D6.4.1 Risk Management report Version: v4 – Final, Date: 28/02/2014 Project Title: SIFEM Contract No. FP7600933 Project Coordinator: National University of Ireland, Galway www.SIFEM project.eu Page 1 of 41 SIFEM FP7ICT20119600933 Semantic Infostructure interlinking an open source Finite Element tool and libraries with a model repository for the multi-scale Modelling and 3d visualization of the inner-ear Deliverable D6.4.1 Risk Management report Responsible Partner: Institute of Communications and Computer Systems (ICCS) StatusVersion: Final Date: 28/02/2014 EC Distribution: Public

Transcript of D6 4 1 Risk Management report 20140228 v4 - Sifem-project · ENT& Ear,&nose,&and&throat& ......

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  1  of  41      

SIFEM FP7-­‐ICT-­‐2011-­‐9-­‐600933

Semantic Infostructure interlinking an open source Finite Element tool and libraries with a model repository for the multi-scale Modelling and 3d

visualization of the inner-ear

Deliverable D6.4.1 Risk Management report

 

 

 

Responsible  Partner:   Institute  of  Communications  and  Computer  Systems  (ICCS)  

Status-­‐Version:   Final  

Date:   28/02/2014  

EC  Distribution:   Public  

 

 

 

 

 

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  2  of  41      

 

Project  Number:   FP7-­‐600933  

Project  Title:   SIFEM  

 

Title  of  Deliverable:   Risk  Management  report  

Date  of  Delivery  to  the  EC:   28/02/2014  

 

Work-­‐package   responsible   for  the  Deliverable:   WP6  –  SIFEM  Infrastructure  Integration  

Main  Editor(s):   ICCS  

Contributor(s):   ICCS,  ISVR,  UCL,  BioIRC,  RTV,  INTRASOFT,  DERI  

Reviewer(s):   INTRASOFT  

Approved  by:   All  Partners  

 

Abstract:   This   document   constitutes   the   deliverable   D6.4.1   Risk  Management  report.  The  objective  of  this  document  is  to  report   identified   risks   and   the   appropriate   contingency  plans   and   mitigation   actions.   More   specifically,   this  deliverable   describes   and   identifies   the   (technically  caused)  hazards  associated  with  each  part  of  the  system,  estimate   and   evaluate   the   risks   associated   with   these  hazards,   control   these   risks,   and   monitor   the  effectiveness  of  that  control  limitations.  The  description  is  based   on   the   published   protocol   and   standards   in   the  area  of  system  risk  management.  

Keyword  List:   Risk   management,   hazards,   contingency   plan,   software  risks,  standards  and  protocols  

 

 

Document  revision  history  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  3  of  41      

Version   Date  Modifications  Introduced  

Modified  by   Modification  Reason  

1   28/01/2014   ICCS   The  Table  of  Contents  (ToC)  was  formed  and  sent  to  all  partners  

2   11/02/2014   INTRASOFT,  RTV   Contribution   form   INTRASOFT  and  RTV  

2.1   13/02/2014   ICCS   Updated  contribution  from  ICCS  and  document  update  

3   25/02/2014   ISVR   Contribution   and   updated   risks  from  ISVR  

3.1   26/02/2014   BioIRC   Contribution   and   updated   risks  from  BioIRC  

3.2   27/02/2014   ICCS   Updated   risks   form   ICCS   and  consolidated  document  

3.3   27/02/2014   DERI   Contribution  from  DERI  

4   28/02/2014   ICCS   Final  Version  from  ICCS  

 

 

 

 

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  4  of  41      

1 GUIDELINES    

Overview  

The  following  report  denotes  the  deliverable  D6.4.1  Risk  Management  report.  

   

Prerequisites  

D2.1  State  of  the  Art:  The  research  conducted  during  this  deliverable  is  necessary  to  identify  state  of  the  art  inner  ear  modelling  techniques  and  identify  the  innovation  of  SIFEM.    

D2.2  User  Requirements  and  Data  Availability  Analysis:  This  deliverable  recorded  the  requirements  of   the  SIFEM  users  and  guides  activities   that  are  undertaken  during  Task  2.4  System  Architecture  and  Functional  Specifications  and  reported  in  this  D2.3  SIFEM  System  Architecture.  

D2.3   SIFEM   System   Architecture:   A   detailed   report   providing   a   thorough   description   of   the  hardware  and  software  components  of  the  SIFEM  system,  together  with  their  functionalities.  

D3.1  Delivery  of  the  SIFEM  FEM  Tool  v1:  First  version  of  the  software  for  the  SIFEM  Finite  Element  Modelling  tool,  which  will  integrate  open  source  FE  libraries  and  corresponding  tools  and  service.  

D4.1  Quantification  of  the  fluid  pathways  in  the  cochlea:  Report  regarding  the  quantification  of  the  compliant  fluid  pathways  in  the  cochlea  for  the  BC  inner  ear  modelling.  

Moreover,  this  deliverable  takes  into  account  the  outcome  of  the  meetings  held  up  to  now.  

No  Other  Prerequisites  are  needed.  

 

Responsibilities  

Each  technical  partner  that  has  responsibilities  in  the  design  and  the  development  of  a  specific  part  of   the   SIFEM   should   clearly   define   the   major   hazards   and   risk   that   would   be   introduced   by   its  software  or  hardware  part.  The  Technical  Manager  would  be  responsible  for  the  circulation  of  the  ToC  and  final  version  of  the  consolidated  deliverable.  

This  deliverable  will  expand  in  parallel  to  the  development  and  research  activities  of  the  project  and  more  risks  will  be  identified  and  recorded  in  the  second  version  of  the  deliverable.  

   

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  5  of  41      

Table  of  Contents  

1   GUIDELINES ............................................................................................ 4  

2   INTRODUCTION .................................................................................... 14  

3   STATE OF THE ART OF RISK MANAGEMENT STANDARDS ..................... 16  

4   RISK MANAGEMENT .............................................................................. 18  

4.1   Introduction  ............................................................................................................  18  

4.2   Risk  Management  Steps  ..........................................................................................  19  

5   SOFTWARE RISK MANAGEMENT ........................................................... 23  

5.1   Software  risk  Management  ......................................................................................  23  

5.1.1   Semantic  Infostructure  and  Storage  Capabilities  ...............................................  23  

5.1.2   Integrate  the  Semantic  Infostructure  stored  RDF  data  with  the  LOD  Cloud  ......  23  

5.1.3   FEM  models  requests  via  the  Search  interface  ..................................................  24  

5.1.4   Incorporation  of  VPH  models  .............................................................................  24  

5.1.5   SIFEM  facing  technology  replacement  issues  ....................................................  24  

5.1.6   Semantic  Annotation  Tool  Usage  .......................................................................  24  

6   RISK ASSESSMENT ................................................................................ 29  

6.1   Introduction  ............................................................................................................  29  

6.2   Estimation  of  Risks  ..................................................................................................  29  

6.3   Measures  .................................................................................................................  30  

6.4   Risk  Assessment  Steps  .............................................................................................  31  

6.5   Risk  Categories  ........................................................................................................  32  

6.6   Risk  Evaluation  ........................................................................................................  33  

7   RISK CONTROLS AND EVALUATION OF RISK ACCEPTANCE ................. 34  

8   CONCLUSIONS ...................................................................................... 41  

 

     

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  6  of  41      

List  of  Figures    

Figure  1:  Example  of  assessment  of  the  identified  risk  according  to  its  probability  and  severity  levels  ............................................................................................................................................................  22  

Figure  2:  The  probability  of  occurrence  vs  severity  for  risks  ...............................................................  39  

 

   

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  7  of  41      

List  of  Tables    

Table  1:  The  levels  of  probability  and  severity  ...................................................................................  30  

Table  2:  Description  of  abbreviations  .................................................................................................  32  

 

   

   

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  8  of  41      

Definitions,  acronyms  and  abbreviations  

Acronym   Title  

Modelling  

BM   Basilar  membrane  

TM   Tectorial  membrane  

RM   Reissner’s  membrane  

OHCs   Outer  hair  cells  

IHC   Inner  hair  cell  

St   Stereocilia  

C   Cortilymph  

SV   Scala  vestibule  

ST   Scala  tympani  

SM   Scala  media  

OC   Organ  of  Corti  

HC   Hensen’s  cell  

DC   Deiter’s  cell  

RL   Reticular  lamina  

IS   Inner  sulcus  

HS   Hensen’s  stripe  

IP   Inner  pillar  cell  

OP   Outer  pillar  cell  

Mod   Modiulus  

BC   Bone  Conduction  

ENT   Ear,  nose,  and  throat  

OAE   Otoacoustic  emissions  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  9  of  41      

DPOAE   Distortion  product  otoacoustic  emissions  

CM   Cochlear  Microphonics  

Other  Methods  and  Processes  

FE   Finite  Element  

FEM   Finite  Element  Method  

SNHL   Sensorineural  hearing  loss  

PTA   Percutaneous  transluminal  angioplasty  

TTS   Temporary  threshold  shift  

RTAE   Requirements  and  Technology  Assessment  Exercise  

PACS   Picture  archiving  and  communication  system  

DICOM   Digital  Imaging  and  Communications  in  Medicine  

2D   Two  dimensions  

3D   Three  dimensions  

Project  Management  

CB   Consortium  Board  

CCB   Change  Control  Board  

CO   Confidential,   only   for   members   of   the   consortium   (including   the  Commission  Services)  

CR   Change  Request  

D   Demonstrator  

DL   Deliverable  Leader  

DM   Dissemination  Manager  

DMS   Document  Management  System  

DoW   Description  of  Work  

Dx   Deliverable   (where   x   defines   the   deliverable   identification   number   e.g.  D1.1.1)  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  10  of  41    

EC   Ethical  Committee  

EM   Exploitation  Manager  

EU   European  Union  

FM   Financial  Manager  

FP   Framework  Programme  

MS-­‐   Microsoft  Corporation  

MSx   project  Milestone  (where  x  defines  a  project  milestone  e.g.  MS3)  

Mx   Month  (where  x  defines  a  project  month  e.g.  M10)  

O   Other  

P   Prototype  

PC   Project  Coordinator  

PM   Partner  Project  Manager  

PO   Project  Officer  

PP   Restricted   to   other   programme   participants   (including   the   Commission  Services)  

PU   Public  

QA   Quality  Assurance  

QAP   Quality  Assurance  Plan  

QDF   Quality  Function  Deployment  

QM   Quality  Manager  

R   Report  

RE   Restricted   to   a   group   specified   by   the   consortium   (including   the  Commission  Services)  

RUP   Rational  Unified  Process  

s/w   Software  

STEP   Standard  Technology  Evaluation  Process  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  11  of  41    

STM   Scientific  and  Technical  Manager  

TL   Task  Leader  

WP   Work  Package  

WPL   Work  Package  Leader  

WPS   Work  Package  Structure  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  12  of  41    

Lexicon  

Term   Description  

Basilar  Membrane  

The   basilar  membrane  within   the   cochlea   of   the   inner   ear   is   a  stiff  structural  element  that  separates  two  liquid-­‐filled  tubes  that  run  along  the  coil  of  the  cochlea,  the  scala  media  and  the  scala  tympani  

Reissner's  membrane  Reissner's  membrane  (vestibular  membrane,  vestibular  wall)  is  a  membrane  inside  the  cochlea  of  the  inner  ear.  It  separates  scala  media  from  scala  vestibuli.  

Finite  Elements  

In  mathematics,  the  finite  element  method  (FEM)  is  a  numerical  technique   for   finding   approximate   solutions   to   boundary   value  problems   for  differential  equations.   It  uses  variational  methods  (the   calculus   of   variations)   to   minimize   an   error   function   and  produce  a  stable  solution  

Organ  of  Corti  The  organ  of  Corti,  found  only  in  mammals,  is  part  of  the  cochlea  of   the   inner   ear   and   is   provided   with   hair   cells   or   auditory  sensory  cells  

Scala  tympani  

Scala   tympani   is   one   of   the   perilymph-­‐filled   cavities   in   the  cochlear   labyrinth   of   the   human   ear.   It   is   separated   from   the  scala  media   by   the   basilar  membrane,   and   it   extends   from   the  round  window   to   the   helicotrema,   where   it   continues   as   scala  vestibuli.  

Scala  vestibuli   Scala   vestibuli   is   a   perilymph-­‐filled   cavity   inside   the   cochlea   of  the  inner  ear  that  conducts  sound  vibrations  to  the  scala  media.  

internal  auditory  meatus  

The   internal   auditory   meatus   (also   meatus   acusticus   internus,  internal   acoustic   meatus,   internal   auditory   canal,   internal  acoustic   canal,   or   IAC)   is   a   canal   in   the   petrous   part   of   the  temporal   bone   of   the   skull   that   carries   nerves   from   inside   the  skull  towards  the  middle  and  inner  ear,  namely  cranial  nerve  VII  and  cranial  nerve  VIII.  There  are  two  internal  auditory  meatus  in  most  individuals,  one  on  the  left  side  of  the  skull  and  one  on  the  right  

Modiolus  The  modiolus   is   a   conical   shaped   central   axis   in   the   cochlea.   It  consists  of  spongy  bone  and  the  cochlea  turns  approximately  2.5  times  around  it  

Bone  Conduction   Bone   conduction   is   the   conduction   of   sound   to   the   inner   ear  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  13  of  41    

through   the   bones   of   the   skull.   Bone   conduction   transmission  can  be  used  with  individuals  with  normal  or  impaired  hearing  

Stereocilia  

In   the   inner   ear,   stereocilia   are   the  mechanosensing  organelles  of  hair  cells,  which  respond  to  fluid  motion  in  numerous  types  of  animals   for   various   functions,   including   hearing   and   balance.  They   are   about   10–50   micrometers   in   length   and   share   some  similar  features  of  microvilli.  

Hair  cells  

Hair  cells  are  the  sensory  receptors  of  both  the  auditory  system  and   the   vestibular   system   in   all   vertebrates.   In   mammals,   the  auditory  hair  cells  are  located  within  the  organ  of  Corti  on  a  thin  basilar  membrane  in  the  cochlea  of  the  inner  ear.  

 

 

 

 

 

 

 

 

 

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  14  of  41    

2 INTRODUCTION  The  following  report  denotes  the  draft  version  of  the  deliverable  D6.4.1  Risk  Management  report.  The  deliverable  describes  and   identifies   the   (technically  caused)  hazards  associated  with  software  development,   estimate   and   evaluate   the   risks   associated  with   these   hazards,   control   these   risks,  and  monitor  the  effectiveness  of  that  control  limitations.  The  description  is  based  on  the  published  protocol  and  standards  in  the  area  of  system  risk  management.  

The  safety  of  any  medical   software  system   is  dependent  on   the  application  of  a  disciplined,  well-­‐defined,  risk  management  process  throughout  the  product   life  cycle.  Hardware,  software,  human,  and  environmental   interactions  must  be  assessed   in   terms  of   intended  use,   risk,  and  cost/benefit  criteria.    

Risk   analysis   is   employed   by   any   medical   software   company   and   is   responsible   for   all   new   and  existing  medical  hardware/software  developed.  All  hardware/software  developed  must  be  proven  to  be  safe  and  efficient  core  to  safe  hardware/software  is  the  hazard  analysis  and  risk  management  process.  

This  report  addresses  these  issues  in  SIFEM  Platform  hardware  and  software.  Risk  Analysis  identifies  the  risks  and  potential  obstacles  to  the  future  exploitation  of  a  project's  results.    

 

The  structure  of  the  description  of  each  component  follows  the  ISO  standard  for  risk  management  reports.    

In   our   approach  we   used   the   ISO   149711:   “Medical   devices   -­‐   Application   of   risk  management   to  medical   devices”   standard.   This   International   Standard   was   developed   specifically   for   medical  device/system  manufacturers  using  established  principles  of  risk  management.  It  could  also  be  used  as  informative  guidance  in  developing  and  maintaining  a  risk  management  system  and  process.  

Each  partner  establishes  documents  and  maintains  throughout  the  life-­‐cycle  an  on-­‐going  process  for  identifying  hazards  associated  with  a  medical  device,  estimating  and  evaluating  the  associated  risks,  controlling  these  risks,  and  monitoring  the  effectiveness  of  the  controls.  This  process  shall   include  (1)   risk   analysis,   (2)   risk   evaluation,   (3)   risk   control   and   (4)   production   and   post-­‐production  information.  

Each   partner   within   the   consortium   had   to   follow   this   specific  methodology   in   order   to  make   a  complete   risk   analysis   about   the   module   they   had   to   develop.   The   results   were   collected   and  analyzed  and  the  outcome  was  a  universal  risk  analysis  report.  

 

 

 

 

 

                                                                                                                 1  http://www.iso.org/iso/catalogue_detail?csnumber=38193  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  15  of  41    

 

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  16  of  41    

3 STATE  OF  THE  ART  OF  RISK  MANAGEMENT  STANDARDS  Healthcare   Failure  Modes   and   Effects   Analysis2   (HFMEA)  has   been   designed   by   the   VA  National  Centre  for  Patient  Safety3  (NCPS)  specifically  for  healthcare.  HFMEA  streamlines  the  hazard  analysis  steps  found  in  the  traditional  Failure  Modes  and  Effects  Analysis  (FMEA)  process  by  combining  the  detectability  and  criticality  steps  of  the  traditional  FMEA  into  an  algorithm  presented  as  a  Decision  Tree.  It  also  replaces  calculation  of  the  risk  priority  number  (RPN)  with  a  hazard  score  that  is  read  directly   from   the   Hazard   Matrix   Table.   This   table   was   developed   by   NCPS   specifically   for   this  purpose.    

Healthcare  FMEA  Steps  

1. Define  the  HFMEA  Topic  -­‐  Define  the  topic  of  the  Healthcare  FMEA  along  with  a  clear  definition  of  the  process  to  be  studied  

2. Assemble  the  Team    -­‐  The  team  is  to  be  multidisciplinary  including  Subject  Matter  Expert(s)  and  an  advisor  

3. Graphically  Describe  the  Process  4. Conduct  a  Hazard  Analysis  5. Actions  and  Outcome  Measures  

Root   cause   analysis4   (RCA)   is   a   class   of   problem   solving   methods   aimed   at   identifying   the   root  causes  of  problems  or  events.  The  practice  of  RCA  is  predicated  on  the  belief  that  problems  are  best  solved  by  attempting  to  address,  correct  or  eliminate  root  causes,  as  opposed  to  merely  addressing  the   immediately   obvious   symptoms.   By   directing   corrective   measures   at   root   causes,   it   is   more  probable   that   problem   recurrence   will   be   prevented.   However,   it   is   recognized   that   complete  prevention  of  recurrence  by  one  corrective  action  is  not  always  possible.  Conversely,  there  may  be  several  effective  measures  (methods)  that  address  the  root  cause  of  a  problem.  Thus,  RCA  is  often  considered   to   be   an   iterative   process,   and   is   frequently   viewed   as   a   tool   of   continuous  improvement.  

RCA   is   typically  used  as   a   reactive  method  of   identifying  event(s)   causes,   revealing  problems  and  solving  them.  Analysis  is  done  after  an  event  has  occurred.  Insights  in  RCA  may  make  it  useful  as  a  pro-­‐active  method.   In   that   event,   RCA   can   be   used   to   forecast   or   predict   probable   events   even  before   they  occur.  While  one   follows   the  other,  RCA   is  a  completely  separate  process   to   Incident  Management.  

Root   cause  analysis   is   not   a   single,   sharply  defined  methodology;   there   are  many  different   tools,  processes,   and   philosophies   for   performing   RCA   analysis.   However,   several   very-­‐broadly   defined  approaches  or   "schools"  can  be   identified  by   their  basic  approach  or   field  of  origin:   safety-­‐based,  production-­‐based,  process-­‐based,  failure-­‐based,  and  systems-­‐based.  

                                                                                                               2  http://www.whaqualitycenter.org/Portals/0/Tools%20to%20Use/Collecting%20Data%20and%20Information/HFMEA%20Steps.pdf  3  http://www.patientsafety.va.gov/  4  http://www.ncbi.nlm.nih.gov/pmc/articles/PMC1292997/  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  17  of  41    

Context  about  regulation  and  standards  

The  specific  need  for  the  creation  and  the  development  of  such  standard  is  the  requirement  for  a  presentation  of   documentation   for   the  maintenance  of   quality   assurance   and  manage   risk   in   the  area  of  medical  devices.  

ISO  9001:  2000  The  International  Organization  for  Standardization  (ISO)  provide  the  first  version  of  a  non-­‐industry-­‐specific  quality  system  standard  (ISO  9001)  in  the  mid  1980s.  Its  update  version  ISO  9001:1994   became   the   leading   standard   for   quality   systems  worldwide.   The   draft   version   of   this  specific  standard  includes  the  ISO  13485:  1996.  The  main  advantage  of  the  final  updated  version  of  ISO  13485:  2003  was  its  harmonization  with  the  medical  device  regulatory  requirements  for  quality  management  systems.  Additionally,   it   includes  features  as  continuous  improvement  and  customer  satisfaction  that  were  not  contained  in  documentation  for  the  regulation  of  medical  device  industry.  

ISO  13485:  2003  is  an  international  standard  that  specifies  requirements  for  a  quality  management  system   where   an   organization   needs   to   demonstrate   its   ability   to   provide   medical   devices   and  related  services  that  consistently  meet  customer  and  regulatory  requirements  applicable  to  medical  devices  and   related  services.  The   introduction  of   the   revised   ISO  13485  standard   in  2003  marked  the   shift   from   procedure-­‐based   to   process-­‐based   quality   management   systems.   Process-­‐based  standards  can  be  viewed  as  a  continuum  of  activities,  inputs  and  outputs  that  become  the  inputs  of  the   next   activity,   whereas   a   procedure-­‐based   system   considers   the   quality   system   in   parts   or  separate  functions,  such  as  design  control,  production  and  process  control.  A  common  issue  of  the  ISO  13485:  2003   standard   is   the   initial  development   to  product   realization  and   the  quality  of   the  organization  assesses  and  manages  risk.  A  main  document  that  is  referred  for  the  risk  assessment  is  ISO  14971:  2007—Medical  devices  –  Application  of  risk  management  to  medical  devices.  

ISO   14971:   2007   document   is   not   a   simple   guidance   text   including   requirements   but   it   includes  recommendations   that   should   be   followed   by   the   manufactures   considering   their   applicability  during   the   design   and   the   development   of   the   product.   Identification   and   traceability   also   is   an  important   theme,   in   terms   of   product   lots   or   batches,   which   carry   with   them   supporting  identification   markings   and   records   throughout   the   process.   The   ability   to   finely   tuning   is   a  significant   value   to   any   medical   device   company.   Actually   this   is   the   main   goal   of   the   Risk  management  process.  Its  clear  role  is  “process  for  a  manufacturer  to  identify  the  hazards  associated  with  medical   devices,   including   in   vitro   diagnostic  medical   devices,   to   estimate   and   evaluate   the  associated  risks,  to  control  these  risks  and  to  monitor  the  effectiveness  of  the  controls.”  

Risk  management   is   a   crucial  part   to  effective  quality   assurance   systems  because   justification   for  quality   system   decisions   should   be   documented   based   on   risk.   Risk   often   is   evaluated   from   two  perspectives:  safety  risk  and  business  risk.  Safety  risks  are  analyzed  based  on  the  class  of  medical  product   and   the   intrinsic   risk   that   it   poses.   For   this   component,   safety   risk   can   be   described   as  likeliness  of  resulting  in  serious  injury  or  death  or  as  causing  harm.  

 

 

 

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  18  of  41    

4 RISK  MANAGEMENT    

4.1 INTRODUCTION  There   are   a   variety   of   risk   analysis   techniques   available   these   days.   Each   has   its   strengths   and  weakness,   depending   on   the   needs   and   practices   of   the   project   team.   So,   selecting   the   right  technique  is  essential.    

All   of   these   techniques   involve   identifying   and   prioritizing   the   risks   to   the   quality   of   the   system  under   test.   Typically,   the   risks   are   grouped   or   organized   by   major   risk   categories,   such   as  functionality,  performance,  security,  and  so   forth.  A  cross-­‐functional   team  of  project  stakeholders  usually  identifies  the  risks.  Rather  than  rely  only  on  the  stakeholders’  opinions  and  recollections,  the  analysis  should  also  draw  upon  historical  bug  and  field  failure  data  from  past  projects,  requirements  and   design   specifications,   sales   figures,   market   research,   and   anecdotal   information   from  customers,  competitors,  or  clients.    

In   our   approach   we   used   the   ISO   14971:   “Medical   devices   -­‐   Application   of   risk   management   to  medical   devices”   standard.   This   International   Standard   was   developed   specifically   for   medical  device/system  manufacturers  using  established  principles  of  risk  management.  It  could  also  be  used  as  informative  guidance  in  developing  and  maintaining  a  risk  management  system  and  process.  

It  deals  with  processes  for  managing  risks,  primarily  to  the  patient,  but  also  to  the  operator,  other  persons,  other  equipment  and  the  environment.  

As  a  general  concept,  activities   in  which  an  individual,  organization  or  government   is   involved  can  expose  those  or  other  stakeholders  to  hazards  which  can  cause  loss  of  or  damage  to  something  they  value.  Risk  management  is  a  complex  subject  because  each  stakeholder  places  a  different  value  on  the  probability  of  harm  occurring  and  its  severity.  

It  is  accepted  that  the  concept  of  risk  has  two  components:  

a)  The  probability  of  occurrence  of  harm;  

b)  The  consequences  of  that  harm,  that  is,  how  severe  it  might  be.  

The  concepts  of  risk  management  are  particularly  important  in  relation  to  medical  devices  because  of   the   variety   of   stakeholders   including  medical   practitioners,   the   organizations   providing   health  care,   governments,   industry,   patients   and   members   of   the   public.   All   stakeholders   need   to  understand  that  the  use  of  a  medical  device  entails  some  degree  of  risk.  The  acceptability  of  a  risk  to  a  stakeholder  is  influenced  by  the  components  listed  above  and  by  the  stakeholder’s  perception  of  the  risk.  Each  stakeholder’s  perception  of  the  risk  can  vary  greatly  depending  upon  their  cultural  background,  the  socio-­‐economic  and  educational  background  of  the  society  concerned,  the  actual  and  perceived  state  of  health  of   the  patient,  and  many  other   factors.  The  way  a   risk   is  perceived  also   takes   into   account,   for   example,   whether   exposure   to   the   hazard   seems   to   be   involuntary,  avoidable,  from  a  man-­‐made  source,  due  to  negligence,  arising  from  a  poorly  understood  cause,  or  directed  at  a  vulnerable  group  within  society.  The  decision  to  use  a  medical  device  in  the  context  of  a   particular   clinical   procedure   requires   the   residual   risks   to   be   balanced   against   the   anticipated  benefits  of  the  procedure.  Such  judgments  should  take  into  account  the  intended  use,  performance  and  risks  associated  with  the  medical  device,  as  well  as  the  risks  and  benefits  associated  with  the  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  19  of  41    

clinical   procedure  or   the   circumstances  of   use.   Some  of   these   judgments   can  be  made  only   by   a  qualified  medical  practitioner  with  knowledge  of  the  state  of  health  of  an  individual  patient  or  the  patient’s  own  opinion.  

As   one   of   the   stakeholders,   the   manufacturer   makes   judgments   relating   to   safety   of   a   medical  device,   including  the  acceptability  of  risks,  taking   into  account  the  generally  accepted  state  of  the  art,   in   order   to   determine   the   suitability   of   a  medical   device   to   be   placed   on   the  market   for   its  intended  use.  This  International  Standard  specifies  a  process  through  which  the  manufacturer  of  a  medical   device   can   identify   hazards   associated  with   a  medical   device,   estimate   and   evaluate   the  risks   associated   with   these   hazards,   control   these   risks,   and   monitor   the   effectiveness   of   that  control.  

 

4.2 RISK  MANAGEMENT  STEPS  Each  partner  establishes  documents  and  maintains  throughout  the  life-­‐cycle  an  ongoing  process  for  identifying  hazards  associated  with  a  medical  device,  estimating  and  evaluating  the  associated  risks,  controlling  these  risks,  and  monitoring  the  effectiveness  of  the  controls.  This  process  shall  include  the  following  elements:  

• risk  analysis  

• risk  evaluation  

• risk  control  

• production  and  post-­‐production  information  

A  schematic  representation  of  the  risk  management  process  is  shown  in  Figure  1.  Depending  on  the  specific   life-­‐cycle  phase,   individual  elements  of  risk  management  can  have  varying  emphasis.  Also,  risk  management  activities  can  be  performed  iteratively  or   in  multiple  steps  as  appropriate  to  the  medical  device.  Annex  B   contains   a  more  detailed  overview  of   the   steps   in   the   risk  management  process.  Compliance  is  checked  by  inspection  of  appropriate  documents.  

 

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  20  of  41    

                                                                                                               Figure  1:  Risk  management  process  

 

Each   partner   within   the   consortium   had   to   follow   this   specific  methodology   in   order   to  make   a  complete   risk   analysis   about   the   module   they   had   to   develop.   The   results   were   collected   and  analyzed  and  the  outcome  was  a  universal  risk  analysis  report.  

The   consortium   compiled  documentation  on   known  and   foreseeable   hazards   associated  with   the  medical  device  in  both  normal  and  fault  conditions.  

 

During  the  risk  analysis  the  factors  that  should  be  recorded  are:  

1. Module  within  the  hazardous  situation  may  occur  

2. Function  of  the  module  

3. Identification  of  the  hazardous  situation  

4. What  caused  the  hazard  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  21  of  41    

5. What  is  expected  to  be  the  effect  of  the  hazard  

6. Estimation  of  the  probability  and  severity  for  the  hazard  

7. Measures  that  should  be  taken  

8. Type  of  measure  that  manages  a  hazard    

• Safety  by  Design  

• Instructions  for  Use  (Manual)    

• Training  

• Defect  prevention    

• Software  Testing    

• Service  Manual    

• Label/symbol    

• Instructions  for  Service  

 

The   risk  management  process  will  be   ratified   through  an   iterative  cycle  of   risks   identification  and  evaluation  as  well  as  their  respective  controls.  To  successfully  accomplish  this  process  a  horizontal  activity   has   been   inserted   to   the   lifecycle   of   the   SIFEM   project   (Task   6.6   Technical   Risk  Management)  starting  from  M13  and  extended  to  the  rest  of  the  project  duration  in  order  to  ensure  the  proper  risk   identification,  analysis  and  control   through  each  phase  of  system  implementation.  The   risk  management   is   supported   by   a   risk   analysis   document,   which  will   be   regularly   updated  following  the  development  process.  Each  partner  estimates  and  evaluates  the  associated  risks,  the  respective   controls,   and  monitors   the   effectiveness   of   the   controls.   This   process  will   include   the  following  elements:  

• Risk  analysis:  Identify  the  risks  according  to  their  probability  and  severity  and  classify  them  to  three  main  categories:  

o General  and  administrative  project  risks  

o Technical  and  scientific  related  risks  

o Exploitation  and  outreach  risks    

• Risk   evaluation:   Risk   evaluation   determines   the   quantitative   and   qualitative   values   of   risk  related  to  a  concrete  situation  or  a  recognized  hazard.  Each  partner  contributes  to  the  risk  assessment  process  by  the  definition  and  the  identification  of  the  different  kind  of  risks  and  hazards  that  might  be  generated  by  a  specific  module  of  the  SIFEM  platform.  The  collection  and  classification  of  the  risks  needs  specific  description  and  formulation  in  a  unique  matrix  for  each  subsystem/module  in  order  to  be  feasible  their  systematic  analysis.  

The  risk,  will  be  considered  as  low  for  1-­‐7  (green),  medium  for  8-­‐14  (yellow)  and  high  15-­‐30  (red).  The  axes  (Figure  1)  include  the  severity  level  and  the  probability  level  (for  simplicity  rating  from  1  to  4).  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  22  of  41    

 Figure  1:  Example  of  assessment  of  the  identified  risk  according  to  its  probability  and  severity  

levels  

• Risk   Control:   Specify   the   contingency   plan   for   each   risk   and   the   respective   control/action  that  should  be  taken  to  eliminate  the  severity  or  probability  of  risk.  

 

 

 

 

6 6 12 18 24 30

5 5 10 15 20 25

4 4 8 12 16 20

3 3 6 9 12 15

2 2 4 6 8 10

1 1 2 3 4 5

1 2 3 4 5

Prob

ability  of  O

ccurance  (P

)

Severity  (S)

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  23  of  41    

5 SOFTWARE  RISK  MANAGEMENT  

5.1 SOFTWARE  RISK  MANAGEMENT    

5.1.1 Semantic  Infostructure  and  Storage  Capabilities  A  basic  service  offered  by  the  Semantic   Infostructure   is  related  to  storing   image  file  data  (such  as  micro-­‐CT   images)   as   well   as   RDF   data   either   a)   from   data   extracted   from   image  metadata   or   b)  RDFized  FEM  models.  This  fundamental  capability  is  the  basis  of  all  tools  that  are  included  in  SIFEM  platform  including  the  Annotator  Tool,  the  Search  Tool  etc.  

A  potential   risk   that  exists   refers   to   the  ability  of   the  platform   to   store   the   increasing  number  of  data,  after  its  long  time  usage.  This  in  turn  refers  to  the  disk  space  that  is  required  to  handle  all  such  data  in  the  pilots’  site.  The  severity  and  occurrence  of  such  a  case  can  be  quite  high,  the  resolvance  however   of   the   issue   is   straightforward   and   includes   the   usage   of   larger   disk   space,   as   well   as  incorporating  compression  algorithms.  

5.1.2 Integrate  the  Semantic  Infostructure  stored  RDF  data  with  the  LOD  Cloud  One  of  the  most  important  services  that  run  in  the  background  is  the  Linking  Component  that  allows  RDF   instances   included   in   SIFEM   repositories   to   be   integrated   with   other   external   resources   of  public   RDF   entities   that   might   exist   the   Linked   Open   Data   cloud.   This   allows   data   that   are   not  maintained  or  curated  by  people  participating  in  SIFEM,  to  be  brought  “closer”  to  our  platform  to  be  used  in  analysis,  help  a  user  extend  his  understanding  for  a  disease  etc.    

However   useful   this   process   of   linking   is,   it   does   suffer   from   various   problems   that   are   not  manageable  by  SIFEM  developer  or  pilots.  The  problem  in  linking  data  is  a  multi-­‐faceted  one,  with  the  basic  aspects  being  the  following:  

a) data  quality  can  be  rather  low,  either  in  terms  of  the  ontologies  used,  or  even  the  way  some  ontologies  might  be  used  

b) the  availability  of  these  data  via  SPARQL  points  is  not  stable,  with  the  HTTP  404  being  the  norm  c) the  variation  of  data  existing  in  such  is  not  large    

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  24  of  41    

For  all  the  above  reasons,  one  can  understand  that  the  occurrence  and  severity  of  this  risk  can  be  high.  The  measure   that  can  be  taken   for   this  action   is   to   investigate  other  more  generic  and  well  curated   repositories   that   can   be   used   (such   as   the   case   of   DBpedia),   as   well   as   investigate   the  possibility   of   incorporating   data   from  within   SIFEM   (such   as   extracted   knowledge   from   partners  papers).  

 

5.1.3 FEM  models  requests  via  the  Search  interface  Another   important   feature   of   the   platform   regards   searching   SIFEM   related   data   (either   images,  RDF  FEM  models  etc).  The  basis  of  this  capability  is  the  SPARQL  query  processing  that  is  created  via  a  User  Interface  that  allows  a  user  to  graphically  request  data  and  receive  the  results.  

One  of  the  main  issues  that  might  occur  refers  to  the  actual  usage  of  the  interface  to  request  data.  The  user  might  not  be  able  to  handle  such  a  tool  to  find  what  s/he  needs.  We  do  consider  this  risk  however  of  low  occurrence,  since  there  the  interface  is  created  in  collaboration  with  the  pilots,  as  well  as  there  is  the  intention  of  creating  a  manual  that  will  help  train  the  user  in  the  whole  platform.  

5.1.4 Incorporation  of  VPH  models  SIFEM  is  a  project  that  acknowledges  the  importance  of  connecting  to  the  VPH  community  either  by  promoting  its  own  software  in  the  VPH  Network-­‐of-­‐Excellence  (NoE)  Community,  or  re-­‐using  tools,  data  and  models.  However,  apart   from  contributing  our  code,   the  re-­‐usability  of   things   from  VPH  NoE  might  not  be  able  to  perform  such  a  task,  as  models  or  data  from  VPH  might  not  be  related  to  SIFEM.  The  occurrence  and  the  severity   is  quite  high,  however  the  SIFEM  Consortium  will   try  and  resolve  this  by  a)  aligning  our  SIFEM  Concept  Model  with  other  open  ontologies  that  are  related  to  VPH,  and  b)  providing  ETL  processes  that  can  help  convert  tools  to  models  in  VPH  and  vice-­‐versa.  

5.1.5 SIFEM  facing  technology  replacement  issues  The   project   incorporates   a   great   number   of   technologies   that   are   of   standard   use   and   are  considered  to  be  state-­‐of-­‐the-­‐art  in  terms  of  data  management,  services  composition  etc.  However,  there   exists   a   risk   of   these   technologies   to   be   outdated   by   the   end  of   the   project,   resulting   in   a  system  that  a  community  (such  as  an  open  source  one)  might  not  be  able  to  extend.  The  severity  and  occurrence  of  such  a  situation  can  be  rather  high,  resulting  in  a  project  that  will  not  survive  the  face  of  time.    

Our  approach  to  deal  with  this  problem,  is  to  keep  up  with  the  latest  technologies  as  well  as  making  all   tools   as  modular   as   possible,   that  minimizing   the   chances   of   having   large   pieces   of   software  becoming  obsolete  in  the  future.  

5.1.6 Semantic  Annotation  Tool  Usage  This   tool   is   responsible   for   allowing   a   user   to   annotate   more   knowledge   to   a   data   entity,   thus  extending  its  capabilities  to  appear  in  search  results.  This  however,  suffers  from  a  problem  of  mis-­‐annotating  the  data,  thus  resulting  in  situations  that  data  appear  in  search  result,  when  they  should  not.   The   severity   and   occurrence   of   this   can   be   rather   high;   however   it   is   believed   that   it   is   a  manageable   situation,   with   the   creation   of   manuals   that   will   help   train   the   user   to   avoid   such  situations.  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  25  of  41    

 

5.1.7 PREPROCESSING  AND  MESHING    

In  pre-­‐processing  and  meshing  procedure  of  inner  ear  modeling  there  are  several  risks  that  should  

be  taken  into  account.  

5.1.7.1 Pre  –  processing    

The  following  risks  are  identified  as  significant  for  the  successful  inner  ear  modelling:  

1. Complex  geometry  of  the  inner  ear.    

Inner  ear  is  not  always  macro  mechanical  model.  When  only  mechanical  behavior  of  the  inner  ear  

and  cochlea  is  considered,  the  inner  ear  can  be  modelled  with  simplified  geometry  on  one  scale.  If  

active  model  of  the  cochlea  is  modelled  then  in  the  model  Organ  of  Corti  should  be  included,  which  

has   several   time   smaller   dimensions   then   the   rest   of   the   inner   ear,   so  multi   –   scale   approach   is  

necessary.  

   Figure  2:  Inner  ear  structure  (left)  and  Organ  of  Corti  (right)  

Organ  of  Corti  consists  of  the  many,  very  small  and  tiny  inner  hair  cells  and  outer  hair  cell,  which  are  

responsible   for   generation   of   the   electrical   current   through   exchange   of   the   potential   and  

generation  of  impulses  which  goes  to  the  brain.  As  a  product  of  outer  hair  cells  behavior  generated  

force  is  applied  on  basilar  membrane,  and  affects  mechanical  behavior  of  the  system,  as  a  backward  

feedback.  For  active  model  complex  geometry  and  multi  –  scale  modelling  will  be  applied.  

2. Inappropriate  images  obtained  from  CT  and  micro  CT  -­‐  means  images  with  poor  resolution,  

which  cannot  be  properly  segmented.  

D6.4.1  Risk  Management  report   Version:  v4  –  Final,  Date:  28/02/2014  

 

Project  Title:  SIFEM                                                                                                                                                                                                                                                                                                                Contract  No.  FP7-­‐600933  

Project  Coordinator:  National  University  of  Ireland,  Galway                                                                                                                                                                          www.SIFEM-­‐

project.eu  

Page  26  of  41    

More  realistic  results  should  be  obtained  for  solving  real  patient  data,  model  created  from  CT  and  

micro   CT   images.   These   images   can   be   useful,   but   it   needs   to   be   with   appropriate   quality,  

resolution,  so  the  process  of  segmentation  can  be  applied  with  satisfactory  accuracy.  

 Figure  3:  Micro  CT  image  with  proper  resolution  for  creation  of  the  real  model  of  the  cochlea.  

Beside  resolution,  one  of  the  problems  in  pre  –  processing  of  real  model  is  size  of  the  images.  Size  of  

the  images  should  not  exceed  certain  values  –  model  must  not  be  with  large  number  of  nodes  and  

elements,  because  calculation  efforts  may  be  very  large.  Calculation  may  take  a  few  days  or  week,  

even  parallel  computing  is  applied.  

3. Data  collected  from  laboratory  tests,  animal  tests  and  human  tests  are  not  sufficient  in  

number  to  produce  a  quality  computational  model.  

Finite   element   method   used   for   modelling   of   the   inner   ear   needs   to   be   verified   with   enough  

number   of   data   obtained   from   clinical   measurement.   Without   enough   number   of   experimental  

results,  simulation  technique  could  not  be  validated.  

 

27    

5.1.7.2 Meshing    

1. Poor  mesh  quality  on  some  segments.  

In  the  certain  parts  of  the  model,  where  geometry  is  complex,  tetrahedral  mesh  may  not  be  correct.  

In  that  case  mesh  should  be  checked  and  corrected  manually.  

     Figure  4:  Poor  mesh  quality  in  the  curved  shapes.  

   

 

5.1.8 FEM  SOLVER    

Finite  element  method  solver  –  PAK  is  used  for  modelling  inner  ear.  First  task  in  inner  ear  modelling  

is  to  define  appropriate  mathematical  model  –  equations  which  will  represent  system  behavior  with  

certain   correctness.   Several   approaches  were   tested   in   order   to   obtain   the   best   agreement  with  

current  analytical  and  experimental   results.  For  mechanical  model  of   the  cochlea   the  best   results  

were  obtained  using  fluid-­‐structure  strong  coupling,  with  acoustic  equation  for  modelling  behavior  

of   the   fluids   in   the   chambers   and   Newtonian   dynamics   for   modelling   behavior   of   the   basilar  

membrane.  

By  using  finite  element  methods  there  are  several  risks  that  may  occur:  

1. Convergence  

 

28    

One  of  the  biggest  issues  in  finite  element  method  is  definition  of  the  convergence  criteria.  In  PAK  

solver  for  convergence  criteria  is  used  quotient  of  Euclidean  norm  of  unknown  variable  increment  

and  Euclidean  norm  of  the  last  known  solution,  from  previous  iteration.  When  this  ratio  is  less  that  

given   tolerance,   convergence   is   achieved.   In   case   of   convergence   problem,   different   criteria   for  

convergence  should  be  implemented.  

2. Too  many  nodes  and  elements.  

Model  should  not  be  with   large  number  of  nodes  and  elements,  because   in  that  case  calculations  

will   take  too   long,  or  will  not  be  possible  to  perform.  Models  should  not  be  simply,  but   they  also  

should   not   be   with   very   fine   mesh,   especially   in   the   areas   that   do   not   contribute   too   much   to  

solution.  Optimal  meshing  algorithm  should  be  implemented.  

3. Implementation  of  the  equations  for  the  active  model  of  the  cochlea.  

Finite  element  method  software,  PAK,  should  be  adapted  with  equations  for  electrical  model.  There  

can  appear  certain  difficulties  with  electro  –  mechanical  coupling  or  convergence.  Then  it  should  be  

started  from  simplified  model  and  then  integration  to  more  complex  model.  

 

 

   

 

29    

6 RISK  ASSESSMENT    

 

6.1 INTRODUCTION  The  Grey   –  Box  Diagrams   split   the   architecture  of   a   system,  whose   risks   are   analysed,   in   smaller  blocks.  The  granularity  of   the  blocks   is  a  subjective  decision,  here   is   required  to  use  the  common  sense  and  reduce  the  system  architecture  in  a  meaningful  number  of  blocks.  

Input   and   output   describe   the   desired   physical   interaction   that   the   system   has   with   the  environment.   Immission   and  emission   are   the  not   desired  physical   interaction   (e.g.   disturbances)  that  the  system  get  and  release  from  and  to  the  environment.  For  each  of  this  block  the  possible  risks  must  be  analysed.  Many  of  the  risk  found  within  one  block  will  be  also  present  in  other  blocks,  or   are   treated   (a   measure   is   adopted)   within   other   blocks,   therefore   it   is   meaningful   to   use  references  inside  the  risk  table.  The  Grey-­‐Box  diagrams  appeared  in  the  Appendix  I.    

 

6.2 ESTIMATION  OF  RISKS    

As  we  have  already  mentioned  the  concept  of   risk  has   two  components:  probability  and  severity.  This  does  not  mean  that  the  two  factors  are  multiplied  to  arrive  at  a  risk  value.  One  way  to  describe  risk  and  to  visualize  the  meaning  of  the  definition  could  be  done  by  a  two-­‐dimensional  risk  chart.  Every  single  risk  is  given  a  score  for  its  probability  and  severity.  Once  the  risks  are  identified,  each  risk  is  assigned  a  level—a  measure  of  its  degree  of  importance.    

The  probability  of  harm  should  take  into  consideration  the  level  or  extent  of  exposure.  This  includes  answering  the  following  types  of  question.  

• Does  the  hazardous  situation  occur  in  the  absence  of  a  failure?  

• Does  the  hazardous  situation  occur  in  a  fault  condition?  

• Does  the  hazardous  situation  occur  only  in  a  multiple-­‐fault  condition?  

• How  likely  is  it  that  a  hazardous  situation  will  lead  to  harm?    

Table  1  demonstrates  the  point  system  we  used  to  describe  the  levels  of  probability.  

The  normal  condition  of  use  is  defined  out  of  1000  patients  a  year  with  a  yearly  use  of  50  days.    

OP

Occurrence probability

Definition Max cases per year

SD

Severity Degree

6 often

≥ 1 out of 100

500 5 catastrophic

5 probable

< 1 out of 100 and ≥ 1 out of 1.000

50 4 very critical

4 sporadic < 1 out of 1.000 and ≥ 1 out of 10.000

5 3 critical

 

30    

3 remote

< 1 out of 10.000 and ≥ 1 out of 100.000

0.5 2 marginal

2 improbable < 1 out of 100.000 and ≥ 1 out of 1.000.000

0.05 1 insignificant

1 unlike < 1 out of 1.000.000

   Risk  evaluation    

Acceptable range

Risk is low compared to the benefits. No action is required to reduce risk

Not acceptable range

Risk is not acceptable. Risk must be reduced to the acceptable range. If not, the benefit over

the risk must be explained.  

Table  1:  The  levels  of  probability  and  severity  

 To   categorize   the   severity   of   the   potential   harm,   the   manufacturer   should   use   descriptors  appropriate  for  the  medical  device.  Estimating   the   severity   of   harm   requires   an   understanding   of   the   medical   use   of   the   IVD  examination  results,   the  analytical  performance  requirements   for  each  application  and  the  extent  to  which  medical  decisions  are  based  on  IVD  examination  results.  For  this  reason,  qualified  medical  input  to  the  risk  estimation  process  is  essential.  Severity   is,   in  reality,  a  continuum.  However,   in  practice,   the  use  of  a  discrete  number  of  severity  levels   simplifies   the   analysis.   In   such   cases,   the   manufacturer   decides   how  many   categories   are  needed  and  how  they  are  to  be  defined.      

 

6.3 MEASURES  For  every  risk  we  use  one  or  more  of  the  following  risk  control  options  in  the  priority  order  listed:    

 a)  inherent  safety  by  design  b)  protective  measures  in  the  medical  device  itself  or  in  the  manufacturing  process  c)  information  for  safety  

 What  is  most  important  on  measures  we  take  is  the  following  three  factors  

 

31    

 1. Implementation  of  each  risk  control  measure  is  verified.    

This   verification   is   recorded   in   the   risk   management   file.     The   effectiveness   of   the   risk  control  measures  is  verified  and  the  results  are  recorded  in  the  risk  management  file.  

2. Risk/benefit  analysis    If   this   evidence   does   not   support   the   conclusion   that   the  medical   benefits   outweigh   the  residual   risk,   then   the   risk   remains   unacceptable.   If   the   medical   benefits   outweigh   the  residual  risk,  then  the  risk  can  be  accepted.  

3. Completeness  of  risk  control    The  manufacturer  shall  ensure  that  the  risk(s)  from  all   identified  hazardous  situations  have  been  considered.  The  results  of  this  activity  shall  be  recorded  in  the  risk  management  file.    

 As  we  have  already   indicated  risk  management  procedure  contains  a  step  during  which  measures  are   taken   to   eliminate   the   probability   and   severity   of   a   risk.   The   measures   are   divided   in   8  categories:  

 1. SbD   Safety  by  Design  

2. IfU   Instructions  for  Use  (Manual)  

3. Tra   training  4. DP   Defect  prevention  

5. SwT   Software  Testing  

6. SM   Service  Manual  

7. Lbl   Label/symbol  

8. IfS   Instructions  for  Service  

 

6.4 RISK  ASSESSMENT  STEPS  Risk  assessment  is  a  step  in  a  risk  management  procedure.  Risk  assessment  is  the  determination  of  quantitative   or   qualitative   value   of   risk   related   to   a   concrete   situation   and   a   recognized   hazard.  Each  partner  contributes  to  the  risk  assessment  process  by  the  definition  and  the  identification  of  the  different  kind  of  risks  and  hazards  that  might  be  generated  by  the  specific  module  of  the  SIFEM  platform.  The  collection  and  classification  of  the  risks  needs  specific  description  and  formulation  in  a  unique  matrix   for  each  subsystem/module   in  order   to  be   feasible   their   systematic  analysis.  The  abbreviations   that  are  utilized  are   reported   in  Table   2  and   the  collected  matrixes  are  presented   in  Appendix.          

 

32    

Table  2:  Description  of  abbreviations  

Measure     description  of  measure  adopted  

Standard     Regulatory  norm  that  applies      

Type  (of  measure  adopted):   SbD:   Safety  by  Design          

        IfU:   Instructions  for  use  (user  manual)  

        Tra:   Training  

        DP:   Defect  prevention  

        SwT:   Software  testing  

        SM:   Service  Manual  

        Lbl:   Label/Symbol  

        IfS:   Instructions  for  Service  

Decision   Yes  if  applied,  No  if  not  applied  

Resp.     Project  partner  responsible  

Verification   Type  of  document  for  the  verification  of  the  measure  

OP     Probability  that  the  error  occurs:   1  (low)  to  6  (high)  

SD     Severity  of  the  error  /  risk  to  users,  patients  and  third  parties:  1  (low)  to  5  (high)  

R     Risk  

N/A     non-­‐applicable  or  not  relevant  

#     cause/effect  ID  in  case  refers  to  same  hazard/cause  

 

 

 

6.5 RISK  CATEGORIES  Risk   analysis   reports   from   every   partner   have   been   gathered   and   analyzed.   Risks   were   initially  separated  according  to  whether  they  occur  in  hardware  or  software  of  the  system.  ISO  standard  9621  describes   the  quality  attributes   found   in   software,  provides  a  more  structured  approach   and   reduces   the   likelihood   of   missing   some   major   risk   elements.   It   follows   industry-­‐standard  quality  characteristics.  In  order  to  group  the  risks  and  make  a  complete  report  of  the  total  risks  we  had  to  somehow  group  them.    For  ISO  9126  “quality  risks  analysis”  techniques,  one  should  use  the  quality  characteristics  and  sub  characteristics   described   in   the   ISO   9126   system   quality   standard   as   the   categories   for   the   risk  analysis.  The  six  main  characteristics  of  quality  are:      

•  Functionality  

•  Reliability  

 

33    

•  Usability  

•  Efficiency  

•  Maintainability  

•  Portability  

 

 

6.6 RISK  EVALUATION  The   risk   evaluation   process   is   the   establishment   of   a   qualitative   or   quantitative   relationship  between   risks   and  benefits,   involving   the   complex  process   of   determining   the   significance  of   the  identified  hazards  and  estimated  risks  to  those  organisms  or  people  concerned  with  or  affected  by  them.  It  is  the  first  step  in  risk  management  and  is  synonymous  with  risk-­‐benefit  evaluation.  In  this  stage   the   range  of   the   risks   could  be  defined  as  acceptable  or  not.   In   the   case  of   the  acceptable  ranges  the  risk  is  low  compared  to  the  benefits  and  thus  no  actions  are  required  to  reduce  the  risk.  On  the  other  way,  if  the  risk  is  not  acceptable,  the  risk  must  be  reduced  to  the  acceptable  range.  If  not,  the  benefit  over  the  risk  must  be  explained.  

 

 

 

34    

7 RISK  CONTROLS  AND  EVALUATION  OF  RISK  ACCEPTANCE    

Function                               Control      

#  Descript

ion  Hazard   #   Effect  

Comment  

OP  

SD  

R   #  Measur

e  Type  

Description  

OP  

SD  

R  Comment  

               

0   #N/A   #N/A  

#N/A      

0  

1   3D  Reconstruction  

       

   

0   #N/A   #N/A  

#N/A  

   

0  

               

0   #N/A   #N/A  

#N/A      

0  

1.1    

Upload  Images  from  local  Hard  Disk  for  reconstruction  

Patient  Sensitive  information  is  Uploaded  

1   Information  is  uploaded  to  the  SIFEM  Infostructure  

 

3   4  

-1

2   Anonymize  Data  

SbD      

1   4  

1  

               

0   #N/A   #N/A  

#N/A      

0  

               

0   #N/A   #N/A  

#N/A      

0 0

               

0   #N/A   #N/A  

#N/A      

0  

2   3D  Visualization  

Low  Computer  Resources  

1   The  visualization  cannot  proceed  

 

3   3  

-1

3   Utilize  the  Grid  Parallel  Processing  Infrastructure  

SbD   0  

1   3  

1  

               

0   #N/A   #N/A  

#N/A      

0  

3   Semantic  Infostructure  

       

   

0   #N/A   #N/A  

#N/A  

   

0  

               

0   #N/A   #N/A  

#N/A      

0  

  Semantic  Infostructure  and  Storage  Capabilities  

Low  Computer  Resources  in  terms  of  disk  space  

  Not  enough  disk  space  to  add  more  micro-­‐CT  images  or  RDF  triples  

 

3   3  

-1

7   Provide  means  of  larger  disk  space  as  well  as  data  compression  

DP   0  

1   1  

1  

               

0   #N/A   #N/A  

#N/A      

0  

  Integrate  the  Semantic  Infostructure  stored  RDF  data  with  the  LOD  Cloud  

Data  available  in  the  Linked  Open  Data  cloud  are  not  associated  (linked)  with  produced  SIFEM-­‐related  data  

  SIFEM  Data  not  well  integrated  with  outside  data  sources  

 

3   3  

-1

4   Incorporate  other  linked  data  sets  and  not  from  LOD  

DP   0  

1   1  

1  

 

35    

  A  user  that  is  agnostic  to  the  platform  requests  FEM  models  via  the  Search  interface  

Data  are  available,  but  user  unable  to  request  them  due  to  not  being  able  to  understand  the  Search  Interface  

  Will  not  receive  the  data  of  interest  

 

1   4  

1 1   Train  the  User  

Tra   0  

1   4  

1  

  Incorporation  of  VPH  models  

Models  from  VPH  NoE  might  mit  be  used  

  VPH  Bridging  will  not  proceed  as  required  

 

3   3  

-1

6   Provide  means  of  ETL  processes,  ontology  alignments  

DP   0  

   

0  

  SIFEM  facing  technology  replacement  issues  

Technologies  could  be  selected  that  might  be  outdated  till  the  end  of  the  project  

  Projects  continuity  after  the  end  of  funding,  could  be  damaged  

 

3   3  

-1

5   Keeping  up  with  latest  libraries  in  all  technologies  

DP   0  

1   1  

1  

  User  misuses  the  Semantic  Annotation  Tool  

User  has  attached  not  relevant  semantic  annotations  to  an  RDF  entity  

  RDF  entity  might  appear  in  search  results  that  is  not  related  too,  thus  confusing  the  search  user  

 

4   3  

-1

1   Train  the  User  

Tra   0  

2   1  

1  

               

0            

 4   Inner  ear  

Modelling          

   0   #N/A   #N/

A  #N/A  

   0  

               

0   #N/A   #N/A  

#N/A      

0  

  MS4  is  due  in  April  2014  (M14)  and  its  verification  is  "Deliver  a  fully  functional  geometry  model  of  the  cochlea  after  gathering  data  in  WP2,  meshing  and  reconstruction  the  cochlea  

Delay  of  work  in  WP3  and  WP4  

  Canot  achieve  MS4  on  time  

The  definition  and  meshing  of  the  "full3D  model"  is  not  yet  complete.  

5   4  

-1

2   Anonymize  Data  

SbD      

1   1  

1  

 

36    

from  histological  data  and  micro-­‐CT  images  in  WP3  and  modelling  in  WP4."    

  Results  from  PAK  box  model  are  not  the  same  as  those  from  the  MATLAB  box  mdoel  

Validity  of  PAK  box  model  

  Affect  further  validation  and  use  of  the  PAK  box  model  

Models  in  PAK  and  MATABL  should  generate  identical  results  

5   3  

-1

2   Anonymize  Data  

SbD      

1   1  

1  

  Compatibility  between  the  skull  model  and  the  coiled  cochlear  model  

Prediction  accuracy  

  Mis-­‐matched  interface  between  the  skull  model  and  the  coiled  cochlear  model  can  affact  input  excitation  for  the  bone  conduction  simulation    

The  interior  surface  of  the  cochlear  cavity  in  the  skull  model  is  meshed  in  a  compatible  way  as  the  external  surface  of  the  coiled  cochlear  model  

2   4  

-1

2        

1   1  

1  

  PAK  model  functions  

less  user-­‐friendly    

  Canot  attract  new  users  

A  model  should  be  user-­‐friendly  and  can  meet  basic  research  purpose  

2   3  

1 2        

1   2  

1  

  Tasks  progress  monitor  

Tasks  delay  

  delay  of  milestones  or  deliveralbes  

Monitor  tasks  progress  can  help  to  make  sure  each  task  is  going  in  a  right  direction  and  can  be  completed  on  time  

2   4  

-1

2        

1   1  

1  

  Compatibility  of  geomtrical  models  

meshing  efficiency  and  computational  cost  

  Bad  geometry  will  cause  problems  in  meshing  

A  good  geometry  should  avoid  extremely  small  

5   4  

-1

2   Anonymize  Data  

SbD      

2   2  

1  

 

37    

process  or  increase  computational  cost  

structures.    

               

0   #N/A   #N/A  

#N/A      

0  

  the  electrical  model  may  not  produce  meaningful  results  

      Although  people  have  done  electrical  finite  element  modelling  of  the  cochlea  before,  that  has  been  in  the  context  of  cochlear  implants  rather  than  in  the  context  of  coupling  of  fields  generated  by  hair  cells  in  a  cochlea  that  does  not  have  an  implant.  Whether  the  lumped  parameter  model  will  apply  to  the  finite  element  model  is  not  yet  known.  A  reason  why  it  may  not  relate  to  the  great  difference  between  the  size  of  the  hair  cells  generating  the  fields,  

3   5  

-1

  #N/A   #N/A  

#N/A  

3   5  

-1

 

 

38    

and  the  cochlea  structures  through  which  the  fields  propagate.  

               

0   #N/A   #N/A  

#N/A      

0  

3   Complex  geometry  

Inappropriate  model  

  Calculation  can  not  be  performed  

 

   

0   #N/A   #N/A  

#N/A  

   

0  

               

0   #N/A   #N/A  

#N/A      

0  

               

0   #N/A   #N/A  

#N/A      

0  

               

0   #N/A   #N/A  

#N/A      

0  

4   Size  of  the  model  

Too  fine  mesh,  large  number  of  nodes  and  elements  

  Calculation  can  not  be  performed  

 

   

0   #N/A   #N/A  

#N/A  

   

0  

               

0   #N/A   #N/A  

#N/A      

0  

               

0   #N/A   #N/A  

#N/A      

0  

               

0   #N/A   #N/A  

#N/A      

0  

5   Insufficiently  clinical  data  

Difficulties  in  measuring  

  FEM  model  can  not  be  verified  

 

   

0   #N/A   #N/A  

#N/A  

   

0  

               

0   #N/A   #N/A  

#N/A      

0  

               

0   #N/A   #N/A  

#N/A      

0  

               

0   #N/A   #N/A  

#N/A      

0  

6   Poor  mesh  quality  

Required  manual  correction  of  the  mesh  

  Calculation  can  not  be  performed  

 

   

0   #N/A   #N/A  

#N/A  

   

0  

               

0   #N/A   #N/A  

#N/A      

0  

               

0   #N/A   #N/ #N/A      

0  

 

39    

A              

   0   #N/A   #N/

A  #N/A  

   0  

7   Convergence  

Inappropriate  criteria  

  Calculation  can  not  be  performed  

 

   

0   #N/A   #N/A  

#N/A  

   

0  

               

0   #N/A   #N/A  

#N/A      

0  

               

0   #N/A   #N/A  

#N/A      

0  

               

0   #N/A   #N/A  

#N/A      

0  

8   Electrical  model  in  FEM  

Difficulties  for  implementation  

  Lack  of  validation  of  the  model  

 

   

0   #N/A   #N/A  

#N/A  

   

0  

               

0   #N/A   #N/A  

#N/A      

0  

 

 

A  way  of  applying  acceptability  criteria  is  by  indicating  in  a  matrix  which  combinations  of  probability  of  harm  and  severity  of  harm  are  acceptable  or  unacceptable.  Such  charts  are  usually  specific  to  a  product  and  its  particular  intended  use.  This  matrix  shows  the  number  of  hazards  corresponding  in  each  category.  The  horizontal  axis  indicates  the  level  of  severity  from  1  to  5,  while  the  vertical  axis  indicates  the  level  of  probability  from  1  to  6.  The  green  part  indicates  acceptable  levels  of  risk  while  the  red  part  indicates  a  hazardous  situation  for  which  measures  are  mandatory.    

After  merging  the  risks  the  outcome  was  really  satisfying.  We  calculated  a  total  of  14  risks.  Below  we  can  see  2  tables  that  demonstrate  the  risks.  

 Figure  5:  The  probability  of  occurrence  vs  severity  for  risks  

Further  analysis  of  the  merged  risks  by  category  gives  us  a  better  picture  of  the  risks  that  may  occur  in  the  system.  

   

 

40    

Modification  of  performance  In  the  risk  management  procedure  a  further  step  is  to  re-­‐calculate  the  probability  and  severity  of  a  risk  so  a  new  table  is  created  that  shows  these  values  after  the  measures  have  been  taken.    

   

 

 

41    

8 CONCLUSIONS    Risk   analysis   is   a   procedure   that   has   many   benefits   for   any   system.   The   incredible   wealth   of  information  that  risk  analysis  provides  about  the  identified  risk.  Of  course,  is  a  cost-­‐effective  and  a  more  in-­‐depth,  numerical  approach  to  analyzing  risk,  which  is  something  performed  on  risk  to  have  a  substantial  impact  on  the  project  objectives.  The  additional  information  that  risk  analysis  provides  arms  you  with  what  you  need  to  deal  with  them  in  the  best  way  possible.  And  as  one  could  imagine,  risk   analysis,   as   a   result   of   the   information  we   have   obtained,   increases   the   confidence   level   of  controlling   and  dealing  with   risk.   The   risk  management   team   is   able   to  develop  better   decisions,  more   effective   responses,   as  well   as   justify   responses   and   recommendations  made.   Risk   analysis  involves   looking   at   future   impacts   and  decision-­‐making.  On   that   note,   it   allows  us   to   control   risk  with   greater   success.   SIFEM   platform   will   be   making   much   more   informed   and   educated  recommendations  and  responses.  This  increases  the  level  of  success  that  the  risk  response  plan  will  have.   Risk   analysis   helps   to   determine   alternatives,   if   available,   and   notice   that   much   of   this  provides  supportive   information.   It   is   like  having  a   little  window  to  a   risk   that  allows  you  to  peek  inside   and   shows   you   how   the   risk   comes   about   and   the   damage   or   the   opportunity   that   it   can  result   it.  Something  else  that  should  be  mentioned  is  that  risk  deals  heavily  with  uncertainty.  Risk  analysis   aims   at   lessening   this   level   of   uncertainty   by   clarifying   the   impact   and   the   potential  outcomes.  We   can   put   together  what   seems   like   a   solid   schedule   but   there   are   always   looming  internal  and  external   factors   that  can  destroy  our  plans.  Risk  analysis   is  meant   to  help  us   foresee  what   could   happen   and   prepare   to   deal  with   those   scenarios.   In   conclusion   risk   analysis   plays   a  central  part  of  risk  management.    After  the  assessment  and  evaluation  of  the  risks  and  the  application  of  each  measure  the  majority  of   the   risk   for   software   development,   processes   and   user   interaction   were   considered   as  acceptable.    As  for  the  conclusion  we  should  notice  that  through  the  risk  management  process  a  researcher  or  a  clinician  has  the  opportunity  to  revise  and   identify  the   large  majority  of  the  risks  and  the  hazards  that  exists  with  the  inner  ear  modeling  as  well  as  the  interaction  with  the  SIFEM  system.  Although  SIFEM  platform   is   not   a   life-­‐threatening   system   that  might   harm   patients   in   a   high   degree   or   to  become  dangerous  for  his  life,  the  risk  management  process  is  the  essential  process  that  aims  at  the  improvement  of  the  quality  of  the  platform  increasing  its  overall  reliability.