D7.4 – Standardization Activities Report – Version 1
Transcript of D7.4 – Standardization Activities Report – Version 1
The work described in this document has been conducted within the project RAINBOW. This project has received funding from the European Union’s Horizon 2020 (H2020) research and innovation programme under the Grant Agreement no 871403. This document does not represent the opinion of the European Union, and the European Union is not responsible for any use that might be made of such content.
ProjectTitle AN OPEN, TRUSTED FOG COMPUTING PLATFORMFACILITATING THE DEPLOYMENT, ORCHESTRATION ANDMANAGEMENTOFSCALABLE,HETEROGENEOUSANDSECUREIOTSERVICESANDCROSS-CLOUDAPPS
ProjectAcronym RAINBOW
Grant AgreementNo 871403
Instrument ResearchandInnovationaction
Call/Topic H2020-ICT-2019-2020/CloudComputing
StartDateofProject 01/01/2020
DurationofProject 36months
D7.4 – Standardization Activities Report – Version 1 WorkPackage WP7–Dissemination,ExploitationandCommunication
LeadAuthor(Org) ThomasPusztai(TUW)
ContributingAuthor(s)(Org)
FrankScherber(IFAT),VasileiosPsomiadis(AUTH),DemetrisTrihinas(UCY),SchahramDustdar(TUW)
DueDate 30.06.2021ActualDateofSubmission 05.07.2021
Version 1.0DisseminationLevelX PU:Public(*on-lineplatform) PP:Restrictedtootherprogrammeparticipants(includingtheCommission) RE:Restrictedtoagroupspecifiedbytheconsortium(includingtheCommission) CO:Confidential,onlyformembersoftheconsortium(includingtheCommission)
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 1 of 19
Copyright © Rainbow Consortium Partners 2021
Versioningandcontributionhistory
Version Date Author Notes
0.1 04.05.2021 ThomasPusztai(TUW) TableofContents
0.2 10.06.2021 ThomasPusztai(TUW) AddSections2and3
0.3 11.06.2021 VasileiosPsomiadis(AUTH),ThomasPusztai(TUW)
ReviewandRevision
0.4 18.06.2021 ThomasPusztai(TUW),DemetrisTrihinas(UCY)
AddOpenHorizonpresentationtoAnnex
0.5 18.06.2021 FrankScherber(IFAT) AddSection4
0.6 18.06.2021 ThomasPusztai(TUW) AddSections1and5
0.7 29.06.2021 ChristinaStratigaki(UBI),ClaudioCasetti(POLITO),ThanassisGiannetsos(DTU),ThomasPusztai(TUW)
Reviewandrevision
1.0 05.07.2021 FrankScherber(IFAT),ThomasPusztai(TUW)
Finalchanges
Disclaimer
Thisdocumentcontainsmaterialand informationthat isproprietaryandconfidential to theRAINBOWConsortiumandmaynotbecopied,reproducedormodifiedinwholeorinpartforanypurposewithoutthepriorwrittenconsentoftheRAINBOWConsortium
Despitethematerialandinformationcontainedinthisdocumentisconsideredtobepreciseandaccurate,neithertheProjectCoordinator,noranypartneroftheRAINBOWConsortiumnoranyindividualactingonbehalf of any of the partners of the RAINBOW Consortium make any warranty or representationwhatsoever,expressorimplied,withrespecttotheuseofthematerial, information,methodorprocessdisclosedinthisdocument,includingmerchantabilityandfitnessforaparticularpurposeorthatsuchusedoesnotinfringeorinterferewithprivatelyownedrights.
In addition, neither the Project Coordinator, nor any partner of the RAINBOW Consortium nor anyindividualactingonbehalfofanyofthepartnersoftheRAINBOWConsortiumshallbeliableforanydirect,indirect or consequential loss, damage, claim or expense arising out of or in connection with anyinformation,material,advice,inaccuracyoromissioncontainedinthisdocument.
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 2 of 19
Copyright © Rainbow Consortium Partners 2021
Table of Contents
Executive Summary ........................................................................................................... 3
1 Introduction ............................................................................................................... 4
2 Standardization Strategy ........................................................................................... 5
2.1 Goal ............................................................................................................................... 5
2.2 Target Standardization Groups ....................................................................................... 5
3 Open Horizon ............................................................................................................. 6
3.1 Project Overview ............................................................................................................ 6
3.2 RAINBOW Contribution Plan .......................................................................................... 6
3.3 Activity until M18 ........................................................................................................... 7
4 Trusted Computing Group .......................................................................................... 8
4.1 Group Overview ............................................................................................................. 8
4.2 RAINBOW Contribution Plan .......................................................................................... 8
4.3 Activity until M18 ......................................................................................................... 10
5 Conclusion and Future Steps .................................................................................... 11
6 References ............................................................................................................... 12
Annex I – RAINBOW Presentation for Open Horizon ........................................................ 13
List of Abbreviations
Abbreviation DefinitionTCG TrustedComputingGroupLFEdge LinuxFoundationEdgeTSC TechnicalSteeringCommitteeTPM TrustedPlatformModuleTNC TrustedNetworkCommunicationsTC TrustedComputingCPC CertificationProgramCommitteeDAA DirectAnonymousAttestationTSS TPMSoftwareStack
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 3 of 19
Copyright © Rainbow Consortium Partners 2021
Executive Summary
ThisdocumentcontainsacomprehensivereportofRAINBOW’sstandardizationactivitiesconducted in the first 18 months of the project. It first describes the goals of thestandardizationactivities,aswellastheworkinggroupstargeted.Then,foreachworkinggroup, an overview of its purpose and goals is provided, followed by RAINBOW’scontributionplan,andtheactivitiesundertakenuntilmonth18.This is a livedocument thatwill beupdatedwith theprogressof the standardizationactivitiesuntiltheendoftheproject,whenits2ndandfinalversionwillbereleased.
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 4 of 19
Copyright © Rainbow Consortium Partners 2021
1 Introduction
Thepresentdeliverable isprepared inthecontextofWorkPackage7“Dissemination,ExploitationandCommunication”anditisassociatedwiththeworkbeingdonewithintaskT7.2“StandardizationActivities”.This deliverable complements D7.2 “Open-Source Contributions, Dissemination,ClusteringandWorkshopActivitiesReport-Version1”(specificallySection3.6)ledbyAUTH,byprovidingacomprehensiveoverviewofthestandardizationactivitiesthatareplannedaspartofRAINBOWandwhichhavebeenundertakenuntilM18.Astheprojectandthestandardizationactivitiesprogress,thisplanmaybeupdatedtoreflectchangedcircumstancesofRAINBOWorthetargetedstandardizationgroups.This report is structuredas follows:Section2outlines thegoalof thestandardizationactivitiesandliststhetargetstandardizationgroups.Sections3and4discussthetargetgroups,ourplansforcontributions,andtheactivitiesthathavebeenundertakensofar.Section5concludesthisreport.
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 5 of 19
Copyright © Rainbow Consortium Partners 2021
2 Standardization Strategy
2.1 Goal
The goal of the RAINBOW standardization activities is to influence fog computingarchitectures of future applications and allow them to benefit from the outcomes ofRAINBOW. There are multiple ways to achieve this goal. One option is to influencerelevant standards, such as OASIS TOSCA or Trusted Computing Group TPM, whileanotheroptionistocontributetosoftwareplatformsthatwilllikelybeusedasabaseforcreatingalargenumberoffogapplicationsinthefuture,makingthemsimilartoade-factoindustrystandard.ForRAINBOW,wearepursuingbothoptions.
2.2 Target Standardization Groups
TheRAINBOWDoAstatesthegoalofcontributingtothreestandardizationgroups.ThesewereoriginallydefinedasOASISTOSCA,TCG,andathirdonetobechosenafterstartingtheproject.WehavechosentotargetthefollowinggroupsaspartoftheRAINBOWstandardizationactivities:
• OpenHorizon1softwareplatformformanagingcontainerizedworkloadsonthenetworkedge(seeSection3).OriginallystartedbyIBM,OpenHorizonisnowpartoftheLinuxFoundationEdgeandhasthepotentialforwidespreadadoptioninedge/fogapplications.
• TrustedComputingGroup (TCG)2,which is the consortium responsible for theTPMstandard(seeSection4).
Originally, OASIS TOSCA3 was supposed to be targeted. It is an open standard formodellingthetopologyofcloudapplications,includingtherelationshipsbetweentheircomponentsandthemanagementprocesses involved.TheoriginalplanforRAINBOWwastoextendTOSCAforthefog,thusmakinganofficialcontributiontothisstandardalogicalstep.However,wedecidedtotakeaKubernetes-nativeapproachforthedesignand development of RAINBOW. Kubernetes is one of the most popular containerorchestration systems in production use,whichmeans that support for this platformleads to higher chances of adoption of RAINBOW by the open source and industrialcommunity.Since,RAINBOWdoesnotmakeuseofTOSCA,itnolongermakessensetocontributetothisstandard,leadingtotheexclusionofTOSCAfromourlistoftargetstandardizationgroups.Instead,wehavedecidedtofocusmoreontheOpenHorizonplatform,becauseofitspotentialtomakealargeimpactinthenearfuture.
1https://www.lfedge.org/projects/openhorizon/2https://trustedcomputinggroup.org3https://www.oasis-open.org/committees/tc_home.php?wg_abbrev=tosca
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 6 of 19
Copyright © Rainbow Consortium Partners 2021
3 Open Horizon
3.1 Project Overview
Open Horizon4 is an open-source platform for managing containerized applicationdeployments and machine learning on edge nodes. The main goal is managing thelifecycle of applications without administrator intervention by finding the mostappropriate devices for their execution and managing updates of these applications.Furthermore,OpenHorizonenablesanapplicationononedevicetousecapabilitiesofotherdevices.TheprojectwasinitiatedbyIBMandcontributedtoLinuxFoundationEdge(LFEdge)inApril2020.WithinLFEdge,italreadyhasmanysynergieswithotherprojects.LFEdgeclassifiesOpenHorizonasaStage2“Growth”project,whichmakesitaprojectthat islikely to have an impact, while offering favourable possibilities for RAINBOW tocontribute[1][2].
3.2 RAINBOW Contribution Plan
WeintendtocontributeRAINBOWcomponents,aftersuitablemodification,totheOpenHorizonplatform.ThegoalisthatthesecomponentsshouldoutlivetheRAINBOWprojectandbeusedinproductionapplications.SinceOpenHorizon ispartof LFEdgeand supportedby IBM, it has thepotential forbecomingveryinfluentialintheedge/fogcommunity.Thus,acontributiontothisproject,wouldinfluencealargenumberofapplications,whichcouldbecreatedbasedonOpenHorizon,leadingtoadirectimpactofRAINBOWinproduction-levelapplications.We have initially identified the following RAINBOW components as candidates forcontributionstoOpenHorizon:
1. TheRAINBOWSidecarProxy forbootstrappingOpenHorizonservicesonedgenodes.
2. RAINBOW Monitoring services for establishing a monitoring infrastructure inOpenHorizon.
3. TheFogifysimulatorforfacilitatingtestingofsomeOpenHorizonscenarios.AsRAINBOWprogressesandthecollaborationwithOpenHorizoncontinues,additionalcomponentsmaybecomeeligibleforcontribution.
4https://www.lfedge.org/projects/openhorizon/
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 7 of 19
Copyright © Rainbow Consortium Partners 2021
3.3 Activity until M18
TUWhasestablishedcontacttoOpenHorizon’sTechnicalSteeringCommittee(TSC)inFebruary2021.On29March2021TUWandUCYpresented5theRAINBOWplatformandthecontributioncandidate components to theOpenHorizonTSC [3]. Thepresentation anddiscussionhave sparked interest in the RAINBOW platform and the suggested contributions.Specifically,theyexpressedthefollowinginterests:
• TheRAINBOWSidecarProxy forbootstrappingOpenHorizonservicesonedgenodes.
• The RAINBOW Monitoring service for gathering and analysing metrics aboutrunningapplicationsonanOpenHorizoncluster.ThisisanaspectthatiscurrentlymissingfromtheOpenHorizonplatform.
• TheFogifyfogsimulatorwasidentifiedasapossibleadditionalcontribution,iftheothercontributionsaresuccessful.
OpenHorizoniscurrentlywaitingforthefirstRAINBOWrelease,whichtheywouldliketotryoutontheirsystems.Afterthistest,theconcretecontributionsfromRAINBOWandfutureactionpointswillbedefined.OpenHorizonhasavarietyoftestsystems,whichareemployedasnecessaryforaparticulartestinggoal.Thesesystemsrangefromthousandsofvirtualmachinestophysicaledgedevices.ThetargetsettingforatestoftheRAINBOWplatformwasnotspecified.TheOpenHorizonTSChasremarkedthataconditionforcontributionstotheirproject,is theavailabilityof support for thedonatedcomponentsnotonly for thedurationofRAINBOW,butalsoaftertheRAINBOWprojectends.WearecurrentlyworkingonfindingasolutiontocaterbothtothisconditionandtheoverallcommitmentpossibilitiesoftheRAINBOWpartnerstowardstheplatform’sdevelopment.InaRAINBOWonlinemeetingofallworkpackageleaders,thefollowingtwoinitialsolutionswereproposed:
1. The Sidecar Proxy could be presented as an optional component in an OpenHorizondeployment.WhencreatinganOpenHorizoncluster,peoplewouldbeable to choosewhether touse theRAINBOWSidecarProxyornot. Ifused, theSidecarProxywouldprovideforeasierbootstrappingofedgenodes.
2. We could try to quickly engage the open source community in the donatedRAINBOWcomponents,whichwouldallowotherdeveloperstoprovidesupportforthesecomponentsaftertheendofRAINBOW.
ThenextstepforRAINBOWistoevaluatetheseoptionsandproposeaplantoOpenHorizon,aftertheyhaveevaluatedthefirstreleaseoftheRAINBOWplatform.
5ThepresentationcanbefoundinAnnexI.
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 8 of 19
Copyright © Rainbow Consortium Partners 2021
4 Trusted Computing Group
4.1 Group Overview
TheTrustedComputingGroup(TCG)6isanot-for-profitorganizationformedtodevelop,defineandpromoteopen,vendor-neutral,globalindustryspecificationsandstandards,supportive of a hardware-based root of trust, for interoperable trusted computingplatforms.TCG’scoretechnologiesincludespecificationsandstandardsfortheTrustedPlatformModule(TPM),TrustedNetworkCommunications(TNC)networksecurityandself-encryptingdrives.TCGalsohasworkinggroupstoextendcoreconceptsof
• trustintofogandcloudsecurity,• virtualizationandotherplatforms,• computingservicesfromtheenterprisetotheInternetofThings.
4.2 RAINBOW Contribution Plan
TheTCG is the internationallyacceptedstandardizationgroup,whichsetsall relevanttechnologiesandstandardsforTrustedComputing(TC).RAINBOWisworkingonandusingthesebasicTCstandardsforbuildingtrustedsystems.Therefore,boththeRAINBOWprojectandTCGbenefitfromthecontinuousexchangeofstandardizationandbackgroundinformation.Infineon’sSecuritybusinessunitismarketleaderforsemiconductor-basedsecurityandsystemsolutionswithsmartcardsecuritycontrollers.ForTCsolutions,Infineonisnowworldwidemarketleaderandistheonlyvendor,whichdeliversthewholeTCsolutionpackageofuseoutofonehand:TPM(thesecuritykernelchip)withthestandardsecurityfirmware, the TPM Software Stack (TSS) according to the TCG specification andapplications.Duetothiscustomer-orientedbackground,Infineonhasabroadexperiencefordeveloping,testingandintegratinghardwareparts(chips)aswellasthenecessarysoftwareandknow-howtocombinethemtosystemsolutions.TheRAINBOWprojectpartnerInfineonTechnologiesAT(IFAT)isanactivememberoftheTCGandcontributesintensivelytotheTCGstandards,usingexperiencefromitswidesecuritybackground,especiallytotheTPM,theTSSspecificationandtheplatformsystemsolutionstandards.Additionally,theRAINBOWprojectpartnerDTUhasalsoestablishedanacademicliaisonwithTCG.InfineonparticipatesinTCGasfollows:
• TCGPromoterlevelmembership• MemberintheTCGsBoardofDirectors
6http://www.trustedcomputinggroup.org
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 9 of 19
Copyright © Rainbow Consortium Partners 2021
• Co-ChairoftheCertificationProgramCommittee(CPC),whichtargetsespeciallythedevelopmentofthenewTCGComplianceandConformanceprogram,theTSSworkinggroupandtheSecurityEvaluationworkinggroup
• ContributesactivelyinWorkingGroups,e.g.theCyberResilience,TPM,PCClient,andTechnicalCommittee
MaintasksattributedtotheRAINBOWproject:
• Infineon along with DTU and UBITECH plans to contribute with relatedorganizationalandtechnicalsupport,technologyandknow-how:
o IntensivetechnicalandorganizationallinksandcapabilitiestotheTCGinTPM,TSSandespeciallytotheCPC(InfineonispresentandengagedinanumberofrelevantgroupsandactivitiesintheTCG).
o Specific TC support and management implementations, which could beusedasasourceofexperienceandalsoastestobjects.
o Existing and novel concepts and their realization for using TC indatacentres (Cloud, Fog, edge) and also in embedded controllers, likeembedded systems or automotive (Non-PC), market demands andevaluationrequirements.
• DTU along with Infineon and UBITECH plans to contribute to the TCGstandardization and discuss the latest advances in DAA andattestation/revocationthathavebeenperformedbyRAINBOW:
o EvaluationoftheconceptforProvisioningofenhancedremoteattestationvariantsintheAttestationWGfocusingontheverificationofpropertiesforcontainers towards the creation of trust aware service graph chains.ValidationofthecurrentconceptwithTCGmembersandtheimpactonthecurrent specificationwhen it comes to the zero-touchattestationaspectofferedbyRAINBOW.
o Evaluationof theDAAmechanism for integration in theCJDNSnetwork.DAA is a privacy-preserving platform authentication mechanismsupportedbyTCGandtheyareinterestedinpromotingtheuseofDAAinvariousapplicationdomains.ThefactthatRAINBOWintroducestheDAAasanintegralpartofCJDNSisaninterestingaspectfortheTNCworkinggroup.
• Infineon’spreviousexperienceswhicharerelevanttothetasksattributedtothe
RAINBOWproject:o TCtestingexperiencefromalreadydevelopedcommercialmodules,APIs
andmanagementsoftware,togetherwiththedevelopmentresultsfromtheFutureTPM,E2SGorCumulusprojectfortheLinuxworldandalsoalreadyexperience for TPM functionality implementation with embeddedprocessorslikeembeddedsystemsandothercommunicationparts.
o ParticipationinseveraltrustandsecurityrelatedpublicprojectsatEUandnationallevelalsoinleadingpositions:
§ FP2020andHorizonEurope,Eniac,ITEA§ Germany:BMBF,BMWi
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 10 of 19
Copyright © Rainbow Consortium Partners 2021
4.3 Activity until M18
Infineonparticipatedinavarietyofworkinggroupswithleadingpositionsaschairandactivecontributortospecifications.InfineonattendedalsothemembersmeetingaspartoftheTCGsBoardofDirectors.Inparticular,sincebeginoftheRAINBOWprojectseveralregular phone conferences and the following members meetings with about 70-100participantseachwereusedfordisseminationactivities:
• TCGMembersMeetingFebruary2020• TCGMembersMeetingJune2020• TCGMembersMeetingOctober2020• TCGMembersMeetingFebruary2021• TCGMembersMeetingJune2021
As part of the DAA mechanism enhanced in the context of RAINBOW, DTU worked together with the TCG responsible for the TSS implementation towards the definition of a new privacy-preserving revocation model presented in the ACM WiSec 2021 conference [4].
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 11 of 19
Copyright © Rainbow Consortium Partners 2021
5 Conclusion and Future Steps
InthisDeliverable,areportoftheRAINBOWStandardizationActivitieswaspresented.Theproject’sstrategyistoinfluencefogcomputingapplicationsofthefutureandletthembenefitfromtheoutcomesofRAINBOW.Tothisend,wehavechosentwotargetgroups:OpenHorizonisanopen-sourceplatformdevelopedbytheLinuxFoundationEdgewiththeaimofmanagingthelifecycleofproductionedgeapplications,whichmakesitagoodtarget for influencing future fog applications. The Trusted Computing Group isresponsiblefortheTPMandothersecurity-relatedstandardsandis,thus,agoodplaceforinfluencingthesecurityaspectsoffutureapplications.Wereportedonourplansforcontributionstobothtargetgroups.ContacthasalreadybeenestablishedwiththegroupsandRAINBOWwasalreadypresentedtoOpenHorizon,sparkinggreatinterestinsomeofourcomponents.Duringthesecondhalfoftheproject,theStandardizationActivitieswillincreasetofulfiltheplanswehaveestablished.Basedontheresponsesofthetargetgroupstoourfirstrelease,adaptations to theseplansmayberequired,while fulfillingourgoals for taskT7.2.Thisdocumentwillbeupdatedwiththeprogressofthestandardizationactivitiesuntiltheendoftheproject,whenits2ndandfinalversionwillbereleased.
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 12 of 19
Copyright © Rainbow Consortium Partners 2021
6 References
[1]LFEdge,“OpenHorizon,”[Online].Available:https://www.lfedge.org/projects/openhorizon/.[Accessed09062021].
[2]LFEdge,“ProjectStages:DefinitionsandExpectations,”[Online].Available:https://wiki.lfedge.org/display/LE/Project+Stages%3A+Definitions+and+Expectations.[Accessed09062021].
[3]LFEdge,“TSC2021-03-29,”[Online].Available:https://wiki.lfedge.org/display/OH/TSC+2021-03-29.[Accessed10062021].
[4]B.Larsen,T.Giannetsos,I.KrontirisandK.Goldman,“Directanonymousattestationontheroad:efficientandprivacy-preservingrevocationinC-ITS,”inWiSec'21:Proceedingsofthe14thACMConferenceonSecurityandPrivacyinWirelessandMobileNetworks,2021.
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 13 of 19
Copyright © Rainbow Consortium Partners 2021
Annex I – RAINBOW Presentation for Open Horizon
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 14 of 19
Copyright © Rainbow Consortium Partners 2021
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 15 of 19
Copyright © Rainbow Consortium Partners 2021
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 16 of 19
Copyright © Rainbow Consortium Partners 2021
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 17 of 19
Copyright © Rainbow Consortium Partners 2021
ProjectNo871403(RAINBOW)
D7.4–StandardizationActivitiesReport–Version1 Date:05.07.2021 DisseminationLevel:PU
Page 18 of 19
Copyright © Rainbow Consortium Partners 2021