BDTCL 765/400 kV SUBSTATION BHOPAL(M.P.) DAILY CHECKLIST FOR ICT'S and REACTORS Date: Shift: Time: Sl. No. Items to be inspected ICT-1 ICT-2 Indore LR Jabalpur LR R Y B R Y B R Y B R Y B R Y B 1 OTI 2 WTI 2.1 HV 2.2 LV 2.3 IV 3 Fan Running nos. 4 Pump Running nos. 5 Oil Level 6 N2 system status 7 Abnormal Noise.If any? 8 Oil Leakages.If any? Date: Shift: Time: 1 OTI 2 WTI 2.1 HV 2.2 LV 2.3 IV 3 Fan Running nos. 4 Pump Running nos. 5 Oil Level 6 N2 system status 7 Abnormal Noise.If any? 8 Oil Leakages.If any? Date: Shift: Time: 1 OTI 2 WTI 2.1 HV 2.2 LV 2.3 IV 3 Fan Running nos. 4 Pump Running nos. 5 Oil Level 6 N2 system status 7 Abnormal Noise.If any? 8 Oil Leakages.If any? Spare ICT Reactor

description

Daily Checks for ICT & Reactors

Transcript of Daily Checks for ICT & Reactors

Sheet1BDTCL 765/400 kV SUBSTATION BHOPAL(M.P.)DAILY CHECKLIST FOR ICT'S and REACTORSDate:Shift:Time:Sl. No.Items to be inspectedICT-1ICT-2Spare ICTIndore LRJabalpur LR765 kV Bus Reactor765 kV Spare Line Reactor765 kV Spare Bus Reactor400 kV Bus ReactorRYBRYBRYBRYBRYB1OTI2WTI2.1HV2.2LV2.3IV3Fan Running nos.4Pump Running nos.5Oil Level6N2 system status7Abnormal Noise.If any?8Oil Leakages.If any?

Date:Shift:Time:1OTI2WTI2.1HV2.2LV2.3IV3Fan Running nos.4Pump Running nos.5Oil Level6N2 system status7Abnormal Noise.If any?8Oil Leakages.If any?

Date:Shift:Time:1OTI2WTI2.1HV2.2LV2.3IV3Fan Running nos.4Pump Running nos.5Oil Level6N2 system status7Abnormal Noise.If any?8Oil Leakages.If any?