Dadabhai Construction Prequalification 21 March 2021 Final..

60
PRE-QUALIFICATION

Transcript of Dadabhai Construction Prequalification 21 March 2021 Final..

Page 1: Dadabhai Construction Prequalification 21 March 2021 Final..

PRE-QUALIFICATION

Page 2: Dadabhai Construction Prequalification 21 March 2021 Final..

INTRODUCTION

INTRODUCTION ABOUT DADABHAI GROUP The Dadabhai Group, as it is known today, had its beginnings as a modest trading house back in the 1950s. It is one of the most progressive and diversified conglomerates in the Kingdom of Bahrain, under the guidance of its Chairman, Mr. Mohammed Dadabhai. During the early 1970s, the company went through a period of rapid change and development, which was in line with the growth taking place in the entire region. These were the years when our mettle was severely tested. But with initiative and determination, we were able to hold our own during those years. It was this ability to respond to the pace of change, swiftly recognize and react to opportunities and our commitment to sustain our business viability that took us from those humble beginnings to, what is now considered, one of the leading construction companies in the region. It is with great pride that we are recognized today, in this competitive sector, as a respected developer for star hotels, furnished luxury apartments, residential, commercial and hospitality developments in the Kingdom of Bahrain, U.A.E. and the entire region. Elite Group of Hotels, Dadabhai Construction, Alusol, Dadabhai Interior, Dadabhai Infrastructure Projects, Dadabhai Trading & Contracting, Dadabhai Travel, Pegasus Real Estate, Elite Facility Management Company, Arabian Neon, Vintage Décor and Al Salmiya Management & Development Co. are a few companies under Dadabhai Group. We can proudly state that the Dadabhai Group of companies provides the best service that this industry has to offer in the Gulf. INTRODUCTION ABOUT DADABHAI CONSTRUCTION Dadabhai Construction, established in 1977, is one of the Kingdom’s oldest and most well-known companies in the construction industry. Dadabhai Construction is an ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018 certified company for Construction of Buildings, Project Management, Infrastructure Works, Interior & Electro-Mechanical Works. We are categorized as Grade AA Construction Company by Ministry of Works, Municipalities Affairs and Urban Planning and as Grade A Construction Company by Military Works Directorate (G.H.Q. Bahrain Defence Force) and Ministry of Housing. Dadabhai Construction has an impressive list of landmark projects behind its name. We have earned an enviable reputation within the industry for excellence in the quality of our planning and implementation. Each project is meticulously executed with the same uncompromising standards that have become our trademark in the commercial sector. However, such an enviable reputation could not have been achieved without the brilliance of our people. Our team of workers have, over the years, catered to market requirements and followed guidelines from top management in the same determined spirit that this company was founded on. It is because of these men and women that we can stand with pride alongside those who have participated in building a modern Bahrain.

Page 3: Dadabhai Construction Prequalification 21 March 2021 Final..

NATURE OF ACTIVITIES

RReessiiddeennttiiaall PPrroojjeeccttss CCoommmmeerrcciiaall PPrroojjeeccttss HHootteell PPrroojjeeccttss AAppaarrttmmeenntt PPrroojjeeccttss IInnffrraassttrruuccttuurree PPrroojjeeccttss IInndduussttrriiaall PPrroojjeeccttss SScchhoooollss CClluubbss && SSoocciiaall CCeenntteerrss OOffffiiccee TToowweerrss SShhooppppiinngg MMaallllss VViillllaa PPrroojjeeccttss PPrroojjeecctt MMaannaaggeemmeenntt IInntteerriioorr DDeessiiggnn MMEEPP WWoorrkkss IInntteerriioorr WWoorrkkss CCaarrppeennttrryy WWoorrkkss CClleeaanniinngg && MMaaiinntteennaannccee

Page 4: Dadabhai Construction Prequalification 21 March 2021 Final..

SUMMARY OF PROJECTS

Completed Projects

Sl. # Project Nature of Project Client Consultant Project Period

1 Kingdom Mall at Janabiya

Shopping Mall with Hypermarket, supermarket, food courts, etc. with built up area of 81000m2

The Private Office of HRH Prince Khalifa Bin Salman Al Khalifa

Arabian East Bureau

20 Months

2 Nawab Office (Parliament Building)

G+3 Office Building with built up area of 5130m2

Ministry of Works Ansari Engineering

14 Months

3 Dana Mall Refurbishment Works – Phase 2

Refurbishment & ID Works

Lulu Bahrain Hypermarket SPC

United Engineering

5 Months

4 Al Nasseriya Accommodations – NBH

Construction of Al Nasseriya Accommodations

Royal Court Adel Ahmadi Associates S.P.C.

8 Months

5 Marassi Shores at Marassi Al Bahrain

11-Storey Beach front Residential Dev. with 6 food & beverages outlet

Eagle Hills Diyar Company WLL

Gulf House Engineering

24 Months

6 Hilton Staff Accommodation at Muharraq

Construction of 11-storey accommodation with 113 flats for Hilton staff

Al Sorouh Hospitality Real Estate S.P.C.

Arab Architects 14 Months

7

Interior Fit-out works for Ramez Hypermarket at Kingdom Mall Janabiya

Interior Fit-out works Ramez Group Ramez Group 5

Months

8

Marassi Al Bahrain, Address Hotel & Serviced Apartments Foundation Works

Raft foundation for Address Hotel

Eagle Hills Diyar Company WLL Parsons 3

Months

9

GHG Crowne Plaza Phase 2 – Boundary Wall, Car Park & Refurbishment of Block A, E, F & G

Refurbishment works

Gulf Hotels Group MACE 5

Months

10

Marassi Al Bahrain, Landscape Phase 1 (Areas 1B2, 1C, 1D1, 1D2 & 1J)

Hard & Soft landscape works

Eagle Hills Diyar Company WLL

Eagle Hills Diyar Company WLL

5 Months

Page 5: Dadabhai Construction Prequalification 21 March 2021 Final..

Sl. # Project Nature of Project Client Consultant Project Period

11 3 Nos. 6-Storey Building at Sitra

3 Nos. 6-Storey Residential Building

Bahrain Defence Force

Bahrain Defence Force

22 Months

12 Building @ Camp M-37

Construction of Accommodation, Maint. Hanger, Ammunition Workshop & Store

Bahrain Defence Force

Bahrain Defence Force

18 Months

13 Seef Terraces G+29 Floors Resi. Bldg. with 173 apts.

Dadabhai Noon Real Estate Co. Habib Modara 24

Months

14 Juffair Heights Residential Project

Construction of 2 Towers of G+3+24 Floors and G+3+25 Floors apartments

Dadabhai Dev. & Properties Management

Habib Modara Art & Architecture

24 Months

15 27 Battalion at Royal Military Police Unit Camp

Construction of Accommodation, Mess and Masjid for 27th Battalion (G+1)

Bahrain Defence Force

Bahrain Defence Force

12 Months

16 Model Youth Center at Busaiteen

Construction of Youth Center G+1 Building for Ministry for Youth & Sports

MYS Al Aáli Engineering

12 Months

17 Beacon Private School Project at Hidd

Beacon Private School Project with built up area of 26000m2

Dadabhai Group Habib Modara 24 Months

18 Shopping Complex at Hala Club at Muharraq

Construction of B+G+Mezz. Shopping Complex

Quraish Dadabhai Habib Modara 18

Months

19 Dana Mall Refurbishment Works – Phase 1

Refurbishment & ID Works

Lulu Bahrain Hypermarket SPC

United Engineering

105 Days

20 Ramez Shopping Complex at Juffair

Interior Fit-out works Ramez Group Ramez Group 80 Days

21

Marassi Residence Car Park Architectural & Finishes Works

Architectural & Finishes Works

Eagle Hills Diyar Company WLL

Eagle Hills Diyar Company WLL

3 Months

22

Interior Fit-out works for Ramez Hypermarket at Hala Mall Muharraq

Interior Fit-out works Ramez Group Ramez Group 90 Days

Page 6: Dadabhai Construction Prequalification 21 March 2021 Final..

Sl. # Project Nature of Project Client Consultant Project Period

23

Marassi Al Bahrain, Area A1 Landscape Works Of Landscape Phase 1

Landscape Works Eagle Hills Diyar Company WLL

Eagle Hills Diyar Company WLL

2 Months

24

Landscaping Civil Works Adjacent To Marassi Residence, Marassi Al Bahrain

Landscaping Civil Works

Eagle Hills Diyar Company WLL

Eagle Hills Diyar Company WLL

2 ½ Months

25 Maint. Works 2014-16 for Ministry of Works

Maintenance Works for Ministry of Works

Ministry of Works Building Maint. Directorate

24 Months

26 Galleria Shopping Complex at Al Ahli Club

Construction of Shopping Mall (G+ 1) & Hypermarket (G+1)

GOYS GOYS 24 Months

27 9 Storey Building at Tubli

Construction of 9-Storey Apartment Building, Type AX

Ministry of Housing

Ministry of Housing

18 Months

28 Platinum Tower, Seef

Construction of GF + 5 Level Car Park + 22 Flrs Office Bldg

M/s. Pearl Development & Real Estate Co.

Habib Modara Art & Architecture

30 Months

29 Abraj Al Lulu, Bahrain

3 Towers of G+4P+46F+Terrace (910 Apartments) [Client Rep.]

M/s. Pearl Development & Real Estate Co.

Habib Modara Art & Architecture/ COWI / IBA

33 Months

30 Elite Crystal Hotel, Juffair

Construction of GF + 3 Level Car Park + 11F Hotel Building

Mohammed Dadabhai Holding Company

Habib Modara/ COWI / GEMAC / SOCOTEC

24 Months

31 Samarah Commercial Dev.at Seef

Construction of GF + 3 Floors Commercial Bldg

Shaikha Hend Salman Mohamed Al Khalifa

MSCEB 10 Months

32 42 Town-houses, Hamala

Construction of 42 Town houses, Type D11

Ministry of Housing

Ministry of Housing

9 Months

33 18 Villas, Sanad – 2

Construction of 18 houses, Type 3M

Ministry of Housing

Ministry of Housing

9 Months

34 Maint. Works 2012-14 for GOYS

Maintenance Works for GOYS GOYS GOYS 24

Months

35 Maint. Works 2012-14 for Ministry of Works

Maintenance Works for Ministry of Works

Ministry of Works Building Maintenance Directorate

24 Months

Page 7: Dadabhai Construction Prequalification 21 March 2021 Final..

Sl. # Project Nature of Project Client Consultant Project Period

36 Printing Press at Hidd

Construction of Printing Press on Ground floor level

Arabian Impressions

Aref Sadiq Design Consultants

6 Months

37 Aluminium Factory at Hidd

Construction of GF + Mezzanine Warehouse/Factory

Dadabhai Group Aref Sadiq Design Consultants

12 Months

38 Philippine School

Expansion Works at Philippine School

Philippine School Bahrain MSCEB 10

Months

39 18 Villas, Sanad – 1

Construction of 18 Town houses, Type 3M

Ministry of Housing

Ministry of Housing

9 Months

40 Overseas - Dubai Hotel Building

2B+GF+13Floor, Hotel Building

Mohammed Ahmed Ali Dadabhai & Partners

National Engineering Bureau

24 Months

41 Elite Resort & Spa, Muharraq

Construction of G+M+10F+T 130 Hotel Service Apts.

H.H. Sh. Khalifa Bin Salman Bin Hamad Al Khalifa

Habib Modara Art & Architecture

22 Months

42 Haji Residence, Mahooz

Construction of B+G+M+10F+Terrace, Residential Project

Mr. Mohammed Abbas Ali Haji

Habib Modara Art & Architecture/ Meritas Mgmnt

20 Months

43 Elite Grande, Seef

Construction of G+M+10F+Terrace 130 Hotel Service Apartments

Akram Miknas & Mohammed Dadabhai

Habib Modara Art & Architecture

22 Months

44 Elite Royale, Juffair

Construction of G+10F+Terrace Residential Project

Essam Yousif Abdulla Abdulkarim

Habib Modara Art & Architecture

15 Months

45 Elite Suites, Sanabis

Construction of B+G+14F+Terrace, 4 Star Hotel

M/s Noon Properties & Mr. Mohammed Dadabhai

Arif Sadiq Design Consultants

21 Months

46 Seef Residence, Seef

Construction of G+7F+Terrace, 178 Hotel Apartments

H.H. Sh. Khalifa Bin Salman Bin Hamad Al Khalifa

Arif Sadiq Design Consultants

17 Months

47 Elite Pavilion, Juffair

Construction of G+10+Terrace Hotel Service Apartments

Sh. Abdulrehman M.R. Al-Khalifa

Bahrain Engineering Bureau

20 Months

48 Elite-3 Apartments, Juffair

Construction of G+8F+Terrace, Residential Project

Sh. Abdulrehman Bin M.R. Al-Khalifa

Bahrain Engineering Bureau

15 Months

49 Elite Hotel, Juffair

Construction of B+G+10F+Terrace, 3 Star Hotel

Mohammed Dadabhai

Arif Sadiq Design Consultants

23 Months

Page 8: Dadabhai Construction Prequalification 21 March 2021 Final..

Sl. # Project

50 Baisan Tower Hotel (B+G+12F+Terrace, 4 Star Hotel) at Hoora

51 Elite Tower (18-storey building) at Seef

52 Factory & Warehouse (2-storey) Building at Hidd

53 Al Quoz Villa, Dubai (Overseas)

54 Factory/Warehouse Building, Sitra

55 2-Storey Workshop at Sitra

56 Warehouse (21 Nos.) Bldg, Sitra (2-storey)

57 Ceramic Mall, Sharjah (Overseas)

58 G+2P+15 Floors+ Terrace Building at Al Khan, Sharjah (Overseas)

59 Asian School at Juffair

60 French School at Busaiteen

61 Extension Building for Pakistan Urdu School at Isa Town

62 Multi-storey Office Building at Diplomat Area

63 Office Bldg at Police Port (Forse Maintenance) at Manama

64 Elite-1 Apartments at Exhibition Avenue

65 Elite-2 Apartments at Mahooz

66 Elite-4 Apartments at Mahooz

67 Elite-5 Apartments at Juffair

68 Baisan Hotel at Hoora

69 Science Centre at Umm Al Hassam

70 Al Ahali Shopping Complex at Mahooz

71 Al Ahali Club Extension (New Millennium School)

72 Ferrari Building at Adliya

73 Phoenicia Hotel at Hoora

74 Silver Residence at Juffair

75 Florida House at Umm Al Hassam

76 Gulam Akhtar Zadeh Building at Manama

77 Bait Al Hoora at Hoora

Page 9: Dadabhai Construction Prequalification 21 March 2021 Final..

Sl. # Project

78 Hassan Al Khaja Building at Hoora

79 Hala Plaza for Mr. Farooq Almoayyed at Juffair

80 Multi-storey Building for Mr. Matrook at Hoora

81 Sh. Salman Building at Adilya

82 Multi-storey Building No. 1 for Mr. Adil Al A’ali at Hoora

83 Multi-storey Building No. 2 for Mr. Adil Al A’ali at Hoora

84 Salmaniya Tower at Salmaniya

85 Multi-storey Building for Mr. Mustafa Syed at Gufool

86 DC Main Office at Salmaniya

87 Building for Y.B.A. Kanoo at Manama

88 Multi-storey Building for Mr. Mustafa Syed at Hoora

89 Mosque at Al Ahali Club at Mahooz

90 Sh. Abdul Rahman Building at Juffair

91 Sh. Moh’d Bin Salman Al Khalifa Building at Manama

92 Majlis for Sh. Daij at Zallaq

93 Dadabhai Travel Office, Dubai (Overseas)

94 2-Storey Warehouse (11 Nos.) Building at Sitra

95 25 Villas for Ali Murthaza at Saar

96 22 Villas at Riffa

97 15 Villas at Umm Al Hassam

98 10 Villas at Tubli

99 10 Villas at Adilya

100 7 Villas at Arad

101 Other various Villas at Bahrain

102 Villas (Satwa Villa, Villa 168, Villa 13, Villa 40) at Dubai (Overseas)

Page 10: Dadabhai Construction Prequalification 21 March 2021 Final..

DADABHAI INTERIOR PROJECTS

Sl. # Project

103 Saudi Airlines Office at Seef (Design and built interior fit-out works for Saudi Airlines at Platinum Tower, Seef)

104 Design and built interior fit-out works for M/s. Arab War Risks Insurance Syndicate Office at Platinum Tower, Seef

105 UAE Exchange (15 branches) at Various Locations in Bahrain (Interior Fit-out works)

106 Adliya Secondary Boys School Maintenance Works for Ministry of Works

107 Saar Secondary Girls School Maintenance Works for Ministry of Works

108 Jet Airways Office at Manama (Interior Fit-out works)

109 Ministry of Labour Building (Isa Town) Maintenance Works for Ministry of Works

110 Cacao Lounge Restaurant at Riffa (Interior Fit-out works)

111 Alpha Atelier Show Room at Moda Mall (Interior Fit-out works)

112 Ministry of Agriculture Budaiya Maintenance Works for Ministry of Works

113 Maskati Pharmacy at Zinj (Interior Fit-out works)

114 Oman Airways Office at Manama (Interior Fit-out works)

115 Isfahani Restaurant at Zinj (Interior Fit-out works)

116 Lifestyle and Shoexpress Showroom at Zinj (Interior Fit-out works)

117 WOK Station Restaurant at Zinj (Interior Fit-out works)

118 Sparadise Spa at Zinj (Interior Fit-out works)

119 Macchiato Corner Restaurant at Zinj (Interior Fit-out works)

120 Prince Pride Restaurant at Budaiya (Interior Fit-out works)

121 Affinity Boutique Cloth & Fashion Showroom at Zinj (Interior Fit-out works)

122 Al-Ghuniam Attorneys Office at Seef (Interior Fit-out works)

123 Busaiteen Youth Centre Joinery Works

124 Bahrain Defence Force (27th Battalion) Joinery Works

125 Zaituna Restaurant at Enma Mall, Riffa (Interior Fit-out works)

126 KFC, Hamad Town (Interior Fit-out works)

127 Zaituna Restaurant at BFH, Manama (Interior Fit-out works)

Page 11: Dadabhai Construction Prequalification 21 March 2021 Final..

DADABHAI INTERIOR PROJECTS

Sl. # Project

128 Kasbah Café at Platinum Tower, Seef (Interior Fit-out works)

129 Painting works at City Centre, Seef

130 Juffair Heights, Juffair Joinery Works

131 Sitra Warehouse Maintenance Works

132 Ahlan Café at Elite Grande Hotel, Seef (Interior Fit-out works)

133 Julious Restaurant at Elite Grande Hotel, Seef (Interior Fit-out works)

134 Jzodiac Lounge at Elite Grande Hotel, Seef (Interior Fit-out works)

135 H2O Shisha Lounge at Elite Grande Hotel, Seef (Interior Fit-out works)

136 Ahlan Café at Elite Seef Residence, Seef (Interior Fit-out works)

137 Ilgiardinio Restaurant at Elite Seef Residence, Seef (Interior Fit-out works)

138 Sip & Dip Bar at Elite Seef Residence, Seef (Interior Fit-out works)

139 Shift 7 at Elite Resort & Spa, Muharraq (Interior Fit-out works)

140 La Brasserie at Elite Resort & Spa, Muharraq (Interior Fit-out works)

141 Noor Tent at Elite Resort & Spa, Muharraq (Interior Fit-out works)

142 O Club at Elite Resort & Spa, Muharraq (Interior Fit-out works)

143 Al Naseem Bar at Elite Resort & Spa, Muharraq (Interior Fit-out works)

144 Awtar Arabic Restaurant at Elite Crystal Hotel, Juffair (Interior Fit-out works)

145 Club 360 at Elite Crystal Hotel, Juffair (Interior Fit-out works)

146 Lotus Coffee Shop at Elite Crystal Hotel, Juffair (Interior Fit-out works)

147 Lotus Lounge at Elite Crystal Hotel, Juffair (Interior Fit-out works)

148 Lotus Smoking at Elite Crystal Hotel, Juffair (Interior Fit-out works)

149 Waikiki Restaurant at Elite Crystal Hotel, Juffair (Interior Fit-out works)

150 Al Omrah Function Hall at Elite Crystal Hotel, Juffair (Interior Fit-out works)

151 Ahlan Café at Elite Crystal Hotel, Juffair (Interior Fit-out works)

152 Filli Restaurant at Manama (Interior Fit-out works)

153 Baker & Spice Restaurant (Interior Fit-out works)

Page 12: Dadabhai Construction Prequalification 21 March 2021 Final..

DADABHAI INTERIOR PROJECTS

Sl. # Project

154 Bennigan’s Restaurant at Amwaj Island (Interior Fit-out works)

155 Mewar Indian Restaurant at Zinj (Interior Fit-out works)

156 The Florist’s Daughter Restaurant Al Aali Mall at Seef (Interior Fit-out works)

157 Marzipan French Café at Zinj (Interior Fit-out works)

158 WOK Station Restaurant at Platinum Tower (Interior Fit-out works)

159 Bread Storey Arabic Restaurant at Galleria (Interior Fit-out works)

160 Mawasim Restaurant at Galleria, Zinj (Interior Fit-out works)

161 Godiva Belgium 1926, Al Aali Shopping Complex (Interior Fit-out works)

162 Dadabhai Travel Head Office, Manama (Interior Fit-out works)

163 Dadabhai Cargo Office at Hidd (Interior Fit-out works)

164 Haji Hassan Group Office at Borhama (Interior Fit-out works)

165 Adventure Hub at Galleria (Interior Fit-out works)

166 Pegasus Office at Platinum Tower, Seef (Interior Fit-out works)

167 The Eye Infirmary (Interior Fit-out works)

168 Joinery Works for Nawab Extension Project

169 Joinery Works for Al Nasseriya Project

170 Joinery Works for Dana Mall Renovation Works

171 Joinery Works for Hilton Staff Accommodation

172 Repair and Repainting of the Compound Wall at EWA Customer Care Building, Juffair

Ongoing Projects

Sl. # Project Nature of Project Client Consultant Project

Period

1 Address Hotel & Address Serviced Apartments

Construction of the Address Podium, Address Hotel, Address Serviced Apartments, Structural Works for Zone 12 & 13 and Structural works for Landscape of Marassi Al Bahrain

Eagle Hills Diyar Company WLL

Parsons 702 Days

Page 13: Dadabhai Construction Prequalification 21 March 2021 Final..

Sl. # Project Nature of Project Client Consultant Project Period

2 Four Buildings at Tubli STP

Construction of Four Buildings at Tubli Sewerage Treatment Plant (Laboratory Building, STP Administration Building And Workshop Building)

Ministry of Works

Ministry of Works

25 Months

3 Ramez Hypermarket at Arad

Construction of Ramez Hypermarket at Arad

Ramez Trading Co.

Mohammed Al Gharib

12 Months

4 Proposed Stables at Endurance Village

Construction of Stables at Endurance Village Royal Court Mohammed

Al Gharib 8

Months

5 BIBF Headquarters Building at Manama Sea Front

Construction of BIBF Headquarters Building at Manama Sea Front

Bahrain Institute of Banking and Finance

Gulf House Engineering

16 Months

6 Diyar Al Muharraq - Asset 24 Phase 2 Infrastructure

Infrastructure Works Diyar al Muharraq WLL

AECOM 18 Months

7 Commercial Tower, Dubai (Overseas)

GF+2B+5P+23 Floors Commercial Building

Mohammed Dadabhai & Partners

National Engg Bureau

30 Months

8 Al Majaz, Sharjah (Overseas)

B+G+2P+18TYP+SW. Pool Building, Sharjah

Mohammed Dadabai & Partners

Mazaya Consulting Engineers

22 Months

9 Palm Hotel at Palm Deira, Dubai (Overseas)

B+G+HC+10Typ+1Suite+1Restaurant+Roof Hotel Bldg.

Mohammed Dadabhai, Shabeer & Ahmed Dadabhai

Mazaya Consulting Engineers

18 Months

DADABHAI INTERIOR PROJECTS Sl. # Project 10 General Maintenance Term Contract for MYS Facilities 11 Renovation Works for the Existing Seef Mall Public Toilets & Lift Lobbies 12 Joinery Works at BIBF 13 Joinery Works at Address Hotel

Page 14: Dadabhai Construction Prequalification 21 March 2021 Final..

Upcoming Projects

Sl. # Project 1 Proposed Residential Development at Tubli 2 Beacon Private School – Phase 2 3 Social Housing Project at Sanad 4 Office Tower Project in Maameer 5 Warehouse Project at Hidd 6 Proposed hotel Project at Juffair 7 Residential Apartment building at DIC, Dubai, UAE (Overseas)

BRIEF DESCRIPTION OF SOME OF THE PROJECTS COMPLETED PROJECTS KKiinnggddoomm MMaallll aatt JJaannaabbiiyyaa This project is a prestigious Shopping Complex along the Sheikh Salman Highway with 79000m2 built up area consisting of hypermarket, supermarket, recreational facilities, commercial outlets, food courts, etc. This is built in a traditional Bahraini architectural style and is ideally located in Janabiya. MMaarraassssii SShhoorreess aatt MMaarraassssii AAll BBaahhrraaiinn Marassi Shores Project is located at Marassi Al Bahrain Development in plot no. 8 & 9. It’s a beach front residential development with 6 Food and Beverages Outlets. The plot area is 9460m2 and the approximate built up area of the building is 54,330m2. The height of building is 44.00 M at roof level and 47 M at upper roof level. Basement 1 is meant for car parks and services. Level 1 is podium or street level meant for car parks and services. Level 2 has landscape areas, swimming pool, Jacuzzi, outdoor play area, indoor gym etc and 30 apartments. Level 3 to Level 11 has apartments and altogether this project has 289 apartments of the following category - Studio, 1 BHK, 2BHK, 3BHK, 4BHK & pent house. NNaawwaabb OOffffiiccee ((PPaarrlliiaammeenntt BBuuiillddiinngg)) The client of this prestigious project is Special Projects Office of Ministry of Works, Municipalities Affairs & Urban Planning. This G+3 office building is situated on Sheikh Daij Avenue, Gudaibiya with a built-up area of 6600m2. AAll NNaasssseerriiyyaa AAccccoommmmooddaattiioonnss –– NNBBHH ((RRooyyaall CCoouurrtt)) The project comprises of Construction and finishes of Single storied Body Guard’s Accommodation Block, Staff Accommodation, Supervisor’s Accommodation Block, Main Kitchen, Warehouse, Utility Building, Recreation Building, Guard house & Substation, External Works, Paved road works in the Al Nasseriya compound at Al Jazayer, Zallaq.

Page 15: Dadabhai Construction Prequalification 21 March 2021 Final..

HHiillttoonn SSttaaffff AAccccoommmmooddaattiioonn @@ BBuussaaiitteeeenn The project, located at Busaiteen, consists of 14-storey main building with a reinforced concrete frame; external cladding; MEP & lift installations; finishes plus associated external works. DDaannaa MMaallll RReeffuurrbbiisshhmmeenntt wwoorrkkss ––PPhhaassee IIII The project comprises of the refurbishment of the existing Dana Mall excluding Lulu Hypermarket that allows for MEP amendments, interior fit outs of common areas, finishes, car park renovations, façade renovations, etc. BBeeaaccoonn PPrriivvaattee SScchhooooll PPrroojjeecctt aatt HHiidddd This school project is spread on a 30000m2 plot with a built up area of 26000m2. The project consists of all modern facilities and amenities in line with international school standards. It has got Junior and Senior Aquatica with semi-Olympic size swimming pool and other amenities and sports facilities for children. AAddddrreessss HHootteell SSuubbssttrruuccttuurree,, MMaarraassssii AAll BBaahhrraaiinn The Address Residences Marassi Al Bahrain is integrated within a new 200,000m2 lifestyle shopping mall (Marassi Galleria) featuring private residential facilities and a world-class waterfront board walk promenade. Construction of heavy raft foundation shall be part of Phase I construction. Main Contract package will be in Phase II. GGHHGG CCrroowwnnee PPllaazzaa PPhhaassee 22 RReeffuurrbbiisshhmmeenntt wwoorrkkss The project comprises of the refurbishment of the existing south wing of the Crowne Plaza that allows for MEP amendments, new windows, façade painting, façade lighting, fire-fighting installations, changing carpet and balancing of negative pressure in main hotel reception, new boundary wall construction, car park asphalt works etc. SSeeeeff TTeerrrraacceess This project is a prestigious residential development at Seef with 173 apartments with stunning & elegant design with spatial efficiency offering maximum opportunity to enjoy the different views from each apartment and also maximizes the usable outdoor space. It has high quality standards, sophisticated state-of-the-art modern high end facilities & amenities in a landmark location at affordable price. JJuuffffaaiirr HHeeiigghhttss,, JJuuffffaaiirr This multi-storied residential project is located in the residential area of Juffair, close to Bahrain’s Diplomatic business area. Juffair Heights will have a modern design structure containing a unique architectural feature. This residential building will have 376 apartments and ample parking facilities. 2277 BBaattttaalliioonn This project is designed by Military Works Directorate for Bahrain Defence Force @ Raas Qareen. The project covers the construction of military police unit camp spreading over a land of 10,000 Sqm including Headquarters building, Soldiers accommodations (2nos), Soldiers Mess Hall, Parking Hanger, Service buildings, Masjid, substation & site development etc.

Page 16: Dadabhai Construction Prequalification 21 March 2021 Final..

MMuuhhaarrrraaqq MMooddeell YYoouutthh CCeenntteerr The project, located at Busaiteen, covers the construction of a youth center spreading over a land area of 11,700 sqm including sports hall, sports complex, various rooms and other related facilities. RRaammeezz HHyyppeerrmmaarrkkeett @@ KKiinnggddoomm MMaallll The Project is a prestigious Shopping Mall interior fit out works @ Kingdom Mall in Janabiya consisting of hypermarket and supermarket interior finishes, joinery works, false ceiling works, MEP works etc. GGaalllleerriiaa SShhooppppiinngg CCoommpplleexx aatt AAll AAhhllii CClluubb This Shopping Complex project at Al Ahli Club will have a Shopping Mall (GF + 1 Floor) and Hypermarket (GF + 1 Floor) with all required facilities and ample car parking area (GF + 2 Floors). DDaannaa MMaallll RReeffuurrbbiisshhmmeenntt WWoorrkkss PPhhaassee 11 The project is Dana Mall Refurbishment works which is designed by United Engineering for Lulu Group. This project consists of refurbishment works in ground floor common lobby, retail shops & related services, and external works. RRaammeezz HHyyppeerrmmaarrkkeett @@ HHaallaa MMaallll,, MMuuhhaarrrraaqq The project is a prestigious shopping complex interior fit out works @ Hala Mall in Muharraq with 10388m2 built-up area consisting of hypermarket and supermarket interior finishes, joinery works, false ceiling works, MEP works, etc. NNBBRR BBaasseemmeenntt CCaarr PPaarrkk AArrcchhiitteeccttuurraall FFiinniisshheess The project consists of complete interior finishes like flooring, ceiling, metal works & architectural works etc. with a built up area of 13500m2 at Marassi Al Bahrain. MMaarraassssii AArreeaa AA11 LLaannddssccaappee wwoorrkkss This project is a prestigious infrastructure development at Diyar Al Muharraq. This project consists of complete landscape, hardscape & other amenities like precast benches, Pergola, KIOSK, signages, metal works, etc. MMaarraassssii AArreeaa AA11 LLaannddssccaappee CCiivviill wwoorrkkss This project is a prestigious infrastructure development at Diyar Al Muharraq with complete civil works for landscape. This project consists of complete RCC retaining wall, excavation, levelling, filling works, etc. SShhooppppiinngg CCoommpplleexx aatt HHaallaa CClluubb aatt MMuuhhaarrrraaqq This Shopping Complex project at Hala Club is ideally located at Muharraq and comprises of Basement + Ground + Mezzanine Floor Shopping area with ample parking facility. MMeeaassuurreedd TTeerrmm CCoonnttrraacctt 22001144--22001166 -- MMiinniissttrryy ooff WWoorrkkss This contract is for the maintenance of various schools and other Ministry buildings in Bahrain for the term 2014-2016.

Page 17: Dadabhai Construction Prequalification 21 March 2021 Final..

IInntteerriioorr ffiitt oouutt wwoorrkkss @@ RRaammeezz JJuuffffaaiirr The project is a prestigious shopping complex interior fit out works @ Murjun Mall in Juffair with 5500m2 built-up area consisting of hyper market & super market interior finishes, joinery works, false ceiling works, MEP works etc. 33 NNooss.. 66--SSttoorreeyy BBuuiillddiinngg aatt SSiittrraa The “3 Nos. 6-Storey Residential buildings” project is a project designed by Military Works Directorate for Bahrain Defence Force @ Sitra. The Project consists of Ground Floor + 6 floors for residential (3 towers). BBuuiillddiinngg @@ MM--3377 aatt SSaaffrraa This project is designed by Military Works Directorate for Bahrain Defence Force @ Safra. The scope of works is construction of Construction of Accommodation, Maintenance Hanger, Ammunition Workshop and Store at Camp M37 at Safra. PPllaattiinnuumm TToowweerr,, SSeeeeff This striking GF + 5 Level Car Park + 22 Floors modern office tower is located in the busy Seef district, Bahrain’s commercial hub. Platinum Tower offers more than just top class business facilities and state-of-the-art communication and security systems. The building also houses a large swimming pool, health club and recreational area. It’s ideal for discerning businessmen, executive bankers, consultants and entrepreneurs. Quality construction and attention to detail put the tower in line with the Company’s long-term strategy and business philosophy that focuses on providing products of uncompromising quality. 99--SSttoorreeyy RReessiiddeennttiiaall BBuuiillddiinngg aatt TTuubbllii This GF + 9 Floors Residential Building is located at Tubli and is a part of a large residential development by the Ministry of Housing. There will be 40 residential apartments in this building with ample parking area. AAbbrraajj AAll LLuulluu These three superb residential towers of Abraj Al Lulu stand tall in the heart of Manama, Bahrain. The complex is close to the financial hub of the city. Two of the impressive towers sport 51 floors each and the third ultra-luxurious tower has 41 floors. Between them they house more than 900 beautiful freehold sea view apartments, each individually crafted by internationally acclaimed designers. Grand entrance lobbies, elegant lounges and sleek, modern public areas set the tone for these desirable downtown residences. The towers are protected by state-of-the-art security systems. For those privileged to live here, every amenity has been provided: health clubs, cinema lounge, restaurant, recreational area; extra large swimming pools and other sports facilities. Abraj Al Lulu will satisfy the most extravagant tastes. The towers are interconnected by a series of decks with attractive landscaped play areas and gardens. Other touches like barbecue kitchens on the terraces, an Internet café, jogging tracks and fountains demonstrate the builders’ foresight in planning a large, self-contained downtown complex that provides and cares for its residents through all its integrated facilities which are of the highest standards.

Page 18: Dadabhai Construction Prequalification 21 March 2021 Final..

SSaammaarraahh CCoommmmeerrcciiaall DDeevveellooppmmeenntt aatt SSeeeeff This GF + 3 Floors Commercial development is located in the busy Seef district, Bahrain’s commercial hub. 4422 TToowwnnhhoouusseess,, HHaammaallaa This project is located in the residential area of Hamala and is a part of a large residential development by the Ministry of Housing. Each Type D11 villa has G + 1 Floor with independent parking area. MMeeaassuurreedd TTeerrmm CCoonnttrraacctt 22001122--22001144 -- MMiinniissttrryy ooff WWoorrkkss This contract is for the maintenance of various schools and other Ministry buildings in Bahrain for the term 2012-2014. MMeeaassuurreedd TTeerrmm CCoonnttrraacctt -- GGOOYYSS This contract is for the maintenance of various clubs (72 clubs) at various locations in Bahrain. 1188 HHoouusseess,, TTyyppee 33MM,, SSaannaadd ((PPrroojjeecctt--22)) Located in the residential area of Sanad, close to Alba round about, Sitra, this project is a part of a large residential development by the Ministry of Housing. Each villa has G + 1 Floor with independent parking area. PPrriinnttiinngg PPrreessss ffoorr AArraabbiiaann IImmpprreessssiioonnss aatt HHiidddd The project is for converting the existing warehouses and offices to a Printing Press with related facilities and offices including machine foundations, etc. AAlluummiinniiuumm FFaaccttoorryy aatt HHiidddd Construction of Aluminium factory, with a built up area of 3000 square meter. The project also includes warehouses and offices Ground + mezzanine floors. PPhhiilliippppiinnee SScchhooooll,, AA’’aallii This project is located in A’ali. This development is part of the expansion works of the school. The works include construction of first floor to RCA Building, home science building, storage building and landscaping area. 1188 TToowwnnhhoouusseess,, SSaannaadd ((PPrroojjeecctt--11)) Set in the residential locality of Sanad, close to Alba round about, Sitra, this project is a part of a large residential development by the Ministry of Housing. Each villa has G + 1 Floor with independent parking area. FFiitt--oouutt wwoorrkkss ffoorr SSaauuddii AArraabbiiaann AAiirrlliinneess OOffffiicceess,, SSeeeeff This office is located on the 21st floor of Platinum Tower at Seef, Bahrain’s commercial hub. This office has a unique design with state-of-the-art communication and security systems. HHaajjii RReessiiddeennccee,, MMaahhoooozz This 12 floor residential building is located at Mahooz and comprises of B+G+M+10F+Terrace, with all facilities like swimming pool, gym and ample parking area.

Page 19: Dadabhai Construction Prequalification 21 March 2021 Final..

EElliittee CCrryyssttaall HHootteell,, JJuuffffaaiirr Set in the residential locality of Juffair close to Bahrain’s Diplomatic business area, Elite Crystal Hotel has a modern design structure containing a unique architectural feature. This imposing hotel building comprises of GF + 3 Level Car Park + 11 Floors and includes night club, banquet hall, many state-of-the-art features and ample parking facilities. EElliittee RRooyyaallee,, JJuuffffaaiirr Ideally situated in Juffair - widely considered as the ‘entertainment capital’ of Manama, this 11-storey block of residential apartments offers furnished and serviced apartments. It houses a swimming pool, health club, Jacuzzi, steam room and sauna, with ample parking for residents, yet offers them the convenience of being able to walk to most of the entertainment areas in the neighbourhood. EElliittee GGrraannddee,, SSeeeeff Another trend-setter this 12-floor block of luxury hotel apartments is located in the business hub of Seef. Its modern spacious suites are well appointed and decorated. The facility also boasts a cinema lounge, health spa, Jacuzzi, sauna, swimming pool and children’s play area. EElliittee RReessoorrtt && SSppaa,, MMuuhhaarrrraaqq The landmark15-floor hotel apartment block is set against a dramatic seaside landscape along the Shaikh Hamad Causeway. With numerous sporting facilities, an attractive seaside Jacuzzi and a health spa that commands breathtaking panoramic views of the sea, this development is the epitome of luxury. Banquet and conference halls, a delightful poolside restaurant, a sports lounge and designated barbeque areas, complete the picture, leaving nothing to be desired. EElliittee TToowweerr,, SSeeeeff Perfectly combining luxury residential apartments with state-of-the-art business facilities, this modern, 18-floor development showcases a charming blend of unpretentious comfort and classic design principles. With a recreational area, snack lounge, private preview theatre, children’s play area, health spa, steam room and more, this is a development that will meet and exceed even the most demanding expectations. EElliittee SSuuiitteess HHootteell,, SSaannaabbiiss Situated in a highly desirable location, this member of the Elite family of serviced apartments has 14 floors, 215 rooms and a host of modern facilities. The 4-star deluxe hotel is located near the business hub of Bahrain. As with all our properties, it is designed to meet exacting standards. SSeeeeff RReessiiddeennccee,, SSeeeeff This 7-floor block Elite property in Seef, the modern commercial centre, contains 178 spacious apartments. All of them are well appointed as is expected of an Elite property. The standard amenities for rest, recreation and exercise are complemented with a special deck development.

Page 20: Dadabhai Construction Prequalification 21 March 2021 Final..

EElliittee HHootteell,, JJuuffffaaiirr Once again the Company broke the mould and established one of Bahrain's first boutique hotels. Elite Hotel, Juffair is a 4-star gem that sets new standards in hospitality. Ideally situated and exquisitely crafted, this 4-star hotel has 10 floors and a myriad facilities. Minutes from the new Gulf International & Convention Centre, the hotel boasts its own conference facilities. FFaaccttoorryy && WWaarreehhoouussee BBuuiillddiinngg,, HHiidddd This 2-storey factory & warehouse building, with a built up area of 7000 square meter, is located at Hidd and has got a range of desirable amenities required for factory/warehouse. FFaaccttoorryy && WWaarreehhoouussee BBuuiillddiinngg,, SSiittrraa Situated in the Northern Industrial Area of Sitra, this project comprises of various warehouses and factory buildings. This was built with pre-engineered structure and has got required facilities. ONGOING PROJECTS AAddddrreessss HHootteell aanndd SSeerrvviicceedd AAppaarrttmmeennttss The Address Residences Marassi Al Bahrain is integrated within a new 200,000 sqm lifestyle shopping mall (Marassi Galleria) featuring private residential facilities and a world-class waterfront boardwalk promenade. Address Hotels + Service apartments is renowned for offering a premium luxury lifestyle experience. The 10-storey hotel will feature 117 rooms, including 20 suites, and will offer a locale that includes a number of retail outlets, waterfront signature restaurants, business facilities, a spa and fitness center and opportunities for lifelong learning. Address serviced apartments is living on a more refined level. A level as rich in amenities and comforts as in location and convenience and aesthetically designed 10 storey, 155 fully furnished and serviced residences. CCoonnssttrruuccttiioonn ooff 44 BBuuiillddiinnggss aatt TTuubbllii SSTTPP Project consists of Construction of Laboratory Building, STP Administration Building, Workshop Building and Service Blocks 1 & 2 including all internal and external associated works in two separate plots at Tubli Sewerage Treatment Plant. Site 1 (Plot No. 08021010): The Laboratory Building with a total Built up area of 2164m2 is 2-storey (G+1) Support and service facilities include service block, substation, guard room, boundary wall and all associated external works. The Mechanical and Electrical Installation works also form part of this contract. Site 2 (Plot No. 08021625): Scope includes demolition of existing structures and facilities including enabling of related services in separate phases. STP Administration Building with a total Built-up area of 2813m2 is 3-storey (G+2). Workshop Building with a total Built up area of 2,970 m2 is 2-storey (G+1). BBIIBBFF HHQQ BBuuiillddiinnggss @@ BBaahhrraaiinn BBaayy The project is designed by Gulf House Engineering for Bahrain Institute of Banking & Finance (BIBF). Construction of the state-of-the-art multi-storey building will contribute to Bahrain’s skyline as an iconic symbol of modern architecture, providing safe and convenient facilities to support the learning process and improve the educational tourism in Bahrain.

Page 21: Dadabhai Construction Prequalification 21 March 2021 Final..

PPrrooppoosseedd SSttaabblleess aatt EEnndduurraannccee VViillllaaggee,, AAll JJaazzaayyeerr ((RRooyyaall CCoouurrtt)) The project comprises of construction and finishes of 12 plots of two types. Each plot comprises of Horse stables, Service Building, Majlis, Horse walker, Horse wash bays and paddocks with network of asphalt roads connecting each plot. The 12 plots have a total number of 16 horse stables block with all facilities for training the horses and 12 Majlis/Service buildings. RRaammeezz HHyyppeerrmmaarrkkeett @@ AArraadd The project comprises of construction of 2-storey mall with car park at Arad (including hypermarket fit out works) with approximate built-up area 11,064m2 together with associated external works and services with ample car parking area. OVERSEAS PROJECTS CCoommmmeerrcciiaall TToowweerr,, TTeeccoomm--DDuubbaaii This modern office block towers GF+2B+5P+23 Floors over the heart of business activities in Dubai’s special TECOM zone on Sh. Zayed Road. It consists of state-of-the-art business facilities, including an unrivalled communication network, health facilities and security system. The Tower epitomises the business environment of today where work challenges reside close to rest and recreation. HHootteell BBuuiillddiinngg,, TTeeccoomm--DDuubbaaii This well-appointed and designed 4-star deluxe hotel is located in the heart of Dubai’s business area, in the special TECOM zone. This 2B+GF+13 Floor Hotel Building showcases all the Company’s hallmarks of a quality property - high quality living standards, state-of-the-art facilities and tremendous value. AAll KKhhaann BBuuiillddiinngg,, SShhaarrjjaahh This G + 2P + 15 Floors + Terrace Building is located at Al Khan, Sharjah with excellence in quality and design and with all amenities. AAll MMaajjaazz PPrroojjeecctt,, SShhaarrjjaahh This proposed project, located in the heart of Sharjah, will have excellence in quality and design and will consists of B + G + 2P + 18 Typ Floors + Swimming Pool. In line with the Company’s ability to home in on prime residential and commercial areas this new project is set in Al Majaz - home of Sharjah’s popular water-park and other family oriented amenities. CCeerraammiicc MMaallll,, SShhaarrjjaahh An exclusive shopping mall for Ceramic and other finishing items for construction industry. VViillllaass aatt DDuubbaaii A lot of villas have been designed and constructed at Dubai with all amenities for modern living for various clients. PPaallmm HHootteell aatt PPaallmm DDeeiirraa,, DDuubbaaii The proposed hotel project consists of B+G+HC+10Typ+1Suite+1Restaurant+Roof Hotel Bldg. located at Palm Deira, Dubai with all amenities.

Page 22: Dadabhai Construction Prequalification 21 March 2021 Final..

HVAC & FIRE FIGHTING DIVISION

Our HVAC & Fire Fighting Division, ALUSOL W.L.L. was formed as a company under the umbrella of Dadabhai Group to undertake HVAC, Fire Fighting, Mechanical & BMS works in the Building Construction Sector. ALUSOL is a company that will provide a level of service far greater than the industry standard with a focus on Energy efficient ideologies. The principal activities of ALUSOL W.L.L. are to design, engineer and install complex Air-conditioning, Ventilation, Fire-fighting & Building Management systems for residential, commercial & industrial buildings which include office towers, hotels, government buildings, factories etc. The Organization operates in the Kingdom of Bahrain with qualified ambitious engineers specialized in the field of Electro-Mechanical Services. We have experienced Engineers & technicians, well equipped with tools and machinery to do quality work. At ALUSOL W.L.L. we look forward to be in the summit ensuring that our clients always get weightage in their venture. We are committed to continuing our contribution to the economic growth of the Kingdom by making stronger the needs and expectations of our clients. Services:

Detailed Engineering, Designing & Execution of Electro-Mechanical Systems Commissioning & Annual Maintenance Contracts

Expertise:

Heating, Ventilation & Air-conditioning for High Rise buildings. Specialist in Central Chilled water systems & DX systems.

Designing & installation of Fire Protection Systems including Fire Alarm, Sprinkler, Hose Reel, Smoke Extract system, Staircase Pressurization System as per BS, NFPA & Local Civil Defense standards.

Engineering, Procurement & installation of Building Management Systems.

Page 23: Dadabhai Construction Prequalification 21 March 2021 Final..

INTERIOR DIVISION Our interior division provides design solutions for residential, commercial, industrial spaces, etc. We strive for design excellence through creativity and innovation. This is reflected in our globally recognized projects. Our core values inspire our designers to embrace design challenges and surpass clients’ expectations. We use our global diversity to deliver an exceptional and unique level of service. Wherever we operate, we want to be seen as the leading multi-cultural design company that works in collaboration to deliver simply the best design. We have done interior fit-out works for more than 1000+ satisfied home/commercial space owners in Abraj Al Lulu, Platinum tower, Galleria, Juffair Heights, Seef Terraces, Hilton Accommodation, Marassi Shores, Kingdom Mall, BIBF, Hidd School, Ministry of Works, Busaiteen Club, Elite group of Hotels, etc. in addition to several Restaurants, Malls, Banks, Showrooms, Lounges, Banquet Halls, Mansions, Villas, etc. We offer semi furnished and fully furnished interior packages with special prices to suit clients’ budget. These packages include array of styles in interior design ranging from Classical to Contemporary to suit individual taste. Packages include wall and floor finishes, furniture, soft furnishings, art objects, light fixtures, along with white goods. We, as a team, are committed to provide our esteemed clients with complete residential and commercial solutions under one roof. We appreciate every opportunity to be of service to our valued clients.

Page 24: Dadabhai Construction Prequalification 21 March 2021 Final..

INFRASTRUCTURE DIVISION Infrastructure works and services works predominantly related to the Building works were forming part the operations of Dadabhai Construction. With the project sizes and number increasing day by day, the Dadabhai Group has recently decided to administer the infrastructure works as a new distinct division under Dadabhai Construction and has set up a team of experienced engineers and highly skilled workforce. The infrastructure division will deal the projects in the following areas in particular: Construction of motorways, streets, roads, other vehicular and pedestrian ways

surface work on streets, roads, highways, bridges or tunnels: asphalt paving of roads;

Elevated highways, construction of tunnels Construction of subways Construction of airfield runways Construction of industrial facilities, such as: refineries, chemical plants Construction of: waterways, harbor works, pleasure ports (marinas), locks, etc.;

dredging of waterways Construction work, other than buildings, such as: outdoor sports facilities Landscape and irrigation works Sewerage works, Drainage Works, Water supply works and all service related

operations. Mission & Vision Mission To continue the growth cycle by identifying every opportunity and implementing it with professional business ethics, integrity and reliability. Vision To be the pioneer and leader of commerce and industry in the Kingdom of Bahrain and lead the nation by example with a futuristic vision, innovative thinking and dynamic implementation that delivers excellence at every step forward. Keys to Success A leading commercial organization in the Kingdom, the Dadabhai Group is present in key sectors in Bahrain's economy, providing quality products and impeccable service. Having achieved many accolades and recognitions towards maintaining business excellence, the group continues its growth in newer areas and opportune sectors. Joining hands in partnership with many organizations, entities and individuals across the globe, the group always maintains its proficient standards of operation benefitting all entities involved. A responsible and committed corporate citizen, the Dadabhai Group continues its commitment to the Kingdom of Bahrain with social programs and projects as well as providing the local talent pool with rewarding career opportunities. The company aims to capture both public and private sector. The endeavor is to function as the catalyst for the country development by undertaking turnkey solutions to country’s infrastructure planning for 2030.

Page 25: Dadabhai Construction Prequalification 21 March 2021 Final..

ELECTRICAL & PLUMBING DIVISION

Our Electrical and Plumbing division is getting established. Electrical division services include Electrical design, installation, maintenance, testing and commissioning, etc. complying with all the required EWA and industry standards and demands of our valuable customers in the most efficient and cost effective manner. Plumbing division services include design, installation, testing and commissioning, etc. of all type of plumbing works for residential and commercial/industrial jobs as per EWA regulations and meeting the requirement of valuable customers.

Page 26: Dadabhai Construction Prequalification 21 March 2021 Final..

KEY PERSONNEL & EXPERIENCE

We have good dedicated team of experienced personnel who earned 6 to 35 years professional experience in gulf involved with our various prestigious projects in Bahrain. Our Construction division is having highly skilled workforce motivated for fulfilling requirement of projects in terms of quality, timely completion, cost parameters and safety aspects. We have Project Division, Contracts Department, Purchase Department, MEP Division, Interior Design, exclusive Architectural Studio functioning with Senior Architects & Draughtsmen with very creative and innovative knowledge in design and architectural concepts. Organization chart is attached for reference.

Page 27: Dadabhai Construction Prequalification 21 March 2021 Final..

O

RG

AN

OG

RA

M –

DA

DA

BH

AI C

ON

STR

UC

TIO

N

Page 28: Dadabhai Construction Prequalification 21 March 2021 Final..

MANPOWER / VEHICLES / PLANTS & EQUIPMENTS

MANPOWER Our highly skilled Manpower includes

Camp In Charges, Crane Operators, Drivers, Watchmen, Electricians, Shuttering Carpenters, Finishing Carpenters, Steel Fitters, Foremen,

Scaffolders, Labour, Machine Operators, Masons, Mechanic, Painters, POP Workers, Rigger/Hoist Operators, Spray Painters, Safety Officers,

Store Keepers, Welders, Etc.

LIST OF PLANTS, EQUIPMENTS, MACHINERIES OWNED BY DADABHAI CONSTRUCTION

SL. # MACHINERY NAME COMPANY TOTAL 1 AIR COMPRESSOR COMPARE 3 2 AIR COMPRESSOR ATLAS COPCO 3 3 ANGLE GRINDER 4.5" MAKITA 16 4 ANGLE GRINDER 4.5" MILWAKEE 2 5 ANGLE GRINDER 4.5" DEWALT 21 6 ANGLE GRINDER 4.5" HILTI 31 7 ANGLE GRINDER 4.5" BOSCH 3 8 ANGLE GRINDER 5" MAKITA 9 9 ANGLE GRINDER 9" MAKITA 12

10 ANGLE GRINDER 9" MILWAKEE 2 11 ANGLE GRINDER 9" DEWALT 15 12 ANGLE GRINDER 9" BOSCH 2 13 ANGLE GRINDER 9" HILTI 11 14 ASPHALT CUTTER ATLAS COPCO 1 15 ASPIRATOR BLOWER MAKITA 5 16 ASPIRATOR BLOWER BOSCH 4 17 ASPIRATOR BLOWER INGCO 1 18 ASPIRATOR BLOWER BALCK & DÉCOR 1 19 BACKHOE LAODER 1CX JCB 2 20 BACKHOE LOADER 3CX JCB 2 21 BANDSAW MACHINE SCHAPPACH 1 22 BANDSAW MACHINE CENTURO 1 23 BAR BENDING MACHINE MARCITAL 1 24 BAR BENDING MACHINE SIMPEDIL 1 25 BAR BENDING MACHINE SILLA 2 26 BLOCK CUTTING MACHINE BALI MEKANO 5 27 BLOCK CUTTING MACHINE MANTA 1 28 BLOCK CUTTING MACHINE IMER 12

Page 29: Dadabhai Construction Prequalification 21 March 2021 Final..

29 BUFFING GRINDER MILWAKEE 3 30 BUFFING GRINDER HILTI 4 31 C-5 TRACK TOOL DEWALT 5 32 CHOPSAW MAKITA 1 33 CHOPSAW MILWAKEE 2 34 CHOPSAW DEWALT 2 35 CIRCULAR SAW DEWALT 12 36 CIRCULAR SAW MAKITA 13 37 COMBI HAMMER MAKITA 6 38 COMBI HAMMER DEWALT 6 39 COMBI HAMMER HILTI 16 40 CONCRETE MIXER MACHINE 250 LTR IMER 8 41 CONCRETE MIXER MACHINE 250 LTR SILLA 7 42 CONCRETE MIXER MACHINE 250 LTR LINO SELLA 4 43 CONCRETE MIXER MACHINE 250 LTR ATIKA 1 44 CONCRETE MIXER MACHINE 350 LTR LINO SELLA 10 45 CONCRETE MIXER MACHINE 400 LTR ESQUIRE 8 46 CONCRETE MIXER MACHINE 750 LTR SILLA 1 47 CONCRETE PLANER BOSCH 2 48 CORDLESS DRYWALL SCREWDRIVER STANLY 2 49 CORDLESS DRYWALL SCREWDRIVER MILWAKEE 3 50 CORDLESS DRYWALL SCREWDRIVER HILTI 6 51 CORDLESS DRYWALL SCREWDRIVER MAKITA 28 52 CORDLESS DRYWALL SCREWDRIVER DEWALT 13 53 CORE CUTTING MACHINE HILTI 4 54 CORE CUTTING MACHINE TYROLIT 2 55 CRADILE 2 56 CUTTER & PLAINER MACHINE VELMEC 2 57 DEMOLITION HAMMER 10.5 KG MAKITA 7 58 DEMOLITION HAMMER 10.5 KG HILTI 7 59 DEMOLITION HAMMER 10.5 KG DEWALT 2 60 DEMOLITION HAMMER 12 KG DEWALT 8 61 DEMOLITION HAMMER 12 KG HILTI 4 62 DEMOLITION HAMMER 4.5 KG HILTI 2 63 DEMOLITION HAMMER 4.5 KG DEWALT 5 64 DEMOLITION HAMMER 5.6 KG HILTI 6 65 DEMOLITION HAMMER 7 KG HILTI 2 66 DEWATERING PUMP 4" -ELECTRICAL LUBI 1 67 DIAMOND GRINDER HILTI 9 68 DRILL PRESS 2 69 DRYWALL SCREWDRIVER DEWALT 9 70 DRYWALL SCREWDRIVER MAKITA 7 71 DRYWALL SCREWDRIVER BOSCH 1

Page 30: Dadabhai Construction Prequalification 21 March 2021 Final..

72 DUMPER SILLA 1 73 DUMPY LEVEL LEICA 1 74 DUMPY LEVEL NEDO 2 75 DUMPY LEVEL SOKKIA 1 76 FINISHING SANDER MAKITA 12 77 FINISHING SANDER DEWALT 1 78 FLOOR POLISHING MACHINE LAVOR 2 79 GENERATOR 10 KVA PARAMAC 1 80 GENERATOR 100 KVA CUMMINS 1 81 GENERATOR 125 KVA CATERPILLER 1 82 GENERATOR 18 KVA FG WILSON 1 83 GENERATOR 200 KVA CUMMINS 2 84 GENERATOR 300 KVA STERLINGS 1 85 GENERATOR 40 KVA CATERPILLER 1 86 GENERATOR 50 KVA CUMMINS 2 87 GENERATOR 6.5 KVA HONDA 3 88 GENERATOR 60 KVA CATERPILLER 1 89 GREASE GUN 2 90 HAND WOOD CUTTER -MANUAL 1 91 JET PRESSURE CLEANER PUMP LAVOR 2 92 JIGSAW MAKITA 5 93 JIGSAW DEWALT 13 94 JIGSAW MILWAKEE 2 95 LASER RECEIVER HILTI 1 96 MAN & MATERIAL HOIST -DOUBLE CABIN ALIMAK 1 97 MAN & MATERIAL HOIST -DOUBLE CABIN TIGER 1 98 MAN & MATERIAL HOIST -DOUBLE CABIN GJJ 2 99 MATERIAL HOIST -SINGLE CABIN 20 MTR ESQUIRE 2 100 PAINT COMPRESSOR GIS 4 101 PAINT COMPRESSOR NUAIR 2 102 PAINT COMPRESSOR STANLY 2 103 PALLET TRUCK 2.5 TON NUILI 1 104 PALLET TRUCK 2.5 TON LINO SELLA 4 105 PALLET TRUCK 2.5 TON TOYOTA 5 106 PALLET TRUCK 3 TON LINO SELLA 4 107 PALLET TRUCK 3 TON NIULI 20 108 PALLET TRUCK 3 TON 14 109 PANEL SAW MACHINE MINIMAX 1 110 PLATE COMPACTOR WACKER NEUSON 5 111 PLATE COMPACTOR DYNAPAC 2 112 PNEUMATIC JACK HAMMER ATLAS COPCO 4 113 POWER ACTUATED TOOL HILTI 9 114 POWER TROWEL ATLAS COPCO 4

Page 31: Dadabhai Construction Prequalification 21 March 2021 Final..

115 POWER TROWEL WACKER NEUSON 5 116 PRESS MACHINE TIGER 1 117 ROLLER COMPACTOR ATLAS COPCO 2 118 ROTARY HAMMER MAKITA 21 119 ROTARY HAMMER DEWALT 19 120 ROTARY HAMMER HILTI 20 121 ROTARY HAMMER MILWAKEE 2 122 ROTATING LASER HILTI 1 123 ROUTER MACHINE MAKITA 6 124 SINGLE BOOSTER PUMP WILO 2 125 SIX WHEEL PICKUP MITSUBISHI 5 126 SIX WHEEL PICKUP HYUNDAI 1 127 SIX WHEEL PICKUP ISUZU 3 128 SKID STEER LOADER JCB 2 129 SKID STEER LOADER BOBCAT 1 130 SKID STEER LOADER SWEEPER JCB 1 131 SLIDING COMPOUND MITER SAW DEWALT 2 132 SLIDING COMPOUND MITER SAW MAKITA 4 133 SLITTING MACHINE WITH VACCUM HILTI 2 134 TABLE WOOD CUTTER MACHINE MAKITA 5 135 TABLE WOOD CUTTER MACHINE 1 136 TABLE WOOD CUTTER MACHINE DEWALT 1 137 TAMPING RAMMER ATLAS COPCO 3 138 TELEHANDLER JCB 1 139 THICKNESER & PLAINER MACHINE TECHNOMAX 1 140 THICKNESER MACHINE CASADEI 1 141 TILE CUTTING MACHINE -ELECTRIC IMER 1 142 TILE CUTTING MACHINE -ELECTRIC NORTAIN 1 143 TILE CUTTING MACHINE -ELECTRIC CLIPPER 1 144 TILE CUTTING MACHINE -MANUAL MONTOLIT 4 145 TOTAL STATION LEICA 2 146 TOTAL STATION SOKKIA 1 147 TOTAL STATION GEODEMETER 1 148 TOWER CRANE POTAIN 3 149 TOWER LIGHT 7 150 TOWER LIGHT WITH GENERATOR KIPOR 2 151 TRIPOD LAICA 2 152 TRIPOD 1 153 TRUCK 15 TON RENAULT 1 154 TRUCK MOUNTED CRANE 10 TON UD TRUCKS 1 155 UNI VACCUM CLEANER HILTI 3 156 VACUUM CLEANER WINDY 2 157 VACUUM CLEANER MAKITA 2

Page 32: Dadabhai Construction Prequalification 21 March 2021 Final..

158 VIBRATOR -DIESEL WACKER NEUSON 1 159 VIBRATOR -ELECTRIC WACKER NEUSON 10 160 VIBRATOR -ELECTRIC MIKASA 1 161 VIBRATOR -ELECTRIC 2 162 VIBRATOR -ELECTRIC DYNAPAC 3 163 VIBRATOR -PETROL WACKER NEUSON 1 164 WATER PUMP .75 HP LINZ 1 165 WATER PUMP 1 HP PADROLLO 5 166 WATER PUMP 1 HP DAVEY 3 167 WATER PUMP 1 HP GRUNDFOS 4 168 WATER PUMP 1 HP MILANO 1 169 WATER PUMP 2 HP PADROLLO 6 170 WATER PUMP 2 HP 1 171 WATER PUMP 2 HP WILO 1 172 WATER PUMP 3 HP WILO 3 173 WELDING MACHINE STAR 2 174 WELDING MACHINE DECA 1 175 WELDING MACHINE AWELCO 3 176 WELDING MACHINE MILLER 2 177 WOOD CUTTING MACHINE CASADEI 1

LIST OF VEHICLES OWNED BY DADABHAI CONSTRUCTION

SL. # VEHICLE TYPE NUMBER OF VEHICLES

1 HEAVY TRUCK 1 2 PICK-UPS 10 3 BUS (61 SEATER) 1 4 BUS (33 SEATER) 1 5 MINI BUS (16 SEATER) 2 6 MINI BUS (14 SEATER) 1 7 CARS/JEEPS 56

SCAFFOLDING MATERIALS OWNED BY DADABHAI CONSTRUCTION

SL. # ITEM NUMBER OF UNITS

1 SCAFFOLDING … VARIOUS MAKES 292479 (APPROX.. 20000M2)

Page 33: Dadabhai Construction Prequalification 21 March 2021 Final..

LIST OF PLANTS, EQUIPMENTS, MACHINERIES & VEHICLES HIRED BY DADABHAI CONSTRUCTION

ITEM QUANTITY GRADERS 3 WATER TANKERS 3 ROCK BREAKER 3 BULDOZER 3 DUMPING TRUCK 5 LOADER 2 MINI BUS (14 seater) 2

LIST OF OTHER HIRING EQUIPMENTS BACKHOE LOADER 3CX

DEWATERING PUMP UPTO 6" DUMP PICKUP

DUMP TRUCK -10 TON EXCAVATOR & MINI EXCAVATOR

EXCAVATOR WITH BREAKER FORKLIFT

FRONT LOADER GENERATOR UPTO 350 KVA

MAN LIFT UPTO 41 MTR MOBILE CRANE UPTO 200 TON

PASSENGER HOIST ROLLER UPTO 25 TON WITH VIBRATOR

SCISSOR LIFT UPTO 30 MTR SKID STEER LOADER TAMPING HAMMER

TELEHANDLER TOWER CRANE

TRAILOR - LOWBED & FLATBED TRAILOR WITH HIAB

TRUCK MOUNTED CRANE UPTO 10 TON VACCUM CLEANER

Page 34: Dadabhai Construction Prequalification 21 March 2021 Final..

QUALITY ASSURANCE SYSTEM The Dadabhai Group of companies stands for Quality and Service. Each wing of the Group such as Trading & Contracting, Construction, Real Estate, Elite Luxury Service Apartments, Dadabhai Travel, Hotel Division etc. is a pioneer in their respective field, as they emphasis in quality and service. Our executives are regularly geared up with training by reputed international agencies and attending updated seminars organized by reputed local and international organizations.

It is the policy of Dadabhai Construction to provide a comprehensive system of Quality Assurance and Quality Control on all projects, irrespective of size or value. We, at Dadabhai Construction, are committed to meet expectations of our clients/customers through systematically designed and managed quality assurance system with continuous upgradation of technology and value systems. This is achieved through: Planning system for effective implementation. Method statement for each activity. Continuous monitoring and corrections. Strong organizational support through Human Resource Development. Adopting latest technology and equipment in construction industry. Uncompromising approach to dedication and commitment towards quality

consciousness.

Page 35: Dadabhai Construction Prequalification 21 March 2021 Final..

HEALTH, SAFETY & ENVIRONMENT POLICY We, Dadabhai Construction, firmly believe that safety is essential and integral part of every activity and operation. Dadabhai Construction Safety Manual is to conserve environmental resources and standards in respect of the operations being carried out by all concerned. Dadabhai Construction aims at zero accident policy and accord highest priority to safety. It is the policy of Dadabhai Construction to abide by the environmental concerns and to provide a safe and healthy work environment for all employees complying with all the requirements and recommendations of statutory and regulatory bodies. Site Engineers and other staff members are trained to carry out effective inspection through check-lists of not only of plant & machinery but also the construction activities and personal behavior of the manpower so as to conform to the norms of safety. Accident investigation is carried out and appropriate corrective measures are initiated to prevent accidents. Safety Officer is primarily responsible for implementing, monitoring and controlling safety systems and standards at project site. Safety at project site is assured by: Preparing Risk Analysis for every activity. Planning safety systems and procedure for effective implementation. Method statement for every activity. Strong organizational support. Continuous monitoring and improvement in systems. Uncompromising approach for safety awareness. Adopting latest techniques and equipment in construction industry. Creating awareness of safety norms among work force.

The commitment to Health, Safety & Environment is well reflected in the HSE policy.

Page 36: Dadabhai Construction Prequalification 21 March 2021 Final..

CERTIFICATES / AWARDS

Page 37: Dadabhai Construction Prequalification 21 March 2021 Final..
Page 38: Dadabhai Construction Prequalification 21 March 2021 Final..
Page 39: Dadabhai Construction Prequalification 21 March 2021 Final..

Abraj Al Lulu has won the

CNBC Arabian Residential

Property Awards for the Best High-Rise Development in Bahrain with 5

star categorization.

Platinum Tower has won the

CNBC Arabian Commercial

Property Awards for the

Best Office Development in Bahrain with 4

star categorization.

Galleria has won the Arabian Property

Awards in the Retail

Development category.

Juffair Heights has won the

Arabian Property

Awards in the Residential High-rise

Development category.

Page 40: Dadabhai Construction Prequalification 21 March 2021 Final..

PHOTOS

NAWAB EXTENSION PARLIAMENT BUILDING, BAHRAIN

NAWAB EXTENSION PARLIAMENT BUILDING, BAHRAIN

Page 41: Dadabhai Construction Prequalification 21 March 2021 Final..

BIBF, BAHRAIN

HILTON STAFF ACCOMMODATION, MUHARRAQ, BAHRAIN

Page 42: Dadabhai Construction Prequalification 21 March 2021 Final..

ADDRESS HOTEL & SERVICED APARTMENTS

MARASSI LANDSCAPE, MARASSI AL BAHRAIN

Page 43: Dadabhai Construction Prequalification 21 March 2021 Final..

JUFFAIR HEIGHTS, BAHRAIN

JUFFAIR HEIGHTS, BAHRAIN

Page 44: Dadabhai Construction Prequalification 21 March 2021 Final..

KINGDOM MALL, JANABIYA

MARASSI SHORES, MARASSI AL BAHRAIN

Page 45: Dadabhai Construction Prequalification 21 March 2021 Final..

BEACON PRIVATE SCHOOL, HIDD

HALA MALL, MUHARRAQ

Page 46: Dadabhai Construction Prequalification 21 March 2021 Final..

SEEF TERRACES, SEEF

GALLERIA SHOPPING COMPLEX AT ZINJ, BAHRAIN

Page 47: Dadabhai Construction Prequalification 21 March 2021 Final..

GALLERIA SHOPPING COMPLEX AT ZINJ, BAHRAIN

GALLERIA SHOPPING COMPLEX AT ZINJ, BAHRAIN

Page 48: Dadabhai Construction Prequalification 21 March 2021 Final..

MUHARRAQ MODEL YOUTH CENTRE

MUHARRAQ MODEL YOUTH CENTRE

Page 49: Dadabhai Construction Prequalification 21 March 2021 Final..

ABRAJ AL LULU, BAHRAIN ABRAJ AL LULU, BAHRAIN

ABRAJ AL LULU, BAHRAIN

Page 50: Dadabhai Construction Prequalification 21 March 2021 Final..

ELITE GRANDE, BAHRAIN

SEEF RESIDENCE, BAHRAIN

Page 51: Dadabhai Construction Prequalification 21 March 2021 Final..

ELITE CRYSTAL HOTEL, BAHRAIN

PLATINUM TOWER, BAHRAIN PLATINUM TOWER, BAHRAIN

Page 52: Dadabhai Construction Prequalification 21 March 2021 Final..

COMMERCIAL TOWER, DUBAI COMMERCIAL TOWER, DUBAI

HOTEL PROJECT, DUBAI AL MAJAZ, SHARJAH

Page 53: Dadabhai Construction Prequalification 21 March 2021 Final..

PALM HOTEL AT PALM DEIRA, DUBAI

GHG CROWNE PLAZA PHASE-2 REFURBISHMENT WORKS

Page 54: Dadabhai Construction Prequalification 21 March 2021 Final..

ELITE PAVILION, JUFFAIR BAISAN TOWER HOTEL, HOORA

FRENCH SCHOOL, BUSAITEEN ASIAN SCHOOL, JUFFAIR

Page 55: Dadabhai Construction Prequalification 21 March 2021 Final..

ELITE TOWER, SEEF ELITE-3 APARTMENTS, JUFFAIR

ELITE RESORT & SPA, MUHARRAQ ELITE RESORT & SPA, MUHARRAQ

Page 56: Dadabhai Construction Prequalification 21 March 2021 Final..

ELITE-4 APARTMENTS, MAHOOZ SILVER RESIDENCE, JUFFAIR

ELITE SUITES HOTEL, SANABIS HAJI RESIDENCE, MAHOOZ

Page 57: Dadabhai Construction Prequalification 21 March 2021 Final..

ELITE HOTEL, JUFFAIR FACTORY/WAREHOUSE, HIDD

ELITE-2 APARTMENTS, MAHOOZ FERRARI BUILDING, ADILYA

BAISAN HOTEL, HOORA ELITE-5 APARTMENTS, JUFFAIR

Page 58: Dadabhai Construction Prequalification 21 March 2021 Final..

PHOENICIA HOTEL, HOORA MOSQUE AT AL AHLI CLUB

ELITE-1 APARTMENTS, HOORA SALMANIYA TOWER, SALMANIYA

Page 59: Dadabhai Construction Prequalification 21 March 2021 Final..

AL AHLI SHOPPING COMPLEX GULAM AKHTAR ZADEH BUILDING

VILLAS AT UMM AL HASSAM VILLAS AT ARAD

SH. SALMAN BUILDING, ADILYA HASSAN AL KHAJA BLDG., HOORA

Page 60: Dadabhai Construction Prequalification 21 March 2021 Final..

CONTACT ADDRESS

Bahrain Dadabhai Construction

P.O. Box 20531 Building No. 192, Road 907, Block 309,

Behind Andalus Garden, Manama, Kingdom of Bahrain Phone: +973-17255209, Fax: +973-17251995

E-mail: [email protected]

U.A.E.

Dadabhai Trading Co. LLC P.O. Box 184566

Pyramid Center, Office No. 313-B, Umm Hurair Road, Near Al Nasser Club, Dubai, United Arab Emirates

Phone: +971-4-2683376, Fax: +971-4-2683375 E-mail: [email protected]

Website: www.dadabhaiconstruction.com, www.dadabhaigroup.com