PROPOSAL D264610 F.A. PROJECT Book 2 of 2 Submitted in accordance with the Highway Law and the Standard Specifications officially finalized and adopted on September 1, 2021 as posted on the Department's website. US CUSTOMARY UNITS Proposal Description: DECK REPLACEMENT NY275 OVER PA RAILROAD Letting of 11/4/2021 @ 10:30 A.M. 50 Wolf Road, Albany, NY 12232

Transcript of D264610 - dot.ny.gov

Page 1: D264610 - dot.ny.gov

PROPOSAL

D264610F.A. PROJECT

Book 2 of 2

Submitted in accordance with the Highway Law and the Standard Specifications officially finalized and adopted on September 1, 2021 as posted on the Department's website.

US CUSTOMARY UNITS

Proposal Description:

DECK REPLACEMENT NY275 OVER PA RAILROAD

Letting of 11/4/2021 @ 10:30 A.M.

50 Wolf Road, Albany, NY 12232

Page 2: D264610 - dot.ny.gov

IMPORTANT BIDDER INFORMATION

0790 1 of 1 L01/01/20 Contracts/Legal 12/30/20

1. Familiarize Yourself with the Standard Specifications. The current NYSDOT Standard Specifications are stipulated onthe front cover of this Project Proposal. Standard Specifications may be accessed at: https://www.dot.ny.gov/main/business-center/engineering/specifications/busi-e-standards-usc . Be certain you access the correct edition of the StandardSpecifications.

2. Upcoming Projects/Contract Documents/Letting Results. Advertisements are available at: www.dot.ny.gov/doing-business/opportunities/const-highway, Contract Documents at: www.dot.ny.gov/doing-business/opportunities/const-notices,and Letting Results at: www.dot.ny.gov/doing-business/opportunities/const-results.

3. Procurement Lobbying Law. NYS Finance Law restricts communication with NYSDOT personnel on procurements;contact can only be made with designated persons. Contact with non-designated persons or other involved Agencies mayresult in disqualification. Project-related technical questions or comments must be submitted through the NYSDOT website at:www.dot.ny.gov/doing-business/opportunities/const-notices. All other questions should be submitted through the website ordirected to Robert Kitchen or the Assistant Director/Director of the Office of Contract Management, (518) 457-2124.

4. DBE/MBE/WBE/SDVOB Goals. www.dot.ny.gov/main/business-center/contractors/construction-division/construction-civil-rights/ebo. Projects may have one goal for participation by Disadvantaged Business Enterprises (DBE) when Federallyfunded, or three separate goals for participation by Minority Business Enterprises (MBEs), Women’s Business Enterprises(WBE) and Service-Disabled Veteran-Owned Business (SDVOB) when Non-Federally funded. If the project has (a)DBE/MBE/WBE/SDVOB goal(s), you must document your good faith efforts to meet the specified participation goals.Solicitation of DBE/MBE/WBE/SDVOBs must begin prior to the submission of your bid. For projects with goals, the Pre-Award Utilization Package must be submitted to the Office of Construction in accordance with §102-12 D/M/WBE Utilization,using the current version of NYSDOT approved Civil Rights reporting software.

5. Bonds. Statutes require that a low bidder file both a Performance Bond and a Labor and Material Bond for the full amountof the contract. Arrangements should be made with a Surety prior to submitting a bid. Failure to secure bonding could result inthe loss of your bid deposit. See §103-03 Contract Bonds.

6. Bid Security. Every bid must be accompanied by a bid bond, certified check or bank cashier's check payable to the NYSDepartment of Transportation, in the sum of the amount shown on the proposal title page. Bonds must be on form CONR 391.Electronic bids must include an electronic bid bond.

7. New York State Can Help You Secure Surety Bonding. The NYS Surety Bond Assistance Program (NYSBAP) providestechnical and financial assistance to help New York State small business or MWBE contractors secure bonding. Contractorsmay be eligible to receive a guarantee of up to 30% to secure a surety bond line, bid bond or a performance and payment bondon State projects. Training is also available to contractors requiring technical support on how to become bond-ready. For moreinformation visit esd.ny.gov/BusinessPrograms/BondingAssistance.html or contact Ms. Huey-Min Chuang at Empire StateDevelopment at (212) 803-3238 or [email protected].

8. Do Not Alter the Bid Proposal Unless Directed to Do So by Amendment. Unauthorized alterations could lead to your bidbeing declared informal. See §102-05 Proposal Submission.

9. The Contractor is responsible for ensuring that all Amendments have been incorporated into its bid. Amendments areposted at: www.dot.ny.gov/doing-business/opportunities/const-notices.

10. Bid on All Items and Sign the Bid. No zero-dollar bids will be allowed for any item. See §102-04 Proposal Content.

11. Bids Should Be Submitted through Bid Express or in a Sealed Envelope prominently labeled “BID ENCLOSED”,addressed to NYSDOT, Office of Contract Management, 50 Wolf Road, First Floor, Suite 1CM, Albany NY 12232 anddelivered prior to the proposal due date and time, during normal business hours (Monday through Friday, 7:00 am to4:00 pm). Clearly identify the Contractor Name, Address, Federal Identification Number, Project Number and ProjectDescription on the envelope. The same Federal Identification number should be used on both the envelope and the PlanholdersList. Low bidders must have a current NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) on file orsubmit one within 10 days of receipt of the contract. Questionnaires are available at: www.dot.ny.gov/bids-and-lettings/construction-contractors/general-info. Please call (518) 457-2124 if a reasonable accommodation is needed toparticipate in the Letting.

D264610

Page 3: D264610 - dot.ny.gov

0800 Per DQAB 2100 L05/07/15 rev. 09/01/2020 Page 1 of 1

REQUIRED CONTRACT PROVISIONS

EEO Goals

DBE/ MBE /WBE/SDVOB Goals

Form CONR 9

Electronic Bidding

Federal Aid Contract Provisions

Insurance Coverage

List of Additional Insured

Railroad Insurance

New York State Uniform Contracting Questionnaire

NOTE: This form was developed for repetitive use throughout all contract proposals and may identify items not applicable to this specific project.

D264610 27

Page 4: D264610 - dot.ny.gov

GOALS FOR EQUAL EMPLOYMENT OPPORTUNITY (EEO) PARTICIPATION

0820 Page 1 of 1 Per Construction EI 17-006

The Contractor shall follow the requirements of §102-11 Equal Employment Opportunity Requirements. The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, which is the county or counties in which the work is located, are as follows:

GOALS FOR PARTICIPATION OF MINORITIES COUNTY % COUNTY % COUNTY % Albany 3.2 Herkimer 2.1 Richmond Table Allegany 6.3 Jefferson 2.5 Rockland 22.6 Broome 1.1 Kings Table St. Lawrence 2.5 Bronx Table Lewis 2.5 Saratoga 3.2 Cattaraugus 6.3 Livingston 5.3 Schenectady 3.2 Cayuga 2.5 Madison 3.8 Schoharie 2.6 Chautauqua 6.3 Monroe 5.3 Schuyler 1.2 Chemung 2.2 Montgomery 3.2 Seneca 5.9 Chenango 1.2 Nassau 5.8 Steuben 1.2 Clinton 2.6 New York Table Suffolk 5.8 Columbia 2.6 Niagara 7.7 Sullivan 17.0 Cortland 2.5 Oneida 2.1 Tioga 1.1 Delaware 1.2 Onondaga 3.8 Tompkins 1.2 Dutchess 6.4 Ontario 5.3 Ulster 17.0 Erie 7.7 Orange 17.0 Warren 2.6 Essex 2.6 Orleans 5.3 Washington 2.6 Franklin 2.5 Oswego 3.8 Wayne 5.3 Fulton 2.6 Otsego 1.2 Westchester 22.6 Genesee 5.9 Putnam 22.6 Wyoming 6.3 Greene 2.6 Queens Table Yates 5.9 Hamilton 2.6 Rensselaer 3.2

(45 FR 65976 – 10/3/1980)

GOALS FOR PARTICIPATION OF MINORITIES BRONX, KINGS, NEW YORK, QUEENS AND RICHMOND COUNTIES

Electricians 9.0 to 10.2 Bricklayers 13.4 to 15.5 Carpenters 27.6 to 32.0 Asbestos workers 22.8 to 28.0 Steam fitters 12.2 to 13.5 Roofers 6.3 to 7.5 Metal lathers 24.6 to 25.6 Iron workers (ornamental) 22.4 to 23.0 Painters 26.0 to 28.6 Cement masons 23.0 to 27.0 Operating engineers 25.6 to 26.0 Glaziers 16.0 to 20.0 Plumbers 12.0 to 14.5 Plasterers 15.8 to 18.0 Iron workers (structural) 25.9 to 32.0 Teamsters 22.0 to 22.5 Elevator constructors 5.5 to 6.5 Boilermakers 13.0 to 15.5

All others 16.4 to 17.5

GOAL FOR PARTICIPATION OF WOMEN

The goal for the participation of women is 6.9%. (43 FR 14888 – 4/7/1978)

These goals are applicable to all the Contractor's construction work (whether or not it is Federal or federally assisted). If the Contractor performs construction work outside of New York State, it shall apply the goals established for the covered area where the work is actually performed.

D26461028

Page 5: D264610 - dot.ny.gov

0821 Page 1 of 1 rev. 02/02/21 Per Construction 12/09/19 L 05/01/20

DBE/MBE/WBE/SDVOB PARTICIPATION GOALS

The Department has established the following participation goal(s) for this contract, expressed as a percentage of the total contract bid amount.

The DBE program applies to Federal-Aid contracts; the MBE, WBE, and SDVOB programs apply to Non-Federal-Aid contracts. For more information see Standard Specifications §102-12 or call the Office of Construction Pre-Award Unit at (518) 457-6472.

Disadvantaged Business Enterprise (DBE) Goal % (Federal-Aid Only)

Minority Business Enterprise (MBE) Goal % (Non Federal-Aid Only)

Women's Business Enterprise (WBE) Goal % (Non Federal-Aid Only)

Service-Disabled Veteran-Owned Business (SDVOB) Goal % (Non Federal-Aid Only)

The NYSUCP DBE Directory is located at: https://nysucp.newnycontracts.com/

The NYS M/WBE Directory is located at: https://ny.newnycontracts.com/

The NYS SDVOB Directory is located at: https://online.ogs.ny.gov/SDVOB/search

D264610 29

5

Page 6: D264610 - dot.ny.gov

CONR9 (01/02/18)

SUPPLEMENTAL INFORMATION AVAILABLE TO BIDDERSThe information checked in the “Digital” column on this form is available at the Contract Documents tab within the Construction Contracting section of the Business Center on the Department’s web site. The information checked in the “Inspection Only” column on this form is available at the Regional Office having jurisdiction for this project, as identified in the advertisement for bids, for inspection and review prior to the letting date. The bidder’s signature on this proposal certifies that they have made themselves aware of the availability of the information indicated below:

THERE IS NO SUPPLEMENTAL INFORMATION AVAILABLE FOR THIS CONTRACT:

INFORMATION Digital1 Inspection Only1. Unsealed Layered or 3D PDF Files2. CADD Information

a. MicroStation DGNb. InRoads DTM and XML formatc. InRoads ALG and XML format

3. Cross Sections in ADOBE PDF format4. Quantity Work-ups2

5. Record Plans6. Rock Cores (available for inspection only)7. Sign Face Layouts in ADOBE PDF format8. Stormwater Pollution Prevention Plan (SWPPP)9. Subsurface Information

a. Subsurface Exploration Logsb. Undisturbed Sample Logsc. Laboratory Test Data from Soil Samplesd. Tabulated Results of Probinge. Tabulated Depth to Bedrockf. Rock Core Evaluation Logsg. Compression Test Data from Rock Samplesh. Rock Outcrop Mapsi. Granular Materials Resource Survey Reportsj. Terrain Reconnaissance Reports

10. Subsurface Information - Other Informationa. Subsurface information from outside sourcesb. Source Information - Granular Material and aggregatesc. Special Subsurface Reports

11. Anticipated Construction Schedule12. Asbestos Information

a. Asbestos Blanket Variancesb. Asbestos Report

13. Special Reports or Other Information:a. Permitsb. Design Approval Documentc. Survey Control Reportd. Wetland Compensation Report

1 – All digital material is provided in ADOBE (PDF) format, unless noted above.2 – Required for all projects.

D26461030

Page 7: D264610 - dot.ny.gov

NYSDOT Electronic Bidding - AASHTOWare Project Bids and Bid Express

0850 1 of 2 Contract Management L09/01/19 06/20/19

Project Bids allows bidders to receive electronic proposal bid item information from the Department's web site and Bid Express to produce an electronic bid. Project Bids is provided free of charge, and can be used on almost any Windows-compatible PC. Benefits may include:

• Project Bids computes item and overall bid totals as estimators work through the list, andalerts estimators if an item is accidentally omitted.

• Electronic files of item bid data will be posted to the NYSDOT website and Bid Expressto coincide with advertising and contract document publication dates.

• When an amended item bid data is downloaded, recognition of changes is automatic.• Electronic bids are processed faster than paper bids, decreasing the time needed for

verification of bids by NYSDOT.

Bid Express allows secure, encrypted bid submittal over the internet. It integrates with Project Bids and includes electronic bid bond verification. Bid Express is a fee-based service. Benefits may include:

• Real-time bid submittal from any location.• No concerns about driving bids to Albany or mail services arriving after the deadline.• The ability to submit a "safety bid" early while continuing to solicit better quotes from

subs and suppliers and to overwrite the safety bid with a new bid right up to thesubmission deadline.

• As data accumulates on Bid Express, there is the ability to search and analyze bids onprior contracts for specific work items, and/or by specific competitors, etc.

• The ability to solicit and receive quotes from subcontractors through the Small BusinessNetwork on Bid Express.

• Contractors who use Bid Express do not submit a paper bid.

First time electronic bidders should:

• Allow at least seven business days to obtain a digital ID and password for biddingthrough Bid Express.

• Follow the procedures in "Download AASHTOWare Project Bids", which are posted athttp://www.dot.ny.gov/bids-and-lettings/construction-contractors/electronic-bid-system

• Enter the Agency as NYSDOT.• Use the appropriate Federal-ID and firm name. Federal-ID must be in the format 12-

3456789. Joint ventures must create a new digital ID. Joint ventures must also sendevidence of the authority of the agent or attorney-in-fact for the joint venturers to act onbehalf of all joint venturers to the Office of Contract Management prior to the Letting.

All electronic bidders should:

• Enter prices for all bid items in the Schedule of Items.• Enter days for the B portion(s) of A + B bids on the A+B Days tab (if applicable).• Enter the required info in the JURAT and Disclosure of Lobbying Activity folders.• Complete the Contract Document Bid-Ability Survey (optional).

D264610 31

Page 8: D264610 - dot.ny.gov

NYSDOT Electronic Bidding - AASHTOWare Project Bids and Bid Express

0850 2 of 2 Contract Management L09/01/19 06/20/19

• Enter the required info in the Bid Bond folder if submitting a bid through Bid Expressand click Verify to verify the bid bond.

• All bids submitted through Bid Express should be 100% complete as noted at the top ofthe page. Submitting a bid that is less than 100% complete through Bid Express couldlead to the bid being declared informal.

Paper Bid Documents: NYSDOT recommends and encourages contractors to bid electronically with Bid Express because of its many advantages, but contractors are not required to bid electronically. If NYSDOT receives both a Bid Express bid and a paper bid from the same contractor, the Bid Express bid will prevail.

Bidders who do not use Bid Express are encouraged to submit an electronic bid file on a CD or flash drive with their paper bid. NYSDOT will not accept electronic bids on any media without a paper bid. If there is any discrepancy between an electronic file submitted with the paper bid and the paper bid, the paper bid will prevail.

When submitting an electronic bid file with your paper bid, include only one .ebsx (Project Bids) file on the CD or flash drive. Do not put anything else on this CD or flash drive.

Amendments: Contractors are solely responsible for recognizing and responding to changes by amendment. If an amendment involves changes to item bid data, an amended Project Bids file will be posted to the Department's website and to Bid Express. This file must be applied to your electronic bid. If there is any discrepancy in the itemized proposals published in paper and electronic formats, in either the contract pay items or quantities, the Department will evaluate the bids based only on that portion that is common to all formats. For example, if an item is missing from any format, the bids will be evaluated excluding that item and if item quantities are different in any format, the bids will be evaluated using the lowest item quantity.

Please notify the Department at 518-457-2124 or 518-457-3583 if you find any such discrepancies. However, not all amendments will involve changes to item bid data.

For assistance:

• NYSDOT 518-457-2124 or 518-457-3583• Bid Express Help Desk (888) 352-2439 or (352) 381-4888• Third-party Software - Contact the vendor of the software. The Department is neither

authorized nor able to assist with any software package.

D26461032

Page 9: D264610 - dot.ny.gov

FHWA-1273 -- Revised May 1, 2012

REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS

I. GeneralII. NondiscriminationIII. Nonsegregated FacilitiesIV. Davis-Bacon and Related Act ProvisionsV. Contract Work Hours and Safety Standards Act

ProvisionsVI. Subletting or Assigning the ContractVII. Safety: Accident PreventionVIII. False Statements Concerning Highway ProjectsIX. Implementation of Clean Air Act and Federal Water

Pollution Control ActX. Compliance with Governmentwide Suspension and

Debarment RequirementsXI. Certification Regarding Use of Contract Funds for

Lobbying

ATTACHMENTS

A. Employment and Materials Preference for AppalachianDevelopment Highway System or Appalachian Local AccessRoad Contracts (included in Appalachian contracts only)

I. GENERAL

1. Form FHWA-1273 must be physically incorporated in eachconstruction contract funded under Title 23 (excludingemergency contracts solely intended for debris removal). Thecontractor (or subcontractor) must insert this form in eachsubcontract and further require its inclusion in all lower tiersubcontracts (excluding purchase orders, rental agreementsand other agreements for supplies or services).

The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.

Form FHWA-1273 must be included in all Federal-aid design-build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services). The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.

Contracting agencies may reference Form FHWA-1273 in bid proposal or request for proposal documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract).

2. Subject to the applicability criteria noted in the followingsections, these contract provisions shall apply to all workperformed on the contract by the contractor's own organizationand with the assistance of workers under the contractor'simmediate superintendence and to all work performed on thecontract by piecework, station work, or by subcontract.

3. A breach of any of the stipulations contained in theseRequired Contract Provisions may be sufficient grounds forwithholding of progress payments, withholding of finalpayment, termination of the contract, suspension / debarmentor any other action determined to be appropriate by thecontracting agency and FHWA.

4. Selection of Labor: During the performance of this contract,the contractor shall not use convict labor for any purposewithin the limits of a construction project on a Federal-aidhighway unless it is labor performed by convicts who are onparole, supervised release, or probation. The term Federal-aidhighway does not include roadways functionally classified aslocal roads or rural minor collectors.

II. NONDISCRIMINATION

The provisions of this section related to 23 CFR Part 230 are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts.

In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR 60, 29 CFR 1625-1627, Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633.

The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60-1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3.

Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR 60, and 29 CFR 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), and Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633.

The following provision is adopted from 23 CFR 230, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements.

1. Equal Employment Opportunity: Equal employmentopportunity (EEO) requirements not to discriminate and to takeaffirmative action to assure equal opportunity as set forthunder laws, executive orders, rules, regulations (28 CFR 35,29 CFR 1630, 29 CFR 1625-1627, 41 CFR 60 and 49 CFR 27)and orders of the Secretary of Labor as modified by theprovisions prescribed herein, and imposed pursuant to 23U.S.C. 140 shall constitute the EEO and specific affirmativeaction standards for the contractor's project activities under

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

L09/06/12Page 1 of 11

D264610 33

Page 10: D264610 - dot.ny.gov

this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR 35 and 29 CFR 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO:

a. The contractor will work with the contracting agency andthe Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract.

b. The contractor will accept as its operating policy thefollowing statement:

"It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre-apprenticeship, and/or on-the-job training."

2. EEO Officer: The contractor will designate and makeknown to the contracting officers an EEO Officer who will havethe responsibility for and must be capable of effectivelyadministering and promoting an active EEO program and whomust be assigned adequate authority and responsibility to doso.

3. Dissemination of Policy: All members of the contractor'sstaff who are authorized to hire, supervise, promote, anddischarge employees, or who recommend such action, or whoare substantially involved in such action, will be made fullycognizant of, and will implement, the contractor's EEO policyand contractual responsibilities to provide EEO in each gradeand classification of employment. To ensure that the aboveagreement will be met, the following actions will be taken as aminimum:

a. Periodic meetings of supervisory and personnel officeemployees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer.

b. All new supervisory or personnel office employees will begiven a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor.

c. All personnel who are engaged in direct recruitment forthe project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women.

d. Notices and posters setting forth the contractor's EEOpolicy will be placed in areas readily accessible to employees, applicants for employment and potential employees.

e. The contractor's EEO policy and the procedures toimplement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means.

4. Recruitment: When advertising for employees, thecontractor will include in all advertisements for employees thenotation: "An Equal Opportunity Employer." All suchadvertisements will be placed in publications having a largecirculation among minorities and women in the area fromwhich the project work force would normally be derived.

a. The contractor will, unless precluded by a validbargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees, and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration.

b. In the event the contractor has a valid bargainingagreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions.

c. The contractor will encourage its present employees torefer minorities and women as applicants for employment. Information and procedures with regard to referring such applicants will be discussed with employees.

5. Personnel Actions: Wages, working conditions, andemployee benefits shall be established and administered, andpersonnel actions of every type, including hiring, upgrading,promotion, transfer, demotion, layoff, and termination, shall betaken without regard to race, color, religion, sex, nationalorigin, age or disability. The following procedures shall befollowed:

a. The contractor will conduct periodic inspections of projectsites to insure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel.

b. The contractor will periodically evaluate the spread ofwages paid within each classification to determine any evidence of discriminatory wage practices.

c. The contractor will periodically review selected personnelactions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons.

d. The contractor will promptly investigate all complaints ofalleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal.

6. Training and Promotion:

a. The contractor will assist in locating, qualifying, andincreasing the skills of minorities and women who are

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

0860 L09/06/12Page 2 of 11

D26461034

Page 11: D264610 - dot.ny.gov

applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved.

b. Consistent with the contractor's work force requirementsand as permissible under Federal and State regulations, the contractor shall make full use of training programs, i.e., apprenticeship, and on-the-job training programs for the geographical area of contract performance. In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistancein accordance with 23 U.S.C. 140(a).

c. The contractor will advise employees and applicants foremployment of available training programs and entrance requirements for each.

d. The contractor will periodically review the training andpromotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion.

7. Unions: If the contractor relies in whole or in part uponunions as a source of employees, the contractor will use goodfaith efforts to obtain the cooperation of such unions toincrease opportunities for minorities and women. Actions bythe contractor, either directly or through a contractor'sassociation acting as agent, will include the procedures setforth below:

a. The contractor will use good faith efforts to develop, incooperation with the unions, joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment.

b. The contractor will use good faith efforts to incorporate anEEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, national origin, age or disability.

c. The contractor is to obtain information as to the referralpractices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information.

d. In the event the union is unable to provide the contractorwith a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, national origin, age or disability; making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency.

8. Reasonable Accommodation for Applicants /Employees with Disabilities: The contractor must be familiar

with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established there under. Employers must provide reasonable accommodation in all employment activities unless to do so would cause an undue hardship.

9. Selection of Subcontractors, Procurement of Materialsand Leasing of Equipment: The contractor shall notdiscriminate on the grounds of race, color, religion, sex,national origin, age or disability in the selection and retentionof subcontractors, including procurement of materials andleases of equipment. The contractor shall take all necessaryand reasonable steps to ensure nondiscrimination in theadministration of this contract.

a. The contractor shall notify all potential subcontractors andsuppliers and lessors of their EEO obligations under thiscontract.

b. The contractor will use good faith efforts to ensuresubcontractor compliance with their EEO obligations.

10. Assurance Required by 49 CFR 26.13(b):

a. The requirements of 49 CFR Part 26 and the State-approved DBE program are incorporated by

reference.

b. The contractor or subcontractor shall not discriminate onthe basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the contracting agencydeems appropriate.

11. Records and Reports: The contractor shall keep suchrecords as necessary to document compliance with the EEOrequirements. Such records shall be retained for a period ofthree years following the date of the final payment to thecontractor for all contract work and shall be available atreasonable times and places for inspection by authorizedrepresentatives of the contracting agency and the FHWA.

a. The records kept by the contractor shall document thefollowing:

(1) The number and work hours of minority and non-minority group members and women employed in each work classification on the project;

(2) The progress and efforts being made in cooperationwith unions, when applicable, to increase employment opportunities for minorities and women; and

(3) The progress and efforts being made in locating, hiring,training, qualifying, and upgrading minorities and women;

b. The contractors and subcontractors will submit an annualreport to the contracting agency each July for the duration of the project, indicating the number of minority, women, and non-minority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. The staffing data should represent the project work force on board in all or any part of the last payroll period preceding the end of July. If on-the-job training is being required by special provision, the contractor

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

0860 L09/06/12Page 3 of 11

D264610 35

Page 12: D264610 - dot.ny.gov

will be required to collect and report training data. The employment data should reflect the work force on board during all or any part of the last payroll period preceding the end of July.

III. NONSEGREGATED FACILITIES

This provision is applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more.

The contractor must ensure that facilities provided for employees are provided in such a manner that segregation on the basis of race, color, religion, sex, or national origin cannot result. The contractor may neither require such segregated use by written or oral policies nor tolerate such use by employee custom. The contractor's obligation extends further to ensure that its employees are not assigned to perform their services at any location, under the contractor's control, where the facilities are segregated. The term "facilities" includes waiting rooms, work areas, restaurants and other eating areas, time clocks, restrooms, washrooms, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing provided for employees. The contractor shall provide separate or single-user restrooms and necessary dressing or sleeping areas to assure privacy between sexes.

IV. DAVIS-BACON AND RELATED ACT PROVISIONS

This section is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts (regardless of subcontract size). The requirements apply to all projects located within the right-of-way of a roadway that is functionally classified as Federal-aid highway. This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. Contracting agencies may elect to apply these requirements to other projects.

The following provisions are from the U.S. Department of

FHWA-1273 format and FHWA program requirements.

1. Minimum wages

a. All laborers and mechanics employed or working uponthe site of the work, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics.

Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions

of paragraph 1.d. of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph 1.b. of this section) and the Davis-Bacon poster (WH 1321) shall beposted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.

b.(1) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met:

(i) The work to be performed by the classificationrequested is not performed by a classification in the wage determination; and

(ii) The classification is utilized in the area by theconstruction industry; and

(iii) The proposed wage rate, including any bona fidefringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.

(2) If the contractor and the laborers and mechanics to beemployed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.

(3) In the event the contractor, the laborers or mechanicsto be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Wage and Hour Administrator for determination. The Wage and Hour Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

0860 L09/06/12Page 4 of 11

D26461036

Page 13: D264610 - dot.ny.gov

will notify the contracting officer within the 30-day period that additional time is necessary.

(4) The wage rate (including fringe benefits whereappropriate) determined pursuant to paragraphs 1.b.(2) or 1.b.(3) of this section, shall be paid to all workers performingwork in the classification under this contract from the firstday on which work is performed in the classification.

c. Whenever the minimum wage rate prescribed in thecontract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof.

d. If the contractor does not make payments to a trustee orother third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.

2. Withholding

The contracting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor under this contract, or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, orhelper, employed or working on the site of the work, all or part of the wages required by the contract, the contracting agency may, after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.

3. Payrolls and basic records

a. Payrolls and basic records relating thereto shall bemaintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-

Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.

b.(1) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the contracting agency. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee ( e.g. , the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH 347 isavailable for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the contracting agency for transmission to the State DOT, the FHWA or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the contracting agency..

(2) Each payroll submitted shall be accompanied by a

subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following:

(i) That the payroll for the payroll period contains theinformation required to be provided under §5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under §5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete;

(ii) That each laborer or mechanic (including eachhelper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR part 3;

(iii) That each laborer or mechanic has been paid notless than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

0860 L09/06/12Page 5 of 11

D264610 37

Page 14: D264610 - dot.ny.gov

(3) The weekly submission of a properly executedcertification set forth on the reverse side of Optional Form WH 347 shall satisfy the requirement for submission of the

this section.

(4) The falsification of any of the above certifications maysubject the contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 231 of title 31 of the United States Code.

c. The contractor or subcontractor shall make the recordsrequired under paragraph 3.a. of this section available for inspection, copying, or transcription by authorized representatives of the contracting agency, the State DOT, the FHWA, or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the FHWA may, after written notice to the contractor, the contracting agency or the State DOT, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.

4. Apprentices and trainees

a. Apprentices (programs of the USDOL).

Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice.

The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the contractor's or subcontractor's registered program shall be observed.

Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly

rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination.

In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.

b. Trainees (programs of the USDOL).

Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration.

The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration.

Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed.

In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved.

c. Equal employment opportunity. The utilization ofapprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30.

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

0860 L09/06/12Page 6 of 11

D26461038

Page 15: D264610 - dot.ny.gov

d. Apprentices and Trainees (programs of the U.S. DOT).

Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting EEO in connection with Federal-aid highway construction programs are not subject to the requirements of paragraph 4 of this Section IV. The straight time hourly wage rates for apprentices and trainees under such programs will be established by the particular programs. The ratio of apprentices and trainees to journeymen shall not be greater than permitted by the terms of the particular program.

5. Compliance with Copeland Act requirements. Thecontractor shall comply with the requirements of 29 CFR part3, which are incorporated by reference in this contract.

6. Subcontracts. The contractor or subcontractor shall insertForm FHWA-1273 in any subcontracts and also require thesubcontractors to include Form FHWA-1273 in any lower tiersubcontracts. The prime contractor shall be responsible for thecompliance by any subcontractor or lower tier subcontractorwith all the contract clauses in 29 CFR 5.5.

7. Contract termination: debarment. A breach of thecontract clauses in 29 CFR 5.5 may be grounds for terminationof the contract, and for debarment as a contractor and asubcontractor as provided in 29 CFR 5.12.

8. Compliance with Davis-Bacon and Related Actrequirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5are herein incorporated by reference in this contract.

9. Disputes concerning labor standards. Disputes arisingout of the labor standards provisions of this contract shall notbe subject to the general disputes clause of this contract. Suchdisputes shall be resolved in accordance with the proceduresof the Department of Labor set forth in 29 CFR parts 5, 6, and7. Disputes within the meaning of this clause include disputesbetween the contractor (or any of its subcontractors) and thecontracting agency, the U.S. Department of Labor, or theemployees or their representatives.

10. Certification of eligibility.

a. By entering into this contract, the contractor certifies thatneither it (nor he or she) nor any person or firm who has aninterest in the contractor's firm is a person or firm ineligible tobe awarded Government contracts by virtue of section 3(a) ofthe Davis-Bacon Act or 29 CFR 5.12(a)(1).

b. No part of this contract shall be subcontracted to any personor firm ineligible for award of a Government contract by virtueof section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1).

c. The penalty for making false statements is prescribed in theU.S. Criminal Code, 18 U.S.C. 1001.

V. CONTRACT WORK HOURS AND SAFETYSTANDARDS ACT

The following clauses apply to any Federal-aid construction contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses shall be inserted in addition to the clauses required by 29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the terms laborers and mechanics include watchmen and guards.

1. Overtime requirements. No contractor or subcontractorcontracting for any part of the contract work which may requireor involve the employment of laborers or mechanics shallrequire or permit any such laborer or mechanic in anyworkweek in which he or she is employed on such work towork in excess of forty hours in such workweek unless suchlaborer or mechanic receives compensation at a rate not lessthan one and one-half times the basic rate of pay for all hoursworked in excess of forty hours in such workweek.

2. Violation; liability for unpaid wages; liquidateddamages. In the event of any violation of the clause set forthin paragraph (1.) of this section, the contractor and anysubcontractor responsible therefor shall be liable for theunpaid wages. In addition, such contractor and subcontractorshall be liable to the United States (in the case of work doneunder contract for the District of Columbia or a territory, to suchDistrict or to such territory), for liquidated damages. Suchliquidated damages shall be computed with respect to eachindividual laborer or mechanic, including watchmen andguards, employed in violation of the clause set forth inparagraph (1.) of this section, in the sum of $10 for eachcalendar day on which such individual was required orpermitted to work in excess of the standard workweek of fortyhours without payment of the overtime wages required by theclause set forth in paragraph (1.) of this section.

3. Withholding for unpaid wages and liquidated damages.The FHWA or the contacting agency shall upon its own actionor upon written request of an authorized representative of theDepartment of Labor withhold or cause to be withheld, fromany moneys payable on account of work performed by thecontractor or subcontractor under any such contract or anyother Federal contract with the same prime contractor, or anyother federally-assisted contract subject to the Contract WorkHours and Safety Standards Act, which is held by the sameprime contractor, such sums as may be determined to benecessary to satisfy any liabilities of such contractor orsubcontractor for unpaid wages and liquidated damages asprovided in the clause set forth in paragraph (2.) of thissection.

4. Subcontracts. The contractor or subcontractor shall insertin any subcontracts the clauses set forth in paragraph (1.)through (4.) of this section and also a clause requiring thesubcontractors to include these clauses in any lower tiersubcontracts. The prime contractor shall be responsible forcompliance by any subcontractor or lower tier subcontractorwith the clauses set forth in paragraphs (1.) through (4.) of thissection.

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

0860 L09/06/12Page 7 of 11

D264610 39

Page 16: D264610 - dot.ny.gov

VI. SUBLETTING OR ASSIGNING THE CONTRACT

This provision is applicable to all Federal-aid construction contracts on the National Highway System.

1. The contractor shall perform with its own organizationcontract work amounting to not less than 30 percent (or agreater percentage if specified elsewhere in the contract) ofthe total original contract price, excluding any specialty itemsdesignated by the contracting agency. Specialty items may beperformed by subcontract and the amount of any suchspecialty items performed may be deducted from the totaloriginal contract price before computing the amount of workrequired to be performed by the contractor's own organization(23 CFR 635.116).

a. Theto workers employed or leased by the prime contractor, and equipment owned or rented by the prime contractor, with or without operators. Such term does not include employees or equipment of a subcontractor or lower tier subcontractor, agents of the prime contractor, or any other assignees. The term may include payments for the costs of hiring leased employees from an employee leasing firm meeting all relevant Federal and State regulatory requirements. Leased employees may only be included in this term if the prime contractor meets all of the following conditions:

(1) the prime contractor maintains control over thesupervision of the day-to-day activities of the leased employees;

(2) the prime contractor remains responsible for the qualityof the work of the leased employees;

(3) the prime contractor retains all power to accept orexclude individual employees from work on the project; and

(4) the prime contractor remains ultimately responsible forthe payment of predetermined minimum wages, the submission of payrolls, statements of compliance and all other Federal regulatory requirements.

b. "Specialty Items" shall be construed to be limited to workthat requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid or propose on the contract as a whole and in general are to be limited to minor components of the overall contract.

2. The contract amount upon which the requirements set forthin paragraph (1) of Section VI is computed includes the cost ofmaterial and manufactured products which are to bepurchased or produced by the contractor under the contractprovisions.

3. The contractor shall furnish (a) a competent superintendentor supervisor who is employed by the firm, has full authority todirect performance of the work in accordance with the contractrequirements, and is in charge of all construction operations(regardless of who performs the work) and (b) such other of itsown organizational resources (supervision, management, andengineering services) as the contracting officer determines isnecessary to assure the performance of the contract.

4. No portion of the contract shall be sublet, assigned orotherwise disposed of except with the written consent of thecontracting officer, or authorized representative, and suchconsent when given shall not be construed to relieve thecontractor of any responsibility for the fulfillment of thecontract. Written consent will be given only after thecontracting agency has assured that each subcontract is

evidenced in writing and that it contains all pertinent provisions and requirements of the prime contract.

5. The 30% self-performance requirement of paragraph (1) isnot applicable to design-build contracts; however, contractingagencies may establish their own self-performancerequirements.

VII. SAFETY: ACCIDENT PREVENTION

T h i s p r o v i s i o n i s applicable to all Federal-aid construction contracts and to all related subcontracts.

1. In the performance of this contract the contractor shallcomply with all applicable Federal, State, and local lawsgoverning safety, health, and sanitation (23 CFR 635). Thecontractor shall provide all safeguards, safety devices andprotective equipment and take any other needed actions as itdetermines, or as the contracting officer may determine, to bereasonably necessary to protect the life and health ofemployees on the job and the safety of the public and toprotect property in connection with the performance of thework covered by the contract.

2. It is a condition of this contract, and shall be made acondition of each subcontract, which the contractor enters intopursuant to this contract, that the contractor and anysubcontractor shall not permit any employee, in performanceof the contract, to work in surroundings or under conditionswhich are unsanitary, hazardous or dangerous to his/herhealth or safety, as determined under construction safety andhealth standards (29 CFR 1926) promulgated by the Secretaryof Labor, in accordance with Section 107 of the Contract WorkHours and Safety Standards Act (40 U.S.C. 3704).

3. Pursuant to 29 CFR 1926.3, it is a condition of this contractthat the Secretary of Labor or authorized representativethereof, shall have right of entry to any site of contractperformance to inspect or investigate the matter of compliancewith the construction safety and health standards and to carryout the duties of the Secretary under Section 107 of theContract Work Hours and Safety Standards Act (40U.S.C.3704).

VIII. FALSE STATEMENTS CONCERNING HIGHWAYPROJECTS

T h i s p r o v i s i o n i s applicable to all Federal-aid construction contracts and to all related subcontracts.

In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by engineers, contractors, suppliers, and workers on Federal-aid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly, and honestly as possible. Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any misunderstanding regarding the seriousness of these and similar acts, Form FHWA-1022 shall be posted on each Federal-aid highway project (23 CFR 635) in one or more places where it is readily available to all persons concerned with the project:

18 U.S.C. 1020 reads as follows:

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

0860 L09/06/12Page 8 of 11

D26461040

Page 17: D264610 - dot.ny.gov

"Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed, or the cost thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction on any highway or related project submitted for approval to the Secretary of Transportation; or

Whoever knowingly makes any false statement, false representation, false report or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or

Whoever knowingly makes any false statement or false representation as to material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal-aid Roads Act approved July 1, 1916, (39 Stat. 355), as amended and supplemented;

Shall be fined under this title or imprisoned not more than 5 years or both."

IX. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERALWATER POLLUTION CONTROL ACT

This provision is applicable to all Federal-aid construction contracts and to all related subcontracts.

By submission of this bid/proposal or the execution of this contract, or subcontract, as appropriate, the bidder, proposer, Federal-aid construction contractor, or subcontractor, as appropriate, will be deemed to have stipulated as follows:

1. That any person who is or will be utilized in theperformance of this contract is not prohibited from receiving anaward due to a violation of Section 508 of the Clean Water Actor Section 306 of the Clean Air Act.

2. That the contractor agrees to include or cause to beincluded the requirements of paragraph (1) of this Section X inevery subcontract, and further agrees to take such action asthe contracting agency may direct as a means of enforcingsuch requirements.

X. CERTIFICATION REGARDING DEBARMENT,SUSPENSION, INELIGIBILITY AND VOLUNTARYEXCLUSION

This provision is applicable to all Federal-aid construction contracts, design-build contracts, subcontracts, lower-tier subcontracts, purchase orders, lease agreements, consultant contracts or any other covered transaction requiring FHWA approval or that is estimated to cost $25,000 or more asdefined in 2 CFR Parts 180 and 1200.

1. Instructions for Certification First Tier Participants:

a. By signing and submitting this proposal, the prospectivefirst tier participant is providing the certification set out below.

b. The inability of a person to provide the certification set outbelow will not necessarily result in denial of participation in this

covered transaction. The prospective first tier participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective first tier participant to furnish a certification or an explanation shall disqualify such a person from participation in this transaction.

c. The certification in this clause is a material representationof fact upon which reliance was placed when the contracting agency determined to enter into this transaction. If it is later determined that the prospective participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the contracting agency may terminate this transaction for cause of default.

d. The prospective first tier participant shall provideimmediate written notice to the contracting agency to whom this proposal is submitted if any time the prospective first tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

e. The terms "covered transaction," "debarred,""suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200.

grantee or subgrantee of Federal funds and a participant (such

the participant who has entered into acovered transaction with a grantee or subgrantee of Federal

covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers).

f. The prospective first tier participant agrees by submittingthis proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction.

g. The prospective first tier participant further agrees bysubmitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transactions," provided by the department or contracting agency, entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold.

h. A participant in a covered transaction may rely upon acertification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.gov/), which is compiled by the General Services Administration.

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

0860 L09/06/12Page 9 of 11

D264610 41

Page 18: D264610 - dot.ny.gov

i. Nothing contained in the foregoing shall be construed torequire the establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of the prospective participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

j. Except for transactions authorized under paragraph (f) ofthese instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default.

* * * * *

2. Certification Regarding Debarment, Suspension,Ineligibility and Voluntary Exclusion First TierParticipants:

a. The prospective first tier participant certifies to the best ofits knowledge and belief, that it and its principals:

(1) Are not presently debarred, suspended, proposed fordebarment, declared ineligible, or voluntarily excluded fromparticipating in covered transactions by any Federal department or agency;

(2) Have not within a three-year period preceding thisproposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;

(3) Are not presently indicted for or otherwise criminally orcivilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (a)(2) of this certification; and

(4) Have not within a three-year period preceding thisapplication/proposal had one or more public transactions (Federal, State or local) terminated for cause or default.

b. Where the prospective participant is unable to certify toany of the statements in this certification, such prospectiveparticipant shall attach an explanation to this proposal.

2. Instructions for Certification - Lower Tier Participants:

(Applicable to all subcontracts, purchase orders and other lower tier transactions requiring prior FHWA approval or estimated to cost $25,000 or more - 2 CFR Parts 180 and 1200)

a. By signing and submitting this proposal, the prospectivelower tier is providing the certification set out below.

b. The certification in this clause is a material representationof fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department, or agency with which

this transaction originated may pursue available remedies, including suspension and/or debarment.

c. The prospective lower tier participant shall provideimmediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous by reason of changed circumstances.

d. The terms "covered transaction," "debarred,""suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations.refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the

refers to any covered transaction under a First Tier Covered

refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds

covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers).

e. The prospective lower tier participant agrees bysubmitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated.

f. The prospective lower tier participant further agrees bysubmitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold.

g. A participant in a covered transaction may rely upon acertification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.gov/), which is compiled by the General Services Administration.

h. Nothing contained in the foregoing shall be construed torequire establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

i. Except for transactions authorized under paragraph e ofthese instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

0860 L09/06/12Page 10 of 11

D26461042

Page 19: D264610 - dot.ny.gov

department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment.

* * * * *

Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion--Lower Tier Participants:

1. The prospective lower tier participant certifies, bysubmission of this proposal, that neither it nor its principals ispresently debarred, suspended, proposed for debarment,declared ineligible, or voluntarily excluded from participating incovered transactions by any Federal department or agency.

2. Where the prospective lower tier participant is unable tocertify to any of the statements in this certification, suchprospective participant shall attach an explanation to thisproposal.

* * * * *

XI. CERTIFICATION REGARDING USE OF CONTRACTFUNDS FOR LOBBYING

This provision is applicable to all Federal-aid construction contracts and to all related subcontracts which exceed $100,000 (49 CFR 20).

1. The prospective participant certifies, by signing andsubmitting this bid or proposal, to the best of his or herknowledge and belief, that:

a. No Federal appropriated funds have been paid or will bepaid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

b. If any funds other than Federal appropriated funds havebeen paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.

2. This certification is a material representation of fact uponwhich reliance was placed when this transaction was made orentered into. Submission of this certification is a prerequisitefor making or entering into this transaction imposed by 31U.S.C. 1352. Any person who fails to file the requiredcertification shall be subject to a civil penalty of not less than$10,000 and not more than $100,000 for each such failure.

3. The prospective participant also agrees by submitting itsbid or proposal that the participant shall require that thelanguage of this certification be included in all lower tiersubcontracts, which exceed $100,000 and that all suchrecipients shall certify and disclose accordingly.

REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONTRACTS

0860 L09/06/12Page 11 of 11

D264610 43

Page 20: D264610 - dot.ny.gov

Page 1 of 25/21/2021 L 9/1/2021

INSURANCE COVERAGEGeneral insurance requirements are specified in Standard Specifications §107-06 – Insurance.

As new work locations and involved parties become known, the Contractor shall secure coverage for any new parties as necessary per §107-06A.4. Proof of coverage for the new additional insured parties shall be provided to the Department.

Proof of the Contractor’s Workers’ Compensation insurance and Disability insurance is required to be provided with the contract agreement. Acceptable proof of all applicable insurances shall be provided before commencing work.

Required InsurancesThe following insurances are required on all contracts:

● Workers’ Compensation ● Disability● Commercial General Liability ● Commercial Automobile● Umbrella or Excess Liability ● Special Protective and Highway Liability

Additional Required InsurancesIf the box is checked, it indicates that it is a known additional required insurance:

Professional Liability Insurance

Known to be required due to professional service requirements associated with: Item 202.XX Demolition of Buildings and Structures Item 211.XX Internally Stabilized Cut Structures Item 551.12 Splices for Steel H-Piles (mechanical splices) Item 553.XX Cofferdams Item 554.XX Fill Type Retaining Walls Item 562.XX Reinforced Concrete 3 Sided Structure Item 570.XX Paint Removal Operations Item 585.XX Structural Lifting Item 586.XX Miscellaneous Structural Reconstruction Item 604.XX Drainage Structures (concrete) Item 619.06nn Temporary Structures Item 625.XX Survey Item 650.XX Trenchless Installation of Casing Item 670.XX Highway Lighting System Item 680.XX Traffic Signal Poles Other:

Marine Protection and Indemnity Insurance

Known to be required due to contract work associated with:

Expected work from watercraft on navigable waters at a known location

A rescue boat/skiff is required (e.g., there will be contract work over water ≥ 5 feet deep, contract work over swift moving water ≥ 2 feet deep, or other situations described in §107-05I – Working Over or Near Water)

D26461044

Page 21: D264610 - dot.ny.gov

Page 2 of 25/21/2021 L 9/1/2021

Railroad Protective Liability Insurance

A foreseeable risk has been identified for contract work to potentially negatively impact the safety of railroad movements and/or cargo at a known work location.

Railroad Entity to be Insured: Western New York and Pennsylvania Railroad, LLCPolicy Single Limit $2,000,000 / Aggregate Limit $6,000,000

Pollution Liability Insurance

Known to be required due to contract work associated with: Item 205.XX Contaminated Soil Operations Item 210.XX Removal & Disposal of Asbestos-Containing Material(buildings, bridges, and highways)

Item 570.XX Paint Removal Operations Item 571.XX Disposal of Paint Removal Waste Item 629.XX Petroleum Storage Tank Closure Operations Other:

Unmanned Aircraft Systems Liability Insurance

There is required contract work involving unmanned aircraft.

Minimum Required Policy Limit: $

Builders’ Risk Policy

The Department has determined that certain contract work is required to be insured under a Builders’ Risk policy.

Minimum Required Policy Limit: $ Structure to be Insured:

D264610 45

Page 22: D264610 - dot.ny.gov

RAILROADS PROTECTIVE LIABILITY

INSURANCE INCLUDING AMENDED

LIMITS

D264610 PIN 6025.10

1. Each policy of railroad protective liability insurance shall be issued with limits of:

BODILY INJURY LIABILITY PROPERTY DAMAGE LIABILITY

Single limit of $2,000,000 combined Bodily Injury Liability and/or Property Damage Liability for each occurrence with a $6,000,000 Aggregate limit applying separately to each annual period.

2. Before any work is started within fifty (50’) of the railroad company's property or right-of-way, or above or below the railroad company’s property or right-of-way, the contractor shallprocure a policy of railroad protective liability insurance:

Owner to be Named Insured: WESTERN NEW YORK AND PENNSYLVANIARAILROAD, LLC

taken out singularly in the name of the railroad company identified as an owner/operator above. Said policy shall be subject first to the approval of named railroad company.

This Railroad Protective Liability Insurance Policy issued to the Company shall be in accordance with the U.S. Department of Transportation; Federal Highway Administration, Federal-Aid Policy Guide, 23 CFR Part 646 Subpart A.

The Contractor shall procure and maintain at his own expense, and without expense to the State or Railroad, the above captioned Railroad Protective Liability Insurance.

Because of railroad involvement, the Contractor's attention is directed to Section 105-09, WORK AFFECTING RAILROADS, in the Standard Specifications.

D26461046

Page 23: D264610 - dot.ny.gov

5/21/2021 L 9/1/2021

LIST OF ADDITIONAL INSURED PARTIES

In accordance with Standard Specifications §107-06A.4 applicable insurance policies shall be endorsed to provide coverage to:

The State of New York / New York State Department of Transportation Any municipality in which the work is being performed Any public benefit corporation, railroad, or public utility whose property or facilities are

affected by the work Any consultants working for or on the project Agents or employees of the above listed parties

Coverage shall be extended to the following known additional insured parties: County of Allegany Town of Friendship Western NY & PA Railroad

D264610 47

Page 24: D264610 - dot.ny.gov

1100 1 of 1 Per Contracts

L01/10/13 Rev. 1/10/20

New York State Vendor Responsibility Questionnaire For-Profit Construction

(CCA-2)

In accordance with Standard Specification Section 105-05 VENDOR RESPONSIBILITY, “The

Contractor shall at all times during the contract term remain responsible.” Failure to maintain

and provide responsibility documentation may result in non-payment or suspension of work.

A New York State Vendor Responsibility Questionnaire For-Profit Construction (CCA-2)

is the primary tool used to perform this review. An approved CCA-2 must be on file with

NYSDOT to be considered for the award of a contract or for the approval of a subcontract. An

approved CCA-2 covers NYSDOT work for one calendar year.

Forms are available at: http://osc.state.ny.us/vendrep/forms_vendor.htm#Construction.

Firms may file either electronically through the OSC site or can print out the CCA-2, and mail a

signed and notarized original copy to:

New York State Department of Transportation

Contract Management

50 Wolf Road, 1st Floor, Suite 1CM

Albany, NY 12232

Whichever method of submission is selected, the Contractor must complete and include

Attachments A, B and C. Further information can be found at: https://www.dot.ny.gov/bids-and-

lettings/construction-contractors/general-info.

Please note if you file online through the OSC site, a responsibility review must still be

completed by NYSDOT before work can start. Therefore, once certified on-line, you must

notify NYSDOT via email at [email protected] which will initiate the review

process. If you file online and do not notify NYSDOT within 3 months, it may be necessary for

you to resubmit and recertify, restarting the process.

If you are not currently performing work for NYSDOT but anticipate bidding or subcontracting

during the next 12 months, you should complete and submit a CCA-2. Please do not wait until

you are scheduled to work on a project.

Questions may be sent to [email protected] or you may call (518) 457-1564.

D26461048

Page 25: D264610 - dot.ny.gov

3400 Per DQAB L09/04/14

Page 1 of 1

SPECIAL NOTES

Location Maps

Landscape Development Notes

R.O.W.

Thruway

Canal

Funding

Asphalt and Fuel Price Adjustments

Specialty Items

Other Special Notes

Other Project Special Notes

NOTE: This form was developed for repetitive use throughout all contract proposals and may identify items not applicable to this specific project.

D264610 49

Page 26: D264610 - dot.ny.gov

SPECIAL NOTE TEMPORARY LANE/SHOULDER CLOSURE RESTRICTIONS FOR MAJOR

HOLIDAYS

EI 17-010 Page 1 of 1 L 05/01/18 or earlier 3408

There shall be no temporary lane/shoulder closures on roadway facilities owned and/or maintained by NYSDOT on the major holidays listed below.

Construction activities that will result in temporary lane/shoulder closures shall be suspended to minimize travel delays associated with road work for major holidays as follows:

Exceptions can only be made under the following conditions: Emergency work. Work within long-term stationary lane/shoulder closures. Safety work that does not adversely impact traffic mobility and has been authorized by

the Regional Traffic Engineer.

Note: The Department reserves the right to cancel any work operations, including lane closures and/or total road closures, that would create traffic delays by unforeseen events. The Contractor would be notified at least seven (7) calendar days prior to the proposed work.

Holiday Falls on Temporary lane closures are NOT allowed from

New Year’s Day Independence Day Christmas Day

Sunday or Monday 6:00 AM Friday before to 6:00 AM Tuesday after

Tuesday 6:00 AM Saturday before to 6:00 AM Wednesday after (starting at 6:00 AM Friday before to 6:00 AM Wednesday after for Christmas Day)

Wednesday 6:00 AM Tuesday before to 6:00 AM Thursday after (starting at 6:00 AM Saturday before to 6:00 AM Thursday after for Christmas Day)

Thursday 6:00 AM Thursday to 6:00 AM Monday after (starting at 6:00 AM Wednesday before to 6:00 AM Monday after for Christmas Day)

Friday or Saturday 6:00 AM Thursday before to 6:00 AM Monday after

Holiday Falls on Temporary lane closures are NOT allowed from Memorial Day Labor Day Monday 6:00 AM Friday before to 6:00 AM Tuesday after

Thanksgiving Day Thursday 6:00 AM Wednesday before to 6:00 AM Monday after

D26461050

Page 27: D264610 - dot.ny.gov

EB 21-019 Page 1 of 1 Rev. March 2021

SPECIAL NOTE

Diesel Emission Reduction Act (DERA) Regulatory Compliance

All NYSDOT prime Contractors are made aware that Environmental Conservation Law (ECL) 19-0323 and New York State Department of Environmental Conservation (NYSDEC) regulation 6 NYCRR Part 248 Use of Ultra Low Sulfur Diesel (ULSD) Fuel and Best Available Retrofit Technology (BART) for Heavy Duty Vehicles requires 100% compliance by December 31, 2019 for regulated heavy duty diesel vehicles working on all State awarded contracts. DERA is a requirement of ECL and NYSDEC is responsible for regulatory enforcement. NYSDOT is responsible for annual Regulatory Entity reporting.

All NYSDOT prime Contractors shall make determinations of regulatory applicability for vehicles in inventory used on active Department contracts beginning October 1 st of the previous year. These determinations shall be based on the definition of Heavy-Duty Vehicle (HDV) including on and off-road diesel vehicles having gross vehicle weights in excess of 8,500 pounds, excluding vehicles that are exempt as defined in 6 NYCRR 248-1.1(b)(14). Prime Contractors shall also quantify project ULSD fuel used by regulated vehicles beginning with active contract work October 1 st of the previous year.

An electronic copy of 6NYCRR Part 248 can be accessed at: https://govt.westlaw.com/nycrr/Browse/Home/NewYork/NewYorkCodesRulesandRegulations?guid=I230dcde07ada11de8a7a9d9968c78f9e&originationContext=documenttoc&transitionType=Default&contextData=(sc.Default)

Electronic copies of the Regulated Entity Vehicle Inventory Form and the Regulated Entity and Contractors Annual Report Form can be accessed under Part 248 Use of Ultra Low Sulfur Diesel Fuel and Best Available Retrofit Technology for Heavy Duty Vehicles at the following link: www.dec.ny.gov/chemical/4754.html.

DERA annual project reporting by NYSDOT prime Contractors shall be submitted to NYSDOT by October 15th of every year for the period between October 1st of the previous year and September 30 th of the current year. The following numbered information shall be submitted:

1. Inclusion of “DERA” and calendar year being reported in subject line of email2. Contact information including firm name, contact person, phone number and e-mail3. Estimated annual total quantity of ULSD fuel used by covered vehicles on NYSDOT contracts4. Required Fleet information for covered vehicles on NYSDOT contracts

Electronic mail submissions to [email protected].

D264610 51

Page 28: D264610 - dot.ny.gov

SPECIAL NOTE OPTIONAL USE OF WARM MIX ASPHALT (WMA) TECHNOLOGIES

3430 Page 1 of 1 EI12008L09/06/12

The contractor has the option of using an Approved WMA Technology in the production of all 402, Hot Mix Asphalt (HMA) items, except SUPERPAVE HMA with Ice Retardant items, Waterproofing Bridge Deck HMA items, and Paver-Placed Surface Treatment items, at no additional cost to the State.

If the contractor chooses to use a WMA technology, the provisions of §401 and §402 shall apply including the following:

Use an approved technology appearing on the Approved List for Technologies for Warm Mix Asphalt. Design a mixture using a WMA Technology in accordance with MM 5.16, Superpave Hot Mix Asphalt Mixture Design and Mixture Verification Procedure. At a minimum, a one point verification of the mixture’s volumetric properties is acceptable for the following situations: When the WMA mix design is based on an existing Production Status HMA mix design. When the WMA mix design is based on, and utilizes a different WMA technology than, an

existing Production Status WMA mix design. Comply with the latest manufacturer’s “Production, Testing, and Compaction Details” from the Approved List for incorporating the WMA technology. Test specimens may be made from plant produced or laboratory prepared WMA. Test specimens must be made from plant produced WMA if adding the WMA technology in the lab does not simulate the production process. The Regional Materials Engineer (RME) may require a State representative be present during the fabrication and testing. Submit the WMA design to the RME for review and verification at least 14 calendar days before production, including: Name of WMA technology and the target dosage rate. If using an additive other than water, o Submit a MSDS for the additive.o Submit either enough of the additive for the laboratory mix design verification, or the

additive pre-blended in the PG Binder at the correct dosage. If the additive is not pre-blended into the PG Binder, include directions for properly incorporating the additive intothe laboratory made mixture.

Prior to the submission of any mix design, contact the RME to determine if there is an increased concern regarding the mixture’s moisture susceptibility based on the WMA technology and/or the type of aggregate being used, or the performance of similar mixes. The RME may require AASHTO T 283 moisture susceptibility test results, meeting a minimum Tensile Strength Ration (TSR) of 80%, as part of the mix design submission.

Submit Production Quality Control Plan revisions incorporating the WMA technology if not previously submitted.

For 80 Series Compaction Method, complete all breakdown roller passes before the mat temperature falls below 230° F, unless approved by the Director, Materials Bureau.

When the asphalt mixture is being placed over a Sheet-Applied Waterproofing Membrane, maintain a minimum delivery temperature in accordance with the Material Detail Sheets prepared by the membrane manufacturer.

D26461052

Page 29: D264610 - dot.ny.gov

HMA WITH CRUSHED GLASS

3440 L07/11/02, L09/06/07, L09/01/15 L07/11/02 Page 1 of 1

SCOPE. This specification covers the requirements for the addition of crushed glass to hot mix asphalt mixtures. The provisions of Section 402 - Hot Mix Asphalt (HMA) Pavements applies except that the Contractor has the option of blending of the crushed glass in the following mixes:

1 1/2 inch Nominal Max. Size 1 inch Nominal Max. Size 3/4 inch Nominal Max. Size Truing and Leveling Course

If the Contractor chooses the crushed glass option, the following modifications to the Standard Specifications shall apply:

MATERIAL REQUIREMENTS

Crushed glass shall be subject to the approval of the Regional Materials Engineer prior to its use. The crushed glass shall contain no more than 1% (by weight) contaminants and shall meet the following gradation:

Sieve Size Percent Passing

3/8 inch 100

1/4 inch 90 - 100

No. 30 0 - 20

Note: The gradation requirements may be modified upon approval by the Regional Materials Engineer.

Crushed glass may be included in the mixture up to 5%, maximum, of the total aggregate weight. The crushed glass, aggregate, and Performance-Graded Binder (PGB) shall meet the requirements specified in the Standard Specification §401-2.01 Hot Mix Asphalt Designs and §401-2.04 Performance-Graded Binder.

CONSTRUCTION DETAILS

The crushed glass shall be proportioned from a separate feed bin approved by the Regional Materials Engineer. In addition, all requirements pertaining to aggregate shall apply to crushed glass including the equipment requirements for automatic proportioning and recording as stipulated for aggregate in §401-3.08.

METHOD OF MEASUREMENT. The provisions of §401-4 and §402-4, Method of Measurement, shall apply.

BASIS OF PAYMENT. The provisions of §402-5, Basis of Payment, shall apply.

D264610 53

Page 30: D264610 - dot.ny.gov

SPECIAL NOTE: USE OF RECLAIMED ASPHALT SHINGLES (RAS) IN THE PRODUCTION OF

ASPHALT MIXTURES

3445 Page 1 of 2 L09/01/15

DESCRIPTION. The provisions below cover the use of Reclaimed Asphalt Shingles (RAS) in the production of asphalt mixtures. Sections 401 and 402 of the NYS Standard Specifications apply except as modified herein.

MATERIAL REQUIREMENTS

The Contractor has the option of using the following:

Manufactured Waste (MW) RAS may be used in shim, base, binder, and top courses (excluding 6.3 HMA Top Course, Waterproofing Bridge Deck Overlay, and Ice Retardant mixtures).

Post Consumer Waste (PCW) RAS and may be used in shim, base and binder courses.

The RAS must be stockpiled at the plant facility and shall be subject to the approval of the Regional Materials Engineer (RME) prior to its use. RAS shall meet the following requirements:

Shall be from a source that has obtained a beneficial use determination (BUD) from the NYS Department of Environmental Conservation (DEC) as specified in 6 NYCRR 360-1.15.

Shall be certified to be asbestos free. Shall be completely free of nails. In addition, it shall contain no more than 1% by weight

of other deleterious materials such as glass, wood, plastic, etc. Shall meet the following gradation:

Sieve Size Percent Passing Min. Max.

¼ inch (6.3 mm) 100 - #4 (4.75 mm) 90 100 #8 (2.36 mm) 75 90 #16 (1.18 mm) 50 70 #30 (0.600 mm) 30 55 #50 (0.300 mm) 15 40 #100 (0.150 mm) 5 25 #200 (0.075 mm) - 15

The maximum RAS allowed in the mixture is 2% by weight of the total mixture. A Control Plan for using shingles in HMA shall be developed and submitted to the Regional Materials Engineer detailing the control and testing of the stockpiles. RAS shall be uniformly blended with RAP to reduce clumping and must be stockpiled separate from other stockpiles. Other methods of reducing RAS clumping can be utilized with the approval of the RME.

Rejuvenator. A rejuvenator shall be added to PCW RAS using a pugmill or similar equipment to pre-blend and stockpile the rejuvenated PCW RAS. Alternatively, a spray system may be used

D26461054

Page 31: D264610 - dot.ny.gov

SPECIAL NOTE: USE OF RECLAIMED ASPHALT SHINGLES (RAS) IN THE PRODUCTION OF

ASPHALT MIXTURES

3445 Page 2 of 2 L09/01/15

to spray the rejuvenator onto the PCW RAS prior to its introduction into the plant mixer. The rejuvenator shall meet the requirements of ASTM D 4552, Standard Practice for Classifying Hot-Mix Recycling Agents. Other liquid products or methods which facilitate softening of the PCW RAS binder may be used with the approval of the Regional Materials Engineer. The application rate shall be as recommended by the rejuvenator supplier.

Mixture Design. Prior to production of the HMA, the mixture design shall be developed to meet all the requirements in the latest Materials Method (MM) 5.16, Hot Mix Asphalt (HMA) Mixture Design and Mixture Verification Procedures, available on the Department’s website. The mixture design shall also meet the performance test criteria listed in the table below. The testing must be performed by an AASHTO Materials Reference Laboratory (AMRL) approved laboratory that has the capability of performing these tests. When RAS is used in conjunction with RAP, the total percentage of reclaimed material shall not exceed the maximum of 20% for Top Course and Binder Course, and 30% for Base Course currently allowed under the specifications during the production of HMA.

Mixture Performance Test Requirements Tests Specification Criteria

Dynamic Modulus, AASHTO TP 79 Report Flow Number, AASHTO TP 79 200, min. Flexural Beam Fatigue, AASHTO T 321, 750μ-Strains 10,000 cycles, min. Overlay Tester, TxDOT TEX-248F 300 cycles, min.

Reclaimed PG Binder Ratio: The ratio of reclaimed PG binder from the RAP and RAS to the total PG binder content shall not exceed 0.2.

CONSTRUCTION DETAILS

The provisions of Section 401 and Section 402 apply except that the RAP/RAS stockpile shall be tested at a frequency of at least once per day of production to determine the asphalt content and the gradation of the combined reclaimed material.

D264610 55

Page 32: D264610 - dot.ny.gov

SPECIAL NOTE: BRIDGE (BIN) PLATE

3450 08-23-95, 06-12-07L 10-19-95 01-28-10, 09-01-15 Page 1 of 2

One Bridge Identification Number (BIN) plate will be required for each bridge in this contract. For each bridge there may, or may not, be an existing BIN plate.

Therefore, one of the following conditions will exist with regard to BIN plates for any particular structure:

Condition No. 1. A BIN plate is attached to the structure but the nature of the work to be done does not require its removal.

Condition No. 2. A BIN plate is attached to the structure and the nature of the work to be done requires its removal.

Condition No. 3. A BIN plate is attached to the structure and is defaced, or otherwise damaged or incorrect.

Condition No. 4. A BIN plate is not attached to the structure.

Under Condition No. 1. the Contractor's sole obligation shall be to protect the plate from damage during the course of the work.

Under Condition No. 2. the Contractor shall be required to remove and store the BIN plate until such time as the BIN plate may be reinstalled without danger of damage. This requirement shall also apply if the BIN plate is being transferred from an existing abandoned bridge to a new in-service bridge. The Contractor shall furnish all necessary expansion anchors.

Under Condition No. 3. the Contractor shall be required to furnish and install a new BIN plate, and remove the damaged BIN plate. The Contractor shall furnish the panel with reflective background, numerals and expansion anchors. IF the BIN number cannot be deciphered the Engineer will supply the number.

Under Condition No. 4. the Contractor shall be required to furnish and install a BIN plate on the completed structure. The Engineer will supply the Bridge Identification Number. The Contractor shall furnish the panel with reflective background, numerals and expansion anchors.

Regardless of which condition governs the BIN plate installation, should damage occur to the BIN plate and the Engineer determines it cannot be repaired, the Contractor shall furnish a new plate consisting of the panel with reflective background, numerals, and expansion anchors at no expense to the State. If the Engineer determines the BIN plate may be repaired, repair shall be done at no expense to the State. This requirement applies to all four conditions.

The material requirements for the three parts of the BIN plate are:

D26461056

Page 33: D264610 - dot.ny.gov

SPECIAL NOTE: BRIDGE (BIN) PLATE

3450 08-23-95, 06-12-07L 10-19-95 01-28-10, 09-01-15 Page 2 of 2

Panel with reflective background. The aluminum panel and reflective background shall conform to the material and fabrication requirements of Material Specification 730-01, Aluminum Sign Panels. The background material shall be green reflective sheeting conforming to Materials Specification 730-05.01 (Class A Sheeting). The size of the panels shall be 1/8 inch thick by 3 inch by 12 inch. The panels shall have two 5/16 inch drilled or punched holes for mounting, located 1/2 inch from the ends of the panel and 1 1/2 inch from the top or bottom of the panel. The reflective sheeting used to form the background shall be a minimum of 3 inches wide by 10 inches long, or may be a full 12 inches long.

Numbers. The numbers shall be reflective sheeting conforming to Materials Specification 730-05.01 (Class A Sheeting), except that the adhesive shall be pressure-sensitive such that the numbers can be applied to the background in the field. The numbers shall be 2 inches high and silver-white in color conforming to FHWA series C dimensions.

Prior to placing the cutout numbers on the panel, the reflective background shall be clean and free of dirt and oil which may adversely affect proper adhesion. The numbers shall be placed on the reflective background, perpendicular to the longitudinal axis of the panel, and vertically centered. The reflective background and numbers shall be coated and/or edge sealed in accordance with the recommendations of the sheeting manufacturer.

Expansion Anchors. 1/4 inch diameter by 1 1/2 inch long stainless steel nail drive expansion anchors meeting GSA Specification A-A-1922 shall be used to attach the BIN plates to concrete and masonry surfaces.

The BIN plates shall be attached to the beginning abutment of the bridge using expansions anchors. The plate shall be placed high on the abutment, near the fascia of the bridge.

The cost of this work shall be included in the various items of the contract.

D264610 57

Page 34: D264610 - dot.ny.gov

US CUSTOMARY FUEL PRICE ADJUSTMENT

EB 15-010 Page 1 of 2 L 09/01/2015 3520

FUEL PRICE ADJUSTMENT1 CONVERSION FACTORS

MATERIAL DESCRIPTION CONVERSION FACTOR ITEM NUMBER2

Unclassified Excavation 0.35 gal/yd3 203.02

Embankment 0.10 gal/yd3 203.03, 620.xx

Fill 0.45 gal/yd3 203.05, 203.06, 203.07, 203.08xx, 203.20, 203.21, 203.25

Controlled Low Strength Material 1.00 gal/yd3 204.01, 204.02, 204.03, 204.04

Trench/Culvert/Structure Excavation 0.50 gal/yd3 206.01, 206.0201

Bituminous Stabilized Course 1.40 gal/yd3 302.01, 307.01

Sub-base Course 1.00 gal/yd3 304 Items

Hot Mix Asphalt 2.50 gal/ton 402 Items3, 405.01, 608.0201023, 619.06014, 624.02xxxx3,4, 633.143,4, 633.153,4, 633.163,4

Milling 0.10 gal/yd2 490 Items

Portland Cement Concrete Pavement 1.00 gal/yd3 502 Items3, 503.1010, 503.1011, 503.1012

Fill Type Retaining Walls 0.45 gal/yd3 554.30xx5, 554.315, 554.4x5

Footing Concrete & Concrete for Structures - All classes

1.00 gal/yd3 555 Items, 582.05

Approach Slabs 0.33 gal/yd2 557.2001, 557.2002, 557.2003, 557.2009, 557.22

Structural Slabs with bottom formwork

0.25 gal/yd2 557.01xx, 557.07, 557.30

Structural Slabs - no bottom formwork

0.15 gal/yd2 557.05xx, 557.09

Class D Concrete 0.05 gal/yd2 557.13, 584 Items

Concrete Barrier, Type A 0.16 gal/ft 606.3001, 606.3021, 606.3031

Concrete Barrier, Type B 0.19 gal/ft 569.01, 606.3002, 606.3022, 606.3032

Concrete Barrier, Type C 0.22 gal/ft 606.3003, 606.3023, 606.3033

Concrete Barrier, Half Section 0.11 gal/ft 569.02, 606.3004, 606.3024, 606.3034

Concrete Median Barrier, Single Slope

0.23 gal/ft 569.05, 606.3041, 606.3043, 606.3044

Concrete Median Barrier Wide, Single Slope

0.28 gal/ft 606.3051, 606.3053, 606.3054

D26461058

Page 35: D264610 - dot.ny.gov

US CUSTOMARY FUEL PRICE ADJUSTMENT

EB 15-010 Page 2 of 2 L 09/01/2015 3520

FUEL PRICE ADJUSTMENT1 CONVERSION FACTORS

MATERIAL DESCRIPTION CONVERSION FACTOR ITEM NUMBER2

Concrete Barrier Half Single Slope

0.17 gal/ft 569.04, 606.3061, 606.3063, 606.3064

Vertical Faced Concrete Parapet 0.10 gal/ft 569.03

Gravel, Stone, Slag 1.00 gal/yd3 411.01, 411.02, 411.03, 623.1x

Concrete Sidewalks and Driveways 1.00 gal/yd3 608.01xx

Topsoil 0.45 gal/yd3 610.10, 610.11xx, 610.14xx

Notes: 1. In accordance with Standard Specification §698-3.02, the index value for the fuel price adjustment is

the posted price for the month of bid letting.2. Item Number - This is the contract pay item number under which these materials are most

frequently paid. Unless indicated otherwise, materials similar to those indicated under the columnentitled “Material Description” are also eligible for adjustment using the factor listed for a similarmaterial with the same pay units regardless of the actual contract pay item number.

3. Quality Adjustment Items (402/502/608/624) are not eligible for fuel price adjustment.4. Fuel Price Adjustment Conversion Factor based on units of TONS of asphalt placed, not the pay units

of this item.5. Fuel Price Adjustment Conversion Factor based on units of CY of backfill paid under this item, not

the pay units of this item.

D264610 59

Page 36: D264610 - dot.ny.gov

US CUSTOMARY ASPHALT PRICE ADJUSTMENT

EB 15-010 Page 1 of 2 L 09/01/2015 3530 Rev. 9/17/15

ASPHALT PRICE ADJUSTMENT1 CONVERSION FACTORS

MATERIAL DESCRIPTION CONVERSION FACTOR ITEM NUMBER2

Bituminous Stabilized Course 0.065 t PGB/yd3 302.01

Asphalt Treated Permeable Base, Type 1

0.030 t PGB/t 402.010902

Asphalt Treated Permeable Base, Type 2

0.035 t PGB/t 402.011902

Shim Course 0.0825 t PGB/t 402.058902

6.3 SUPERPAVE HMA 0.067 t PGB/t 402.068xxxx8 RR

9.5 SUPERPAVE HMA 0.062 t PGB/t 402.09xxxx

12.5 SUPERPAVE HMA 0.055 t PGB/t 402.12xxxx

19 SUPERPAVE HMA 0.049 t PGB/t 402.19xxxx

25 SUPERPAVE HMA 0.045 t PGB/t 402.25xxxx

37.5 SUPERPAVE HMA 0.040 t PGB/t 402.37xxxx Paved Placed Surface Treatment, Types A, B, and C

0.064 t PGB/t 415.01xxyy03

Micro-Surfacing, Quick-Set Slurry

0.078 t PGB/t 410.102102 RR, 410.103102 RR, 410.104102 RR, 410.202302 RR, 410.203302 RR

Straight Tack Coat 0.0026 t PGB/gal 407.0103

Asphaltic Sealants (ASTM 6690) 0.0027 t PGB/gal 402.75xx RR, 402.76xx RR, 402.76020018

Chip Seal 0.0027 t PGB/gal 410.0105006, 410.07

Asphalt Emulsion for Cold Recycling 0.0027 t PGB/gal 416.02xx

Fog Seal and Dilute Tack Coat 0.0016 t PGB/gal 407.0102, 416.04, 410.0106006

PG Binder for Cold Recycling 0.0043 t PGB/gal 416.03

Asphaltic Sealant – Clean & Seal 0.225 t PGB/LNMI 402.76030008, 412.76030001

Asphaltic Sealant – Treating Cracks 0.240 t PGB/LNMI 412.76040001

Asphaltic Sealant – Rout & Seal 0.270 t PGB/LNMI 402.76010008 Repair of HMA Pavement, Temporary Asphalt

See Note 4 633.14, 633.15, 633.16, 619.06xx

True and Leveling, Asphalt Sidewalks, Driveways, Bike Paths, Gutters

See Note 5 402.017902, 402.01890xxx, 608.020102, 624.02xx

D26461060

Page 37: D264610 - dot.ny.gov

US CUSTOMARY ASPHALT PRICE ADJUSTMENT

EB 15-010 Page 2 of 2 L 09/01/2015 3530 Rev. 9/17/15

ASPHALT PRICE ADJUSTMENT1 CONVERSION FACTORS

Notes: 1. In accordance with Standard Specification §698-3.01, the index value for the asphalt price

adjustment is the average posted price of Performance Graded Binder (PGB) for the month of bidletting.

2. Item Number - This is the contract pay item number under which these materials are mostfrequently paid. Unless indicated otherwise, materials similar to those indicated under the columnentitled “Material Description” are also eligible for adjustment using the factor listed for a similarmaterial with the same pay units regardless of the actual contract pay item number.

3. Quality Adjustment Items (402/608/624) are not eligible for asphalt price adjustment.4. Asphalt Price Adjustment Conversion Factor based on units of TONS of asphalt placed, not the pay

units of this item. The conversion factor for HMA Pavement Repair and Temporary Asphalt will bebased on the actual asphalt mixture used.

5. The conversion factor for Truing and Leveling, Driveways, and other items that allow asphalt mixoptions, will be based on the actual mixtures used.

6. A two digit suffix (RR) at the end of a contract pay item indicates a special specification.7. The conversion factors for HMA mixed with slag shall be increased by 25%.8. t = tons

D264610 61

Page 38: D264610 - dot.ny.gov

SPECIAL NOTE Survey Work for Sidewalks and Curb Ramps

EB 19-037 Page 1 of 1 L 09/01/19 3608 Rev. 9/18/19

The contractor shall be responsible for field verifying all elevations and dimensions to ensure that the final layout of sidewalks and curb ramps meet ADA requirements prior to pouring concrete or placing asphalt or pavers. The survey work necessary to meet these requirements shall be included in the cost of Item 625.01 - Survey Operations.

A Contract Control Plan is not necessary for work limited to sidewalks and curb ramps.

D26461062

Page 39: D264610 - dot.ny.gov

PIN 6025.10 Page 1 of 5

PIN 6025.10NY 275 OVER WNY & PA RR BRIDGE DECK REPLACEMENT

TOWN OF FRIENDSHIPCOUNTY OF ALLEGANY

SPECIAL NOTES

CONTRACTUAL

1. PROJECT DESCRIPTIONThis project will consist of the following suggested work:

NY 275 over WNY & PA RR – BIN 1061560 Implement work zone traffic control – One lane stage Remove bridge deck using any flagging necessary with RR Support girders and replace bearings. Install new bridge deck and railing Reconstruct highway approaches Flip staging and repeat with other half of the bridge.

2. COORDINATION WITH OTHER CONTRACTORSIn accordance with Section 102 Cooperation between Contractors, the bidders are beingmade aware of the following contracts in the vicinity of the Contract Limits:

Maintenance ForcesJob Order Contract

Early and constant coordination will be required between the various prime and sub-contractors. The Engineer in Charge shall be kept informed of the coordination efforts andany potential impacts to the project schedule.

3. OVERTIMEWhen Department funds are allocated, the Department intends to have inspection resourcesavailable if the contractor desires to work overtime and has received permission to do so.

4. CONTRACT LIMITSThe contract limits shall include all areas where works occurs, including advanced signingcovered under this contract. The Contractor shall be responsible for the highway withinthe contract limits.

5. LANE CLOSURESThe contract shall utilize Short, Intermediate and Long-term lane closures as part of thecontract. The contractor shall use the appropriate standard sheets for layouts.

D264610 63

Page 40: D264610 - dot.ny.gov

PIN 6025.10 Page 2 of 5

6. CONTRACTOR’S USE OF ROW FOR STAGINGAny location outside the project limits that the Contractor would like to use for projectstaging and within the State ROW, shall require the approval of the Resident Engineer(RE), or Engineer in Charge (EIC). In addition, restoration of the staging area shall becompleted to the satisfaction of the RE and EIC. Reference is made to §107-08(A) of theNYSDOT Standard Specifications.

7. RESTRICTED HIGHWAY USEIn accordance with §104-08 of the Standard Specifications, highways where work is to beperformed under this contract SHALL BE designated restricted highways.

8. MAINTENANCE JURISDICTIONUpon completion and acceptance of this contract, the maintenance jurisdiction will revertto preconstruction conditions.

9. ACTUAL FIELD CONDITIONSThe Contractor’s attention is directed to the fact that due to the nature of rehabilitationprojects, the exact extent of work cannot always be accurately determined prior to thecommencement of work. These contract documents have been prepared based on fieldinspection during design and other available information. Actual field conditions mayrequire modifications to construction details and work quantities. The contractor shallperform the work in accordance with field conditions and as directed by the Engineer-in-Charge.

ENVIRONMENTAL NOTES

1. DISPOSAL OF WASTE MATERIALThis project corridor has locations within and/or adjacent to environmentally sensitiveareas. The Contractor shall not place fill in any environmentally sensitive area (wetlands,waters of the US, the 100-year floodplain, etc) unless specified in the project plans. Theselocations are shown on the plans or are described in these special notes.

The Engineer-in-Charge (EIC), working in conjunction with the ConstructionEnvironmental Coordinator (CEC), shall approve the final location and restoration of allwaste sites.

2. CONTROLLING THE INTRODUCTION AND MOVEMENT OF INVASIVESPECIESThere are no known locations of invasive species within the work limits for this project.All equipment shall be cleaned prior to arriving at the work site to prevent the introductionof invasive species.

3. NORTHERN LONG EARED BATSThis note is to advise the contractor of tree cutting restrictions to protect rare species ofbats that potentially occur in the vicinity of this project.

D26461064

Page 41: D264610 - dot.ny.gov

PIN 6025.10 Page 3 of 5

Trees three inches or greater in diameter at breast height (DBH), including snags/dead trees, are considered potential summer habitat for the federally- and State-listed threatened northern long-eared bat (Myotis septentrionalis). Coordination with State and/or federal regulatory agency review has been performed.

Based on this coordination, all tree removal (>3” dbh) must be done between October 1 and March 31.

Removal of trunks and branches from previously felled trees may occur without authorization during the restricted period.

The Contractor shall notify the EIC immediately if a need is identified to remove standing trees, that were NOT originally specified for removal by the NYSDOT; that are live or dead, three inches DBH or greater. Tree cutting (other than originally specified removals) shall not commence until authorized by the EIC.

If the contractor is unable to abide by these restrictions, the EIC must be provided notice of such, including justification. Anticipated delays in the work schedule due to tree cutting restrictions will be taken into consideration in the work order. Unanticipated delays in the work schedule that are caused by tree cutting restrictions will be addressed in accordance with Section 100 of the NYSDOT Standard Specifications

4. FUELING AREASConstruction equipment shall not be refueled by portable fuel tanks within streamcorridors. Absorbent materials shall be stored on-site for immediate clean-up response inthe event of a petroleum or hazardous waste spill. The phone number for the NYSDECSpill Response Team (1-800-457-7362) shall also be visibly posted at the project site.

5. MIGRATORY BIRD PROTECTIONThis is to notify the contractor of the potential presence of protected migratory birds nestingunder the bridge in this contract. Under no circumstances may protected birds, eggs or nestsbe harmed or destroyed without consultation and/or permitting.

Migratory bird nests may typically be found with eggs or unfledged chicks from April 15th

to August 15.th The contractor and/or the EIC should inspect bridges scheduled for workactivities within these time frames for active nests. If nests are determined to be occupied,or if nearby nest(s) are determined to be from a bird of prey, the CEC should be consultedfor options prior to proceeding with the work. If nests are observed before April 15th orafter August 15th they can be presumed to be unoccupied and can be removed. At no timeshould nests of hawks, falcons or eagles be destroyed, as these birds of prey return to thesame nest site annually.

If there are any questions regarding this special note or how to proceed, the contractorand/or the EIC should consult with the CEC.

D264610 65

Page 42: D264610 - dot.ny.gov

PIN 6025.10 Page 4 of 5

6. SPOTTED LANTERNFLYThe New York State Department of Agriculture and Markets has implemented newactions to protect New York, and its surrounding states, from the establishment of theinvasive spotted lanternfly (SLF). The Department, working in collaboration with theState Department of Environmental Conservation (DEC), issued a quarantine thatrestricts the movement of certain goods brought into New York from Delaware, NewJersey, Pennsylvania, and Virginia, states impacted by SLF. To help slow the spread ofSLF into New York, the quarantine requires certificates of inspection issued from theimpacted states on the following regulated articles entering New York State:

• Any living life stage of the SLF.• Brush, debris, bark, or yard waste.• Landscaping, remodeling, or construction waste.• Logs, stumps, or any tree parts.• Firewood of any species.• Packing materials, such as wood crates or boxes.• All plants and plant parts, including but not limited to nursery stock, greenlumber, fruit and produce and other material living, dead, cut, fallen (includingstumps), roots, branches, mulch, and composted and uncomposted chips.• Outdoor household articles, including, but not limited to, recreational vehicles,lawn tractors and mowers, mower decks, grills, grill and furniture covers, tarps,mobile homes, tile, stone, deck boards, mobile fire pits, and any equipmentassociated with these items, and trucks or vehicles not stored indoors.• Any other article, commodity, item, or product that has or that is reasonablybelieved to be infested with or harboring SLF.

New York’s order requires travelers transporting any of the above items to have documentation listing the origin and destination of shipments. It also prohibits unnecessarily stops while traveling through the quarantine area. The State Department of Agriculture and Markets will operate compliance checks at strategic locations around the State to enforce the regulations.

TECHNICAL NOTES

1. PG BINDER AND MIX DESIGN LEVELRequirements of this note apply to all Section 402 and Section 404 Asphalt (HMA andWMA) items in this contract.

PG BINDER

Use polymer or Terminal Blend Crumb Rubber modified PG 64V-22 (Very High) meetingthe requirements of AASHTO M 332, Standard Specification for Performance GradedAsphalt Binder using Multiple Stress Creep Recovery (MSCR), for the production of hotmix asphalt mixtures for this project. In addition, the binder grade must also meet theelastomeric properties as indicated by one of the following equations for %R3.2:

1. For Jnr3.2 ≥0.1, %R3.2 >29.371 * Jnr3.2-0.2633

D26461066

Page 43: D264610 - dot.ny.gov

PIN 6025.10 Page 5 of 5

2. For Jnr3.2 <0.1, %R3.2 > 55

WhereR3.2 is % recovery at 3.2 kPaJnr 3.2 is the average non-recoverable creep compliance at 3.2 kPa

When terminal blend CRM PG binder is used, the following shall apply:• Crumb rubber particles shall be finer than #30 sieve size.• The CRM PG binder shall be storage-stable and homogeneous.• The Dynamic Shear Rheometer (DSR) shall be set at 2-mm gap.• The CRM PG binder shall be 99% free of particles retained on the 600 µm sieve as

tested in accordance with Section 5.4 of M 332.

Use of polyphosphoric acid (PPA) to modify the PG binder properties is prohibited for mixtures under this contract. This prohibition also applies to the use of PPA as a crosslinking agent for polymer modification.

MIX DESIGN

The mixture designs must be developed in accordance with the criteria specified in the HMA items that are appropriate for an Estimated Traffic Level of <30 Million ESALs.

Note: The PG binder for this project will be modified with polymer or CRM additives to meet the requirements stated above. Handling of the HMA shall be discussed at pre-construction and pre-paving meetings.

2. CLEARING AND GRUBBINGAny miscellaneous items found in the highway right-of-way that are located within thearea disturbed by construction, including reference markers and delineators, shall beremoved under Item 201.06, Clearing & Grubbing.

Any tree trimming necessary for sight distance on the detour shall be removed under Item201.06.

Carcasses within the ROW shall be removed by the Contractor under Item 201.06.

3. MILLING DOSPOSALThe contractor shall deliver project pavement millings to Residency 6-1, Friendship, NY.Delivery ½ mile from project limits.

D264610 67

Page 44: D264610 - dot.ny.gov

SPECIAL NOTE

RAILROAD DATA

D264610 PIN 6025.10

Prospective bidders may require railroad operations information for certain activities such as estimating the acquisition cost of railroad-related insurance policies.

Railroad operations information at locations near or at the project site(s) is provided by the Federal Railroad Administration (FRA) at the following website:

https://safetydata.fra.dot.gov/OfficeofSafety/PublicSite/Crossing/Xingqryloc.aspx

If the relevant railroad operations information provided by the FRA database lists zero (0) trains per day, a minimum of one (1) train per day should be assumed unless there are no railroad tracks present on the property at the project site(s).

Because of railroad involvement, the Contractor's attention is directed to Section 105-09, WORK AFFECTING RAILROADS, in the Standard Specifications.

D26461068

Page 45: D264610 - dot.ny.gov

SPECIAL NOTEASBESTOS REMOVAL

SUPPLEMENTAL REQUIREMENTSPIN 6025.10

Page 1 of 2

This Special Note applies specifically to the following Payment Item:

(a) 210.3312 Removal & Disposal of Bond Breaker/Filler ACM (BV14) Square Feet

1. General - Certifications RequirementsAll employees involved in the work must be properly and appropriately certified asidentified in Subpart 56-3 of Industrial Code Rule 56, as promulgated by the New YorkState Department of Labor (NYSDOL). This includes all individuals involved in allportions of the work, including managing, supervising, designing, inspecting orperforming the work.

2. Location and Condition of Asbestos-Containing Materials

The Contractor is cautioned that confirmed Asbestos-Containing Material has beenidentified on the project in the following locations:

BIN 1061560 – SR 275 over Western NY & PA Railroad

Confirmed Asbestos-Containing Material in the form of Sheet Packing, located inthe horizontal joint between the top of the back wall and the bridge deck on bothends of the bridge. This material is non-friable and in good condition.

Additional information is available in Asbestos Assessment Survey that has been provided as supplemental information available to bidders (CONR9).

3. Asbestos Abatement Summary

The following quantities are estimates and represent only an approximation for theconvenience of the Contractor in estimating the overall extent of asbestos removalrequired:

BIN 1061560 – SR 275 over Western NY & PA Railroad

Approximate quantity to be removed is 116.0 Square Feet of Sheet Packing, which willbe paid as a Square Foot amount utilizing Item Number 210.3312 Removal & Disposalof Bond Breaker/Filler ACM (BV14).

The Contractor shall note that Blanket Variance 14 (BV14), Asbestos-Containing Non-friable Materials on Bridges, Right-of-Ways and Highways, is available for use on thisproject and is appropriate for use on this structure. Perform any necessary abatementprocedures as detailed by BV14 (File No. 18-0381), utilizing Item 210.3312. TheContractor shall be paid only for actual removed quantity of asbestos material, to bequantified in the field, and to be verified by the Project Engineer.

The Contractor shall note that BV14 assumes the ACM to be abated from the bridge is ina non-friable state. Should this material be found in the field to have been made friableeither by weathering/mechanical action or by the Contractor’s activities during

D264610 69

Page 46: D264610 - dot.ny.gov

SPECIAL NOTEASBESTOS REMOVAL

SUPPLEMENTAL REQUIREMENTSPIN 6025.10

Page 2 of 2

abatement, the Contractor shall handle and dispose of the material as asbestos waste and not construction and demolition (C&D) debris.

4. Contractor Responsibilities

It is the Contractor's responsibility to remove and dispose of the Asbestos-ContainingMaterial in strict accordance with NYSDOL Industrial Code Rule 56 (ICR 56) and BlanketVariance 14 (BV14). The Contractor is further responsible for the planning of theremoval, including scoping, timing, phasing, removal methods to be utilized, NYSDOLand United States Environmental Protection Agency (USEPA) notifications, and anyNYSDOL filing fees. All removal operations shall be performed within the context of thegeneral construction staged operation and ICR 56 and/or BV14. All waste transportationand disposal shall be in accordance with applicable USEPA Regulations (40 CFR Part61, NESHAPS). As per Standard Specifications Section 210-3, the Contractor isresponsible for scheduling a coordination meeting regarding the asbestos removal atleast two weeks prior to any asbestos abatement work.

In lieu of compliance with the above referenced requirements, the Contractor may applyfor a site-specific variance. To utilize a site-specific variance, the Contractor shall meetall conditions of the variance, as stated by the New York State Department of Labor(NYSDOL). All costs associated with the application for site-specific variances shall beborne by the Contractor. All proposed site-specific variances shall be reviewed andapproved by both the Engineer in Charge and NYSDOT Landscape/Environmental Unitpersonnel, prior to submittal to NYSDOL.

5. Compliance Air Monitoring

This project involves the removal of exterior Asbestos-Containing Materials. As such,compliance air monitoring will not be required in association with Industrial Code Rule56. However, the NYSDOT will also provide a project monitor to monitor and providefinal acceptance of the asbestos abatement project. The Contractor will notify theEngineer-in-Charge who will contact the Construction Environmental Coordinator 2weeks prior to the start of any asbestos removal work to make arrangements for projectmonitoring.

6. Requirements for Project Documents

The Contractor shall provide the Engineer with two (2) complete sets of recorddocuments, including chain-of-custody records, worker sign in/out sheets, proof ofworker certifications, results of daily monitoring, and other such records as requested oras required by law and specification to be kept on record. These shall be assembled asa single, logical report, with all information bound together.

END OF SPECIAL NOTE

D26461070

Page 47: D264610 - dot.ny.gov

SPECIAL NOTE

RAILROAD AGREEMENT

D264610 PIN 6025.10

This project requires an agreement between the State of New York and WESTERN NEW YORK & PENNSYLVANIA RAILROAD (WNYP). This agreement may not yet be approved by the Office of the State Comptroller. NYSDOT works directly with the Railroad to obtain an approved agreement and anticipates having the agreement approved by the time of contract award. The agreement will provide reimbursement to the Railroad for its services provided in support of the project, as deemed necessary by the State, including:

ENGINEERING, PERMITTING, PROTECTIVE SERVICES, and INSPECTION

The Contractor is advised that until the State’s agreement with the Railroad has been approved by the Office of the State Comptroller, the Contractor may not be allowed to coordinate with the Railroad or secure the necessary Railroad permits, approvals and/or services to allow for the performance of contract work above, below or within fifty (50) feet of a Railroad or Railroad property.

To avoid any delays resulting from the State’s Railroad agreement not being approved by the time the Contractor is ready to begin working, the Contractor should coordinate with NYSDOT when scheduling any work activities requiring coordination with the Railroad or permits, approvals, and/or services from the Railroad. Further information regarding delay provisions can be found in Section 108-04 of the Standard Specifications.

Additionally, the Contractor's attention is directed to Section 105-09, WORK AFFECTING RAILROADS, in the Standard Specifications.

D264610 71

Page 48: D264610 - dot.ny.gov

SPECIAL NOTE

COORDINATION WITH RAILROADS

D264610 PIN 6025.10

This project requires Coordination with WESTERN NEW YORK AND PENNSYLVANIA RAILROAD, LLC.

The Contractor shall coordinate with the Railroad named above to acquire permits, plan reviews, approvals, authorizations, and/or protective services, necessitated by the Railroad to allow for contract work to occur above, below or within fifty (50) feet of the Railroad or Railroad property. It is anticipated that the Railroad will require its personnel to perform protective services for the Contractor while construction operations on the project take place above, below or within fifty (50) feet of the Railroad or Railroad property. The Railroad may require these protective servicesto ensure the safe operation of trains, prevent the delay of trains, or in the interest of the safety ofall property and personnel on the project. The Railroad may not be able to fulfill all Contractorrequest(s) for Railroad protective services due to the Railroad’s own operational needs.Therefore, flexibility in the Contractor’s schedule and means and methods is recommended.

In consultation with the State’s Engineer-in-Charge, the Contractor shall initiate coordination with the Railroad’s point of contact listed below as early as possible in the project. The acquisition of any necessary permits, plan reviews, approvals, authorizations and/or protective services from the Railroad must occur before the Contractor is authorized to perform any work above, below or within fifty (50) feet of the Railroad or Railroad property. It is recommended that the Contractor coordinate with the State’s Engineer-In-Charge and the Railroad when assembling its project schedule so appropriate durations and sequencing of activities requiring Railroad coordination and services can be appropriately captured.

Costs incurred by the Railroad for these coordination activities and services provided to the Contractor, as deemed necessary by the State, are reimbursable by the State through an agreement with the Railroad. The RAILROAD AGREEMENT SPECIAL NOTE contains additional information regarding the status of the State’s agreement with the Railroad named above.

WESTERN NEW YORK AND PENNSYLVANIA RAILROAD, LLC. POINT OF CONTACT:Mr. Jesse Coats Assistant Chief Engineer & Manager of Real Property Western New York & Pennsylvania Railroad, LLC 3146 Constitution Avenue Olean, NY 14760 Phone: (716) 372-8136 Email: [email protected]

Additionally, the Contractor's attention is directed to Section 105-09, WORK AFFECTING RAILROADS, in the Standard Specifications.

D26461072

Page 49: D264610 - dot.ny.gov

3750 Per DQAB L05/07/09

Page 1 of 1

SPECIAL SPECIFICATIONS

NOTE: This form was developed for repetitive use throughout all contract proposals and may identify items not applicable to this specific project.

D264610 73

Page 50: D264610 - dot.ny.gov

ITEM 203.24010017 - SHOULDER BACKUP MATERIAL

L 01/09/14 Page 1 of 2 Rev. Nov., 2013

DESCRIPTION:

This work shall consist of furnishing, placing, grading, compacting, and trimming shoulder backup material of the type indicated adjacent to shoulders to the lines, grades, and locations indicated in the contract documents or to the lines, grades, and locations directed by the Engineer, in accordance with these specifications and details shown in the plans.

MATERIALS:

General. Except as indicated below, §304-2 shall apply. Where the term “subbase course” is used in that subsection, “shoulder backup material” shall replace it.

Material incorporated into the work need not be stockpiled. The State may test for plasticity, soundness, and gradation at its discretion, or may decide not to test for these properties. Materials incorporated into the work shall consist of uncontaminated materials, free of glass, conforming with these specifications, the contract documents, and the directions of the Engineer.

Unless indicated otherwise in the contract documents, the Contractor may choose the type or types of material to use from the list of types given below. Intermixing of the permitted types, however, will be subject to the approval of the Engineer.

Material that proves to be, or that is determined by the Engineer to be impractical to place, grade, trim or compact as shown in the contract documents or as directed by the Engineer shall not be used.

Type A (Crusher-run, crushed gravel, or crushed stone.) Shoulder backup material of this type shall consist of well graded crusher-run material from a stone quarry or gravel source, or crushed Portland cement concrete. The material shall contain no organic, deleterious, hazardous or toxic material. Gradation shall be subject to the approval of the Engineer, but no material larger than 1 inch in greatest dimension will be allowed. Materials shall not show losses greater than 20% after four cycles of the Magnesium Sulfate Soundness test.

Type B (Subbase Course, Type 2.) Shoulder backup material of this type shall meet the material requirements of Subbase Course, Type 2. The Regional Geotechnical Engineer will examine each proposed source of material for compliance with these specification requirements, and submit an evaluation of the material including any limiting conditions to the Engineer.

Type C (Subbase Course, Type 4.) Shoulder backup material of this type shall meet the material requirements of Subbase Course, Type 4 of the Standard Specifications, except the material furnished shall consist of sand and gravel or a blend of sand and gravel and stone. The Regional Geotechnical Engineer will examine each proposed source of material for compliance with these specification requirements, and submit an evaluation of the material including any limiting conditions to the Engineer.

Type D (Recycled Asphalt Concrete.) Material provided under this option shall consist of uncontaminated recycled asphalt concrete pavement produced on the contract or from other sources as approved by the Engineer. Recycled asphalt concrete pavement shall be substantially free of pieces larger than 1.5 inches.

Type E (Select Structural or Granular Fill.) Material provided under this option shall consist of material conforming to the soundness, gradation, and pH requirements for Select Structural Fill or Select Granular Fill, except top size shall not exceed that for Type C.

D26461074

Page 51: D264610 - dot.ny.gov

ITEM 203.24010017 - SHOULDER BACKUP MATERIAL

L 01/09/14 Page 2 of 2 Rev. Nov., 2013

CONSTRUCTION DETAILS:

The material shall be placed on the grade in a manner to minimize segregation using equipment and procedures approved by the Engineer. Uncontrolled spreading from piles dumped on the grade resulting

in segregation will not be permitted. Maximum loose lift thickness prior to compaction shall be 6 inches. The contractor's compaction methods and equipment shall be approved by the Engineer. After compaction, the finished surface of the compacted material at the shoulder edge shall not extend above the edge of the shoulder nor be more than 0.4 inches below the shoulder. Tolerance elsewhere shall be 1½ inch, except the surface shall be graded to drain at every location.

If the final grade of the material is not in reasonable close conformity to the lines and grades indicated in the contract documents, or to those directed by the Engineer, the material shall be trimmed to achieve reasonably close conformance. Additional material shall be brought in to fill deficiencies, and excess material (trimmings) shall be removed. Trimmings may be incorporated into the shoulder backup work at other locations along the project if such opportunities exist and provided gradation of the resulting material remains in conformance with the gradation requirement for the selected option. When it is not possible to incorporate the trimmings in the shoulder backup work the trimmings shall be disposed of or used elsewhere in the contract in a manner approved by the Engineer.

METHOD OF MEASUREMENT:

Shoulder Backup Material will be measured for payment as the number of tons evidenced by delivery tickets, properly placed, graded, compacted, and trimmed along the edge of shoulder in accordance with these specifications and the directions of the Engineer.

When truck scales are not available within reasonable distance of the source of the material, as determined by the Engineer, the quantity paid for will be determined using conversion factors and the loose volume of shoulder backup material determined by measuring the dump truck bodies. The Contractor shall select the trucks to be used for delivery of the material with the approval of the Engineer. Once the trucks are selected and approved by the Engineer, no other trucks shall be used for delivery of this material. The trucks shall be uniformly loaded to the satisfaction of the Engineer.

Additional material brought in as part of the trimming operation to fill deficiencies will be measured for payment. The quantity of trimmings removed from the shoulder backup operation and not incorporated into the shoulder backup work elsewhere, however, will not be measured for payment under this pay item, and the Engineer will make an appropriate adjustment to the measured quantity.

Unless other conversion factors are indicated in the Contract Documents, the conversion factor will be 0.05tons per cubic foot, loose measure.

BASIS OF PAYMENT:

The unit price bid per ton for Shoulder Backup Material shall include the cost of all labor, materials, and equipment necessary to satisfactorily furnish, place, grade, compact, and trim Shoulder Backup Material.

D264610 75

Page 52: D264610 - dot.ny.gov

ITEM 304.04000004 - PREPARING FINE GRADE

Rev 9/15/17 Page 1 of 1 7/24/96

DESCRIPTION This work shall consist of preparing fine grade on the existing subbase course in conformity with the lines, grades, thicknesses and typical sections shown on the plans or as determined by field conditions and as directed by the Engineer.

MATERIALS Granular material that is required for fine grading shall conform to the material specification for the appropriate granular material shown in the contract documents for the appropriate application.

CONSTRUCTION DETAILS The final surface of the existing subbase course shall be fine graded so that after final compaction and prior to placement of overlaying material, the surface elevation shall not vary more than ¼ inch above or below the design line and grade. The surface shall be prepared within the stated tolerance, and approved by the Engineer, prior to placing an overlaying material. If the subbase course is disturbed after approval, the Contractor shall repair and regrade the damaged areas.

METHOD OF MEASUREMENT This work will be measured for payment as the number of square yards of existing subbase surface satisfactorily fine graded, measured to the nearest square yard.

BASIS OF PAYMENT The unit price bid per square yard shall include the cost of all labor, materials, and equipment necessary to satisfactorily complete the work. Granular material that is required shall be paid for separately.

D26461076

Page 53: D264610 - dot.ny.gov

ITEM 490.17011018 – PRODUCTION COLD MICROMILLING

EI 18-009 Page 1 of 2 L 01/01/19

DESCRIPTION: This work shall consist of the production cold micromilling, shaping and removal of portions of existing Hot Mix Asphalt (HMA) pavement surfaces and subsequent cleaning as indicated in the contract documents and as directed by the Engineer.

MATERIALS: Provisions of §490-2 Materials and §490-2.01 Equipment shall apply except as modified in Construction Details.

CONSTRUCTION DETAILS: Provisions of §490-3 Construction Details apply except as modified below:

Equipment: The Contractor shall provide a milling machine with a minimum 7-foot micromilling drum that has at least 3 wraps of teeth. The spacing between each tooth shall not exceed 1/4 inch. Other tooth spacing configurations for the micromilling drum may be allowed by the Director, Materials Bureau, if demonstrated to meet the surface texture requirements. The milling machine shall be capable of milling to the depth indicated in the contract documents. The Contractor may utilize a machine with a micromilling drum less than 7 feet wide for non-mainline areas, including shoulders and ramps of less than 7 feet, gore areas, turnouts, etc.

The Contractor shall submit a copy of the manufacturer’s specifications to the Engineer a minimum of 2 work days prior to the construction of a test section indicating the drum is designated as a micromilling drum meeting the requirements of this specification.

Test Section: Prior to micromilling, the Contractor shall select the machine operation speed and inform the Engineer. The Contractor shall select a test area with a minimum length of 500 lane feet and mill a lane width at the selected speed. The suggested target forward speed for the milling machine is 30 feet per minute. The Engineer will randomly select 5 locations along the test section, and the Contractor shall measure the texture of the milled surface in accordance with Test Method NY 490-01 Texture Measurement for Micromilled Surface, witnessed by the Engineer or their representative. The texture value shall be no less than 5.0 at any of the tested areas. The Engineer will review texture measurements, consistency of profile, and cross slope of the test section. If the texture value at any location is below 5.0, the Contractor shall adjust the operation, typically by reducing the forward speed of the machine. The Contractor shall mill an additional 500-foot path and measure the texture of the milled surface at 5 random locations selected by the Engineer and repeat until the texture value is 5.0 or greater. Production micromilling will not be allowed until acceptable results are obtained. A test section is not required for equipment used for non-mainline areas.

Production Micromilling: The Contractor shall perform micromilling using the settings from the acceptable test section such as forward speed, drum revolutions, etc. There shall be no visible longitudinal lip between passes. Any lip greater than 1/4 inch in differential shall be milled again to remove the differential. The Contractor shall perform micromilling such that the milled surface is free from waves or irregularities exceeding 1/4 inch, measured using a 10-foot straight edge. To maintain an acceptable profile, there may be occasional exceptions where the bottom of a wheel path and other low point defects may not be textured.

D264610 77

Page 54: D264610 - dot.ny.gov

ITEM 490.17011018 - PRODUCTION COLD MICROMILLING

EI 18-009 Page 2 of 2 L 01/01/19

The Contractor shall perform one texture measurement on the milled surface every 500 feet along the length of the milling path and record the data on BR 359. The first measurement shall be located at a transverse offset of 3 feet from the right edge of the milling. Further transverse offsets shall be 3 feet greater than the previous offset. At no time shall the transverse offset be closer than 3 feet to the left edge of milling. When the transverse offsets have reached the limits of the milling width, the texture measurement shall be taken at the transverse offset 3 feet from the right edge of the milling. The measurement locations shall then continue every 500 feet beginning at a transverse offset of 3 feet from the right edge. After the initial 5,000 feet, the frequency of testing will be reduced to once every 1000 feet if measurements exceed the minimum value of 5.0. If the subsequent reduced measurements are not meeting the minimum value of 5.0, the testing frequency shall increase to every 500 feet.

The Engineer shall witness at least 5 texture measurements per day. If the texture value is below 5.0, the Contractor shall stop and re-mill the area below a minimum of 5.0. The Engineer will determine the limits by performing texture measurements to the limits of re-mill. The Contractor shall also modify the operation so that the minimum texture results are achieved.

The equipment used for non-mainline areas (shoulders and ramps of less than 7 feet, gore areas, turnouts, etc.) shall provide a textured surface comparable to the mainline milled surface and to the same tolerances as the mainline milling machine. Texture measurements are not required when micromilling the shoulders if the same equipment and settings are used as the mainline. If a separate machine is used on the shoulders, the Contractor shall perform texture measurements and ensure the texture values are at least 5.0.

The Engineer will perform at least one random texture measurement per mainline lane mile for quality assurance. If the texture value is below 5.0, the Engineer will take additional tests to determine the limits of the area that has texture value below 5.0. The Contractor shall re-mill these areas to provide the required surface texture.

METHOD OF MEASUREMENT: Provisions of §490-4 Method of Measurement apply.

BASIS OF PAYMENT: Provisions of §490-5 Basis of Payment apply except as modified below:

The cost of texture measurement will be included in the bid price.

Payment will be made under: Item No Description Pay Unit 490.17011018 Production Cold Micromilling Square Yard

D26461078

Page 55: D264610 - dot.ny.gov

ITEM 557.01040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURE

SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORK

REQUIREDITEM 557.05040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURE

SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORKNOT REQUIRED

ITEM 557.07040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURESLAB WITH SEPARATE WEARING SURFACE - BOTTOM FORMWORKREQUIRED

ITEM 557.09040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURE SLAB WITHSEPARATE WEARING SURFACE - BOTTOM FORMWORK NOT REQUIRED

EI 08-018 Page 1 of 3 L 01/08/09

DESCRIPTION. Furnish and place lightweight, high performance (Class HP) concrete to construct superstructure slabs as shown in the contract documents.

MATERIALS. Use materials meeting §557-2. Perform additional work as follows:

A. Design. Design a lightweight, high-performance concrete mixture, proportionedaccording to the American Concrete Institute Manual of Concrete Practice, ACI 211.2,Standard Practice for Selecting Proportions for Structural Lightweight Concrete.

1. Produce a homogeneous mixture of cement, pozzolan (Fly Ash or GGBFS),microsilica, fine aggregate, lightweight coarse aggregate, air entraining agent, normalrange set-retarding, water-reducing admixture, and water, as designed.

2. Use Type I, I/II, II (§701-01) or Type SF (§701-03) cement. Use a minimumcementitious content of 675 lb/yd³. Use 15-20% pozzolan (§711-10, Flyash, or §711-12GGBFS), and 6-10% microsilica (§711-11).

3. Use lightweight coarse aggregate conforming to §703-10, with a gradation in the 3/4inch to No. 4 size designation in ASTM C330, Table 1.

4. Determine the cement content for each trial batch by means of a yield test accordingto ASTM C138.

a. At least 10 working days prior to concrete placement, provide the Materials Engineerwith a copy of the trial mix design with the following data:

• Fine and coarse aggregate (saturated, surface dry condition) content in lb/yd³.• Cementitious content in lb/yd³.• Water content in lb/yd³.• Unit weight of freshly mixed concrete in accordance with ASTM C138.• Dry unit weight in accordance with ASTM C567.• 28-day compressive strengths.• Batch quantities of all materials as they will appear on the batch record.

b. The Materials Engineer, or their representative, will approve the batch quantitiesprior to use. Use these values to manufacture all lightweight concrete for this project,and periodically correct the batch weights to account for changes in the fine aggregatefineness modulus and aggregate moisture contents in accordance with MaterialsMethod 9.1, or current Department directives.

B. Stockpile Handling. Construct lightweight coarse aggregate stockpile(s) at theproduction facility so as to maintain uniform moisture throughout the pile. Continuously anduniformly sprinkle the stockpile(s) with water using a sprinkler system approved by theMaterials Engineer. Soak for a minimum of 48 hours, or until the stockpile has achieved a

D264610 79

Page 56: D264610 - dot.ny.gov

ITEM 557.01040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURE

SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORK

REQUIREDITEM 557.05040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURE

SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORKNOT REQUIRED

ITEM 557.07040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURESLAB WITH SEPARATE WEARING SURFACE - BOTTOM FORMWORKREQUIRED

ITEM 557.09040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURE SLAB WITHSEPARATE WEARING SURFACE - BOTTOM FORMWORK NOT REQUIRED

EI 08-018 Page 2 of 3 L 01/08/09

minimum internal moisture content of 15% by weight. If a steady rain of comparable intensity occurs, turn off the sprinkler system.

If the rain ceases prior to the end of the wetting period, restart the sprinkling system. At the end of the wetting period, or when a rainfall ceases beyond the end of the wetting period, allow stockpiles to drain for 12 to 15 hours immediately prior to use.

C. Sampling of Materials. The Materials Engineer’s representative, will take a 1 litersample of microsilica in accordance with Materials Method 9.1, or current Departmentdirectives, for each day’s placement for testing. Sampling of other materials will be at thedirection of the Regional Materials Engineer.

D. Batching. After the materials have been accepted for this work, determine theproportions for concrete and equivalent batch weights based on trials made with materials tobe used in the work.

• If densified microsilica powder is used and added independently - weigh cumulatively in thefollowing order: cement, fly ash (or GGBFS), then microsilica. Base the batching toleranceof ± 0.5 % on the total weight of cementitious material, for each material draw weight.

• If densified microsilica powder is used as part of blended cement - weigh cumulatively inthe following order: blended cement, then fly ash (or GGBFS). Base the batching toleranceof ± 1% on the total weight of cementitious material, for each material draw weight.

E. Compressive Strength Determination. Achieve an average 28-day compressivestrength of 3600 psi, or greater, with no individual cylinder compressive strength less than3000 psi.

F. Density Determination. Produce concrete with an average dry unit weight rangingfrom 110 to 115 lb/ft³ when tested in accordance with ASTM C567.

CONSTRUCTION DETAILS. Apply the provisions of §557-3 and the following modifications:

A. Concrete Manufacturing and Transporting. Add the following to §557-3.01:1. Use slump, unit weight and air tests as a control measure to maintain a suitableconsistency. Perform slump, unit weight and air tests according to Materials Method 9.2.Determine air content by the volumetric method (roll-a- meter) as described in ASTMC173. Air content and slump placement limits are:

Minimum Desired Maximum

Air Content (%) 5.0 6.5 8.0Slump (inches) 2 1/2 3-5 5

D26461080

Page 57: D264610 - dot.ny.gov

ITEM 557.01040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURE

SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORK

REQUIREDITEM 557.05040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURE

SLAB WITH INTEGRAL WEARING SURFACE - BOTTOM FORMWORKNOT REQUIRED

ITEM 557.07040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURESLAB WITH SEPARATE WEARING SURFACE - BOTTOM FORMWORKREQUIRED

ITEM 557.09040018 - LIGHTWEIGHT, HIGH - PERFORMANCE SUPERSTRUCTURE SLAB WITHSEPARATE WEARING SURFACE - BOTTOM FORMWORK NOT REQUIRED

EI 08-018 Page 3 of 3 L 01/08/09

2. If the lightweight coarse aggregate moisture content at the time of batching is lessthan saturated surface dry (SSD), introduce the coarse aggregate, along withapproximately b of the total mixing water, into the mixer and mix for a minimum of 10minutes, then continue batching the remaining ingredients. If the coarse aggregate is inan SSD condition, batch the coarse aggregate routinely with the fine aggregate,admixtures, cement, fly ash (or GGBFS), microsilica, and mixing water, then mixcompletely.

3. Have the lightweight aggregate manufacturer supply a service representative at thesite for the first two days of concrete placement operations to assist in the control oflightweight concrete mixing and placement.

B. Handling, Placing and Finishing. Handle and place concrete according to §557-3.05,except that pumping is not permitted. When an integral wearing surface is required, finish theconcrete according to 557- 3.07. If the concrete will be overlaid with a separate wearingsurface, finish the surface according to 557-3.09.

C. Testing. Test the concrete according to Materials Method 9.2. The unit mass of the freshconcrete during placement should be compared to that which was submitted with trial mixdesign. Make adjustments to the concrete mix at the batching facility based on slump, unitweight and air tests. The Engineer will cast cylinders, in sets of 2 individual cylinders, at afrequency of 1 set for each 50 yd³, or fraction thereof actually placed. A minimum of 1 setwill represent each day's concrete placement.

D. Curing. Cure the concrete according to §557-3.11, except that only continuous wetting isallowed. In cold weather, the provisions of §557-3.12 shall apply.

E. Repairs. Make any repairs as per the provisions of §557-3.16. Proposed repairs requireDeputy Chief Engineer, Structures approval.

F. Rejection of Concrete. The Engineer will reject any concrete represented by a 28-daycylinder set with an average compressive strength less than 3600 psi, or an individual cylinderwith a compressive strength less than 3000 psi.

G. Loading Limitations. The loading limitations of §557-3.14 apply, except that concretecylinder sets designated for early loading must attain an average compression strength of3600 psi, or greater, with no individual cylinder less than 3000 psi.

METHOD OF MEASUREMENT. Apply all of the provisions of §557-4.

BASIS OF PAYMENT. Apply all of the provisions of §557-5.

D264610 81

Page 58: D264610 - dot.ny.gov

ITEM 559.16960118 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE

ITEM 559.17960118 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE FOREXISTING BRIDGE DECKS

1 of 2 Rev. May 2021

DESCRIPTION. Under this work the Contractor shall furnish and apply, in accordance with this

specification, a protective sealer to concrete surfaces, at locations indicated on the plans or where directed

by the Engineer.

MATERIALS. The protective sealer used on concrete surfaces shall be one appearing on the

Department's Approved List and shall meet the requirements of the following subsection:

717-03 - Penetrating Type Protective Sealers

CONSTRUCTION DETAILS.

A. General. Only penetrating type sealers shall be applied to walking or riding surfaces. The

Contractor shall provide the Engineer with the sealer Manufacturer's written instructions for

application and use, at least five (5) working days before the start of work. Only one (1) brand

and specific type of sealer will be allowed for use on each individual element of a project (i.e.

each pier, deck, abutment, etc.).

B. Surface Preparation.

1. New Concrete. All required surface texturing, and saw cut grooving, shall be completed

before the surface is prepared. All concrete that is to be sealed shall air dry for fourteen (14) days

after curing has been removed, or for the length of time specified in the manufacturer's written

instructions, whichever is longer. If the concrete is subjected to rain or moisture from other

project operations, the drying period shall be extended twenty-four (24) hours for every day the

concrete is subjected to water. After the drying period has ended, the concrete surfaces shall be

lightly sand, shot or water blasted in accordance with the sealer manufacturer’s recommendations

followed by vacuum cleaning, to remove loose particles.

2. Existing Concrete. Concrete surfaces to be sealed shall be thoroughly cleaned by light

sand, shot or water blasting in accordance with the sealer manufacturer’s recommendations

followed by vacuum cleaning, to remove loose particles. If the concrete is subjected to rain or

moisture from other project operations, the surface will be allowed to air dry for a minimum of

forty-eight (48) hours before the sealer is applied.

Care shall be taken while blast cleaning that all dirt is removed with minimal exposure of coarse

aggregate. After cleaning, no blasting residue, laitance, curing compounds, standing water, oil,

dirt or other foreign particles shall be present, which may prevent penetration or adhesion of the

sealer. All surface preparation work shall be completed and approved by the Engineer, before

sealer application can commence.

C. Weather Limitations. Sealer materials shall not be applied during wet weather conditions or, if

in the opinion of the Engineer, adverse weather conditions are anticipated within twelve (12)

hours of the completion of sealer application. Ambient and surface temperatures shall be a

minimum of 40oF-during application and until the sealed concrete is dry to the touch.

Application by spray methods will not be permitted during windy conditions, if in the opinion of

the Engineer unsatisfactory results will be obtained.

D26461082

Page 59: D264610 - dot.ny.gov

ITEM 559.16960118 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE

ITEM 559.17960118 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE FOREXISTING BRIDGE DECKS

2 of 2 Rev. May 2021

D. Sealer Application. The sealer shall be used as supplied by the Manufacturer without thinning

or alteration, unless specifically required in the Manufacturer's instructions. Thorough mixing of

the sealer before and during its use shall be accomplished as recommended by the Manufacturer.

Equipment for sealer application shall be clean of foreign materials and approved by the Engineer

before use.

If a penetrating sealer is used, a minimum of two (2) coats of the sealer shall be applied to

achieve uniform coverage. The total quantity of sealer applied by all coats shall be equal to the

quantity required at the application rate specified in the Approved List. The second and each

additional coat shall be applied perpendicular to the previous coat. Care shall be taken when

applying each coat, such that running or puddling does not occur. Each coat shall be allowed to

dry for a minimum of two (2) hours before the next coat is applied. The final coat shall be

allowed to dry according to the manufacturer's instructions, before the removal of maintenance

and protection of traffic.

On sloping and vertical concrete surfaces, sealer application shall progress from bottom to top.

Care shall be taken to ensure that the entire surface of the concrete is covered and all pores filled.

METHOD OF MEASUREMENT. The work will be measured as the number of square feet of structural

concrete sealed.

BASIS OF PAYMENT. The unit price bid per square feet shall include the cost of furnishing all labor,

materials and equipment necessary to satisfactorily complete the work.

Payment will be made under:

Item No. Item Pay Unit

559.16960118 Protective Sealing of Structural Concrete Square Foot

559.17960118 Protective Sealing of Structural Concrete Square Foot

for Existing Bridge Decks

D264610 83

Page 60: D264610 - dot.ny.gov

ITEM 559.18960118 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE ONNEW BRIDGE DECKS AND BRIDGE DECK OVERLAYS

1 of 2 July 2009

DESCRIPTION. Under this work the Contractor shall furnish and apply, in accordance with this specification, a protective sealer to concrete surfaces, at locations indicated on the plans or where directed by the Engineer.

MATERIALS. The protective sealer used on new concrete bridge decks shall be one appearing on the Department's Approved List, which does not contain an aqueous solvent/carrier and shall meet the requirements of the following subsection:

717-03 - Penetrating Type Protective Sealers

CONSTRUCTION DETAILS.

A. General. The Contractor shall provide the Engineer with the sealer manufacturer'swritten instructions for application and use, at least five (5) working days before thestart of work. Only one (1) brand and specific type of sealer will be allowed for useon each deck.

B. Surface Preparation. All concrete bridge decks shall air dry for twenty-four (24) hoursafter the time of completion of saw cut grooving. If the concrete is subjected to rain ormoisture from other project operations, the drying period shall be extended twenty-four(24) hours from the time that the concrete has stopped being wetted. All required surfacetexturing, saw cut grooving, barriers, parapets, sidewalks and safetywalks shall becompleted, before the surface is cleaned. After the drying period has ended, the concretesurface shall be cleaned by vacuum methods, to remove loose particles.

After cleaning, no laitance, standing water, oil, dirt or other foreign particles shall be present, which may prevent penetration of the sealer. All surface preparation work shall be completed and approved by the Engineer before sealer application can commence.

C. Weather Limitations. Sealer materials shall not be applied during wet weatherconditions or when adverse weather conditions are anticipated within twelve (12) hoursof the completion of sealer application. Ambient and surface temperatures, duringapplication, and until the sealed concrete is dry to the touch, shall be a minimum of 40oF.Application by spray methods will not be permitted during windy conditions, if in theopinion of the Engineer, unsatisfactory results will be obtained.

D. Sealer Application. The protective sealer shall be used as supplied by the Manufacturerwithout thinning or alteration. Equipment for sealer application shall be clean of foreignmaterials and approved by the Engineer before use. The sealer shall be applied bybrushing, spraying or rolling, as recommended by the Manufacturer.

A minimum of two (2) coats of the sealer shall be applied to achieve uniform coverage.The total quantity of sealer applied by all coats shall be equal to the quantity required atthe application rate specified in the Approved List. The second and each additional coatshall be applied perpendicular to the previous coat. Care shall be taken when applying

D26461084

Page 61: D264610 - dot.ny.gov

ITEM 559.18960118 - PROTECTIVE SEALING OF STRUCTURAL CONCRETE ONNEW BRIDGE DECKS AND BRIDGE DECK OVERLAYS

2 of 2 July 2009

each coat, such that running or puddling does not occur. Each coat shall be allowed to dry for a minimum of two (2) hours before the next coat is applied. The final coat shall be allowed to dry according to the Manufacturer's instructions, before the removal of maintenance and protection of traffic.

METHOD OF MEASUREMENT. The work will be measured as the number of square feet of concrete sealed.

BASIS OF PAYMENT. The unit price bid per square feet shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work.

D264610 85

Page 62: D264610 - dot.ny.gov

ITEM 621.05020004 – PREPARING GRADE FOR VEGETATION CONTROL STRIP

Page 1 of 2

10/12/2010

DESCRIPTION This work shall consist of trimming, grading and reshaping the existing shoulder break area to remove excess material, establish proper grade, provide for satisfactory transverse drainage and prepare a uniform, compacted surface in preparation for placement of a Vegetation Control Strip (VCS) at the site of a proposed guide rail run installation, in accordance with the contract documents and as directed by the Engineer.

MATERIALS The materials used to bring the area beyond the edge of shoulder up to proper grade and/or cross slope shall be available native soil suitable for fill and generated from this operation, or suitable fill material delivered to the site, unless payment for select material is specified in the Contract Documents.

CONSTRUCTION DETAILS This work shall include the following:

A. Removing and disposing of sod, topsoil, organic material, shoulder backup material,deteriorated shoulder stabilization material and other loose, unsuitable or excess materialadjacent to the existing shoulder.

B. Grading the area in preparation for placement of the proposed Vegetation Control Strip toa uniform cross slope such that after compaction the top surface shall not extend abovenor more than ¼ inch below true grade and surface at any location, or as detailed in theContract Documents.

C. Building up low areas beyond the edge of shoulder, within the limits of the VegetationControl Strip, using suitable fill material placed at proper grade. If the available volumeof excess native soil suitable for fill removed from within the same guide rail installationsite is not sufficient to establish proper grade throughout the run, fill material from othersources shall be delivered to the site. Suitable fill material delivered from other sources,such as other guide rail installation sites, or borrow areas and placed at the site will bepaid under Item 203.03 – Embankment in Place.

D. Compacting the area beyond the existing shoulder within the limits of the proposedVegetation Control Strip (VCS) to the satisfaction of the Engineer.

E. All excess material not reused as suitable fill material shall be the Contractor’s propertyfor disposal as surplus materials under the provisions of Section 203-3.02.B Disposal ofSurplus Excavated Materials.

D26461086

Page 63: D264610 - dot.ny.gov

ITEM 621.05020004 – PREPARING GRADE FOR VEGETATION CONTROL STRIP

Page 2 of 2

10/12/2010

METHOD OF MEASUREMENT This work will be measured as the number of linear feet of preparing grade in preparation for placement of a Vegetation Control Strip (VCS) measured along each edge of shoulder which such work is performed.

BASIS OF PAYMENT The unit price bid per linear foot shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, except that, where specified in the plans, suitable fill or select material brought in to fill low areas will be paid for under the appropriate item.

D264610 87

Page 64: D264610 - dot.ny.gov

4000 Page 1 of 1 Per DQAB L05/07/09

PREVAILING WAGE RATES

NOTE: This form was developed for repetitive use throughout all contract proposals and may identify items not applicable to this specific project.

D26461088

Page 65: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ���

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a->+Y+*'?+-%!./01$&!!!!!O/1(+*'?+-%!)'?$!!!!!!!!!!!5!!!!!!!!!!!!!!56:56:4546!!!!!!!!!!!6!!!!!!!!!!!!!!5V:64:4546!!!!!!!!!!!4!!!!!!!!!!!!!!57:54:4546!!!!!!!!!!!V!!!!!!!!!!!!!!5W:46:4546!!!!!!!!!!!7!!!!!!!!!!!!!!58:54:4546!!!!!!!!!!!W!!!!!!!!!!!!!!59:5;:4546!!M.3555V]56;!58:56:4545!EQHb3!c!EJ#EKH3!BL.<CMNBCJL.!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!M'?$,!!!!!!!!!!_&+%F$,!BQaQ.C!aH<L.:BL.BMQCQ!_J.J<EQMIIIZ!V6IW9!!!!!!!!!!!!46I[5!]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]]!d!BHMO548;]55V!58:56:4546!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!M'?$,!!!!!!!!!!_&+%F$,!B'&=$%?$&!'%>!O+($>&+S$&!!!!!!!!EQHb3!H.)!EJ#EKH3!!!!!!!BL.<CMNBCJL.!!!!!!!B'&=$%?$&IIIIIIIIIIIIIIIIIIZ!VVI6V!!!!!!!!!!4VI[5e'!!!!!!!O+($>&+S$&IIIIIIIIIIIIIIIIIZ!V;I;6!!!!!!!!!!4;I4We'!

D264610 89

Page 66: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ���

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a'#46>2<6<(2))))))))X'\M)KJ''''''M)L[_YY)ZJ''''''46>(2<6))))))))))))))))))))X'YM)ZM''''''M)L[_YY)ZJ'!""#$"#%&'''()''$4A'04(:bC'-(7]'4?9:<(@'-(7]',23454234264'-(7]'/(89:'''-(7]'#>(2BCW<;<2W'-(7]'H>:<C=?(C'-(7]'5@DC'*:4C<342=b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

D26461090

Page 67: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ��

!!!!!"#$"%&'!%(!)$%#*+!(,#-.!!!!!!!"$%.'/.0%*!,*+!(01'$!%".0/!!!!!!!/,",10-0.0'&!2!!!!!!!3-,)4,*555555555555555555556!78598!!!!!!!!!:;<7=5=>!!!!!!!?$%#*+4,*!+0))0*)!4,/@0*'!!!!!!!!%"'$,.%$55555555555555555556!=A587!!!!!!!!!:;<7=5=>!!!!!!!?$%#*+4,*!.$#/B!+$0C'$!!!!!!!!D.$,/.%$!.$,0-'$!#*0.E555556!=F5G>!!!!!!!!!:;<7=5=>!!!!!!!?$%#*+4,*!H$#/B!+$0C'$555556!=75:F!!!!!!!!!:;<7=5=>!!!!!!!I0*'4,*!,*+!H'/@*0/0,*555556!G=5:>!!!!!!!!!:;<7G5=>!!!!!!!J'/@,*0/55555555555555555556!=75:F!!!!!!!!!:;<7=5=>!!!!!!K#1&.,.0%*2!!!!!!!L,1-'!K"-0/'$555555555555556!F>5M:!!!!!!!!!:;<7G5=>!!!!!!!3-,)4,*555555555555555555556!78598!!!!!!!!!:;<7=5=>!!!!!!!?$%#*+!4,*!.$#/B!+$0C'$55556!=75:F!!!!!!!!!:;<7=5=>!!!!!!!?$%#*+4,*!+0))0*)!4,/@0*'!!!!!!!!%"'$,.%$55555555555555555556!=A587!!!!!!!!!:;<7=5=>!!!!!!!?$%#*+4,*!.$#/B!+$0C'$!!!!!!!!D.$,/.%$!.$,0-'$!#*0.E555556!=F5G>!!!!!!!!!:;<7=5=>!!!!!!!I0*'4,*!N!H'/@*0/0,*55555556!G=5:>!!!!!!!!!:;<7G5=>!!!!!!!J'/@,*0/55555555555555555556!=75:F!!!!!!!!!:;<7=5=>!!!!!!KO0./@0*)!&.$#/.#$'&P!!!!!!!$,0-$%,+!/,.'*,$Q!!!!!!!0*&.,--,.0%*!,*+!!!!!!!4,0*.'*,*/'R!.@0$+!$,0-!!!!!!!.Q"'!#*+'$)$%#*+!(-#0+!%$!!!!!!!),&!(0--'+!.$,*&40&&0%*!!!!!!!/%*+#0.!,*+!/,1-'!!!!!!!0*&.,--,.0%*&!D0*/-#+0*)!!!!!!!,*Q!,*+!,--!(01'$!%".0/!!!!!!!)$%#*+!"$%+#/.!1Q!,*Q!!!!!!!%.@'$!*,4'!4,*#(,/.#$'+!!!!!!!(%$!.@'!+#,-!"#$"%&'!%(!!!!!!!)$%#*+!(,#-.!"$%.'/.0%*!!!!!!!,*+!(01'$!%".0/!!!!!!!/,",10-0.0'&ER!"0"'.Q"'!!!!!!!/,1-'!0*&.,--,.0%*!,*+!!!!!!!4,0*.'*,*/'!S%1&!%$!!!!!!!"$%S'/.&R!,*+!4,0*.'*,*/'!!!!!!!1%*+0*)!%(!$,0-&P!T0"'.Q"'!!!!!!!/,1-'!0*&.,--,.0%*!!!!!!!L,1-'!K"-0/'$555555555555556!FM5F8!!!!!!!!!:;<7G5=>!!!!!!!3-,)4,*555555555555555555556!775FM!!!!!!!!!:;<7=5=>!!!!!!!?$%#*+4,*!U0))0*)!J,/@0*'!!!!!!!!V"'$,.%$55555555555555555556!G>5=8!!!!!!!!!:;<7=5=>!!!!!!!?$%#*+4,*!H$#/B!U$0C'$!!!!!!!!D.$,/.%$W.$,0-'$!#*0.E555556!=:5F8!!!!!!!!!:;<7=5=>!!!!!!!?$%#*+4,*!H$#/B!U$0C'$555556!==598!!!!!!!!!:;<7=5=>!!!!!!!I0*'4,*!N!H'/@*0/0,*55555556!GF5>8!!!!!!!!!:;<7G5=>!!!!!!!J'/@,*0/55555555555555555556!==598!!!!!!!!!:;<7=5=>!3VVHXVHY2!!!!!,5!TZ[U!\VI[UZ]K2!X'O!]',$&!U,QR!T$'&0+'*.&!U,QR!J'4%$0,-!!!U,QR!?%%+!3$0+,QR![*+'"'*+'*/'!U,QR!I,1%$!U,QR!H@,*B&)0C0*)!!!U,QR!L@$0&.4,&!U,QR!,*+!Y-'/.0%*!U,Q!(%$!.@'!T$'&0+'*.!%(!!!.@'!_*0.'+!K.,.'&!,*+!Y-'/.0%*!U,Q!(%$!.@'!?%C'$*%$!%(!X'O!!!]%$B!K.,.'R!"$%C0+'+!.@'!'4"-%Q''!O%$B&!.O%!+,Q&!1'(%$'!%$!!!.O%!+,Q&!,(.'$!.@'!@%-0+,Q5!WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW!!YIYLM8=AW>>9!>M>78>8M!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!a,.'&!!!!!!!!!!3$0*)'&!

D264610 91

Page 68: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ���

!"!#$%&#&'()*"+,-))))#.,/01230+.,4))))))))$!"!567(!8)#'$9))))))):&;!%75$&#<)#';"!)'(=)))))))!>?&5@!($)))))))#ABC-)/DC+3-1EEEEEEEEEEEEEEF)GHEIJ))))))))))GKLMENH)))))))O1.2,PQA,EEEEEEEEEEEEEEEEEEF)NIEMR))))))))))GKLMENH)))))))&,/0ACC-1)%-DA+1QA,S)))))))$-C-PA0A))))))))"+,-QA,T$-3U,+3+A,S)))))))!V2+DQ-,0)7D-1A0.1EEEEEEEEEF)GGERN))))))))))GKLMENH))))))$1--)$1+QQ-1EEEEEEEEEEEEEEEEF)WIEGX))))))))))GKLYEYJ)))AE)(-Z)[-A1\/)=A]8)51-/+P-,0\/)=A]8)O..P):1+PA]8)=-3.1A0+.,)))=A]8)&,P-D-,P-,3-)=A]8)"AB.1)=A]8)9-0-1A,\/)=A]8)))$UA,/_++,_)=A]8)=A])Aa0-1)$UA,/_++,_8)#U1+/0QA/)=A]E)SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS))!(O&RJGWSRRN)RITRNTWRNJ)))))))))))))))))))))))))))))))))))%A0-/)))))))))):1+,_-/)7D-1A0+,_)!,_+,--1b))))))))!c#'9'$&(O)'(=)5'9&(O)))))))O%7?5)NEEEEEEEEEEEEEEEEEEEEF)GNEHM))))))))))WIEMMLA)))))))O%7?5)WEEEEEEEEEEEEEEEEEEEEF)GREYJ))))))))))WIEMMLA)))))))O%7?5)GEEEEEEEEEEEEEEEEEEEEF)GREWY))))))))))WIEMMLA)))))))O%7?5)HEEEEEEEEEEEEEEEEEEEEF)WXEJR))))))))))WIEMMLA)))))))@'<$!%)@!#6'(&#EEEEEEEEEEEEF)GGEHM))))))))))WIEMMLA))))))6!'9[)'(=)6&O6d'[)))))))O%7?5)NEEEEEEEEEEEEEEEEEEEEF)HNEMN))))))))))WJEWMLA)))))))O%7?5)WEEEEEEEEEEEEEEEEEEEEF)HREJR))))))))))WJEWMLA)))))))O%7?5)GEEEEEEEEEEEEEEEEEEEEF)GIEYH))))))))))WJEWMLA)))))))O%7?5)HEEEEEEEEEEEEEEEEEEEEF)HMEMN))))))))))WJEWMLA)))))))O%7?5)MEEEEEEEEEEEEEEEEEEEEF)HHEMN))))))))))WJEWMLA)))))))O%7?5)XEEEEEEEEEEEEEEEEEEEEF)HGEMN))))))))))WJEWMLA)))))))O%7?5)IEEEEEEEEEEEEEEEEEEEEF)HWEYH))))))))))WJEWMLA))))))$?((!")'(=)<6':$)))))))O%7?5)NEEEEEEEEEEEEEEEEEEEEF)HHEWH))))))))))WJEGMLA)))))))O%7?5)WEEEEEEEEEEEEEEEEEEEEF)HGERW))))))))))WJEGMLA)))))))O%7?5)GEEEEEEEEEEEEEEEEEEEEF)HREWG))))))))))WJEGMLA)))))))O%7?5)HEEEEEEEEEEEEEEEEEEEEF)GIEWW))))))))))WJEGMLA)))))))@'<$!%)@!#6'(&#EEEEEEEEEEEEF)HXEXM))))))))))WJEGMLA):.1)!c#'9'$&7()'(=)5'9&(Ob):77$(7$!b)))AE)5'&=)67"&='[<b))(-Z)[-A1\/)=A]e)@-Q.1+AC)=A]e)&,P-D-,P-,3-)))=A]e)"AB.1)=A]e)$UA,/_++,_)=A]e)#U1+/0QA/)=A]8)1-_A1PC-//))).a)0U-)PA]).a)0U-)Z--).,)ZU+3U)0U-)U.C+PA])QA])aACC8)))D1.+P-P)0U-)-QDC.]--)Z.1/)-+0U-1).,)0U-)Z.1)PA])))+QQ-P+A0-C])D1-3-P+,_)0U-)U.C+PA]).1).,)0U-)/3U-P2C-P)Z.1)))PA])+QQ-P+A0-C])a.CC.Z+,_)0U-)U.C+PA]E)!c#'9'$&7()'(=)5'9&(O)#"'<<&:&#'$&7(<)))))O%7?5)Nb))'/DUAC0)DA-1e)A20.QA0+3)a+,-)_1AP-1e)BA3U.-)))*-f3-D0)01A30.1)Q.2,0-P8)12BB-1)0+1-P4e)BCA30.D)DCA,0)))*A20.QA0-P4e)3ABC-ZA]e)3A+//.,)A2_-1e)3-,01AC)Q+f)3.,31-0-)))DCA,0)*A20.QA0-P4e)3U-11])D+3-1S).-1)M)0.,)3ADA3+0]e)))31A,-e)31A,-/)A,P)P-11+3/)*/0--C)-1-30+.,4e)P1A_C+,-e)P2AC)))P12Q)DA-1e)a1.,0)-,P)C.AP-1)*H)32E)]PE)A,P).-14e)))U.+/08*$.Z).1)G)P12Q4e)D+C-)P1+-1e)D.Z-1)_1AP-1)Z+0U)))-C-A0+.,)C.AP-1)A00A3UQ-,0e)V2A11])QA/0-1)*.1)-V2+AC-,04e)

D26461092

Page 69: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ���

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aT[;T\VXDA!!!!;<=>?!LA!V"*#.'/!I7,4!K.0#)3&:!]&'+!?,$*&''&1:!]')*+$,-:!!!V7/$-./&1!I$30,&/&!]*,&.1&,!CIK[!6*&D:!V7/$-./)0!J)3&!!!;,.1&,:!B.08#$&!CU90&*/!,.0/$,!K$73/&1:!<744&,!),&1D:!!!B.08#$&!U90.%./$,!J7''!]2)3E!CIV!@L@!$,!")-)'.,!/6*&D:!!!B.08!J)'')3E!K.0#)3&:!B&'/!?'.0&,!CIK[!6*&D:!B'.08/$*!!!?'.3/!CV7/$-./&1D:!B$$-!/,708!:!I.4'&2.6:!I.)""$3!V7E&,:!!!I&3/,.'!K)9!!I$30,&/&!?'.3/!CV7/$-./&1D:!I$30,&/&!I7,4!

D264610 93

Page 70: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ��!

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a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b(:)/5)/*"""/'2)O0(*"A')"+1$%)/*"/'2)O0(*"A'/)"V)1$'/*"A/$%8"G'()/*"""/'2)O0(*"A/$%50/*"A/$%50/";J'5&"50J)2"$%%)::0/'):<*"""'Z/$50/7"4031$%50/*"'Z/0"A$31*"M),,".0'(5"@V>W."HY"A0J)/"4/$():"

D26461094

Page 71: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ���

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

D264610 95

Page 72: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ���

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a!"1D10!!!!!!!!!!!!0FDFF!!!!!!U*$52*5$-%N!I$-.,&.*-%N!!!!!!!H&).3#$2).@!U*&&%N!!!!!!!T&%7&$'N!H)@@&$'!-.7!H#7,&.Da!"/DAC!!!!!!!!!!!!0bD/F!!!!!!T).7#(!&$&2*#$'DDDDDDDDDDDDDa!0cD/1!!!!!!!!!!!!0bD/F!EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE!!OHIP11""E11b!1QR1/R01/c!STPUVKU!IW!OH[UXYYN!HJPUN!GHI]Z!!XP[!\O[[YZUZd!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!H-*&'!!!!!!!!!!W$).@&'!O$#.(#$B&$'L!!!!!!!!I$.-,&.*-%N!H&).3#$2).@!!!!!!!U*#.&![&$$)2B,-.N!H)@@&$N!!!!!!!H#7,-.N!U*$52*5$-%!!!!!!!\-2+).&$<!\#?&$'!W&.2&!!

D26461096

Page 73: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ��!

"""""#$%&'($)*"+$%&,)'"-(.&$%'%"""""""#$%&'($/////////////////////0"12/33""""""""""""14/25""""""67%%'%$/////////////////////0"83/39""""""""""""14/25"::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::"";<=>341?:33@"3AB3?B13?5"""""""""""""""""""""""""""""""""""C,'%)""""""""""D$E.F%)";,G($%$)H""""""""IC>J+"?/////////////////////0"1A/2@""""""""""""1?/29""""""IC>J+"1/////////////////////0"12/1@""""""""""""1?/29"K#<LM"<NO"KPIKQ<M";<=>C#C"-;<66PDP-<RP>N"""""IC>J+"?H""DS,FT,.U">V'G(,$W",.W"7,.W"G(,')U"=VSS"XS(,'U"-7,E."""6,YU"-(.&$%'%",FF$%F,'%"GE.U"-(.&$%'%"G(('U"IE."GVFFZU"K,.W"""($"T%&7E.%"[EG$,'($"\,&]"7,TT%$U",)(."'%.W%$U"($',$"""TE_%$U",[%:"T%.'"G$%,]%$U"K,.WS%$"(X",SS")'%%S"T%)7U"6T,SS"""F%.%$,'($"X($"S,G($%$)"'((S)*"E.)',SS,'E(."(X"G$EWF%"""W$,E.,F%"E%U"+E%"S,Z%$)U"LEG$,'($"'Z%"$(SS%$)U"R,T%$"""W$ESS"W(&'($U"Q,'%$"VT"(%$,'($"a?:?B1bb",.W")E.FS%"""WE,7$,F,TcU"N(ddS%"a,)7,S'*"FV.E'%*")%%WE.F",.W"""),.WGS,)'E.FcU";,G($%$)"(."&7,E."SE.]"X%.&%"%$%&'E(.U"$(&]""")SE''%$",.W"(Y%$"V.E'U"+V)7%$"'Z%"&(.&$%'%"),Y",.W",SS"""('7%$"F,)*"%S%&'$E&*"(ES",.W",E$"'((S"(%$,'($)U"Y$%&]E.F"""S,G($%$)"""IC>J+"1H""=S,)'%$)U"D($T")%''%$U")'(.%"($"F$,.E'%"&V$G""")%''%$)U"O%)EF.,'%W",)7,S'"$,]%$)"a.('"'("E.&SVW"&(SW""",'&7cU"',ES"($")&$%Y"(%$,'($"(.",)7,S'",[%$/""<SS"$(&]"""($"W$ESSE.F"T,&7E.%"(%$,'($)"a%_&%'"eV,$$Z"T,)'%$",.W""")ETES,$"'Z%cU",&%'ZS%.%"'($&7"(%$,'($)U"(YW%$T%."::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::""+<PN333@:3?5"39B3?B13?5"""""""""""""""""""""""""""""""""""C,'%)""""""""""D$E.F%)"+,E.'%$)H"a=JP;OPNI""""->N6RCJ-RP>Nc""""""""=JP;OPNI"->N6RCJ-RP>N"""""""=$V)7"f"C(SS///////////////0"1@/42""""""""""""?5/9?"""""""6$,Z"+,E.'E.F*""""""""Q,SS&([%$E.F*""""""""6,.WGS,)'E.FBQ,'%$""""""""KZW$(GS,)'E.F*"6YE.F""""""""6&,XX(SW"($",.Z"7,.F%W""""""""$EFFE.F"S,'X($T*"#(_E%)//0"1@/58""""""""""""?5/9?"""""""R,E.FBO$ZY,SS/////////////0"19/?2""""""""""""?5/9?""""""K#<LM"f"KPIKQ<M"""""""->N6RCJ-RP>N"""""""=$EWF%"+,E.'E.F////////////0"82/93""""""""""""12/@3"::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::""+;J3311:33A"39B3@B1313"<;;#I<NM:"R7%"R(Y.)7E)"(X"<SS%.*"<ST,*"<TE'Z*"<.F%SE&,*"=%SX,)'"""=(SE[,$*"-,.%,W%,*"-%.'%$[ESS%*"-S,$])[ESS%*"-VG,*"D$E%.W)7E*"""I%.%)%%*"I$,.F%$*"KVT%*"N%Y"KVW)(.*"CV)7X($W*"6&7E(*"QE$'"""""""""""""""""""""""""""""""""""C,'%)""""""""""D$E.F%)"+;J=#CB+P+#DPRR#C""""""""g>N#"1//////////////////////0"84/@8""""""""""""14/81"

D264610 97

Page 74: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ����

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!""#$%&'(()!''*"'+,'*,-'-*"""""""""""""""""""""""""""""""""""./012""""""""""$345612"#7.8%9:;."$8<<;.=================>"?@=)(""""""""""""-A=?B"!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!""#C;;'**-!''-"'*,'*,-'*?"""""""""""""""""""""""""""""""""""./012""""""""""$345612"#D110"E10/F"GH3I13===============>"-(=-A""""""""""""*B=B+"!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!""<;JK'?*B!''*"'B,'*,-'*)"""""""""""""""""""""""""""""""""""./012""""""""""$345612"<3LMI"N34O132P""""""""Q.RS7"*=====================>"-(=A'""""""""""-A=A(T/""""""Q.RS7"-=====================>"-(=B'""""""""""-A=A(T/"""$RR<%R<;P"/="7/4N"CHF4N/U2P"%1G"&1/32"V/UW"K1EH34/F"V/UW"""85N1X15N15M1"V/UW":/HY3"V/UW"<D/5I264O456"V/UW"ZD3420E/2"V/U"<.SZ9"V.8[;."Z:J##8$8ZJ<8R%#"""Q.RS7"*P""74MI!LX2W"X/51F"03LMI2W"\F/0YHU"E/0134/F2"03LMI2"""]203/46D0"HY2_W"2456F1"/F1"NLEX"03LMI2W"NLEX20132W"""31M14O132W"631/2132W"03LMI"0431E/5a"0/5N1E2W"Y/0MD"03LMIW"""E1MD/54M2W"21E4!03/4F132W"FHG!YHU"03LMI2W"/2XD/F0"""N42034YL0H3"03LMI2W"/640/0H3W"E413"03LMI2"/5N"NLEXM3101"""0UX1"O1D4MF12W"03LMI"E1MD/54Ma"\L1F"03LMI"""Q.RS7"-P""#X1M4/F4b1N"1/30D"EHO456"1cL4XE150!"1LMF4N"0UX1"H3"""24E4F/3"H\\!D46DG/U"1cL4XE150a"GD131"5H0"21F\!FH/N1NW"""203/\\F1"].H22_"M/33413W"21F\!MH50/451N"MH5M3101"L540a"""R\\!D46DG/U"0/5N1E"Y/MI"NLEXW"0G45"156451"1cL4XE150W"NHLYF1"""D40MD1N"1cL4XE150"2D131"5H0"21F\"FH/N1N="!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!""<;JK'?*B!''A"'B,'*,-'*)"C;J[&"d"C8QCeJ&P"<Re%#C87#"R$"J:KR%Va"J:$.;Va"fS.%#a"e;#<"J:KR%V"""""""""""""""""""""""""""""""""""./012""""""""""$345612"<.SZ9"V.8[;.""""""""Q.RS7"*=====================>"-(=A'""""""""""-A=A(T/""""""Q.RS7"-=====================>"-(=B'""""""""""-A=A(T/"""/=""7J8V"CR:8VJ&#P"%1G"&1/3g2"V/Ua"K1EH34/F"V/Ua"85N1X15N15M1"""V/Ua":/YH3"V/Ua"<D/5I264O456"V/Ua"ZD3420E/2"V/Ua"X3HO4N1N"""0D1"1EXFHU11"GH3I2"0D1"GH3I456"N/U"Y1\H31"/5N"0D1"GH3I456"""N/U"/\013"0D1"DHF4N/U="""""""""<.SZ9"V.8[;.#"Z:J##8$8ZJ<8R%#"""Q.RS7"*P"&/3NE/5W"74MILX2W"X/51F"03LMI2W"\F/0YHU"E/0134/F2"""03LMI2"]203/46D0"HY2_W"2456F1"/F1"NLEX"03LMI2W"NLEX20132W"""31M14O132W"631/2132W"03LMI"0431E/5a"0/5N1E2W"Y/0MD"03LMIW"""E1MD/54M2W"21E4!"03/4FH32W"FHG!YHU"03LMI2W"/2XD/F0"""N42034YL0H3"03LMI2W"/640/0H3W"E413"03LMI2"/5N"NLEXM3101"

D26461098

Page 75: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ����

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aRO]bARR[!RQ\RO\9ROcK!8I7a!(+!12!1FF-%&(1"(>2!(=%2"(3(%-!>3!"'%!.2(>2!B'()'!$-%&1(*%=!(2!"'%!+.-&%#!3>-!"'(+!)*1++(3()1"(>2C!B'()'!(2!"'(+!%N10$*%!B>.*=!F%!8*.0F%-+K!RO]b!(2=()1"%+!"'%!*>)1*!.2(>2!2.0F%-!>-!=(+"-()"!)>.2)(*!2.0F%-!B'%-%!1$$*()1F*%C!(K%KC!8*.0F%-+!I>)1*!RO]bK!'%!2%N"!2.0F%-C!RR[!(2!"'%!%N10$*%C!(+!12!(2"%-21*!2.0F%-!.+%=!(2!$->)%++(2?!"'%!B1?%!=%"%-0(21"(>2K!RQ\RO\9ROc!(+!"'%!%33%)"(&%!=1"%!>3!"'%!0>+"!).--%2"!2%?>"(1"%=!-1"%C!B'()'!(2!"'(+!%N10$*%!(+!Y.*#!OC!

D264610 99

Page 76: D264610 - dot.ny.gov

��������� �����

������������������������������������������� ����

!"#$%&'()*(&+,-./)0)(1&2/1-&,/3-4&/,-&5+6/3-6&3*&,-70-83&/00&,/3-&89/(1-4&)(&39-&8*00-83).-&:/,1/)()(1&/1,--;-(3&<=>?@&1*.-,()(1&39)4&80/44)7)8/3)*(&/(6&,/3-%&A5,.-B&C/3-&D6-(3)7)-,4&=0/44)7)8/3)*(4&0)43-6&5(6-,&39-&EEA'EE&)6-(3)7)-,&)(6)8/3-&39/3&(*&*(-&,/3-&+,-./)0-6&7*,&39)4&80/44)7)8/3)*(&)(&39-&45,.-B&/(6&39-&+5:0)49-6&,/3-&)4&6-,).-6&:B&8*;+53)(1&/&2-)193-6&/.-,/1-&,/3-&:/4-6&*(&/00&39-&,/3-4&,-+*,3-6&)(&39-&45,.-B&7*,&39/3&80/44)7)8/3)*(%&&?4&39)4&2-)193-6&/.-,/1-&,/3-&)(8056-4&/00&,/3-4&,-+*,3-6&)(&39-&45,.-BF&)3&;/B&)(8056-&:*39&5()*(&/(6&(*(G5()*(&,/3-4%&HI/;+0-J&A'K?!"#!G""L&MN#ON!"#$%&A'&)(6)8/3-4&39-&,/3-4&/,-&45,.-B&,/3-4&:/4-6&*(&/&2-)193-6&/.-,/1-&8/0850/3)*(&*7&,/3-4&/(6&/,-&(*3&;/P*,)3B&,/3-4%&K?&)(6)8/3-4&39-&A3/3-&*7&K*5)4)/(/%&!"#!&)4&39-&B-/,&*7&45,.-B&*(&29)89&39-4-&80/44)7)8/3)*(4&/(6&,/3-4&/,-&:/4-6%&Q9-&(-I3&(5;:-,F&""L&)(&39-&-I/;+0-F&)4&/(&)(3-,(/0&(5;:-,&54-6&)(&+,*658)(1&39-&2/1-&6-3-,;)(/3)*(%&MN#ON!"#$&)(6)8/3-4&39-&45,.-B&8*;+0-3)*(&6/3-&7*,&39-&80/44)7)8/3)*(4&/(6&,/3-4&5(6-,&39/3&)6-(3)7)-,%&A5,.-B&2/1-&,/3-4&/,-&(*3&5+6/3-6&/(6&,-;/)(&)(&-77-83&5(3)0&/&(-2&45,.-B&)4&8*(6583-6%&'()*(&?.-,/1-&C/3-&D6-(3)7)-,4&=0/44)7)8/3)*(<4@&0)43-6&5(6-,&39-&'?RS&)6-(3)7)-,&)(6)8/3-&39/3&(*&4)(10-&;/P*,)3B&,/3-&+,-./)0-6&7*,&39*4-&80/44)7)8/3)*(4T&9*2-.-,F&#""U&*7&39-&6/3/&,-+*,3-6&7*,&39-&80/44)7)8/3)*(4&2/4&5()*(&6/3/%&HV?WXKHJ&'?RSGYZG""#"&"[N!\N!"#$%&'?RS&)(6)8/3-4&39/3&39-&,/3-&)4&/&2-)193-6&5()*(&/.-,/1-&,/3-%&YZ&)(6)8/3-4&39-&43/3-%&Q9-&(-I3&(5;:-,F&""#"&)(&39-&-I/;+0-F&)4&/(&)(3-,(/0&(5;:-,&54-6&)(&+,*658)(1&39-&2/1-&6-3-,;)(/3)*(%&"[N!\N!"#$&)(6)8/3-4&39-&45,.-B&8*;+0-3)*(&6/3-&7*,&39-&80/44)7)8/3)*(4&/(6&,/3-4&5(6-,&39/3&)6-(3)7)-,%&?&'?RS&,/3-&2)00&:-&5+6/3-6&*(8-&/&B-/,F&545/00B&)(&]/(5/,B&*7&-/89&B-/,F&3*&,-70-83&/&2-)193-6&/.-,/1-&*7&39-&85,,-(3&(-1*3)/3-6N=>?&,/3-&*7&39-&5()*(&0*8/04&7,*;&29)89&39-&,/3-&)4&:/4-6%&&&GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG&&&&&&&&&&&&&&&&&&&&?SH&_HQHCWD?QDY&?XXH?KA&XCY=HAA&#%@&Z/4&39-,-&:--(&/(&)()3)/0&6-8)4)*(&)(&39-&;/33-,a&Q9)4&8/(&:-J&b&&/(&-I)43)(1&+5:0)49-6&2/1-&6-3-,;)(/3)*(&b&&/&45,.-B&5(6-,0B)(1&/&2/1-&6-3-,;)(/3)*(&b&&/&/1-&/(6&Z*5,&_).)4)*(&0-33-,&4-33)(1&7*,39&/&+*4)3)*(&*(&&&&/&2/1-&6-3-,;)(/3)*(&;/33-,&b&&/&8*(7*,;/(8-&</66)3)*(/0&80/44)7)8/3)*(&/(6&,/3-@&,50)(1&Y(&45,.-B&,-0/3-6&;/33-,4F&)()3)/0&8*(3/83F&)(8056)(1&,-c5-434&7*,&45;;/,)-4&*7&45,.-B4F&49*506&:-&2)39&39-&/1-&/(6&Z*5,&C-1)*(/0&Y77)8-&7*,&39-&/,-/&)(&29)89&39-&45,.-B&2/4&8*(6583-6&:-8/54-&39*4-&C-1)*(/0&Y77)8-4&9/.-&,-4+*(4):)0)3B&7*,&39-&_/.)4G>/8*(&45,.-B&+,*1,/;%&D7&39-&,-4+*(4-&7,*;&39)4&)()3)/0&8*(3/83&)4&(*3&4/3)47/83*,BF&39-(&39-&+,*8-44&6-48,):-6&)(&!%@&/(6&O%@&49*506&:-&7*00*2-6%&

D264610100

Page 77: D264610 - dot.ny.gov

��������� �����

������������������������������������������� � ��

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

D264610 101

Page 78: D264610 - dot.ny.gov

STATE PREVAILING WAGE RATES

4025 Page 1 of 1 EB 06-035 L 01/06/11 9/15/11

The New York State Department of Labor (NYSDOL) has issued a project-specific prevailing wage rate schedule for this Contract. The New York State Labor Law requires the Contractor and all subcontractors to ensure that all workers employed in the performance of a public work contract are paid not less than the prevailing wage rate and supplemental (fringe) benefits in the locality where the work is performed.

The project-specific prevailing wage rate schedule, together with all updates and amendments, is incorporated by reference in this Contract, and made a part hereof, as though fully set forth herein. The schedule may be accessed by visiting the NYSDOL website, navigating to the appropriate web page for prevailing wages, and entering the Prevailing Rate Case Number (PRC#). The PRC# is found on NYSDOL Form PW-200, the following page in this Contract Proposal. The project-specific prevailing wage rate schedule and all wage rate amendments are annexed electronically through the following link:

www.labor.ny.gov

It is the obligation of the Contractor and all subcontractors to obtain all updated prevailing wage rate schedules and to pay all workers in accordance with the periodic wage rate schedule updates issued by the NYSDOL. Any changes or clarifications of labor classifications, and information on the applicability of particular prevailing wage rates, must be obtained from the Office of the Director of the Bureau of Public Work at the New York State Department of Labor.

D264610102

Page 79: D264610 - dot.ny.gov

PREVAILING WAGE SCHEDULE FOR ARTICLE 8 PUBLIC WORK PROJECT

Attached is the current schedule(s) of the prevailing wage rates and prevailing hourlysupplements for the project referenced above. A unique Prevailing Wage Case Number(PRC#) has been assigned to the schedule(s) for your project.

The schedule is effective from July 2021 through June 2022. All updates, corrections, postedon the 1st business day of each month, and future copies of the annual determination areavailable on the Department's website www.labor.ny.gov. Updated PDF copies of yourschedule can be accessed by entering your assigned PRC# at the proper location on thewebsite.

It is the responsibility of the contracting agency or its agent to annex and make part, theattached schedule, to the specifications for this project, when it is advertised for bids and /orto forward said schedules to the successful bidder(s), immediately upon receipt, in order toinsure the proper payment of wages.

Please refer to the "General Provisions of Laws Covering Workers on Public WorkContracts" provided with this schedule, for the specific details relating to otherresponsibilities of the Department of Jurisdiction.

Upon completion or cancellation of this project, enter the required information and mail ORfax this form to the office shown at the bottom of this notice, OR fill out the electronicversion via the NYSDOL website.

NOTICE OF COMPLETION / CANCELLATION OF PROJECT

Date Completed: Date Cancelled:

Name & Title of Representative:

Phone: (518) 457-5589 Fax: (518) 485-1870W. Averell Harriman State Office Campus, Bldg. 12, Room 130, Albany, NY 12240

www.labor.ny.gov. PW 200 [email protected]

Andrew M. Cuomo, Governor Roberta Reardon, Commissioner

NYSDOT

NEIL SERGOTT, DQAB PS&E UNITNYSDOTPOD 2350 WOLF ROADALBANY NY 12232

Schedule Year 2021 through 2022Date Requested 08/09/2021PRC# 2021008392

Location AlleganyProject ID# D264610Project Type Replace deck on NY 275 bridge over WNY & PA RR in Allegany county. Mill and fill bridge approaches.

Replace highway-rail where necessary.

D264610 103

Page 80: D264610 - dot.ny.gov

General Provisions of Laws Covering Workers on Article 8 Public Work Contracts

Introduction

The Labor Law requires public work contractors and subcontractors to pay laborers, workers, or mechanics employed inthe performance of a public work contract not less than the prevailing rate of wage and supplements (fringe benefits) in thelocality where the work is performed.

Responsibilities of the Department of Jurisdiction

A Department of Jurisdiction (Contracting Agency) includes a state department, agency, board or commission: a county,city, town or village; a school district, board of education or board of cooperative educational services; a sewer, water, fire,improvement and other district corporation; a public benefit corporation; and a public authority awarding a public workcontract.

The Department of Jurisdiction (Contracting Agency) awarding a public work contract MUST obtain a Prevailing RateSchedule listing the hourly rates of wages and supplements due the workers to be employed on a public work project.This schedule may be obtained by completing and forwarding a "Request for wage and Supplement Information" form (PW39) to the Bureau of Public Work. The Prevailing Rate Schedule MUST be included in the specifications for the contract tobe awarded and is deemed part of the public work contract.

Upon the awarding of the contract, the law requires that the Department of Jurisdiction (Contracting Agency) furnish thefollowing information to the Bureau: the name and address of the contractor, the date the contract was let and theapproximate dollar value of the contract. To facilitate compliance with this provision of the Labor Law, a copy of theDepartment's "Notice of Contract Award" form (PW 16) is provided with the original Prevailing Rate Schedule.

The Department of Jurisdiction (Contracting Agency) is required to notify the Bureau of the completion or cancellation ofany public work project. The Department's PW 200 form is provided for that purpose.

Both the PW 16 and PW 200 forms are available for completion online.

Hours

No laborer, worker, or mechanic in the employ of a contractor or subcontractor engaged in the performance of any publicwork project shall be permitted to work more than eight hours in any day or more than five days in any week, except incases of extraordinary emergency. The contractor and the Department of Jurisdiction (Contracting Agency) may apply tothe Bureau of Public Work for a dispensation permitting workers to work additional hours or days per week on a particularpublic work project.

There are very few exceptions to this rule. Complete information regarding these exceptions is available on the "Requestfor a dispensation to work overtime" form (PW30) and "4 Day / 10 Hour Work Schedule" form (PW 30.1).

Wages and Supplements

The wages and supplements to be paid and/or provided to laborers, workers, and mechanics employed on a public workproject shall be not less than those listed in the current Prevailing Rate Schedule for the locality where the work isperformed. If a prime contractor on a public work project has not been provided with a Prevailing Rate Schedule, thecontractor must notify the Department of Jurisdiction (Contracting Agency) who in turn must request an original PrevailingRate Schedule form the Bureau of Public Work. Requests may be submitted by: mail to NYSDOL, Bureau of Public Work,State Office Bldg. Campus, Bldg. 12, Rm. 130, Albany, NY 12240; Fax to Bureau of Public Work (518) 485-1870; orelectronically at the NYSDOL website www.labor.ny.gov.

Upon receiving the original schedule, the Department of Jurisdiction (Contracting Agency) is REQUIRED to providecomplete copies to all prime contractors who in turn MUST, by law, provide copies of all applicable county schedules toeach subcontractor and obtain from each subcontractor, an affidavit certifying such schedules were received. If the originalschedule expired, the contractor may obtain a copy of the new annual determination from the NYSDOL websitewww.labor.ny.gov.

The Commissioner of Labor makes an annual determination of the prevailing rates. This determination is in effect fromJuly 1st through June 30th of the following year. The annual determination is available on the NYSDOL websitewww.labor.ny.gov.

Payrolls and Payroll Records

Every contractor and subcontractor MUST keep original payrolls or transcripts subscribed and affirmed as true underpenalty of perjury. As per Article 6 of the Labor law, contractors and subcontractors are required to establish, maintain,and preserve for not less than six (6) years, contemperaneous, true, and accurate payroll records. At a minimum, payrollsmust show the following information for each person employed on a public work project: Name, Address, Last 4 Digits ofSocial Security Number, Classification(s) in which the worker was employed, Hourly wage rate(s) paid, Supplements paid

D264610104

Page 81: D264610 - dot.ny.gov

or provided, and Daily and weekly number of hours worked in each classification.

The filing of payrolls to the Department of Jurisdiction is a condition of payment.Every contractor and subcontractor shallsubmit to the Department of Jurisdiction (Contracting Agency), within thirty (30) days after issuance of its first payroll andevery thirty (30) days thereafter, a transcript of the original payrolls, subscribed and affirmed as true under penalty ofperjury. The Department of Jurisdiction (Contracting Agency) shall collect, review for facial validity, and maintain suchpayrolls.

In addition, the Commissioner of Labor may require contractors to furnish, with ten (10) days of a request, payroll recordssworn to as their validity and accuracy for public work and private work. Payroll records include, but are not limited to timecards, work description sheets, proof that supplements were provided, cancelled payroll checks and payrolls. Failure toprovide the requested information within the allotted ten (10) days will result in the withholding of up to 25% of thecontract, not to exceed $100,000.00. If the contractor or subcontractor does not maintain a place of business in New YorkState and the amount of the contract exceeds $25,000.00, payroll records and certifications must be kept on the projectworksite.

The prime contractor is responsible for any underpayments of prevailing wages or supplements by any subcontractor.

All contractors or their subcontractors shall provide to their subcontractors a copy of the Prevailing Rate Schedulespecified in the public work contract as well as any subsequently issued schedules. A failure to provide these schedulesby a contractor or subcontractor is a violation of Article 8, Section 220-a of the Labor Law.

All subcontractors engaged by a public work project contractor or its subcontractor, upon receipt of the original scheduleand any subsequently issued schedules, shall provide to such contractor a verified statement attesting that thesubcontractor has received the Prevailing Rate Schedule and will pay or provide the applicable rates of wages andsupplements specified therein. (See NYS Labor Laws, Article 8 . Section 220-a).

Determination of Prevailing Wage and Supplement Rate Updates Applicable to All Counties

The wages and supplements contained in the annual determination become effective July 1st whether or not the newdetermination has been received by a given contractor. Care should be taken to review the rates for obvious errors. Anycorrections should be brought to the Department's attention immediately. It is the responsibility of the public workcontractor to use the proper rates. If there is a question on the proper classification to be used, please call the districtoffice located nearest the project. Any errors in the annual determination will be corrected and posted to the NYSDOLwebsite on the first business day of each month. Contractors are responsible for paying these updated rates as well,retroactive to July 1st.

When you review the schedule for a particular occupation, your attention should be directed to the dates above thecolumn of rates. These are the dates for which a given set of rates is effective. To the extent possible, the Departmentposts rates in its possession that cover periods of time beyond the July 1st to June 30th time frame covered by aparticular annual determination. Rates that extend beyond that instant time period are informational ONLY and may beupdated in future annual determinations that actually cover the then appropriate July 1st to June 30th time period.

Withholding of Payments

When a complaint is filed with the Commissioner of Labor alleging the failure of a contractor or subcontractor to pay orprovide the prevailing wages or supplements, or when the Commissioner of Labor believes that unpaid wages orsupplements may be due, payments on the public work contract shall be withheld from the prime contractor in a sufficientamount to satisfy the alleged unpaid wages and supplements, including interest and civil penalty, pending a finaldetermination.

When the Bureau of Public Work finds that a contractor or subcontractor on a public work project failed to pay or providethe requisite prevailing wages or supplements, the Bureau is authorized by Sections 220-b and 235.2 of the Labor Law toso notify the financial officer of the Department of Jurisdiction (Contracting Agency) that awarded the public work contract.Such officer MUST then withhold or cause to be withheld from any payment due the prime contractor on account of suchcontract the amount indicated by the Bureau as sufficient to satisfy the unpaid wages and supplements, including interestand any civil penalty that may be assessed by the Commissioner of Labor. The withholding continues until there is a finaldetermination of the underpayment by the Commissioner of Labor or by the court in the event a legal proceeding isinstituted for review of the determination of the Commissioner of Labor.

The Department of Jurisdiction (Contracting Agency) shall comply with this order of the Commissioner of Labor or of thecourt with respect to the release of the funds so withheld.

Summary of Notice Posting Requirements

The current Prevailing Rate Schedule must be posted in a prominent and accessible place on the site of the public workproject. The prevailing wage schedule must be encased in, or constructed of, materials capable of withstanding adverseweather conditions and be titled "PREVAILING RATE OF WAGES" in letters no smaller than two (2) inches by two (2)inches.

D264610 105

Page 82: D264610 - dot.ny.gov

The "Public Work Project" notice must be posted at the beginning of the performance of every public work contract, oneach job site.

Every employer providing workers. compensation insurance and disability benefits must post notices of such coverage inthe format prescribed by the Workers. Compensation Board in a conspicuous place on the jobsite.

Every employer subject to the NYS Human Rights Law must conspicuously post at its offices, places of employment, oremployment training centers, notices furnished by the State Division of Human Rights.

Employers liable for contributions under the Unemployment Insurance Law must conspicuously post on the jobsite noticesfurnished by the NYS Department of Labor.

Apprentices

Employees cannot be paid apprentice rates unless they are individually registered in a program registered with the NYSCommissioner of Labor. The allowable ratio of apprentices to journeyworkers in any craft classification can be no greaterthan the statewide building trade ratios promulgated by the Department of Labor and included with the Prevailing RateSchedule. An employee listed on a payroll as an apprentice who is not registered as above or is performing work outsidethe classification of work for which the apprentice is indentured, must be paid the prevailing journeyworker's wage rate forthe classification of work the employee is actually performing.

NYSDOL Labor Law, Article 8, Section 220-3, require that only apprentices individually registered with the NYSDepartment of Labor may be paid apprenticeship rates on a public work project. No other Federal or State Agency ofoffice registers apprentices in New York State.

Persons wishing to verify the apprentice registration of any person must do so in writing by mail, to the NYSDOL Office ofEmployability Development / Apprenticeship Training, State Office Bldg. Campus, Bldg. 12, Albany, NY 12240 or by Faxto NYSDOL Apprenticeship Training (518) 457-7154. All requests for verification must include the name and socialsecurity number of the person for whom the information is requested.

The only conclusive proof of individual apprentice registration is written verification from the NYSDOL ApprenticeshipTraining Albany Central office. Neither Federal nor State Apprenticeship Training offices outside of Albany can provideconclusive registration information.

It should be noted that the existence of a registered apprenticeship program is not conclusive proof that any person isregistered in that program. Furthermore, the existence or possession of wallet cards, identification cards, or copies ofstate forms is not conclusive proof of the registration of any person as an apprentice.

Interest and Penalties

In the event that an underpayment of wages and/or supplements is found:

- Interest shall be assessed at the rate then in effect as prescribed by the Superintendent of Banks pursuant tosection 14-a of the Banking Law, per annum from the date of underpayment to the date restitution is made.

- A Civil Penalty may also be assessed, not to exceed 25% of the total of wages, supplements, and interest due.

Debarment

Any contractor or subcontractor and/or its successor shall be ineligible to submit a bid on or be awarded any public workcontract or subcontract with any state, municipal corporation or public body for a period of five (5) years when:

- Two (2) willful determinations have been rendered against that contractor or subcontractor and/or its successorwithin any consecutive six (6) year period.

- There is any willful determination that involves the falsification of payroll records or the kickback of wages orsupplements.

Criminal Sanctions

Willful violations of the Prevailing Wage Law (Article 8 of the Labor Law) may be a felony punishable by fine orimprisonment of up to 15 years, or both.

Discrimination

No employee or applicant for employment may be discriminated against on account of age, race, creed, color, nationalorigin, sex, disability or marital status.

No contractor, subcontractor nor any person acting on its behalf, shall by reason of race, creed, color, disability, sex ornational origin discriminate against any citizen of the State of New York who is qualified and available to perform the workto which the employment relates (NYS Labor Law, Article 8, Section 220-e(a)).

D264610106

Page 83: D264610 - dot.ny.gov

No contractor, subcontractor, nor any person acting on its behalf, shall in any manner, discriminate against or intimidateany employee on account of race, creed, color, disability, sex, or national origin (NYS Labor Law, Article 8, Section 220-e(b) ).

The Human Rights Law also prohibits discrimination in employment because of age, marital status, or religion.

There may be deducted from the amount payable to the contractor under the contract a penalty of $50.00 for eachcalendar day during which such person was discriminated against or intimidated in violation of the provision of the contract(NYS Labor Law, Article 8, Section 220-e(c) ).

The contract may be cancelled or terminated by the State or municipality. All monies due or to become due thereundermay be forfeited for a second or any subsequent violation of the terms or conditions of the anti-discrimination sections ofthe contract (NYS Labor Law, Article 8, Section 220-e(d) ).

Every employer subject to the New York State Human Rights Law must conspicuously post at its offices, places ofemployment, or employment training centers notices furnished by the State Division of Human Rights.

Workers' Compensation

In accordance with Section 142 of the State Finance Law, the contractor shall maintain coverage during the life of thecontract for the benefit of such employees as required by the provisions of the New York State Workers' CompensationLaw.

A contractor who is awarded a public work contract must provide proof of workers' compensation coverage prior to beingallowed to begin work.

The insurance policy must be issued by a company authorized to provide workers' compensation coverage in New YorkState. Proof of coverage must be on form C-105.2 (Certificate of Workers' Compensation Insurance) and must name thisagency as a certificate holder.

If New York State coverage is added to an existing out-of-state policy, it can only be added to a policy from a companyauthorized to write workers' compensation coverage in this state. The coverage must be listed under item 3A of theinformation page.

The contractor must maintain proof that subcontractors doing work covered under this contract secured and maintained aworkers' compensation policy for all employees working in New York State.

Every employer providing worker's compensation insurance and disability benefits must post notices of such coverage inthe format prescribed by the Workers' Compensation Board in a conspicuous place on the jobsite.

Unemployment Insurance

Employers liable for contributions under the Unemployment Insurance Law must conspicuously post on the jobsite noticesfurnished by the New York State Department of Labor.

D264610 107

Page 84: D264610 - dot.ny.gov

To all State Departments, Agency Heads and Public Benefit Corporations IMPORTANT NOTICE REGARDING PUBLIC WORK ENFORCEMENT FUND

Budget Policy & Reporting Manual

B-610Public Work Enforcement Fund

effective date December 7, 2005

1. Purpose and Scope:

This Item describes the Public Work Enforcement Fund (the Fund, PWEF) and itsrelevance to State agencies and public benefit corporations engaged in construction orreconstruction contracts, maintenance and repair, and announces the recently-enactedincrease to the percentage of the dollar value of such contracts that must be deposited intothe Fund. This item also describes the roles of the following entities with respect to theFund:

- New York State Department of Labor (DOL),- The Office of the State of Comptroller (OSC), and- State agencies and public benefit corporations.

2. Background and Statutory References:

DOL uses the Fund to enforce the State's Labor Law as it relates to contracts forconstruction or reconstruction, maintenance and repair, as defined in subdivision two ofSection 220 of the Labor Law. State agencies and public benefit corporations participatingin such contracts are required to make payments to the Fund.

Chapter 511 of the Laws of 1995 (as amended by Chapter 513 of the Laws of 1997,Chapter 655 of the Laws of 1999, Chapter 376 of the Laws of 2003 and Chapter 407 of theLaws of 2005) established the Fund.

3. Procedures and Agency Responsibilities:

The Fund is supported by transfers and deposits based on the value of contracts forconstruction and reconstruction, maintenance and repair, as defined in subdivision two ofSection 220 of the Labor Law, into which all State agencies and public benefit corporationsenter.

Chapter 407 of the Laws of 2005 increased the amount required to be provided to this fundto .10 of one-percent of the total cost of each such contract, to be calculated at the timeagencies or public benefit corporations enter into a new contract or if a contract is amended.The provisions of this bill became effective August 2, 2005.

D264610108

Page 85: D264610 - dot.ny.gov

To all State Departments, Agency Heads and Public Benefit Corporations IMPORTANT NOTICE REGARDING PUBLIC WORK ENFORCEMENT FUND

OSC will report to DOL on all construction-related ("D") contracts approved during themonth, including contract amendments, and then DOL will bill agencies the appropriateassessment monthly. An agency may then make a determination if any of the billedcontracts are exempt and so note on the bill submitted back to DOL. For any instancewhere an agency is unsure if a contract is or is not exempt, they can call the Bureau ofPublic Work at the number noted below for a determination. Payment by check or journalvoucher is due to DOL within thirty days from the date of the billing. DOL will verify theamounts and forward them to OSC for processing.

For those contracts which are not approved or administered by the Comptroller, monthlyreports and payments for deposit into the Public Work Enforcement Fund must be providedto the Administrative Finance Bureau at the DOL within 30 days of the end of each monthor on a payment schedule mutually agreed upon with DOL.

Reports should contain the following information:

- Name and billing address of State agency or publicbenefit corporation;

- State agency or public benefit corporation contact andphone number;

- Name and address of contractor receiving the award;- Contract number and effective dates;- Contract amount and PWEF assessment charge (if

contract amount has been amended, reflect increase ordecrease to original contract and the adjustment in thePWEF charge); and

- Brief description of the work to be performed under eachcontract.

Checks and Journal Vouchers, payable to the "New York State Department of Labor"should be sent to:

Department of LaborAdministrative Finance Bureau-PWEF Unit

Building 12, Room 464State Office CampusAlbany, NY 12240

Any questions regarding billing should be directed to NYSDOL's Administrative FinanceBureau-PWEF Unit at (518) 457-3624 and any questions regarding Public Work Contractsshould be directed to the Bureau of Public Work at (518) 457-5589.

D264610 109

Page 86: D264610 - dot.ny.gov

Introduction to the Prevailing Rate Schedule

Information About Prevailing Rate Schedule

This information is provided to assist you in the interpretation of particular requirements for each classification of worker contained in theattached Schedule of Prevailing Rates.

Classification

It is the duty of the Commissioner of Labor to make the proper classification of workers taking into account whether the work is heavy andhighway, building, sewer and water, tunnel work, or residential, and to make a determination of wages and supplements to be paid orprovided. It is the responsibility of the public work contractor to use the proper rate. If there is a question on the proper classification to beused, please call the district office located nearest the project. District office locations and phone numbers are listed below.

Prevailing Wage Schedules are issued separately for "General Construction Projects" and "Residential Construction Projects" on a county-by-county basis.

General Construction Rates apply to projects such as: Buildings, Heavy & Highway, and Tunnel and Water & Sewer rates.

Residential Construction Rates generally apply to construction, reconstruction, repair, alteration, or demolition of one family, two family, rowhousing, or rental type units intended for residential use.

Some rates listed in the Residential Construction Rate Schedule have a very limited applicability listed along with the rate. Rates foroccupations or locations not shown on the residential schedule must be obtained from the General Construction Rate Schedule. Pleasecontact the local Bureau of Public Work office before using Residential Rate Schedules, to ensure that the project meets the required criteria.

Payrolls and Payroll Records

Contractors and subcontractors are required to establish, maintain, and preserve for not less that six (6) years, contemporaneous, true, andaccurate payroll records.

Every contractor and subcontractor shall submit to the Department of Jurisdiction (Contracting Agency), within thirty (30) days after issuanceof its first payroll and every thirty (30) days thereafter, a transcript of the original payrolls, subscribed and affirmed as true under penalty ofperjury.

Paid Holidays

Paid Holidays are days for which an eligible employee receives a regular day's pay, but is not required to perform work. If an employeeworks on a day listed as a paid holiday, this remuneration is in addition to payment of the required prevailing rate for the work actuallyperformed.

Overtime

At a minimum, all work performed on a public work project in excess of eight hours in any one day or more than five days in any workweek isovertime. However, the specific overtime requirements for each trade or occupation on a public work project may differ. Specific overtimerequirements for each trade or occupation are contained in the prevailing rate schedules.

Overtime holiday pay is the premium pay that is required for work performed on specified holidays. It is only required where the employeeactually performs work on such holidays.

The applicable holidays are listed under HOLIDAYS: OVERTIME. The required rate of pay for these covered holidays can be found in theOVERTIME PAY section listings for each classification.

Supplemental Benefits

Particular attention should be given to the supplemental benefit requirements. Although in most cases the payment or provision ofsupplements is straight time for all hours worked, some classifications require the payment or provision of supplements, or a portion of thesupplements, to be paid or provided at a premium rate for premium hours worked. Supplements may also be required to be paid or providedon paid holidays, regardless of whether the day is worked. The Overtime Codes and Notes listed on the particular wage classification willindicate these conditions as required.

Effective Dates

When you review the schedule for a particular occupation, your attention should be directed to the dates above the column of rates. Theseare the dates for which a given set of rates is effective. The rate listed is valid until the next effective rate change or until the new annualdetermination which takes effect on July 1 of each year. All contractors and subcontractors are required to pay the current prevailing ratesof wages and supplements. If you have any questions please contact the Bureau of Public Work or visit the New York State Department ofLabor website (www.labor.ny.gov) for current wage rate information.

Apprentice Training Ratios

The following are the allowable ratios of registered Apprentices to Journey-workers.

For example, the ratio 1:1,1:3 indicates the allowable initial ratio is one Apprentice to one Journeyworker. The Journeyworker must be inplace on the project before an Apprentice is allowed. Then three additional Journeyworkers are needed before a second Apprentice isallowed. The last ratio repeats indefinitely. Therefore, three more Journeyworkers must be present before a third Apprentice can be hired,and so on.

Please call Apprentice Training Central Office at (518) 457-6820 if you have any questions.

Page 18

Prevailing Wage Rates for 07/01/2021 - 06/30/2022 Published by the New York State Department of LaborLast Published on Aug 01 2021 PRC Number 2021008392

D264610110

Page 87: D264610 - dot.ny.gov

Title (Trade) Ratio

Boilermaker (Construction) 1:1,1:4

Boilermaker (Shop) 1:1,1:3

Carpenter (Bldg.,H&H, Pile Driver/Dockbuilder) 1:1,1:4

Carpenter (Residential) 1:1,1:3

Electrical (Outside) Lineman 1:1,1:2

Electrician (Inside) 1:1,1:3

Elevator/Escalator Construction & Modernizer 1:1,1:2

Glazier 1:1,1:3

Insulation & Asbestos Worker 1:1,1:3

Iron Worker 1:1,1:4

Laborer 1:1,1:3

Mason 1:1,1:4

Millwright 1:1,1:4

Op Engineer 1:1,1:5

Painter 1:1,1:3

Plumber & Steamfitter 1:1,1:3

Roofer 1:1,1:2

Sheet Metal Worker 1:1,1:3

Sprinkler Fitter 1:1,1:2

If you have any questions concerning the attached schedule or would like additional information, please contact the nearest BUREAU ofPUBLIC WORK District Office or write to:

New York State Department of LaborBureau of Public WorkState Office Campus, Bldg. 12Albany, NY 12240

District Office Locations: Telephone # FAX #

Bureau of Public Work - Albany 518-457-2744 518-485-0240

Bureau of Public Work - Binghamton 607-721-8005 607-721-8004

Bureau of Public Work - Buffalo 716-847-7159 716-847-7650

Bureau of Public Work - Garden City 516-228-3915 516-794-3518

Bureau of Public Work - Newburgh 845-568-5287 845-568-5332

Bureau of Public Work - New York City 212-932-2419 212-775-3579

Bureau of Public Work - Patchogue 631-687-4882 631-687-4902

Bureau of Public Work - Rochester 585-258-4505 585-258-4708

Bureau of Public Work - Syracuse 315-428-4056 315-428-4671

Bureau of Public Work - Utica 315-793-2314 315-793-2514

Bureau of Public Work - White Plains 914-997-9507 914-997-9523

Bureau of Public Work - Central Office 518-457-5589 518-485-1870

Page 19

Prevailing Wage Rates for 07/01/2021 - 06/30/2022 Published by the New York State Department of LaborLast Published on Aug 01 2021 PRC Number 2021008392

D264610 111