D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

11
LCTPC WP Phone Meeting #71 – 26.11.2008 Micromegas module 1 D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin, M. Riallot, F. Senée, Y-H Shin, S. Turnbull, R. Yonamine (Carleton, KEK, Saclay) LCTPC WP Phone Meeting #71, 26 November 2008 Status of Micromegas Status of Micromegas module(s) data taking module(s) data taking • Large Prototype TPC • Cosmic ray data • First beam events • Schedule

description

Status of Micromegas module(s) data taking. D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin, M. Riallot, F. Senée, Y-H Shin, S. Turnbull, R. Yonamine (Carleton, KEK, Saclay) LCTPC WP Phone Meeting #71, 26 November 2008. Large Prototype TPC Cosmic ray data - PowerPoint PPT Presentation

Transcript of D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

Page 1: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 1

D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,M. Riallot, F. Senée, Y-H Shin, S. Turnbull, R. Yonamine

(Carleton, KEK, Saclay)

LCTPC WP Phone Meeting #71, 26 November 2008

Status of Micromegas Status of Micromegas module(s) data takingmodule(s) data taking

• Large Prototype TPC

• Cosmic ray data

• First beam events

• Schedule

Page 2: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 2

Large Prototype TPC

Optical fiber

Page 3: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 3

Beam trigger

Page 4: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 4

Cosmic ray data

• Vmesh = - 360 V = Vanode

• Vcathode ~ - 12 740 V, Icathode ~ 61 μA

• Gas monitoring (flow, overpressure, 02, H20)

• 02~ 40 ppm, H20 ~ 20 ppm

• Rate ~ 0.7 Hz using the 3 triggers

• Different shaping ( 100 ns < peaking time < 2 μs)

• ~ 400 000 events

Page 5: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 5

Last night cosmic ray data

• Peaking time : 1 μs• Time bin : 40 ns

• Gas mixture : Ar/CF4/Iso (95:3:2)

Page 6: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 6

Last night cosmic ray data

Peaking time:

1 μs

Page 7: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 7

Last night cosmic ray data

Peaking time:

200 ns

Page 8: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 8

First beam events

• Peaking time : 1 μs Ee- = 5 GeV

• Time bin : 40 ns

• Gas mixture : Ar/CF4/Iso (95:3:2)

Page 9: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 9

First beam events

0

50

100

150

200

250

300

0 1 2 3 4 5 6

p (GeV)

Rat

e (H

z)

Page 10: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 10

TPC position for beam test

~7.7°

Page 11: D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

LCTPC WP Phone Meeting #71 – 26.11.2008

Micromegas module 11

Schedule

• Beam available at 5:30 pm (night shift?)

• Tomorrow (afternoon), replace the standard Micromegas module to resistive Micromegas Module (~ 3h)

• As soon as possible, mount the safety valve and start to cool the PCMAG

• First beam tests with the magnet at B = 0T and then B = 1T should be possible beginning of next week

• Software analysis will continue with the help of Yun Ha Shin (Carleton)