D3.6 Africa
I
Lead bene
Delivery da
Revision: 1
Dissemin
PU: Publi
PP: Restr
RE: Restr
a: Discussio
mproving t
eficiary: Roy
ate: 09/05/2
1.5
nation Leve
c
ricted to oth
ricted to a g
on report
the Effectiv
yal Danish D
2017
el
her program
group specif
PRO
veness of C
D3.6 Afric
Defence Co
mme particip
fied by the c
Public
OJECT TIT
Capabilitie
ca: Discuss
ollege
pants (includ
consortium
TLE:
es (IEC) in E
sion report
ding the Co
(including t
S
EU conflict
mmission)
the Commis
CSA projeStart date:
Duration:
t preventio
X
ssion)
IECEUect: 65337101/05/2015 33 months
i
n
U
5 s
i
D3.6 Africa: Revision h
Rev. D
1.0 6
1.1. 0
1.2 1
1.3. 0
1.4. 0
1.5 0
: Discussion
This project haThe content of contains.
history
Date
6/11/2016
07/11/2016
15/03/17
06/04/2017
07/04/2017
07/05/2017
report
s received funding frthis document reflec
Autho
Thoma
Jonas
Thoma
Thoma
Thoma
Kirsi H
rom the European Uncts the authors’ view a
or
as Mandru
s Pilgaard,
as Mandru
as Mandru
as Mandru
Hyttinen, LA
Public
nion’s Horizon 2020 and the European C
p, RDDC
RDDC
p, RDDC
p, RDDC
p, RDDC
AU
research and innovaommission is not res
Notes
Templa
Minute
roundt
Introdu
Full dr
Final d
Coord
Review
comple
tion programme undesponsible for any use
ate created
es from sem
table comp
uction writt
raft edited.
draft submi
inator
w and final
eted
CSA proStart date
Duration
er grant agreement Ne that may be made o
d.
minar and
piled.
tten.
itted to IEC
version
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
CEU
U
5 s
D3.6 Africa
Contents
EXECUTIV
1 INTRO
2 ROUN
3 PUBLI
4 CONC
a: Discussio
VE SUMMA
ODUCTION
NDTABLE O
C SEMINA
CLUSIONS .
on report
ARY ...........
.................
ON THE FO
AR AT KORN
.................
..................
..................
UR AFRICA
NLOFTET,
..................
Public
..................
..................
AN CASE S
KASTELLE
..................
..................
..................
STUDIES 31
ET ..............
..................
S
..................
..................
1st October
..................
..................
CSA projeStart date:
Duration:
..................
..................
2016 ........
..................
..................
IECEUect: 65337101/05/2015 33 months
3
...... 4
...... 6
...... 7
.... 18
.... 26
U
5 s
3
D3.6 Africa:
One round
project. Th
DRC. This
discussion
Effectivene
organised
participant
studies as
effectivene
drawing bo
but also hig
Libya is p
mission. S
mission is
CAR the E
humanitari
mission th
However, t
be address
case of th
interventio
was limited
not preven
that it was
of the EU,
to primarily
that year. A
mandate. H
operations
given by t
operations
members t
and the EU
central ele
: Discussion
This project haThe content of contains.
EXECUTI
dtable even
he events f
s report pro
during th
ess of Inte
by the Roya
s included
s well as p
ess of inter
oth a rather
ghlighting th
plagued by
South Sudan
without dou
EU-force ma
an action,
hat was rep
the EU-forc
sed, and on
e DRC fou
n into the to
d in size an
nt the flaring
the first ES
that some m
y Kinshasa
Again the E
However, th
s, especially
the membe
s. This was
to commit a
USEC miss
ement of th
report
s received funding frthis document reflec
IVE SUMM
ts were org
focused on
ovides inform
he event.
ernational A
al Danish D
experts on
practitioners
rnational as
r pessimisti
he difficultie
internation
n has return
ubt, the larg
anaged to s
and for pol
placed by a
ce missions
n the mediu
r cases we
own of Bun
nd time, and
g up of the
SDP mission
member-sta
, mandated
EU-force de
he deploym
y around na
er-states fo
very visibl
and deploy
sions, that fo
he peace-a
rom the European Uncts the authors’ view a
MARY
ganised in t
the WP3’s
mation on t
The round
Assistance
Defence Col
the Africa
s of crisis
ssistance to
c picture of
es for EU w
al strife to
n into civil w
ger strategic
stabilise a c
itical dialog
a UN force,
s also highli
um to long
ere debated
ia, to stop a
d managed
conflict aft
n, and it bec
ates wanted
d to assist t
ployment w
ment highligh
ational cave
or EU led m
e in the lat
forces. Th
ocused on
greement.
Public
nion’s Horizon 2020 and the European C
the framewo
s four case
the roundta
dtable disc
and Local
llege on 31
in general
managem
o the four
f the curren
working as a
such an e
war, whilst
cal and me
critical secu
gue to take
, and the f
ights a num
term impac
d. The first
and pre-em
to achieve
ter it had le
came a tren
d. In 2006 th
he UN forc
was limited i
hted a num
eats in oper
military ope
ter CAR de
he two othe
help implem
Even thou
research and innovaommission is not res
ork of Work
e studies on
able event,
cussion an
Ownership
October-1.
, sub-matte
ent. A tota
African ca
nt situation
conflict ma
extent, that
the technic
dium to lon
urity situatio
place. The
force mana
mber of inte
ct of this typ
was opera
pt an unfold
its objectiv
ft. The imp
ndsetter for
he EU agai
e MONUC
n size and
mber of less
ration, logis
erations, co
eployment,
r EU missio
menting the
gh the EU
tion programme undesponsible for any use
k Package
n Libya, CA
and presen
d the sub
p in the fo
November
er experts,
al of 18 sp
ases from d
in the four
anager in th
t EU had t
cal impact o
ng term imp
on which all
e EU-force
ged to larg
rnal EU cha
pe of militar
ation Artemi
ding ethnic
es. Howeve
ortant impli
the future m
n deployed
in securing
time, and m
ons learned
tics, but als
ompared to
where it w
ons in the
e SSR prog
was involv
CSA proStart date
Duration
er grant agreement Ne that may be made o
as part of
AR, South
nts the mai
bsequent s
our case s
r 2016. The
on peace a
peakers ex
different pe
countries i
is context.
to withdraw
of the small
pacts are no
lowed for in
was a robu
gely fulfil its
allenges tha
ry intervent
is, the EU
conflict. Th
er, the depl
ication of A
more indep
a robust m
g the DRC e
managed to
d for the EU
so the diffe
o for instan
was difficult
DRC was t
gram that co
ved many
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
the IECEU
Sudan and
in points of
seminar on
tudies was
roundtable
and conflict
xplored the
erspectives,
n question,
w from that
EU airport
ot visible. In
nternational
ust bridging
s mandate.
at needs to
ions. In the
led military
e operation
oyment did
Artemis was
endent role
military force
elections in
achieve its
U for future
rent priority
nce NATO-
to get EU-
the EUPOL
onstituted a
years, and
U
5 s
U
d
f
n
s
e
t
e
,
,
t
t
n
l
g
.
o
e
y
n
d
s
e
e
n
s
e
y
-
-
L
a
d
D3.6 Africa: initiated a
long term
and ambit
EUSEC m
considerat
Brussels a
securing b
: Discussion
This project haThe content of contains.
whole rang
objectives.
ions, and t
missions wa
ion. Furthe
and then w
etter comm
report
s received funding frthis document reflec
e of new in
The study
then the bu
as plagued
rmore the s
what happe
munication a
rom the European Uncts the authors’ view a
nitiatives, the
shows, tha
udget availa
by being
study show
ns on the
and coopera
Public
nion’s Horizon 2020 and the European C
e missions
at there was
able and re
overambitio
ws that there
ground in
ation betwee
research and innovaommission is not res
did not ma
s a discrepa
eality on th
ous, and n
e is a disco
the DRC,
en the two l
tion programme undesponsible for any use
nage to ach
ancy betwe
he other ha
not taking t
onnect betw
and there
evels.
CSA proStart date
Duration
er grant agreement Ne that may be made o
hieve there
een project
and. The E
the DRC c
ween what
is an urge
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
medium to
formulation
EUPOL and
context into
happens in
ent need of
U
5 s o
n
d
o
n
f
D3.6 Africa:
1
One round
Package 3
CAR, Sout
main point
The round
and took
attended b
specialist,
participant
major them
discussant
civilian cris
it was attem
presentatio
On 1st No
Defence C
manageme
during the
people from
The purpo
research re
the four ca
useful for
report in an
and inform
: Discussion
This project haThe content of contains.
INTRODU
dtable even
3 of the IEC
th Sudan an
s and findin
dtable discu
place at th
by thirteen p
as well as
s can be fo
mes of from
t. Through
sis manage
mpted to ide
ons and dis
ovember 20
College, in p
ent in Africa
roundtable
m the public
ose of the
esults to a b
ases studies
future EU
n open pee
mative discus
report
s received funding frthis document reflec
UCTION
nt and one
CEU projec
nd the DRC
ngs of discu
ussion was
he Danish
participants
s practitione
ound below
m the studie
this roundt
ement missi
entify challe
cussion is o
016 at the D
partnership
a, focusing
e the partic
c with intere
public sem
broader aud
s, and to dr
CSDP miss
er review pro
ssion.
rom the European Uncts the authors’ view a
public sem
ct. The even
C. This repo
ussion durin
organised
Defence Li
s, including
ers of crisi
w. Five spea
es, and eac
able event
ons in the f
enges that w
outlined in t
Danish Def
with the IE
on the four
cipants wer
est in the fie
minar was f
dience, sec
raw out gen
sions. An u
ocess, and
Public
nion’s Horizon 2020 and the European C
minar have
nts focused
ort provides
ng the event
by Royal D
brary at Ka
African sub
is managem
akers gave
ch presenta
the IECEU
four cases
were to be o
the below se
fence Libra
CEU partne
r case-studi
re the sub-
eld.
firstly to co
condly to ha
neral conclu
underlying g
the use of e
research and innovaommission is not res
been orga
d on the W
information
ts.
Danish Defe
astellet, Co
b-matter ex
ment and E
presentatio
ation was f
U study find
studies wer
of a more g
ection.
ary at Kaste
ers, organis
es. Thirty p
matter expe
nvey and p
ave in depth
usions from
goal was to
expert discu
tion programme undesponsible for any use
nised in th
P3’s four c
n on the eve
ence Colleg
openhagen.
xperts, peac
EU-crisis m
ons that out
followed by
dings on the
re put within
eneral natu
ellet, Copen
sed a public
people atten
erts, Africa
present som
h discussion
m the four st
o receive fe
ussants hel
CSA proStart date
Duration
er grant agreement Ne that may be made o
he framewo
case studies
ents, and p
ge 31st Oct
. The roun
ce and conf
managemen
tlined the fi
y sub-matte
e effectiven
n a wider c
ure. The ma
nhagen, Ro
c seminar o
nded. As wa
nist, practit
me of the
ns on the fin
tudies, whic
eedback on
lped genera
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
ork of Work
s on Libya,
resents the
tober 2016,
dtable was
flict studies
nt. A list of
ndings and
r expert as
ness of EU
ontext, and
ain points of
oyal Danish
on EU crisis
as the case
tioners and
preliminary
ndings from
ch could be
n the study
ate an lively
U
5 s
k
,
e
,
s
s
f
d
s
U
d
f
h
s
e
d
y
m
e
y
y
D3.6 Africa:
2
Aim of disc
Participant
Dr. Annem
Dr. Thoma
Dr. Judith V
Dr. Arnold
Lasse Kris
Elisa Norva
Agnes Fou
Dr. Jyrki R
Maruan El-
Welcome a
Prof. PeenEU conflictcompare aidentified, of interest October 20research presearch. Iremember however, aproject nee
Congo cas
Prof. Mandthe projectcase studypresentatiosince 2003difficult to ito identify wundertakenlonger avascope and the project
: Discussion
This project haThe content of contains.
ROUNDT
2016
cussion: To
ts:
marie Peen R
as Mandrup
Verweijen,
Kammel, A
stensen, form
anto, FINCE
ures, HoM,
Ryohomäki,
-Krekshi, C
and introduc
n Rodt startet prevention
at EU operain order to ifrom the EU
016 the projpackage is dIt is a this stthat despite
also importaeds to ident
se: Prof. Tho
drup startedt, and what y, which, at on was cons3 – in five midentify the what the EUn. The diffic
ailable, and mandate, wts. The EU p
report
s received funding frthis document reflec
ABLE ON
identify com
Rodt, RDDC
, RDDC/SU
Ghent Univ
AIES
mer HoM E
ENT
Project Zing
CMC Finlan
risis Manag
ction to the
ed by introdn and capactions in diffemprove futu
U in Brusseject was nedone. Curretage importe the fact thant to rememtify concrete
omas Mand
d with a dische was prea later stagsequently o
major engagimpact of th
U has doneculty in this that the fivewhich constprojects we
rom the European Uncts the authors’ view a
N THE FOU
mmon findin
C
U
versity, Belg
UAVSEC S
go, CAR
nd
gement Initia
IECEU pro
ducing the IEcity buildingerent regionure operatio
el, which shoearly half-waently compatant point ouhe it is an Ember, that te proposals
drup
claimer and esenting at tge, would beonly the prelements, buhese specifin the DRC
is that it bote programs titute direct
ere initiated
Public
nion’s Horizon 2020 and the European C
UR AFRIC
ngs from ca
gium
South Sudan
ative
oject and co
ECEU Horizg. The basicns and highons. Fortunows that theay in 3-yeararative workut and highl
EU-funded pthere is a ne for the futu
pointed outhis stage we separatedliminary find
ut not operatfic EU initiatC, what kindth back in tivery differechallengesto help imp
research and innovaommission is not res
CAN CASE
ase studies
n
ontext: Prof.
zon 2020 pc idea behinhlight the lesately enougere is an intr project perk is being unlight weakn
project, thereed to be pure.
ut that he hawas a combid and constidings. The Eting alone. Ttives. The fod of projectsime, which ent in natures in creatingplement a pe
tion programme undesponsible for any use
E STUDIES
in order to
Annemarie
roject, and d the projec
ssons learnegh the projeterest in theriod and thendertaken, besses in thee is full acaolicy releva
ad only receination of thitute to sepaEU had beeThis by natuocus of the s and programeans that e, time, reso an overvieeace-agree
CSA proStart date
Duration
er grant agreement Ne that may be made o
S 31ST OC
make comp
e Peen Rod
its academct was to loed and less
ect have rece project. Bye main part but still roome work, and
ademic freedant, because
ently been ahe DRC revarate studieen present iure made itDRC studyams that hat the involveources avai
ew, but alsoement that E
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
CTOBER
parisons
dt
ic focus on ok and
sons ceived a lot y end of
m for d dom. It is e the
added to iew and
es. The in the DRC t more y was firstly as been ed are no ilable, comparing
EU had
U
5 s
D3.6 Africa: been involvEU had to and had toof armed inthreat to thproject, whbest practibig challento sustain tmaintainedattracting sArtemis, wenablers frEUFOR whthe 2006 eEU-membebetween 2EUSEC. Athe implemoperation, humanitaridifficult to a
Initial findin
No solu
EU Les
FAdiffsuc
EUpoleleforc
15-stra
Ge Lim
cooEUdonbeccer
EU Ma
donLoc
Strapaycenpho
: Discussion
This project haThe content of contains.
ved in draftnavigate w
o embark onnsurgents whe local pophilst the conce SSR, sin
nges operatthe infrastrud. A direct cstudents du
which was larom non-EUhich was a
elections, aner states, a005-2015 la
All these initimentation of
since it tooan situationassess the
ng/ lessons
exit strategution, but thFOR: Deplossons learnRDC/PR foficult for EU ccessful, limPOL – fromice present ctions. No lces. -year strategategy. neral findin
mited impactordination. C and coopenors undermcause fundirtain areas. SEC – mucin goal wasnors. EU ancal parties wategy changys. Problemntre in Kinchones to com
report
s received funding frthis document reflec
ing. It was aithin a politi
n a complicawere and stipulation. In enflict was stince there wing in the Ducture and pconsequence to loss of
aunched in 2U members military opend was undend then Turaunched boiative was af the peace-k place bac
n. The operalonger term
learned
gy, limited dhat was not oyed to seced: Largestrces fortifieforces to o
mited violencm IPU to PN
at beginninong term po
gy to estab
gs: t, different tCorruption seration betwmines the png will disa
ch more pros to secure end UN problwhere not trge. Focus o
m with salarihasa are no
mmunicate,
rom the European Uncts the authors’ view a
a tremendoical contextated nation-ill are activeessence thell ongoing.
were immediDRC is the sprovide logi
ce of this waf income an2003. It wassuch as So
eration depler joint Frenrkey. As paroth two EUPa part of an -agreementck in 2003, bation was li
m impact of t
deployment the aim. Go
cure 2006 et part of forcd airport maperate. Natce, local res
NC. 2004 Kinng. First tasolice trainin
lish a profes
types of polstill a proble
ween internarocess. Lacppear. Judi
oblematic thelections. Tems of coorustworthy aon logistics es being pa
ot working, owhile many
Public
nion’s Horizon 2020 and the European C
ous task duet, where the-building pre in DRC, ee EU was inThat posediate securitysize of the cistics. For inas the policed distance s Frence-leouth Africa aoyed in supnch and Gert of the pea
POL missionEU promise
t. It is difficubut it manamited in arethe operatio
time and roood logisticlections. ce in Gabonaking it diffitional caveasistance. nchasa. Ob
sk was to mng. Internati
ssional sec
ice leading em. Police national donock of sustainicial reform
han EUPOLTraining of sordination. Eand did not and HR ele
aid out to deonly one rey places the
research and innovaommission is not res
e to complee internationoject. This hspecially in
nvolved in ad a significay concerns country and nstance raile training ceto centres.d dominateand Canadapport of the erman lead, ace agreemn and then te to the Conult to investiged to stabea of operaton.
obust mandcs due to pro
n. Vulnerabcult to use. ats made op
bjective chaake police fonal funding
curity force.
to infightingnot serving ors have wonability plandifficult also
. security forcEU impact o
want to cooements. Impead soldiersmains oper
ere is no net
tion programme undesponsible for any use
x nature of nal communhad to be dthe East, c
a post-conflint challengethat neededthe lack of s and roadsentres havinThe first EUd EU-operaa. In 2006 thUN force inand had pa
ment the EUthe military ngolese govgate the imilise an thretion and in l
ate (Bunia)oximity of E
le due to re No clear m
ps. difficult.
nged over tforce capabg went prim
Problem of
g and compthe interest
orked well, bn. Locals doo, magistrat
ces not cooron local actooperate. portant that s. Computeational. Poltwork cover
CSA proStart date
Duration
er grant agreement Ne that may be made o
the DRC conity had takeone whilst t
constituting ict state-buie in implemd attention.infrastructu
s are not beng difficultieU operationation, whichhe EU depln the DRC tarticipation
U in the periotraining mis
vernment tompact of the eatening selength, and
). No long teEntebbe airp
esponse timmandate ma
Elections r
time, virtualble of handlmarily to sec
f implement
petition, lackts of the pobut infightino not want retes do not d
rdinated beors did not w
soldiers goers set up inlice instead r. No comm
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
onflict. The en sides, the numbera constant ilding
menting One of the
ure. Difficulteing es of was
h got critical oyed to secure from most od ssion o support Artemis curity and it is
erm port.
e. ade it elatively
ly no ing
curity
ting the
k of pulation. g between eform, dare enter
tween work well.
ot their operationsusing cell-
mon
U
5 s
r
t
s
D3.6 Africa:
docact
Imp HR
dowarediff
Coobud
Discussion
Dr. Judith V
Go2nd peractdiff
Wif Go
are Ma
join Foc Bila
arm Ma
ear Sym Foc
doi Com
propro
Fra Hea
with
Thomas M
No equ
Judmig
ProEU
South Sud
: Discussion
This project haThe content of contains.
ctrine or traors. portant to id
R focus startwn, the Cone yet to be sferent countordination: dgets-cycles
n
Verweijen:
od idea to fEUPOL. In
rceptions ofor as they s
ferent actorsfe of commaod idea to f
e well arrangny soldiers
ning rebels cus on infraateral focusmy. rgin of fraudrlier. mbolic valuecus on armyng police wmmon doct
oblem. Mighoblem in joinagmentationad of EUSEh different le
Mandrup:
common duipment madith: Systemght be in offoblem with m say no.
an case: D
report
s received funding frthis document reflec
ining manua
dentify whatted 2012. Fngolese werseen. Still notries. Lack of truss, normative
focus on 2nd
nteresting tof Congolesesupported (s. ander of armfocus on boged, but it isthat are trainstead.
astructure dos on infantry
d has been
e should alsy rather tha
work and dorine: Differe
ht not mattent operationn on donor aEC often trieeaders taki
octrine makakes it difficum not gearedfice. many actors
r. Arnold Ka
rom the European Uncts the authors’ view a
al, because
t the EU areocus on estre supposedo military do
st and comme values etc
d EUPOL. To look at bilae actors. Foname?). Pe
my base: Fath negatives not implemained are no
oes not proy training, w
reduced. M
so be includn police: Diminating arent donors wr that much
ns between and patronaes to make ng different
kes it difficuult to repair d for long te
s makes it p
ammel
Public
nion’s Horizon 2020 and the European C
e the military
e doing andtablishing ad to take ovoctrine of th
mon interesc..
To get a moateral defenor a lot of Coerceptions o
amilies folloe and positivmented dueot being app
oduce resultwhile EUSEC
More accura
ded in reporifficult to doreas. with differen
h, as the uniunits.
age. a personal t paths.
ult to shape r and maintaerm plannin
possible for
research and innovaommission is not res
y forces are
what the Ua military edver funding he defence f
st a key cha
re coherentnce programongolese, thof Congoles
ow soldiers ve sides of me to lack of fpointed to jo
ts. C aimed at
ate estimatio
rt. o police wor
nt doctrine dits still have
imprint. Ma
the future oain. ng. Problem
r Congolese
tion programme undesponsible for any use
e being train
UN are doingucation. Aftthemselvesforces. Troo
llenge. Diffe
t paper andms. Also intehe EU was se army sold
on deploymmissions. Ofunding. obs. Conseq
reforming th
ons of the s
k when it is
does not nee cohesion.
akes it difficu
of the militar
of econom
e to approac
CSA proStart date
Duration
er grant agreement Ne that may be made o
ned by diffe
g. ter EUSEC s. The effecops still trai
erent intere
d conclusioneresting to lnot seen asdiers on the
ment to fronOn paper ma
quence: Ma
he administ
size of the fo
s the military
ecessarily reIt could how
ult to remai
ry. Too muc
mic junctures
ch other act
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
rent
closed cts of this ned by
ests,
ns focus on ook at s a neutral ese
t lines. any things
any are
tration of
orces than
y that are
epresent a wever be a
n on track
ch different
s and who
tors when
U
5 s
D3.6 Africa:
Backgroun
The indepefrom two loagreementThe since influence inwas linkedsigned in Awas expecMore than
Preliminary
Su
: Discussion
This project haThe content of contains.
nd:
endence of ong civil wat was reachthe indepenn South Sud to ethnic te
August 2015cted to retur
1 mio. IDP’
y findings:
Planning c Mis Mis
co Se Me
20 SO
an SIA
Operation Fir On Pro Bu
Competen Pro Th La En
Comprehe EU We Cru
evapro
Interopera Co
on Go Dif Re
uccesses First CSD Training Good co Due to li
report
s received funding frthis document reflec
South Sudars and conf
hed in 2005,ndence in 2dan. The ouensions and5. JMEC unrn to Juba in’s. currently
capacity: ssion followssion basednstructed
ecurity situaember state11 disappe
OR differed d how BrusAC requiremal capacity:
rst aviation snly seven moblems of fi
udgetary connces: oblem of reus change ck of region
ntry training ensiveness UAVSEC laceekly meetiucial momeacuation plaocedures mability ooperation b
the groundood relationfferent apprelatively goo
DP missionof personn
ooperation wmited mand
rom the European Uncts the authors’ view a
an caused flict between, which inclu011 bilaterautbreak of cd personal mnder the lean April 2016y. Tensions
wed standard on wrong
tion differenes lost intereared as situfrom view o
ssels assessments did n: security mis
member stateinding suitanstrains due
cruiting skilfrom secon
nal expertiseshould hav
cked visibilitngs betwee
ent: Evacuatans foresee
might have h
between EUd. s with emba
roaches betod cooperat
in aviation el under dif
with other acdate no harm
Public
nion’s Horizon 2020 and the European C
it to becomn Muslim anuded agreeal relations civil war 201matters betwdership of F
6, but fled care continu
rd CSDP ruassumption
nt than repoest in missiouation did nof Brussels sed situatioot fit South
ssion deploes seconde
able personne to strict ru
led people ndment to coe.
ve dealt mor
ty en EUDel antion of EUA
en and no chelped the m
UAVSEC an
assies and tween HQ’stion with loc
security fficult conditctors m
research and innovaommission is not res
e a landlocknd Christian
ements on hwere priorit
13 betweenween the twFestus Mogountry in Ju
uing, Masha
les for missn that secon
orted by Tecon. Euphoriot improve.institutions.
on. Sudan purp
yed by EUed personnenel for aviatules. Howev
in aviation sontracts to g
re specifica
nd EUAVSEACSEC aftechain of commission.
nd other inte
NGO’s s, especiallycal authoritie
tions
tion programme undesponsible for any use
ked countryn populationhow to sharetised, whichPresident a
wo. A peacegae. Vice-Pruly 2016 aftear still claim
sions nd airport te
chnical Assa for new S . Gap betwe
poses.
el, no third stion securityver FPI prov
security get right nu
lly to situati
EC r deteriorati
mmand prop
ernational o
y EU and UNes.
CSA proStart date
Duration
er grant agreement Ne that may be made o
y. It had to rns. The peae the oil-revh reduced Eand Vice-Pe agreemenresident (VPer massive s to be VP.
erminal cou
istance MisSouth Sudan
een mission
states engay ved very fle
umbers
ion
ion on the gperly decide
organisation
N.
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
recover ace-venues. EU resident
nt was P) Machar clashes.
ld be
ssion n state in
n in field
aged
xible.
ground. No ed. Better
ns perfect
U
5 s
D3.6 Africa:
Sh
Discussion
Lasse Chr
Expectaconditio
Time onmission
Difficult institutioThese pconduct
Not suremore un
Lack of Two are Evacua Lack of Importa
from the Problem
they ho
Arnold Kam
Agrees up miss
Difficult study w
Difficult was term
Further
Peter Horne
Jubafor U
Central Afr
The findingministries,
: Discussion
This project haThe content of contains.
Partial fuhortfalls Mission Difficultie No impa Situation No susta
n
istensen:
ations oftenons. n ground 14n was deploy
to train wheons where nproblems wt from missie if missionnderprovidestrategic pl
eas of frictiotion plans mchain of co
ant to learn fe lessons lem that it is dld no secret
mmel:
that time spsion.
to get in towas EU fund
to get info minated twoproblems o
e/RDDC-RU
a (internatioUN, so not o
rican Repub
gs based onNGO’s etc,
report
s received funding frthis document reflec
ulfilment of m
based on wes in deployct on overa
n changed cainable impa
too high fro
4 months. Lyed. Thingsen traineesnot suited fohere not forion staff. was overp
ed than ovelanning. on: made in Bruommand intefrom the lesearned repodifficult to obt informatio
pan betwee
uch with theded. Could babout the oo years agoof a change
UC:
onal) airportonly EU.
blic case: E
n two separ, and 34 inte
rom the European Uncts the authors’ view a
mandate
wrong assumying suitableall security incausing misact
om politicia
ack of follows change du are illiterator their posireseen from
rovided withrprovided.
ussels withoernally in Essons, bad oorts. btain classifn.
en TAM and
e right peopbe becauseoverall compo. in people g
t relatively w
lisa Norvan
rate studieserviews for
Public
nion’s Horizon 2020 and the European C
mptions e personnen South Sudssion to be e
ns, not taki
w up from tiuring 6 monte and non-eitions. Civil
m home. Ca
h support st
out consultinU mission. or good. Pr
fied docume
d deploymen
ple. Not pose the EU delprehensive
going in and
well working
nto
, and on 23second stu
research and innovaommission is not res
l dan evacuated
ng account
ime TAM mnths. english speadministratused a bit o
taff. Necess
ng the miss
roblem inter
ents that rea
nt was too l
ssible via thlegation waapproach.
d out.
g today. Sti
3 qualitativeudy.
tion programme undesponsible for any use
on the actu
made their as
eaking. Majotion staff waof indisciplin
sary with sta
ion.
rnally in EU
ally should
ong. Should
e EU channas not well-cEU respons
ll no sustain
interviews
CSA proStart date
Duration
er grant agreement Ne that may be made o
ual situation
ssessment
ority of headas not expenary/unortho
aff, and mis
that they d
not be class
d have bee
nels, even tconnected. se was that
nable evacu
with people
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
n and
until
ds of rienced. odox
ssion was
o not learn
sified as
n a follow
though the
project
uation plan
e from
U
5 s
D3.6 Africa:
Backgro
CAR becamhistory of vforces couinfrastructubetween CChapter VIconflict froneeded thethe operatiended on 9The aim ofBangui airp
Findings:
Political – S
Inte
Inte
Ext
Ext
Capability
S
Capability
So
T C
: Discussion
This project haThe content of contains.
ound on CA
me indepenviolent militald not proteure resulted
Christians anII interventiom spreadine EU Councion, so the E945. 18 EU f the deployport.
Strategic le
ernal Succe EU pro Contrib CAR di Operat Military
ernal Failure EU res Deploy
ternal succe Military EU effo EUFOR
ternal failure Limited Securit Misbeh
reputatassaultsituatio
Judith Vnumbe
1: Planning
Success: F
2: Operatio
Success: Moperations.The structuChallengesit.
report
s received funding frthis document reflec
AR-conflict:
ndence in 1ary takeoveect the popud in many IDnd Muslimson. And ledg, and to stcil decided oEU Battle Gmembers c
yment: To co
evel
esses oved to be abuted to preid not becomion part of t
y operationaes ponse failu
yment delayesses y interventioort helped reR RCA broues d mandate ity deteriorathaviour fromtion of EU trted a girl(s?
ons. Verweijen cr of mechan
g
rance as a
onal capacit
Multinational re of the op
s: Inflexible f
rom the European Uncts the authors’ view a
960 and is rs. A coup i
ulation. The DPs. The vio. French ini to the depl
top unfoldinon (2014/73
Group was ncontributed ontribute to
a global seceventing theme a terrorithe EU comal goals wer
re due to deyed up to 6 m
on was the reduce tensiught added
n terms of tted once EU
m EUFOR Rroops. A gro?). Also men
comment: Dnisms.
framework
y
lity and neu
peration wasfunding me
Public
nion’s Horizon 2020 and the European C
one of the win 2013 spaviolence th
olence wasitiative to stloyment of O
ng humanita3/CFSP). Hnot deployeas well as n
o provision o
curity actor, e conflict ist haven
mprehensivere met
elay months, wh
right decisioions and imvalue to oth
time, area oU left.
RCA toward oup of girls ntioned that
Difficult to es
nation.
utrality were
s suitable fochanism, fr
research and innovaommission is not res
worlds leastarked a civilhat followed based oneabilize situaOperation S
arian crisis. owever, thed. Initial planon-EU couof safe and
achieving t
e approach
hen situation
on mprove secuher foreign t
of operation
population reported th
t EU forces
stablish sco
e advantage
or the operaragmented p
tion programme undesponsible for any use
t developed war the inecombined w ethnic and
ation. UNSCSangaris anAs further ce Ukraine cran called foruntries Geosecure env
heir politica
n required a
urity troops in th
s and resou
had a negaat UN troophad particip
ope of incide
es to other in
ational envirpre-deploym
CSA proStart date
Duration
er grant agreement Ne that may be made o
d countries.effective sewith poor
d religious liCR (2127), nd MISCA tocontributionrisis overshr 1100 troop
orgia and Movironment a
al goal
a rapid depl
e area
urces.
ative effect ps had sexupated in sim
ents, becau
nternationa
ronment ment trainin
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
It has a curity
nes authorized o stop the s where
hadowed ps, but ontenegro. round
oyment.
on the ually milar
use of a
l
g or lack of
U
5 s
f
D3.6 Africa: Capability
Suc Go Lim
Capability
Suctha
Chares
Capability
Capability
Lim
Operation currently, bresented b
Discussion
Agnes Fou
Inc Lan
mis Coo Not
be
Judith Verwthat conclu
Themes:
Freintecou
InteFre
Libyan cas
The EU-prMission Libfall of the rrise of radi
: Discussion
This project haThe content of contains.
3: Interope
ccess: Goood task divi
mited resour
4: Compete
ccess: Stroan other forcallenges: In
servists dep
5: Compreh
6: Technolo
mited infrast
ended in 20but there arby the popul
n:
ures:
orporation onguage issusunderstandoperation bt sure if misimproved. U
weijen: A suusion.
ench role in erests. So wuntries role elligence facench speaki
se: Dr. Jyrki
rogram invebya (EUBAMregime of Mcal Islamic
report
s received funding frthis document reflec
rability
d local netwision betwerces pooled
ences
ng respect ces. nexperienceloyed.
hensivenes
ogy
ructure
015. CAR cre accusatiolation.
of local poliues. Meetindings.
between intession wouldUN not at fu
uccess bec
the intervewhy is it thatin that, andctor. What ang troops to
Ryohomäk
estigated in M Libya). T
M. Ghaddafi,movements
rom the European Uncts the authors’ view a
works en UN, Fra for larger im
towards pro
ed officers d
s
carried out eons that they
ce and secugs had to b
ernational ohave been
ull capacity.
ause it was
ntion was vt the EU is i
d in the confare the EU o French sp
ki
the Libyan he mission , that resultes. For the E
Public
nion’s Horizon 2020 and the European C
nce and EUmpacts
oportionality
deployed to
elections fory are comm
urity forces be held in bo
organisationn more succ
No agreem
s so short, o
vital. Franceinterveningflict in geneforces depl
peaking cou
case was thcame on thed in Libya
EU the estab
research and innovaommission is not res
U.
y principle.
a challengi
r the first timmitting murd
would haveoth French
ns needs imcessful if lonment in plac
or despite it
e did not inte, and what ral? oying into?
untries.
he Europeahe backdropdeterioratin
blishment o
tion programme undesponsible for any use
EU describe
ng environm
me. 12,000 ers and crim
e been usefand English
provement.nger. But trace to share i
was so sho
ervene becais France a
Not optima
an Union Bop of the Libyng into furthf an Integra
CSA proStart date
Duration
er grant agreement Ne that may be made o
ed as less a
ment. Main
UN troops mes and the
ful. h to avoid
. ansition to Uintel.
ort? Difficult
ause of econd the neig
al to deploy
order Assistyan civil waher civil strifeated Border
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
aggressive
ly
in place ey are
UN should
t to make
onomic ghbouring
non-
tance r and the e and the r
U
5 s
D3.6 Africa: Managemeauthorities Middle Easwas suppo2013 and wMalta and On the surdevelop, amission proplanning a
Reasons fo
Libya, an a
ThrGa
No
The interve
Inte Ala
cas Hou Fra
Aftermath
Pas Ran
late Har
Internal as
Libycou
By inte
ShoStru
Internation
Col
: Discussion
This project haThe content of contains.
ent system to control ist and Sub-osed to havewas eventuLibya due t
rface of thinnd not mucovides somnd develop
or failure
Inability to Politico-strEU responIntelligenceThe reality
accidental s
ree provinceddafi 1969-interest in
ention
ernational nan J. Kupermsualties sevuse of Com
ance led, the
ssivity from nd Corp. 13e 2011. Optrsh resentm
spects
ya a rentieruntry. 2013 sever
erests. ocks followeuctural regi
nal framewo
llapse realis
report
s received funding frthis document reflec
(IBM) was ats borders,
-Saharan Afe a capacityally evacuato security cgs the EUB
ch evidenceme important
ing such m
grasp comrategic: Toonsibility, but e. Problem
y was again
state
es until 196-2011. unitary state
narrative argman: Intervevenfold mmons repo
e internatio
the interna3,000 troopstimistic estim
ment toward
r state unde
ral groups w
ed: Collapsonalism, ina
ork
sed by inter
rom the European Uncts the authors’ view a
at the strateand therebfrica, wherey building d
ated in July concerns, thBAM missio
of capacityt insights prissions.
plex natureo high ambit
road forcedwith missiost the missi
63. Little com
e – the EU
gued that Gention multi
rt on Libya.nal commun
ational comms might havmate. ds foreign tro
er Gaddafi.
were fighting
e of immedability to dis
rnational co
Public
nion’s Horizon 2020 and the European C
egic level any protect EU
e Libya funcimension fo2014. Howe
hat made a n was a comy building carovided by t
e of “state” intions of the d upon EU. on planning ion
mmon histo
failed to rea
Gaddafi was iplied the du
Must readnity followe
munity, exave been eno
oops on the
Removing h
g for power
iate politicastribute…
ommunity. T
research and innovaommission is not res
n attempt toU from the t
ctioned as aocusing on tever, a lot opermanent
mplete failuan be foundthe failures,
n Libya. EU, too littl before dep
ory. Colonia
alise that.
a threat to uration of th
. d.
cerbated though, if the
e ground.
him took aw
r and resour
al arrangem
Tried to enga
tion programme undesponsible for any use
o enable thethreat of ma
a stepping straining. It wof staff had
presence ire. The IBM
d. Neverthel, especially
e action wh
loyment.
l rule until m
the Arab Sphe conflict s
he situation.reconstruct
way the stab
rces. No na
ents after th
age state-b
CSA proStart date
Duration
er grant agreement Ne that may be made o
e weak Libyass migratiostone. The was launcheto rotate ben Libya imp
M concept dless the EUon how the
hen required
monarchy 1
pring sixfold and i
. tion had tak
bilising elem
ational elites
he revolutio
building mea
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
yan on from the mission ed May etween possible. did not UBAM e EU is
d. Not only
951-1969,
ts
ken place
ment of the
s, only local
on 2.
asures.
U
5 s
D3.6 Africa:
Friecon
EUBAM Li
Nee Pro No Wh
ass
Mandate:
Sup
Effective re
IBM Wh
wor Tra Wh
Why failure
Theto t
Hea Too
Lessons to
Inteant
MaTim
By was
How
Discussion
Maruan El-
Val Not Sid
com Trib
con How
mu
: Discussion
This project haThe content of contains.
ends of Libyntrol.
bya:
eds assessoblems alrea
SOMA. hen the invitsessment.
pport Libya
esults:
M concept nhen asked ifrk wasted, a
aining and mhen the miss
e?
e undividedtalk to. avily suppoo little, too l
o learn
elligence. Cticipated by ndate overl
me wasted ttime of the s beyond thw can we fi
n
-Krekshi
lid conclusiot an issue o
de lining keymplicated thbal matters nfusion wasw to make anicipalities
report
s received funding frthis document reflec
ya coordina
sment done ady in plann
tation finally
n authoritie
not bought af they wanteas they had
mentoring wsion was ev
sovereignt
orted state-bate? Better
Current, but looking at h
ly optimistico develop gevacuation
he political ct the ambiti
ons. Some of identity cry officials anhings. not so impo
s a matter ina mission wand commu
rom the European Uncts the authors’ view a
ated the effo
in 2012 ning, no sov
y came, mis
s
and effectiveed the IBM d not been awas somewhvacuated, th
ty, that was
building andto do some
also backgrhistory bookc and shouldgrand concen of EUBAMcapabilities ons of the m
nuances thrisis of the Lnd placing o
ortant. Libyan the 1950’swork: Identifyunities in bo
Public
nion’s Horizon 2020 and the European C
ort. EU role
vereign in L
ssion was la
e concept, thasked beforhat successhe focus wa
necessary
d consolidatething than
round. Probks. d have beeepts.
M Libya, secof the EU.
member sta
hat need to bLibyans, moown people
a more imps but not anfy the peoplorder areas
research and innovaommission is not res
to help atte
Libya, difficu
aunched fas
e Libyans sre. sful. as on the op
for a strate
tion needednothing?
blems in Lib
n downscal
curing a civi
ates to the p
be addressore of politic
lacking ski
portant than nymore. e to work wto secure b
tion programme undesponsible for any use
end the urge
ulty in obtain
st based on
said no. This
perational.
gic mission
d
bya could ha
ed to impro
lian crisis m
political real
ed. cal isolationlls in the ad
tribe. The c
with. Buildingborders.
CSA proStart date
Duration
er grant agreement Ne that may be made o
ent priority o
ning inform
an outdate
s meant mo
n did not exi
ave been be
ove effective
managemen
lity?
. dministration
case of iden
g relations w
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
of border
ation
ed needs
onths of
ist. No one
etter
eness.
nt operation
n
ntity
with
U
5 s
D3.6 Africa: General di
Thomas MEU driven
How Diff All
Judith Verw
Howpla
Thithe
Agnes Fou
No
Annemarie
Diff
Lasse Kris
Whbe
Common t
Arnold Kam
Pla Inte
equ Stra
lon Les
suc
Thomas M
Cha Dec
to lCon
Lanme
Judith Verw
How
: Discussion
This project haThe content of contains.
scussion
Mandrup: Improjects?
w are theseferent appromember sta
weijen:
w did thesen? When dos dimensio
ey have inve
ures:
strategy fo
e Peen Rod
ferent types
stensen:
hy are missirealistic.
hemes in th
mmel:
anning. Oveelligence. Puipment. rategy. Whag term impassons learnccesses.
Mandrup:
ange of percreasing inteave nationngo). nguage and
ember states
weijen:
w come the
report
s received funding frthis document reflec
pact of milit
e aligned? oaches. Hoates have a
e missions coes the EU n should be
ested mone
r CAR in sp
t:
s of strategi
ons always
he case stud
erambitious Proper traini
at is the oveact when ened. Have w
rsonnel eveterest of menal interests
d capabilities to deploy
e EU is not a
rom the European Uncts the authors’ view a
tary operati
w adjustablan interest, s
come aboutdecide to c
e included. Iy? What is
pite of mone
c goals. No
s decided to
dies
planning. Dng. Is the e
rall approacngaging?
we learned a
ry 6-12 monember states in the han
s. Having ththe right ca
able to mob
Public
nion’s Horizon 2020 and the European C
ons on EU
le are we if so it is diffic
t? The influeconduct theIs the EU mthe wider fr
ey going the
ot just geogr
owards exce
Decreasing ducation go
ch of the EU
at all? Impo
nths makeses. Could alds of the E
he right peoapabilities.
bilize knowle
research and innovaommission is not res
normative p
things do ncult to priori
ence of Frase missions
more likely toramework o
ere.
raphic or ge
ellence? No
interest of mood enough
U? What is
rtant to lear
s it possibleso be the oU, nations a
ople for the
edge ahead
tion programme undesponsible for any use
projects. Ho
not go as wetise
nce. How ds, and wheno intervene
of relations?
eopolitical.
ot always ap
member stah? Late arriv
the overall
rn from prio
to repeat pther way aract on their
missions. W
d of a missio
CSA proStart date
Duration
er grant agreement Ne that may be made o
ow does this
e want?
does it fit in n do they noin countries
?
ppropriate. G
ates. Realityval of prope
strategy, th
or failures as
prior mistakeround, if tooown. (Belg
Willingness
on?
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
s affect the
a wider ot? s where
Goals must
y gap. er
he medium-
s well as
es o important ians in the
from the
U
5 s
t
D3.6 Africa:
Ter
Lasse Kris
Impsha
Imp
Annemarie
It issen
: Discussion
This project haThe content of contains.
rminology o
stensen:
portant to haaring. portant to sp
e Peen Rod
s less relevanse. Strengt
report
s received funding frthis document reflec
of success is
ave contact
pecify that m
t:
ant to look aths and wea
rom the European Uncts the authors’ view a
s dangerou
t to people w
mission suc
at if EU is aaknesses.
Public
nion’s Horizon 2020 and the European C
s. Wider pic
who has wo
ccess is bas
at fault. No p
research and innovaommission is not res
cture should
orked on the
sed on the w
point in poin
tion programme undesponsible for any use
d be taken i
e same are
whole conte
nting fingers
CSA proStart date
Duration
er grant agreement Ne that may be made o
into conside
ea earlier. In
ext.
s, unless it m
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
eration.
nformation
makes
U
5 s
D3.6 Africa:
3
Speakers:
Dr. Annem
Dr. Thoma
Dr. Judith V
Lasse Kris
Elisa Norva
Agnes Fou
Dr. Jyrki R
Maruan El-
Prof. Gorm
P.E. Holge
South Sud
Polsta
If dmis
Stre Pro Sou
sta Situ Set Mis Mis
Bru Ukr
expdes
Tooreswhe
Samparquicris
Go comrea
: Discussion
This project haThe content of contains.
PUBLIC S
marie Peen R
as Mandrup
Verweijen,
stensen, form
anto, FINCE
ures, HoM,
Ruohomäki,
-Krekshi, C
m Rye Olsen
er Bernt Han
an – EU CS
litical speectes and Bruiscussions
ssion. ength and c
oblem to aimuth Sudan mndards in auation comptting an endssion did hossion managussels after raine exampert fatigue.signing a seo much focu
sults being aen relating me challengrtly to blameckly in publ
sis there in tfor second
mplicated coalistic.
report
s received funding frthis document reflec
SEMINAR
Rodt, RDDC
, RDDC/SU
Ghent Univ
mer HoM E
ENT
Project Zing
CMC Finlan
risis Manag
n, RUC
nsen, Centr
SDP Missio
ch before mussels. are not in li
capabilities m high? Notmission end
an 18-monthplicated by d-goal at goowever stopgement wasprojects haple – weak . Experts didecurity sectous on buzzwachieved reto the strateges in all EUe, as they aic and medthe public o or third besoncepts and
rom the European Uncts the authors’ view a
AT KORN
C
U
versity, Belg
UAVSEC S
go, CAR
nd
gement Initia
re for Africa
ns – Expec
ission vs. re
ne of reality
of mission t necessarild goal: To mh span. Normnumber of f
ood enoughp Juba airpos slightly un
ad begun. EU influencd not synchor. words. Politlated to theegic goal. U missions.re under pria, exemplif
or media. st solution ad standards
Public
nion’s Horizon 2020 and the European C
NLOFTET
gium
South Sudan
ative
a Studies, U
ctations vs.
eality on gro
y, it could h
is dependey, but could
make Juba amal span isfactors. No instead of e
ort from goinndisciplined
ce. Tired of hronize or c
tical pressue strategic a
. How can tressure fromfied by the s
and show ps might not
research and innovaommission is not res
, KASTEL
n
C
Reality – La
ound. Differ
ave an influ
nt on politicd be. airport live us 5 years. aviation seexcellenceng into a sod, with appro
experts frooordinate a
re to deliveaim. First 12
hat be addrm public andsituation in
political courbe the way
tion programme undesponsible for any use
LLET
asse Christe
rence in per
uence on th
cal decision
up to interna
curity in plawould have called blac
oval reques
m EU and Udvice. Diffe
r results fas2 months we
ressed? Pold media. FoSouth Suda
rage. Implemforward, bu
CSA proStart date
Duration
er grant agreement Ne that may be made o
ensen
rception fro
e success o
.
ational secu
ace at begine been betteck hole sts and repo
US. Sufferinerent ways o
st, resulting ere in reality
litical systeocus movesan. No focu
menting higut should be
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
m member
or failure of
urity
nning. er
orts sent to
ng from of
in few y wasted
m only s away veryus on the
ghly e more
U
5 s
f
y
D3.6 Africa:
EUmadou
Suc
EU as conf
1. B 2. E 3. S
Historical s
EU Cai Wh
Fig
Con
The
A p
: Discussion
This project haThe content of contains.
standards king it difficuble standaccess can a
flict manage
BackgroundEU interestsSomalia, Ma
setting
involvemeiro summit 2
hat were the Idealism
Africa. To prov Bureauht against t Threat Islamic This pe Decisio
ncerns of th Somali
Somalicountry
Mali: Fsecurity
CAR: Arelucta
e implemen Somali EU Sta AU me
as well Mali: 1. EU sta AU: Re
pattern? CA French Europe EUTM Inside t EU sta
not tota
report
s received funding frthis document reflec
or best pracult to persuards also be bypa
er – Gorm R
d and the figs and policyali, CAR
nt did not b2000 and o
e EU interesm? A wish t
ve EU as anucratic or inserrorism of failed sta
c radicalizaterception haon making inNational leFrance stroon Africa. Majority of
he EU a: The EU ran failed stay. EU howevrench interey with link to
Also a failednce from EUted EU invoa: 1. Comp
ake: Stabilitymber states as gaining . Funding oke: Fighting
esources, traAR
troops ean troops o2016. the framewokes? Show ally clear
rom the European Uncts the authors’ view a
ctice is not uade others
assing prob
Rye Olsen
ght against y instrument
egin until afnwards
sts in this prto improve s
n effective istitutional s
ates. The Eion after 9/1as a strong n the EU vel: some songest state
states have
reluctant – cate. Channever only inteest and preso radical Isl
d state, but U to get involvement rehensive ay. s acting on funding forf African Tr
g Islamist thaining natio
on the groun
ork of compworld that
Public
nion’s Horizon 2020 and the European C
even possi to impleme
blems in ord
terrorism ts
fter the cold
rocess? Whsituation in
nternationaelf-interest?
uropean Se11 influence o
states are me in the EU,
e no interes
comprehenelling of funerested duessure on EUlamism. no EU inter
volved.
approach, 2
national intr troops. roops, 2. EUhreat onal interest
nd, as well
prehensive EU was abl
research and innovaommission is not res
ble in the Eent them. Af
der to solve
d war
hy has the EAfrica. Imp
al actor/conf?
ecurity Strat
n EU foreig
more interes, having a b
st.
nsive approands into Some to US presU to proclai
rest. French
2. support of
terests. Aim
UTM
t.
as Georgia
approach le to act as
tion programme undesponsible for any use
EU itself (Frafricans are w
larger issue
EU involvedlementing E
flict manage
tegy 2003.
gn policy.
sted in Africabig influence
ach. Threat malia in ordssure m as a thre
h tried to ad
f AMISON,
med at curbin
n troops. E
a conflict m
CSA proStart date
Duration
er grant agreement Ne that may be made o
ankfurt airpwell aware
es.
d itself in AfrEuropean id
er?
a than othee on decisio
from terrorer to stabili
eat to Europ
d pressure,
3. EUTM.
ng domestic
EUFOR-RCA
managemen
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
ort), of the EU
rica? deas in
ers on making
rism from ze the
pean
, but
c critique
A.
nt actor, but
U
5 s
D3.6 Africa:
Comments
Mo Com Lea
Notuse
Othyea
Afrifor
Eurpeo
Afri Aid
areabo
On A q Afri
and Imp
Discussion
JudEspind
Wh Set
Hum
bei Kno
app
Thorea
Las Jub
traf Exp
havinto
Mis Val
: Discussion
This project haThe content of contains.
AU sta Conclu
logistic
s by Holger
ore than onemmon secuading role ot just the are in case eleher interestsars. Also looica will havethe increasrope reactinople movingica increasi
d agenda. Ise doing with out value sy
Lasse Krisquestion of iican alternad not just owportant to ge
n
dith Verweijpecially fromustry.
hat drives tht of institutio
mphrey (cong dictated owledge. Mproaches.
omas Mandasons for acsse Kristensba Internatiofficking. Alsperienced cving contacto doing busssions tightllues. Not bi
report
s received funding frthis document reflec
kes: Nationsion: A mars and no cr
Bernt Hans
e factor in Eurity area of militias. Hrmies. Preseections do ns than just soking at Afre 1/3 of thesed involvemng on increag to areas inngly becom
s economic our values
ystem.
stensens obideals vs. reative to EU wwn ideals. et off the hi
en: Institutiom defence s
he aid agendonal interes
orrect name? values.
Many in Afric
drup: Not alwcting. sen: Answeonal Airporto, easiest w
corruption, bt to corrupt iness. y controlledg difference
rom the European Uncts the authors’ view a
al security (rket for confritique.
sen
EU approach
High numberent at electinot go as thsecurity maica as a conworld’s pop
ment from thasing Chinen Africa.
ming a markdiplomacy when appr
servations. ealities. with China
gh horse
onal interessector. Mus
da? Institutts on differe
?) Perhaps
can elite hav
ways image
er to Holgerst: Fear that way of EU tobut did not dpeople, due
d by Brussee in reality,
Public
nion’s Horizon 2020 and the European C
(Boko Haraflict manag
h to Africa
r of young pions, wherehey intend.nagement. ntinent in dipulation, atthe EU. ese involvem
ket - so not jreplacing aroaching Afr
changes pe
sts, at natiost be a raiso
ional intereent levels.
better to se
ve studied i
e driven. Ex
s questionsit would be o act. do corruptioe to extent.
els. Not alwabut the con
research and innovaommission is not res
am), prestigement in Af
people joinine political pa
African secifferent waytracting inte
ment. Not ju
just terrorisid? Value arica? Preac
erspective.
nal level coon d’etre for
st of the aid
ee where w
in US and E
xamples of B
s. a hub for te
on. HoweveExample o
ays for the gntext might n
tion programme undesponsible for any use
e. Sends sifrica. Troop
ng militias iarties have t
curity highery with the neerest from C
ust funding,
m and secuagenda. EU ching days a
Important to
uld be takemilitary ins
d industry.
e have sha
EU, so they
Burundi, Ke
errorist trave
r, impossiblf Israeli citiz
good of the not make it
CSA proStart date
Duration
er grant agreement Ne that may be made o
gnal to donps in return f
ncreases setheir own m
r on the ageew world orChina. This
but also Ch
urity interesDoubt abo
are over. Un
o adjust to r
en into consstitutions an
red values,
already are
enya. Differe
el as well a
le to work wzen bribing
e mission. possible.
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
nors. for money,
ecurity risk.militias to
enda in lastder. is a reason
hinese
ts. ut what we ncertainty
realities
ideration. nd defence
instead of
e aware of
ent
s drug
without his way
U
5 s
t
D3.6 Africa:
Go Big
thepre
Jon
Libya – Th
EU Sho Stra Cap Ma
evid Rea
Diff Inte
inte Fra Dem Afte
inte Liby
of G
Internation
Whbui
EU EU EU
EUBAM
Neepro
Lac Wh
wor
Mandate
Sup
Mandate fu
LibySec
: Discussion
This project haThe content of contains.
rm Rye Olsg change one French. Spessure makenathan Fish
e impossib
BAM Libya ort mission.ategic dimepacity buildndate wisedence of caasons for fa Problem
Libyan s Too high Misplaceferent levelservention haervention toance led, intmocratic deermath: Paservention unya’s state aGaddafi too
nal framewo
hen danger lding meas interest in did not hav given role
eds assessoblems in geck of informhen missionrsened.
pport of Lib
ulfilled?
yans discarcurity mode
report
s received funding frthis document reflec
sen: Insecurn security sipecial forcees it difficulter: Image d
le task? Dr
– Europea. ension: IBMing dimens, mission wapacity buildailure s of graspintate was fu
h ambitions ed mission s of identitieappened to protect civternational ceficiency bessivity of intnlikely. as a rentier sk away this
ork
of collapse ures Libya frameve seat at Fto help mod
sment team etting there.ation was c was launch
yan authori
rded EU IMel).
rom the European Uncts the authors’ view a
rity about owde. US estas providing t to station ldriven. Exam
r. Jyrki Ruo
n Union Bo
ion: Traininas a compleding today.
ng complex nctioning. of EU. Liby
es, but still astop Benghilians driftedcommunity hind EU’s nternational c
state distribs distribution
was realise
ed in neighbFriends of Ldernise the
only spent . Could not carried to plhed, inform
ties in enha
B model, as
Public
nion’s Horizon 2020 and the European C
wn values iablishing smlarger strik
larger forcemple of Uga
hamäki
order Assista
ng ete failure.
nature of ”s
yans did not
a sense of fhazi bloodbd into a regfollowed.
normative pcommunity
buting the on and desta
ed, internati
bourhood pibya meetinLibyan bor
short time ogo to southanning. ation was n
ancing… etc
s they want
research and innovaommission is not res
n EU. mall bases iking capabilies. anda ridicul
ance Missio
IBM concep
state” in Lib
t want adva
feeling Libyath. House ime change
ower. after Gadda
il wealth keabilized Liby
ional comm
olicy. ng in Dohader control.
on ground, hern part of
not up to da
c.
ted a single
tion programme undesponsible for any use
n Africa in city, but with
ing Kenyan
on
pt not devel
byan. Missio
anced IBM c
an. of Common
e by military
afi was disp
pt people frya.
munity tried t
and experieLibya.
te and situa
agency mo
CSA proStart date
Duration
er grant agreement Ne that may be made o
close coope smaller for
n army.
loped and n
on planned
concept. Int
ns argued “y means”
placed. Gro
rom uprising
to establish
enced seve
ation on gro
odel (US Ho
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
eration withrces. Public
no
as if
elligence
“that
und
g. Removal
state-
ere
ound had
omeland
U
5 s
c
D3.6 Africa:
Traany
A failure?
A fu It w Sec
Lessons to
Mo Pro Ove Sho
a lin How
Comments
Agr Com
AU Fin
Islasitu
General qu
Jyr A d
undstru
Thoput
EUNo
Hum Sym
leaind
Elisa Norva
Backgroun
: Discussion
This project haThe content of contains.
aining and mymore
unctioning swould have cond or thir
o learn
ore focus onoblems shouerly optimisould EU devnear procesw can we fi
s by Maruan
rees with mmments on More of a Problem
process.isolation
Libya recman for
EU perceconducte
perspectivancial and
amic rights, uation much
uestions an
rki Ruohamädifferent kindderstandingucture to talomas Mandt pressure oFOR Libyareal possib
mphrey: Mimbolic valueders, the wependent fr
anto – CAR
nd CAR
report
s received funding frthis document reflec
mentoring w
state that wbeen necesrd best optio
n intel and muld have be
stic mandatevelop its cass with an ot the politica
n El-Kreksh
most of Jyrkistate admi
a failure of with nation Everyone . ceives a larEurope/EUeption of seed trade thee. Gaddafi public efforbut in light
h more if he
d comment
äki: Regiond of system
g of the localk to.
drup: Shouldon Brussels?n mission. C
bility becausstrust presee of Gaddaest looks hyrom EU.
R – Caught
rom the European Uncts the authors’ view a
was more su
was necessassary with hons should h
mission planeen anticipae pacity of cr
overly optimal ambitions
i
’s presentanistration: the transitio
nal counterpin state adm
rge number .
ealing of borere for centuregime pout put in AU of Libyan s had been a
ts
al aspect com of talking tal power stru
d EU have s? Completely se of Libyanent betweenfi killing hugypocritical.
in regional a
Public
nion’s Horizon 2020 and the European C
uccessful, b
ary for the mheavy capachave been
nning ated
risis managemistic goal?s of membe
tion
onal procesparts. Politicministration
of migrants
rders in souuries.
ured a lot of from Libya.
situation withalive.
ould have bto people shucture was
stayed out o
unrealistic.n resentmenn EU and Age. But on hGaddafi kill
and nationa
research and innovaommission is not res
but it is not p
mission did city state-bupursued
ement to a
er states to t
ss in Libya thcal isolationwas replac
s. Role perc
uth Libya no
money into. Gaddafi kih revolution
been better hould have needed. No
of Libya? W
. Ambition ont towards f
African eliteshigher levelling has blo
al state inte
tion programme undesponsible for any use
possible to v
not exist. uilding
transformat
the political
han an EU law prohib
ced with the
ceived in Lib
ot optimal, a
o the AU. lling was ag
n, it would h
handled bybeen in pla
o one inside
Why did EU
of France, Itforeign milits. Trust mus, in perspeccked AU in
rests?
CSA proStart date
Duration
er grant agreement Ne that may be made o
validate its
tive process
l reality?
failure bited transitie law of polit
bya as bein
as tribes in
gainst humahave compli
y EU. ace. More e the Libyan
end up in L
taly, but no tary presencst be earnedctive of Africbecoming
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
effect
s instead of
onal tical
g a police
areas have
an rights, cated the
n power
Libya? Who
one else. ce. d. can
U
5 s
f
D3.6 Africa:
Siz Lea Pow
clas Wid Suf
Why did E
Viocha
Fraasswas
Pol To
The missio
Res 950 Tar
tha Dep
Achieveme
34 EU Mili Clo
Fre EU
and Op Num In t Go
awaloca
Challenges
Depthe
Sho Wa Ma Diff Issu No Nat Loc
: Discussion
This project haThe content of contains.
ze of Ukrainast developwer shifts thshes in pasde corruptioffering both
U intervene
olent coup inange and seance has besessed in bes ”on the edlitical creditaaddress se
on
stricted ma0 troops, incrgeted most
at were not tployed Apri
ents and en
individuals contributeditary interve
ose cooperaench speakiFOR operad EU delegaeration commber of IDPthat sense, od knowledareness. Plal commun
s
ployment dee situation caowed lack o
ay of fundingndate limiteferent approues related functioning
tional caveacal infrastru
report
s received funding frthis document reflec
e. Independed and poohrough violest years. on, state no from intern
e?
n 2013 spareized poweeen involvedeginning thadge of genoability
ecurity threa
ndate cluding 150t critical spotargeted. l 2014, ope
nablers
interviewedd in preventention was aation and cong area.
ated in spiritation on the
mposition apP’s decreasEUFOR mi
dge of area ayed a big ity.
elayed 6 moalled for rapof political wg military oped in terms oaches to loto multicult
g host goverats cture, or lac
rom the European Uncts the authors’ view a
dence from orest countryent coups. N
t able to pronal problems
rked civil war. Coup devd in CAR sinat the confli
ocide”. Fren
ats
from Georgots in CAR,
erational Jun
d of which thting the conappropriate oordination w
t of comprehe ground. ppropriate toed substanssion was aand backgrrole. EU Fo
onths with dpid deploymwill from somperations afof time. ocal populaturalism rnment
ck of same.
Public
nion’s Horizon 2020 and the European C
France in 1y in the worNational res
otect its citizs, but also e
ar. Marginaveloped intonce 1960, bict was not
nch initiative
gia but problem
ne 2014.
he answersnflict from sp for the situwith UN an
hensive app
o the operantially duringa success.round, goodorce Comma
difficulties inment. me memberffected the
tion from di
. Critical, es
research and innovaommission is not res
1960. rld. sources con
zens. external
lized Muslimo an ethnic but only to pso violent, b
e to UN and
ms only mo
s are basedpreading ation d France. F
proach and
ational area.g mission.
d local netwander had l
n force gen
r states towcontribution
ifferent inter
specially at
tion programme undesponsible for any use
ntrolled by e
m populatioconflict.
protect its owbut 6 monthEU mission
ved to othe
French dom
cooperated
work contribuarge autono
eration. Thi
ards CSDPns and the r
rnational or
beginning o
CSA proStart date
Duration
er grant agreement Ne that may be made o
elites, result
on in the nor
wn citizenshs after the ns.
er districts in
minated miss
d with comm
uted to gooomy in work
is was prob
P. running of th
rganizations
of operation
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
ting in
rth wanted
. France coup, CAR
n Bangui
sion in
mission
d situation king the
lematic, as
he mission
s.
n
U
5 s
R
D3.6 Africa:
Mis Lac
Lessons to
Fraope
Cle Coo
ope Fun Inte Cha
doc
Agnes Fou
If c EU EU
ma Diff
dep Suc Exi Info
mu Psy
are
Thomas M
Mu Con Con
fun Mo
FARDC
Lac Lac ”Fig MO
of c Nor
righ Som
bet
DDR(RR) a
Dem Sec
: Discussion
This project haThe content of contains.
sbehaviour ck of air sur
o learn
amework naeration. ear mandateoperation aeration. nding systeelligence, shallenges to ctrine, admi
ures comme
apital in CAFOR shouldFOR had idndate to doferent groupployment. ccess in tert strategy wormation intltinational cychological
eas where n
Mandrup – D
ch bigger snflicts in Congo has noctioned rela
ost of EU’s a
cks the mosck of disciplghting with
ONUSCO, Ecoordinationrmative humhts. This dome progrestter trained a
and SSR
mobilizationcurity Secto
report
s received funding frthis document reflec
from EUFOrveillance ca
ation (Franc
e can be boand coordina
m should bharing, storincoherencnistrative p
ents:
AR falls, coud have beedentified who so. ps are now
rms of trust-was more oftelligence. Mcoherent forcontext sho
not even the
DR Congo
scale – time ongo go bact always beatively well.activities in
st basic equine and comyour family
EU and bilatn between dman rights aoes not workss in decreaand educat
n, Disarmamor Reform
rom the European Uncts the authors’ view a
OR towards apabilities
ce) played k
oth a sourceation betwe
e reformeding and coll
ce of internarocedures,
untry falls. Imn deployed
hich rebel ch
rearmed an
-building witf an exit datMore a caserce working ould be takee police dare
and spaceck a long timeen a collap
Congo is do
uipment mmand andon your ba
teral involvedonors has agenda. UNk in reality. sing numbeed human r
ment, Repat
Public
nion’s Horizon 2020 and the European C
local popul
key role in th
e for succeseen internati
. lecting ational forceparallel com
mportant to to 4th distrhiefs that sh
nd are not h
th the local te than a ree of many n together en into accoed go.
me. Difficultpsed state. C
one in coop
d control ack”. Familieement – supbeen a pro
N not allowe
er of child srights wise.
triation, Re
research and innovaommission is not res
ation affecte
he establish
ss and failurional actors
es need to bmmand line
o learn. rict in Banguhould have
happy with c
population al strategy.
nations work
ount. IDP’s
t to control.Congo unde
peration with
es move witpport and trblem.
ed to suppor
oldiers. New
integration,
tion programme undesponsible for any use
ed attitude t
hment and r
re s key to effe
be addresses.
ui. been arrest
changes ma
when EUFOLack of tra
king to obta
were not w
er Belgian c
h others
th the soldieaining – firs
rt groups th
w recruits c
and Resett
CSA proStart date
Duration
er grant agreement Ne that may be made o
towards op
running of t
ectiveness o
ed. Langua
ted, but lac
ade during
OR was preansition. ain informati
willing to retu
colonial rule
ers. st in UN his
hat violate h
coming in th
tlement.
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
eration.
he
of
ge,
ked the
EUFOR
esent.
ion than a
urn to
e
tory. Lack
uman
hat are
U
5 s
D3.6 Africa:
Diff
EU in DR.
Op Op
into EU EU
Artemis
Sho Log
EUFOR
Nat Lac Par
EUPOL
Invhum
Lacdiff
Lim Loc Foc
EUSEC
”So Mili Fin Bio Op Nor
From a goo
No
Judith Verw
Inte Alw Not
be New
sec
: Discussion
This project haThe content of contains.
ficult due to
Congo
s. Artemis 2s. EUFOR 2o Congo, staPOL 2005-SEC 2005-
ort term goagistically we
tional caveack of clear mrtly a succe
olved in maman rights. ck of coordiferent donor
mited impactcal resistanccus has bee
ometimes beitary law bedings:
ometric payms room estarmative issu
od idea to r
real military
weijen com
eresting howways anothet a new situplayed. w recruitmecurity reform
report
s received funding frthis document reflec
o context
2003. Preve2006. Deploayed in Gab2014. Help
-2016. Focu
al in stabilizell working d
ats made mmandates ess
any process
nation for trrs. t, infighting ce to reformen on the ar
etter to do seing implem
ment systemablished in ues like hum
real impact
y training si
ments:
w EU pusheer donor mouation. Huge
ent might noms.
rom the European Uncts the authors’ view a
ent potentiaoyed 4000 tbon. build up the
used on atte
zing and credue to proxi
mission diffic
ses. Training
raining cour
between dom. Judicial rrmed forces
something tented
m implemenKinchasa nman rights a
ince 2002
es through soving in whee continuan
ot solve pro
Public
nion’s Horizon 2020 and the European C
al ethnic gentroops to se
e police forempt to crea
eating securimity of Ente
cult
g, both for s
rses. Office
onors. reform probs instead of
than nothing
nted, but stiot in operatagenda.
security secen EU movence in secur
blems, as e
research and innovaommission is not res
nocide. Cleaecure electio
ce, riot contate military
rity ebbe airpor
short term t
rs attending
lematic. f the police.
g”
ill problemation anymor
ctor reformes out rity sector re
existing troo
tion programme undesponsible for any use
ar exit strateons. Half th
trol trainingforce that c
rt
asks, but al
g same cou
tic. re.
eform. Dono
ops are not
CSA proStart date
Duration
er grant agreement Ne that may be made o
egy, clear mhe force nev
. could provid
lso long ter
urses offered
ors letting th
being reach
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
mandate. ver went
de security.
m such as
d by
hemselves
hed by
U
5 s
D3.6 Africa:
4
The two ev
in the form
external ex
where the
the author
four cases
Pla
bet
mis
In a
and
imp
The
to s
Lat
the
The
sta
wor
All
the
rea
dep
The
and
The
kno
The
bac
: Discussion
This project haThe content of contains.
CONCLU
vents forme
mulation an
xperts and t
academic
rs of the ind
scrutinised
anning overa
tween ambi
ssion object
all the case
d it was ofte
portant to le
e missions s
share and c
te arrival of
e establishm
e EU suffers
tes. It lacks
rld.
the operatio
e committed
ason was of
ploy.
ere is a nee
d securing t
ere is an im
owledge of t
e deployed
ckground to
report
s received funding frthis document reflec
SIONS
ed a central
nd identifica
the participa
and method
dividual cas
d was:
ambitious: T
tions and o
tives.
studies a d
en replaced
eave to the E
suffered fro
cooperate o
equipment:
ment of cent
s from the f
s and overa
ons suffered
personnel
ften that nat
ed to establi
that rotated
mmediate ne
the current
personnel a
o be able to
rom the European Uncts the authors’ view a
role proces
ation of co
ants in the e
dological qu
se-studies e
The mission
bjectives on
decreasing i
by nationa
EU.
om an intelli
n intelligenc
: The logisti
ral logistica
fact that it is
rching appr
d from lang
was not alw
tional intere
ish and imp
personnel
eed of estab
operations
and the pla
maximize t
Public
nion’s Horizon 2020 and the European C
ss in the wr
ommon find
events also
uality was t
essential fe
ns and prog
n one side,
interest from
l interests a
gence gap,
ce, which d
ical support
al hubs.
s product of
roach and c
guage challe
ways trained
ests decided
prove the les
has got acc
blishing a ce
for future u
nners need
the effect of
research and innovaommission is not res
riting of the
dings from
functioned
tested and
eed-back. T
gram genera
and then re
m the EU m
and bilatera
which was
amaged the
t was insuff
f the will and
common str
enges and c
d for the job
d whom the
ssons learn
cess to thes
entral datab
use.
ds to have th
f the missio
tion programme undesponsible for any use
individual c
the differe
as an open
commented
The general
ally suffered
esources av
member state
l initiatives.
caused be
e missions.
icient and t
d ambitions
rategy defin
capability pr
b they were
member st
ned and iden
se reports.
base compil
he needed o
ns.
CSA proStart date
Duration
er grant agreement Ne that may be made o
case studie
ent case st
n peer revie
d upon. Th
l conclusion
d from a dis
vailable and
es could be
It was cons
e lack of abi
there is a n
s of its many
ning its role
roblems, m
send in to
tates were w
ntified fram
ling the exis
operational
IECEUoject: 653371: 01/05/2015n: 33 months
No 653371 of the information it
s, and later
tudies. The
ew process,
is provided
ns from the
screpancy
d realistic
e detected,
sidered too
lity and will
eed for a
y member
in the
eaning that
do. The
willing to
eworks,
sting
U
5 s
r
e
,
d
e
t