge. John Graindorge is a member of the
Australasian Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity to which he is undertaking to qualify as a competent person as defined in the 2004 edition of the “Austra lasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. John Graindorge is a full-time employee of Snowden Mining Industry Consultants Pty Ltd. John Graindorge consents to the inclusion in
the report of the matters based on his information in the form and context in which it appears.
The information in this presentation that relates to the Ore Reserves is based upon information compiled by Xianglin Cheng. Xianglin Cheng is a member of the Australasian
Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity to which he is undertaking to qualify as a competent person as defined in the 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Xianglin Cheng is a full-time employee of Karara Mining Limited. Xianglin Cheng consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
General Disclaimer
This presentation may include forward-looking statements. These forward-looking statements are based on management’s expectations and beliefs concerning future events.
Forward-looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Gindalbie Metals that could cause actual
results to differ materially from such statements. Gindalbie Metals makes no undertaking to subsequently update or revise the forward-looking statements made in this release to
reflect events or circumstances after the date of this release.
There are a number of risks, both specific to Gindalbie Metals and of a general nature which may affect the future operating and financial performance of Gindalbie Metals and the
value of an investment in Gindalbie Metals including and not limited to economic conditions, stock market fluctuations, iron ore demand and price movements, timing of access to
infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve and resource estimations, native title and title risks, foreign
currency fluctuations, and mining development, construction and commissioning risk.
All dollar amounts shown in this presentation are in Australian dollars unless otherwise stated.
2
Disclaimer
Ore Reserves and Mineral Resources Reporting Requirements
As a company with securities listed on the ASX, Gindalbie is required to report its ore reserves and mineral resources in compliance with the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). While Gindalbie’s reserve and resource estimates comply with the JORC Code, they may not
comply with the relevant guidelines in other countries, and do not comply with the U.S. SEC's Industry Guide 7, which, among other things, may require the use of different
assumptions for the estimation of reserves, and does not recognise mineral resources. Accordingly, Gindalbie would not be permitted to report mineral resources in an SEC filing.
Investors should note that Gindalbie's ore reserves may be lower if they were calculated under Industry Guide 7 and that its mineral resources are not proved or probable
reserves, for the purposes of Industry Guide 7 and there can be no assurance that such mineral resources will ultimately be converted into such reserves or that Gindalbie will be
able to legally and economically extract them.
Future Performance
This announcement contains certain “forward looking” statements. The words “believe”, “anticipate”, "expect”, “project”, “forecast”, “estimate”, “potential”, “could”, “may”, “target”,
“consider” and “will” and other similar expressions are intended to identify forward looking statements. Forward looking statements, opinions and estimates provided in this
announcement are based on assumptions and contingencies which are subject to change without notice, as are statements about market and industry trends, which are based on
interpretations of current market conditions.
Forward-looking statements including projections, indications or guidance on future earnings or financial position and estimates are provided as a general guide only and should
not be relied upon as an indication or guarantee of future performance. There can be no assurance that actual outcomes will not differ materially from these statements. To the full
extent permitted by law, Gindalbie and its directors, officers, employees, advisers, agents and intermediaries disclaim any obligation or undertaking to release any updates or
revisions to the information to reflect any change in expectations or assumptions.
There are a number of risks, both specific to Gindalbie and of a general nature which may affect the future operating and financial performance of Gindalbie and the value of an
investment in Gindalbie including and not limited to economic conditions, stock market fluctuations, iron ore demand and price movements, timing of access to infrastructure,
timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve and resource estimations, native title and title risks, foreign currency
fluctuations, and mining development, construction and commissioning risk.
3
Corporate Snapshot
• Listed in ASX since
1994
• Major shareholder–
Ansteel(36%)
• 1,900 km2 tenement
holding in Western
Australia
• Key asset – 50%
stake* in Karara Project
(50% Ansteel)
4
* A series of convertible shareholder loans provides Ansteel with the right to move to
approx. 62% ownership of Karara
• Resource of ~2.4 billion tonnes* supports long-life operation
• Construction completed, final ramp-up phase
• First magnetite concentrate shipment, January 2013
• Infrastructure in place for future expansion
Karara – a large, high quality magnetite project
* See resource table in appendix section
5
Video
6
Karara History
First DSO
Shipment
• First Karara
Development
Talks between
Gindalibe and
Ansteel
• MOU signed
• Offtake Agreement
Signed
• Senior Debt
Facility Signed
First
magnetite
concentrate
shipped
• Feasibility Study
Completed
• JV signed
First magnetite
concentrate
produced
• Environmental
Approval
Received
• Construction
started
2006
2007
2009
2010
2011
2012
2013
Karara Process Simplified Flow Sheet
8
Premium Product for Global Market
• Ansteel purchasing 70% of production
under life-of-mine offtake contract
• Strong interest from major steel mills
for remaining production
• Concentrate pricing based on Platts
IODEX 62% Fe CFR Index, plus
premium for iron content and quality
9
Karara – A Premium Product
Karara
Concentrate
Hamersley
Pilbara Blend
Fe% (Iron) 68.2% 62.2%
SiO2% (Silica) 4.75% 3.6%
Al2O3% (Alumina) 0.10% 2.1%
P% (Phosphorus) 0.01% 0.1%
High iron content, low impurities
• Karara Phase II
Post Phase I optimisation
Relatively low cost expansion and
attractive economics
• Lodestone (GBG – 100%)
Large scale magnetite deposit
(1,482mt resource*)
Evaluation program to identify DSO
opportunities
Assessing options to crystalise value
• Targeting further DSO resources
Gindalbie Growth Opportunities in Mid West
10
* See resource table in appendix section
Our Future
• Deliver Karara Phase 1
• Maximise potential of our Mid
West position;
Leverage off infrastructure,
Phase 2 and tenement
landholding
• Build on our strengths;
Experienced team
Local knowledge
Strong Chinese partner and
relationship
• Assess options to diversify
11
Appendix
12
Magnetite Resources
13
Karara Mining Ltd Magnetite Resources Inclusive of Ore Reserves as at 30 June 2012
Gindalbie Metals Ltd Magnetite Resources Inclusive of Ore Reserves as at 30 June 2012
Magnetite Reserve
14
Karara Mining Ltd Magnetite Reserve as at 30 June 2012
Hematite Resource
15
Karara Mining Ltd Hematite Resources Inclusive of Ore Reserves as at 30 June 2012
Gindalbie Metals Ltd Hematite Resources Inclusive of Ore Reserves as at 30 June 2012
Hematite Reserve
16
Karara Mining Ltd Hematite Reserve as at 30 June 2012
Hinge Resource
JORC (2004) Tonnes (Mt) Fe (%)
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
LOI (%)
Measured 0.68 60.2 6.4 1.8 0.08 0.02 4.9
Indicated 0.99 60.4 6.9 1.8 0.07 0.01 4.0
Inferred 0.04 58.1 7.1 1.9 0.12 0.01 7.0
Total 1.70 60.3 6.7 1.8 0.07 0.02 4.4
17
JORC (2004) Oxidation
State
Tonnes (Mt)
Fe (%)
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
LOI (%)
Inferred Transitional 0.61 59.6 9.0 0.8 0.06 0.01 2.3
Inferred Fresh 0.75 60.7 7.7 0.8 0.06 0.01 2.4
Total 1.37 60.2 8.3 0.8 0.06 0.01 2.4
Karara Mining Ltd - Hinge Magnetite Mineral Resource Reported above a 0% Fe cut-off grade
as at Dec 31, 2012
Karara Mining Ltd - Hinge Hematite Mineral Resource Reported above a 57% Fe cut-off grade
as at Dec 31, 2012
*Small discrepancies may occur due to rounding
18
For more information contact Michael Weir
Manager Corporate &
Investor Relations
T: +618 9480 8700
F:+618 9480 8799
Level 9, London House
216 St Georges Tce, Perth WA 6000
www.gindalbie.com.au