D - Warner Fences · 2018. 3. 25. · Maximum glass spans and spigot requirements for the Taupo...

5
 BALUSTRADING - TAUPO

Transcript of D - Warner Fences · 2018. 3. 25. · Maximum glass spans and spigot requirements for the Taupo...

  • PRODUCER STATEMENT PS1

     BALUSTRADING - TAUPO

  • � ACfNZ

    Bl,B2,F2,F4 Building Code Clause(s) ................................. .

    PRODUCER STATEMENT - PS1 - DESIGN (Guidance notes on the use of this form are printed on page 2)

    ISSUED BY: .................... P.&P..CQNS.\.J.LIIN.G.ENG.INE.ERS..LIMITE.D .......................................................................... . (Design Firm)

    . WARNER FENCING & GA TES LIMITED TO ........................................................................................................................................................... . (Owner/Developer)

    TO BE SUPPLIED TO: ... �������!.��.�.����······························································································· (Building Consent Authority)

    IN RESPECT OF: .......... ��.�!!.��Y�.� .. ��.�.?.�. ��.��.�.:.�� ��. �.����.�.:.��. �Y. .! �.�.�?. .?.���.?.!� ................... . (Description of Building Work)

    AT: .............................. Y.AR1;9.V.�.�;J;I�� ................................................. ··················································· (Address)

    ....................................................................... LOT ........................ DP ....................... SO ............... .

    We have been engaged by the owner/developer referred to above to provide ... �!���!�.���. ��?.��� ............ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . services in respect of the requirements of

    B (Extent of Engagement)

    Clause(s) ...... L.!�g .f:?.,f.4 ................................................................... of the Building Code for All O or Part only [ZJ (as specified in the attachment to this statement), of the proposed building work.

    The design carried out by us has been prepared in accordance with: Bl/VMl & GLASS TESTING

    [Z] Compliance Documents issued by the Ministry of Business, Innovation & Employment. ...................................... or (verification method/ acceptable solution)

    0 Alternative solution as per the attached schedule ................... .... ................................. ................... .

    The proposed building work covered by this producer statement is described on the drawings titled W. ��N�.� . .f.�.I'.'!����

    A.�.�!.�.?. .................................................. and numbered .R.Ef;.t�n43.I.DS.�.&.EN.G .. O.t .............................. ; together with the specification, and other documents set out in the schedule attached to this statement. On behalf of the Design Firm, and subject to: (i) Site verification of the following design assumptions ... �.l;f�R .�QJ:"�$. .A I .l;N..!:) .. Of .t?.1;��(?,J:-.! .C.�.t,.q.,i(...�.U.QJ:-.!$. ..... (ii) All proprietary products meeting their performance specification requirements;

    I believe on reasonable grounds that a) the building, if constructed in accordance with the drawings, specifications, and other documents provided or listed in the attached schedule, will comply with the relevant provisions of the Building Code and that b), the persons who have undertaken the design have the necessary competency to do so. I also recommend the following level of construction monitoring/observation: OCM1 OCM2 CM3 OCM4 OCM5 (Engineering Categories) or D as per agreement with owner/developer (Architectural)

    MR. P PRAKASH I, ..................................................... am. (Name of Design Professional)

    [Z]CPEng ... ?.��.��-� ............... #

    OReg Arch ...................... . #

    I am a Member of: [Z] IPENZ ONZIA and hold the following qualifications: ...... �:�:.��'.�_i!�:.�'..�.�� ............................ . The Design Firm issuing this statement holds a current policy of Professional Indemnity Insurance no less than $200,000*. The Design Firm is a member of ACENZ: D SIGNED BY ..... M8.-.P..P.R�.!

  • Maximum glass spans and spigot requirements for the Taupo spigot.

    Glass Glass Wind zones

    Height Width Medium 32-37 M/S High 37-44 M/S Very High - 44-50 M/S

    1160 1000 2 Spigots 2 Spigots 2 Spigots

    1160 1050 2 Spigots 2 Spigots 2 Spigots

    1160 1100 2 Spigots 2 Spigots 2 Spigots

    1160 1150 2 Spigots 2 Spigots 2 Spigots

    1160 1200 2 Spigots 2 Spigots 2 Spigots

    1160 1250 2 Spigots 2 Spigots 2 Spigots

    1160 1300 2 Spigots 2 Spigots 2 Spigots

    1160 1350 2 Spigots 2 Spigots 2 Spigots

    1160 1400 2 Spigots 2 Spigots 2 Spigots

    Please note All glass spans & spigot requirements are based on the correct fixings being used as per the PS1 when installing.

    Calculations are for a balustrade situation only.

  • SPIGOTS, GLASS & HANDRAIL COMBINED

    Cuboid handrail - 90-degree corner bracket.

    Cuboid handrail - In-Line joiner bracket.

    PS1 Taupo Balustrading CPTaupo Balustrades EG pageTaupo Balustrades Fixing PageTaupo spans pageFinal page Taupo balustrades