D. Britton
Project Manager’s Report
David Britton 12/Jan/2005
12/Jan/2005 Project Manager’s Report D. Britton
Overview
1. Resources
2. Project Maps
3. Tier-1 Hardware
12/Jan/2005 Project Manager’s Report D. Britton
GridPP1 Financial Summary
SLA FY01 £1,522,055SLA FY02 £1,639,723SLA FY03 £1,602,243SLA FY04 £1,778,706 (Note-1)
£6,542,727£171,911 (Note-2)
Issued £4,746,476Carried forward £143,050 (Note-3)
£4,603,426CERN £5,666,835 (Note-4)
Miscellaneous £12,658£16,997,556
(£2,444)£99,633 (Note-5)
£102,077
Over (under) spend
University Grants
Recoverable costs (estimate)Total GridPP1 funds remaining (estimate)
Grand Total GridPP1 Expenditure
RAL
Non SLA
Globus Support
SLA Subtotal
GridPP1 Grants Subtotal
Balance of £3.6m attributed to GridPP2
To be confirmed by PPARC
Dissemination officer Grant
Planned.
£56,283 EDG cost claim£18,349 (Est.) Manchester.£25,000 (Est.) Bristol.
12/Jan/2005 Project Manager’s Report D. Britton
GridPP1 Financial Summary
TOTAL FY2001 FY2002 FY2003 FY2004
CERN £5,666,835 £0 £907,843 £2,379,162 £2,379,829
DataGrid £3,647,223 £561,819 £1,098,147 £1,272,651 £714,606
Tier-1/A £3,654,985 £836,345 £913,455 £630,552 £1,274,634
Tier-2 £102,143 £0 £0 £24,499 £77,645
Applications £2,051,827 £97,403 £662,348 £738,856 £553,221
Operations £1,874,543 £417,827 £431,181 £590,750 £437,786
TOTAL £16,997,556 £1,913,394 £4,012,973 £5,636,469 £5,437,721
Breakdown by Financial Year
1/Jan/2005
£3.65m
£5.67m
£3.65m
£2.05m£1.87m
CERN
DataGrid
Tier - 1/A
ApplicationsOperations
No significant changes to categories
FY03 hardware spend slipped to FY04
12/Jan/2005 Project Manager’s Report D. Britton
GridPP2 Financial Summary
Jan 2005
£0.81m
£2.77m
£2.86m
£0.82m
£0.66m
£2.99m
£2.70m
£1.00m
£2.40m
Tier-1/AHardware
Tier-2Operations
Applications
M/S/N
LCG-2
MgrTravel
Ops
Tier-1/AOperations
Category Sub-Cat Posts iSY FY04 FY05 FY06 FY07 Total CostLCG £0Tier-1 Staff 13.5 39.5 £437,914 £906,278 £942,529 £408,429 £2,695,151Tier-1 Hardware £700,000 £800,000 £900,000 £0 £2,400,000Tier-2 Staff 19.0 50.2 £447,783 £813,941 £1,082,032 £448,302 £2,792,059Tier-2 Hardware £150,000 £50,000 £0 £0 £200,000Applications Staff 19.0 50.0 £313,190 £1,027,785 £1,072,414 £450,704 £2,864,093N/M/S Staff 14.5 42.6 £458,194 £920,174 £964,050 £426,559 £2,768,977Operations Managers 3.4 10.5 £161,910 £319,853 £329,170 £143,529 £954,463Operations Staff 2.0 5.3 £35,224 £145,994 £150,823 £64,893 £396,934Operations Travel £131,284 £272,000 £284,000 £119,000 £806,284Operations Misc £30,000 £40,000 £40,000 £15,000 £125,000
71 198 £2,865,499 £5,296,026 £5,765,018 £2,076,417 £16,002,961£16,002,077
(£884)
GridPP2 TotalTotal Available
Surplus (Deficit)
Total includes £102,077 carriedforward from GridPP1.
Funds are fully allocated.
12/Jan/2005 Project Manager’s Report D. Britton
GridPP1 Effort Summary
Effort Delivered
Effort Expected (Months)
Months Fraction
Effort funded via SLA ~600 575 96%
Effort funded via Grants 795 ~750 94%
TOTAL 1395 1325 95% “Unfunded” effort reported
on Middleware 254
“Unfunded” effort reported on Applications
155
TOTAL 409
Approximately 38.7 FTE/year funded in GridPP1 and approximately 48.2 FTE/year effort reported against deliverables.
12/Jan/2005 Project Manager’s Report D. Britton
GridPP2 Effort Summary
Other Funding
Work Area FTE Total Posts Unfilled FTE
Application Interfaces 18.5 20 1 (Note-1)
Middleware/Security/Networking 14.5 18 2 ~10
Tier-2 14 21 13 ~8 (Note-2)
Tier-1 13.5 13.5 2 3
EGEE Infrastructure Support 9.5
Project Management Board 3.4 (Note-3) 0 0
Operations (Note-4) 2 0 0
TOTAL 62.5 72.5 18 ~30
GridPP2 Funding
Note-1: Not possible to estimateNote-2: May fall once Tier-2 posts are in place; expected about 4.Note-3: Reduced from 3.6 in previous planning.Note-4: Dissemination officer and Production Manager.
62.5 FTE/year (c.f. GridPP1 38.7).Tier-2 hardware posts currently being filled.
12/Jan/2005 Project Manager’s Report D. Britton
Overview
1. Resources
2. Project Maps
3. Tier-1 Hardware
12/Jan/2005 Project Manager’s Report D. Britton
GridPP1 Final ProjectMap
1. 1 2. 1 3. 1 4. 1 5. 1 6. 1 7. 11.1.1 1.1.2 1.1.3 1.1.4 2.1.1 2.1.2 2.1.3 2.1.4 3.1.1 3.1.2 3.1.3 3.1.4 4.1.1 4.1.2 4.1.3 4.1.4 5.1.1 5.1.2 5.1.3 6.1.1 6.1.2 6.1.3 6.1.4 7.1.1 7.1.2 7.1.3 7.1.41.1.5 2.1.5 2.1.6 2.1.7 2.1.8 3.1.5 3.1.6 3.1.7 3.1.8 4.1.5 4.1.6 4.1.7 4.1.8 6.1.5
2.1.9 3.1.9 3.1.10 4.1.9
1. 2 2. 2 3. 2 4. 2 5. 2 6. 2 7. 21.2.1 1.2.2 1.2.3 1.2.4 2.2.1 2.2.2 2.2.3 2.2.4 3.2.1 3.2.2 3.2.3 3.2.4 4.2.1 4.2.2 4.2.3 4.2.4 5.2.1 5.2.2 5.2.3 6.2.1 6.2.2 6.2.3 7.2.1 7.2.2 7.2.31.2.5 1.2.6 1.2.7 1.2.8 2.2.5 2.2.6 2.2.7 3.2.5 3.2.6 3.2.7 3.2.8 4.2.5 4.2.6 4.2.71.2.9 1.2.10 3.2.9
1. 3 2. 3 3. 3 4. 3 5. 3 6. 3 7. 31.3.1 1.3.2 1.3.3 1.3.4 2.3.1 2.3.2 2.3.3 2.3.4 3.3.1 3.3.2 3.3.3 3.3.4 4.3.1 4.3.2 4.3.3 4.3.4 5.3.1 5.3.2 5.3.3 6.3.1 6.3.2 6.3.3 6.3.4 7.3.1 7.3.2 7.3.3 7.3.41.3.5 1.3.6 1.3.7 1.3.8 2.3.5 2.3.6 2.3.7 3.3.5 3.3.6 4.3.51.3.9 1.3.101.3.11
1. 4 2. 4 3. 4 4. 4 5. 41.4.1 1.4.2 1.4.3 1.4.4 2.4.1 2.4.2 2.4.3 2.4.4 3.4.1 3.4.2 3.4.3 3.4.4 4.4.1 4.4.2 4.4.3 4.4.4 5.4.1 5.4.2 5.4.3 5.4.41.4.5 1.4.6 1.4.7 1.4.8 2.4.5 2.4.6 2.4.7 3.4.5 3.4.6 3.4.7 3.4.8 4.4.5 4.4.6 5.4.51.4.9 3.4.9 3.4.10 Metric OK 1.1.1
Metric not OK 1.1.11. 5 2. 5 3. 5 4. 5 Task complete 1.1.1
1.5.1 1.5.2 1.5.3 1.5.4 2.5.1 2.5.2 2.5.3 2.5.4 3.5.1 3.5.2 3.5.3 3.5.4 4.5.1 4.5.2 4.5.3 4.5.4 Task overdue 1.1.11.5.5 1.5.6 1.5.7 1.5.8 2.5.5 2.5.6 2.5.7 3.5.5 3.5.6 3.5.7 122 days 1.1.11.5.9 1.5.10 Task not due soon 1.1.1
Not Active 1.1.12. 6 3. 6 4. 6 No Task or metric
2.6.1 2.6.2 2.6.3 2.6.4 3.6.1 3.6.2 3.6.3 3.6.4 4.6.1 4.6.2 4.6.32.6.5 2.6.6 2.6.7 2.6.8 3.6.5 3.6.6 3.6.7 3.6.8 Navigate up2.6.9 3.6.9 3.6.103.6.113.6.12 Navigate down
External link2. 7 3. 7 Link to goals
2.7.1 2.7.2 2.7.3 2.7.4 3.7.1 3.7.2 3.7.3 3.7.42.7.5 2.7.6 2.7.7 2.7.8 3.7.5 3.7.6
2. 8 3. 82.8.1 2.8.2 2.8.3 2.8.4 3.8.1 3.8.2 3.8.32.8.5
WP8
1 2 3
Deployment
WP4
WP5
Fabric
Technology
WP6
Due within
ATLAS
GridPP Goal
ResourcesInteroperability Dissemination
Tier-1
Tier-A
LHCb Tier-2
CERN DataGrid Applications Infrastructure
WP1
WP2
WP3
LCG Creation
Applications
WP7
ATLAS/LHCb
CMS
BaBar
CDF/DO
UKQCD
Other
Data Challenges
Rollout
Testbed
30-Sep-04Status Date
Int. Standards
Open Source
Worldwide Integration
UK Integration
Monitoring
DevelopingEngagement
Participation
To develop and deploy a large scale science Gridin the UK for the use of the Particle Physics community
Presentation Deployment
5 6 74
Update
Clear
Metric OK
Metric not OK
Tasks Complete
Tasks Overdue
Tasks due in next 90 days
Tasks deactivated
Change Forms Enacted
44 0 168 0 3 20 7
12/Jan/2005 Project Manager’s Report D. Britton
GridPP2 ProjectMap
K 0. Production Grid I
H H H H H H
K 1. 1 I K 2.1 I K 3.1 I K 4.1 I K 5.1 I K 6.1 I
K 1. 2 I K 2.2 I K 3.2 I K 4.2 I K 5.2 I K 6.2 I
K 1. 3 I K 2.3 I K 3.3 I K 4.3 I K 6.3 I
K 1. 4 I K 2.4 I K 3.4 I K 4.4 I K 6.4 I
K 2.5 I K 3.5 I
Navigate down K
External link I
Link to goals HK 2.6 I K 3.6 I
BaBar
Portal
ExternalLCG
Planning
Non-LHC Apps
Applications Metadata
Interoperability
ATLAS Dissemination
Deployment
GridPP2 Goal
To develop and deploy a large scale production quality grid in the UK for the use of the Particle Physics community
Tier-A Tier-1 Tier-2 Deployment Middleware Support Experiment Support Grid Operations
1 654M/S/N LHC Apps Management
Data & Storage Ganga SAMGrid
Grid Technology Workload LHCb
Computing Fabric
Engagement
Grid Deployment Security CMS UKQCD KnowledgeTransfer
32
Management
Management
& MonitoringInformation PhenoGrid
Network LHC Deployment
12/Jan/2005 Project Manager’s Report D. Britton
GridPP2 ProjectMap
J K
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.10 0.11 0.12 0.13 0.14 0.15 0.16 0.17 0.100 0.101 0.102 0.103 0.104 0.105 0.106 0.107 0.108 0.109 0.110 0.111 0.112 0.113 0.114 0.115 0.116
0.18 0.19 0.20 0.21 0.22 0.23 0.24 0.25 0.26 0.27 0.28 0.29 0.30 0.31 0.32 0.33 0.34 0.117 0.118 0.119 0.120 0.121 0.122 0.123 0.124 0.125 0.126 0.127 0.128 0.129 0.130 0.131 0.132 0.133
0.35 0.36 0.37 0.38 0.39 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.134 0.135 0.136 0.137 0.138 0.139 0.140 0.141 0.142 0.143 0.144 0.145 0.146 0.147 0.148 0.149 0.1500.52 0.53 0.54 0.55 0.56 0.57 0.151 0.152 0.153 0.154 0.155 0.156
H H H H H H
K 1. 1 I J 2.1 K J 3.1 K J 4.1 K J 5.1 K J 6.1 K
2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5
2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 4.1.6 4.1.7 4.1.8 4.1.9 4.1.10 5.1.6 5.1.7 5.1.8 5.1.9 5.1.10 6.1.6 6.1.7 6.1.8 6.1.9
2.1.11 2.1.12 3.1.11 3.1.12 3.1.13 4.1.11 4.1.12 4.1.13 4.1.14 5.1.11 5.1.12
K 1. 2 I J 2.2 K J 3.2 K J 4.2 K J 5.2 K J 6.2 K
2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5
2.2.6 2.2.7 2.2.8 2.2.9 2.2.10 3.2.6 3.2.7 4.2.6 4.2.7 4.2.8 4.2.9 4.2.10 5.2.6 5.2.7 5.2.8 5.2.9 5.2.10 6.2.6 6.2.7 6.2.8 6.2.9 6.2.10
2.2.11 2.2.12 2.2.13 2.2.14 2.2.15 4.2.11 4.2.12 4.2.13 4.2.14 5.2.11 5.2.12 5.2.13 5.2.14 5.2.15 6.2.11 6.2.12 6.2.13
K 1. 3 I J 2.3 K J 3.3 K J 4.3 K J 6.3 K
2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5
2.3.6 2.3.7 2.3.8 2.3.9 2.3.10 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10
2.3.11 3.3.11 3.3.12 3.3.13 4.3.11 4.3.12 4.3.13
K 1. 4 I J 2.4 K J 3.4 K J 4.4 K J 6.4 K
2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 4.4.1 4.4.2 4.4.3 4.4.4 4.4.5 6.4.1 6.4.2 6.4.3 6.4.4
2.4.6 2.4.7 2.4.8 2.4.9 2.4.10 3.4.6 3.4.7 3.4.8 3.4.9 3.4.10 4.4.6 4.4.7 4.4.8 4.4.9
2.4.11 2.4.12 2.4.13 2.4.14 2.4.15 3.4.11 3.4.12 3.4.13 3.4.14 3.4.15
J 2.5 K J 3.5 K 60 Days2.5.1 2.5.2 2.5.3 2.5.4 2.5.5 3.5.1 3.5.2 3.5.3 3.5.4 3.5.5
K 2.5.6 2.5.7 2.5.8 2.5.9 2.5.10 3.5.6 3.5.7 3.5.8 3.5.9 Monitor OK 1.1.1I 2.5.11 Monitor not OK 1.1.1H Milestone complete 1.1.1
J 2.6 K J 3.6 K Milestone overdue 1.1.1
2.6.1 2.6.2 2.6.3 2.6.4 2.6.5 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 Milestone due soon 1.1.1
2.6.6 2.6.7 2.6.8 2.6.9 2.6.10 3.6.6 3.6.7 3.6.8 3.6.9 3.6.10 Milestone not due soon 1.1.1
2.6.11 2.6.12 2.6.13 Item not Active 1.1.1
LHC Deployment
Applications
Project Planning
5Non-LHC Apps
Navigate downExternal link
PhenoGrid
Other Link
Computing Fabric
Production Grid Milestones Production Grid Metrics
1LCG External
+ next
Portal Engagement
UKQCD Knowledge Transfer
Status Date - 30/Sep/04
Grid Technology
ManagementM/S/N
Metadata
Storage Interoperability
Dissemination
LHC Apps
Project Execution
BaBar
SamGrid
CMS
LHCb
GANGA
ATLAS
Network
GridPP2 Goal: To develop and deploy a large scale production quality grid in the UK for the use of the Particle Physics community
Grid Deployment
2 3
Workload
6
Security
InfoMon
4
Update
Clear
253 Milestones, 112 Monitoring Metrics at present.Work to be done:
LCG area to be defined.Production Grid details refined.Some metrics are not yet finalised.Specific risks and dependencies to be included.
12/Jan/2005 Project Manager’s Report D. Britton
Risk Register
Li Im Risk Li Im Risk Li Im Risk Li Im Risk Li Im Risk Li Im RiskR1 Recruitment/retention difficulties 3 2 6 2 2 4 2 2 4 2 2 4R2 Sudden loss of key staff 1 4 4 1 3 3 1 3 3 1 3 3R3 Minimal Contingency 1 2 2 2 2 4 1 2 2R4 GridPP deliverables late 1 3 3 4 2 8R5 Sub-components not delivered to project 2 4 8 2 3 6 2 3 6 2 4 8 2 3 6R6 Non take-up of project results 2 1 2 2 3 6 1 4 4R7 Change in project scope 1 1 1 2 2 4 1 1 1R8 Bad publicity 2 2 4 1 3 3 1 3 3R9 No publicity 1 1 1
R10 External software dependence 2 3 6 2 4 8 1 4 4 3 2 6R11 Lack of monitoring of staff 1 2 2 2 2 4 2 3 6 1 2 2R12 Withdrawal of an experiment 1 4 4 1 4 4 1 2 2R13 Lack of cooperation between Tier centres 1 4 4 1 2 2R14 Scalablity problems 1 3 3 2 3 6 1 3 3R15 Software maintainability problems 2 2 4 1 3 3R16 Technology shifts 1 3 3 1 4 4 1 3 3 2 3 6R17 Repitition of research 3 2 6R18 Lack of funding to meet LCG PH-1 goals 1 3 3R19 Adequate persistency solution not ready 1 3 3R20 Conflicting software requirements 4 1 4 2 2 4R21 Tier-A hardware fails to meet requirements 1 3 3R22 Other Hardware fails to meet requirements 1 1 1R23 Hardware physical risk (large scale) 1 4 4R24 Hardware physical risk (small scale) 2 2 4R25 Hardware procurement problems 2 2 4R26 LAN Bottlenecks 2 1 2R27 Tier-2 organisation fails 2 2 4
R28 Tier-2 hardware not used as planned 2 1 2R29 SYSMAN effort inadequate 2 3 6R30 Firewalls interfere with Grid 1 3 3R31 Inablility to establish trust relationships 2 2 4R32 Security inadequate to operate Grid 3 3 9R33 GGF does not establish standards 1 3 3R34 Minimal open source code development 2 2 4R35 Failure of international cooperation 3 2 6 1 4 4R36 e-Science and GridPP divergence 2 2 4R37 Institutes do not embrace Grid 1 3 3R38 Grid is not stable enough for use 1 3 3R39 Delay of the LHC 2 2 4R40 Lack of future funding 1 4 4 2 2 4R41 Network backbone failure 0 4 0.4R42 Network backbone bottleneck 1 2 2Alt-i-r
Currently using GridPP1 Register.
13 Changes made: 2 Risks added 5 risks reduced 5 risks increased 1 adjusted
2 previously High riskswere reduced. R10_GridPP (S.linux) R14_LCG (Stability)
1 risk elevated to High. R32_INF (Security)
12/Jan/2005 Project Manager’s Report D. Britton
Tier-1 Hardware
The issues here are:
•The “fair” allocation of Tier-1 hardware
•International MOU’s and other less formal commitments
•The Disk-CPU balance and the real cost of Tape
•The absolute scale.
Enter the Spreadsheet
12/Jan/2005 Project Manager’s Report D. Britton
Tier-1 Hardware
Input
Splits Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape
ALICE 33% 67% 0% 36% 49% 15% 33% 55% 12% 28% 57% 15% 25% 57% 18%ATLAS 25% 75% 0% 38% 56% 6% 42% 43% 15% 36% 46% 18% 36% 49% 15%CMS 28% 69% 3% 60% 27% 13% 45% 25% 30% 37% 24% 39% 39% 43% 18%LHCb 62% 34% 5% 16% 72% 12% 14% 77% 9% 12% 78% 11% 15% 82% 3%BaBar 43% 54% 3% 34% 59% 7% 34% 62% 4% 32% 65% 3% 31% 65% 3%CDF 39% 61% 0% 32% 68% 0% 31% 69% 0% 51% 49% 0% 48% 52% 0%D0 23% 77% 0% 68% 23% 9% 69% 23% 8% 76% 10% 13% 71% 11% 18%H1 0% 100% 0% 56% 25% 19% 54% 30% 16% 47% 32% 21% 42% 32% 26%MINOS 100% 0% 0% 9% 62% 30% 7% 61% 32% 5% 52% 43% 4% 47% 49%SNO 60% 40% 0% 61% 34% 5% 57% 39% 4% 51% 43% 6% 48% 45% 7%ZEUS 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0%Other Exp. 75% 25% 0% 69% 31% 0% 65% 35% 0% 60% 40% 0% 57% 43% 0%PhenoGrid 6% 94% 0% 5% 95% 0% 5% 95% 0% 4% 96% 0% 3% 97% 0%UKQCD 23% 77% 0% 18% 82% 0% 25% 75% 0% 34% 66% 0% 31% 69% 0%Other Thr. 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%Other 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
2006 2007 20082004 2005
Weights 2004 2005 2006 2007 2008
ALICE 1 1 1 1 1ATLAS 1 1 1 1 1CMS 1 1 1 1 1LHCb 1 1 1 1 1BaBar 3 2 1 0.5 0.3CDF 1 0.9 0.8 0.5 0.3D0 1 0.9 0.8 0.5 0.3H1 1 0.9 0.8 0.5 0.3MINOS 1 1 1 1 1SNO 0 0.9 0.8 0.5 0.3ZEUS 1 0.9 0.8 0.5 0.3Other Exp. 1 1 1 1 1PhenoGrid 0.3 0.3 0.3 0.3 0.3UKQCD 0.3 0.3 0.3 0.3 0.3Other Thr. 0.3 0.3 0.3 0.3 0.3Other 0.1 0.1 0.1 0.1 0.1
September
Shares Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape
ALICE 3 12 0 6 16 22 12 31 20 23 64 30 38 97 64ATLAS 36 237 0 112 339 177 283 462 493 553 960 690 1038 1588 949CMS 13 72 37 75 68 149 127 111 402 237 207 626 466 572 496LHCb 36 44 67 21 194 143 42 367 129 78 719 186 189 1173 82BaBar 68 187 117 78 280 156 90 260 48 95 264 24 106 246 23CDF 10 36 0 15 66 0 30 105 0 68 91 0 73 89 0D0 6 44 0 32 22 39 66 35 39 103 19 46 109 19 61H1 0 76 0 34 31 109 67 59 97 83 77 93 83 71 117MINOS 17 0 0 3 43 93 5 76 117 9 126 191 13 176 363SNO 0 0 0 13 15 10 25 27 9 31 36 9 33 35 11ZEUS 0 73 0 0 121 0 0 191 0 0 231 0 0 214 0Other Exp. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0PhenoGrid 0 6 0 0 11 0 1 19 0 1 37 0 2 58 0UKQCD 1 10 0 2 20 0 7 32 0 20 55 0 36 88 0Other Thr. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 191 796 221 392 1224 898 756 1777 1354 1301 2886 1895 2186 4426 2166
20082004 2005 2006 2007
M&O Authors 2004 2005 2006 2007 2008
ALICE 6 6 6 6 6ATLAS 109 113 113 113 113CMS 36 47 47 47 47LHCb 45 50 50 50 50BaBar 40 44 44 44 44CDF 20 20 20 20 20D0 20 20 20 20 20H1 26 26 26 26 26MINOS 13 13 13 13 13SNO 9 9 9 9 9ZEUS 25 25 25 25 25Other Exp. 0 0 0 0 0PhenoGrid 7 7 7 7 7UKQCD 15 15 15 15 15Other Th. 0 0 0 0 0Other 0 0 0 0 0
Table of “M&O Authors. Future information sketchy.To preserve unitarity ought to: be an FTE count to come from groups not experiments.
12/Jan/2005 Project Manager’s Report D. Britton
Tier-1 Hardware
Weights 2004 2005 2006 2007 2008
ALICE 1 1 1 1 1ATLAS 1 1 1 1 1CMS 1 1 1 1 1LHCb 1 1 1 1 1BaBar 3 2 1 0.5 0.3CDF 1 0.9 0.8 0.5 0.3D0 1 0.9 0.8 0.5 0.3H1 1 0.9 0.8 0.5 0.3MINOS 1 1 1 1 1SNO 0 0.9 0.8 0.5 0.3ZEUS 1 0.9 0.8 0.5 0.3Other Exp. 1 1 1 1 1PhenoGrid 0.3 0.3 0.3 0.3 0.3UKQCD 0.3 0.3 0.3 0.3 0.3Other Thr. 0.3 0.3 0.3 0.3 0.3Other 0.1 0.1 0.1 0.1 0.1
September
Shares Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape
ALICE 3 12 0 6 16 22 12 31 20 23 64 30 38 97 64ATLAS 36 237 0 112 339 177 283 462 493 553 960 690 1038 1588 949CMS 13 72 37 75 68 149 127 111 402 237 207 626 466 572 496LHCb 36 44 67 21 194 143 42 367 129 78 719 186 189 1173 82BaBar 68 187 117 78 280 156 90 260 48 95 264 24 106 246 23CDF 10 36 0 15 66 0 30 105 0 68 91 0 73 89 0D0 6 44 0 32 22 39 66 35 39 103 19 46 109 19 61H1 0 76 0 34 31 109 67 59 97 83 77 93 83 71 117MINOS 17 0 0 3 43 93 5 76 117 9 126 191 13 176 363SNO 0 0 0 13 15 10 25 27 9 31 36 9 33 35 11ZEUS 0 73 0 0 121 0 0 191 0 0 231 0 0 214 0Other Exp. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0PhenoGrid 0 6 0 0 11 0 1 19 0 1 37 0 2 58 0UKQCD 1 10 0 2 20 0 7 32 0 20 55 0 36 88 0Other Thr. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 191 796 221 392 1224 898 756 1777 1354 1301 2886 1895 2186 4426 2166
20082004 2005 2006 2007
M&O Authors 2004 2005 2006 2007 2008
ALICE 6 6 6 6 6ATLAS 109 113 113 113 113CMS 36 47 47 47 47LHCb 45 50 50 50 50BaBar 40 44 44 44 44CDF 20 20 20 20 20D0 20 20 20 20 20H1 26 26 26 26 26MINOS 13 13 13 13 13SNO 9 9 9 9 9ZEUS 25 25 25 25 25Other Exp. 0 0 0 0 0PhenoGrid 7 7 7 7 7UKQCD 15 15 15 15 15Other Th. 0 0 0 0 0Other 0 0 0 0 0
Input
Splits Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape
ALICE 33% 67% 0% 36% 49% 15% 33% 55% 12% 28% 57% 15% 25% 57% 18%ATLAS 25% 75% 0% 38% 56% 6% 42% 43% 15% 36% 46% 18% 36% 49% 15%CMS 28% 69% 3% 60% 27% 13% 45% 25% 30% 37% 24% 39% 39% 43% 18%LHCb 62% 34% 5% 16% 72% 12% 14% 77% 9% 12% 78% 11% 15% 82% 3%BaBar 43% 54% 3% 34% 59% 7% 34% 62% 4% 32% 65% 3% 31% 65% 3%CDF 39% 61% 0% 32% 68% 0% 31% 69% 0% 51% 49% 0% 48% 52% 0%D0 23% 77% 0% 68% 23% 9% 69% 23% 8% 76% 10% 13% 71% 11% 18%H1 0% 100% 0% 56% 25% 19% 54% 30% 16% 47% 32% 21% 42% 32% 26%MINOS 100% 0% 0% 9% 62% 30% 7% 61% 32% 5% 52% 43% 4% 47% 49%SNO 60% 40% 0% 61% 34% 5% 57% 39% 4% 51% 43% 6% 48% 45% 7%ZEUS 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0%Other Exp. 75% 25% 0% 69% 31% 0% 65% 35% 0% 60% 40% 0% 57% 43% 0%PhenoGrid 6% 94% 0% 5% 95% 0% 5% 95% 0% 4% 96% 0% 3% 97% 0%UKQCD 23% 77% 0% 18% 82% 0% 25% 75% 0% 34% 66% 0% 31% 69% 0%Other Thr. 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%Other 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
2006 2007 20082004 2005
Table of “Splits”: CPU/Disk/Tape ratio.Future information is sketchy.
12/Jan/2005 Project Manager’s Report D. Britton
Tier-1 Hardware
Input
Splits Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape
ALICE 33% 67% 0% 36% 49% 15% 33% 55% 12% 28% 57% 15% 25% 57% 18%ATLAS 25% 75% 0% 38% 56% 6% 42% 43% 15% 36% 46% 18% 36% 49% 15%CMS 28% 69% 3% 60% 27% 13% 45% 25% 30% 37% 24% 39% 39% 43% 18%LHCb 62% 34% 5% 16% 72% 12% 14% 77% 9% 12% 78% 11% 15% 82% 3%BaBar 43% 54% 3% 34% 59% 7% 34% 62% 4% 32% 65% 3% 31% 65% 3%CDF 39% 61% 0% 32% 68% 0% 31% 69% 0% 51% 49% 0% 48% 52% 0%D0 23% 77% 0% 68% 23% 9% 69% 23% 8% 76% 10% 13% 71% 11% 18%H1 0% 100% 0% 56% 25% 19% 54% 30% 16% 47% 32% 21% 42% 32% 26%MINOS 100% 0% 0% 9% 62% 30% 7% 61% 32% 5% 52% 43% 4% 47% 49%SNO 60% 40% 0% 61% 34% 5% 57% 39% 4% 51% 43% 6% 48% 45% 7%ZEUS 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0%Other Exp. 75% 25% 0% 69% 31% 0% 65% 35% 0% 60% 40% 0% 57% 43% 0%PhenoGrid 6% 94% 0% 5% 95% 0% 5% 95% 0% 4% 96% 0% 3% 97% 0%UKQCD 23% 77% 0% 18% 82% 0% 25% 75% 0% 34% 66% 0% 31% 69% 0%Other Thr. 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%Other 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
2006 2007 20082004 2005
September
Shares Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape
ALICE 3 12 0 6 16 22 12 31 20 23 64 30 38 97 64ATLAS 36 237 0 112 339 177 283 462 493 553 960 690 1038 1588 949CMS 13 72 37 75 68 149 127 111 402 237 207 626 466 572 496LHCb 36 44 67 21 194 143 42 367 129 78 719 186 189 1173 82BaBar 68 187 117 78 280 156 90 260 48 95 264 24 106 246 23CDF 10 36 0 15 66 0 30 105 0 68 91 0 73 89 0D0 6 44 0 32 22 39 66 35 39 103 19 46 109 19 61H1 0 76 0 34 31 109 67 59 97 83 77 93 83 71 117MINOS 17 0 0 3 43 93 5 76 117 9 126 191 13 176 363SNO 0 0 0 13 15 10 25 27 9 31 36 9 33 35 11ZEUS 0 73 0 0 121 0 0 191 0 0 231 0 0 214 0Other Exp. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0PhenoGrid 0 6 0 0 11 0 1 19 0 1 37 0 2 58 0UKQCD 1 10 0 2 20 0 7 32 0 20 55 0 36 88 0Other Thr. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 191 796 221 392 1224 898 756 1777 1354 1301 2886 1895 2186 4426 2166
20082004 2005 2006 2007
M&O Authors 2004 2005 2006 2007 2008
ALICE 6 6 6 6 6ATLAS 109 113 113 113 113CMS 36 47 47 47 47LHCb 45 50 50 50 50BaBar 40 44 44 44 44CDF 20 20 20 20 20D0 20 20 20 20 20H1 26 26 26 26 26MINOS 13 13 13 13 13SNO 9 9 9 9 9ZEUS 25 25 25 25 25Other Exp. 0 0 0 0 0PhenoGrid 7 7 7 7 7UKQCD 15 15 15 15 15Other Th. 0 0 0 0 0Other 0 0 0 0 0
Weights 2004 2005 2006 2007 2008
ALICE 1 1 1 1 1ATLAS 1 1 1 1 1CMS 1 1 1 1 1LHCb 1 1 1 1 1BaBar 3 2 1 0.5 0.3CDF 1 0.9 0.8 0.5 0.3D0 1 0.9 0.8 0.5 0.3H1 1 0.9 0.8 0.5 0.3MINOS 1 1 1 1 1SNO 0 0.9 0.8 0.5 0.3ZEUS 1 0.9 0.8 0.5 0.3Other Exp. 1 1 1 1 1PhenoGrid 0.3 0.3 0.3 0.3 0.3UKQCD 0.3 0.3 0.3 0.3 0.3Other Thr. 0.3 0.3 0.3 0.3 0.3Other 0.1 0.1 0.1 0.1 0.1
Table of “Strategic Weights.”
Movement of M&O authors. Future stategic importance. Other factors?
Clearly controversial…… requesting input.
12/Jan/2005 Project Manager’s Report D. Britton
Tier-1 Hardware
Input
Splits Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape
ALICE 33% 67% 0% 36% 49% 15% 33% 55% 12% 28% 57% 15% 25% 57% 18%ATLAS 25% 75% 0% 38% 56% 6% 42% 43% 15% 36% 46% 18% 36% 49% 15%CMS 28% 69% 3% 60% 27% 13% 45% 25% 30% 37% 24% 39% 39% 43% 18%LHCb 62% 34% 5% 16% 72% 12% 14% 77% 9% 12% 78% 11% 15% 82% 3%BaBar 43% 54% 3% 34% 59% 7% 34% 62% 4% 32% 65% 3% 31% 65% 3%CDF 39% 61% 0% 32% 68% 0% 31% 69% 0% 51% 49% 0% 48% 52% 0%D0 23% 77% 0% 68% 23% 9% 69% 23% 8% 76% 10% 13% 71% 11% 18%H1 0% 100% 0% 56% 25% 19% 54% 30% 16% 47% 32% 21% 42% 32% 26%MINOS 100% 0% 0% 9% 62% 30% 7% 61% 32% 5% 52% 43% 4% 47% 49%SNO 60% 40% 0% 61% 34% 5% 57% 39% 4% 51% 43% 6% 48% 45% 7%ZEUS 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0% 0% 100% 0%Other Exp. 75% 25% 0% 69% 31% 0% 65% 35% 0% 60% 40% 0% 57% 43% 0%PhenoGrid 6% 94% 0% 5% 95% 0% 5% 95% 0% 4% 96% 0% 3% 97% 0%UKQCD 23% 77% 0% 18% 82% 0% 25% 75% 0% 34% 66% 0% 31% 69% 0%Other Thr. 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%Other 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
2006 2007 20082004 2005
Weights 2004 2005 2006 2007 2008
ALICE 1 1 1 1 1ATLAS 1 1 1 1 1CMS 1 1 1 1 1LHCb 1 1 1 1 1BaBar 3 2 1 0.5 0.3CDF 1 0.9 0.8 0.5 0.3D0 1 0.9 0.8 0.5 0.3H1 1 0.9 0.8 0.5 0.3MINOS 1 1 1 1 1SNO 0 0.9 0.8 0.5 0.3ZEUS 1 0.9 0.8 0.5 0.3Other Exp. 1 1 1 1 1PhenoGrid 0.3 0.3 0.3 0.3 0.3UKQCD 0.3 0.3 0.3 0.3 0.3Other Thr. 0.3 0.3 0.3 0.3 0.3Other 0.1 0.1 0.1 0.1 0.1
M&O Authors 2004 2005 2006 2007 2008
ALICE 6 6 6 6 6ATLAS 109 113 113 113 113CMS 36 47 47 47 47LHCb 45 50 50 50 50BaBar 40 44 44 44 44CDF 20 20 20 20 20D0 20 20 20 20 20H1 26 26 26 26 26MINOS 13 13 13 13 13SNO 9 9 9 9 9ZEUS 25 25 25 25 25Other Exp. 0 0 0 0 0PhenoGrid 7 7 7 7 7UKQCD 15 15 15 15 15Other Th. 0 0 0 0 0Other 0 0 0 0 0
September
Shares Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape Disk CPU Tape
ALICE 3 12 0 6 16 22 12 31 20 23 64 30 38 97 64ATLAS 36 237 0 112 339 177 283 462 493 553 960 690 1038 1588 949CMS 13 72 37 75 68 149 127 111 402 237 207 626 466 572 496LHCb 36 44 67 21 194 143 42 367 129 78 719 186 189 1173 82BaBar 68 187 117 78 280 156 90 260 48 95 264 24 106 246 23CDF 10 36 0 15 66 0 30 105 0 68 91 0 73 89 0D0 6 44 0 32 22 39 66 35 39 103 19 46 109 19 61H1 0 76 0 34 31 109 67 59 97 83 77 93 83 71 117MINOS 17 0 0 3 43 93 5 76 117 9 126 191 13 176 363SNO 0 0 0 13 15 10 25 27 9 31 36 9 33 35 11ZEUS 0 73 0 0 121 0 0 191 0 0 231 0 0 214 0Other Exp. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0PhenoGrid 0 6 0 0 11 0 1 19 0 1 37 0 2 58 0UKQCD 1 10 0 2 20 0 7 32 0 20 55 0 36 88 0Other Thr. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 191 796 221 392 1224 898 756 1777 1354 1301 2886 1895 2186 4426 2166
20082004 2005 2006 2007
Output – guidelines for the User Board withinwhich to perform actual allocation.Output – guidelines within which international MOU’s can be discussed.Note current lack of information on absolute scale.
12/Jan/2005 Project Manager’s Report D. Britton
Tier-1 Hardware
We would like the CB’s input to this Hardware allocation process.
A breakdown from each institute of estimated M&O FTE/experiment for 2005 to 2008 would significantly reduce the current influence of the “strategic weights”.
Ideally, we would like the blessing of the CB for this approach and then, with some added assessment of the actual scale of the hardware, present to PPARC for consideration in the context of both the international MOU’s (BaBar, LHC, etc) and for post-GridPP planning.