Cypark Brochure
-
Upload
matsuda-hagiwara -
Category
Documents
-
view
217 -
download
0
Transcript of Cypark Brochure
8/19/2019 Cypark Brochure
http://slidepdf.com/reader/full/cypark-brochure 1/6
CREATING SUSTAINABLE
ENERGY FUTURE
RENEWABLE ENERGY PARK
RIMBA TERJUN, JOHOR
RENEWABLE ENERGY PARK
KUALA PERLIS, PERLIS
INTEGRATED RENEWABLE ENERGY PARK
BUKIT PALONG, NEGERI SEMBILAN
INTEGRATEDINTEGRATED RENEWABLE ENERGY PARK
PAJAM, NEGERI SEMBILAN
1
8/19/2019 Cypark Brochure
http://slidepdf.com/reader/full/cypark-brochure 2/6
PRE-CLOSURE
POST-CLOSURE ECONOMIC TRANSFORMATION
Transforming dump sites, an environmental bane to an economic and environmental boon is the raison
d’etre of our business. The crit ical goal of landfill remediation is to protect human health and the environment
by eliminating airborne vectors, contaminat ion of land and water, air pollution and a host of other problems
caused by open dumping. The ult imate aim is to return land back to the communit y in a form that will benefit
the environment and the community.
As an environmental technology and engineering specialist, Cypark combines technologies andengineering proficiency, with high-end research and development, to develop systems specifically for
restoring brownfields like the Contaminated Land Assessment Remediation and Information System
(COLARIS), Sustainable Environmental Restoration (SER) and Groundwater Assessment Remediation and
Information System (GARIS).
We have taken our business a step further by venturing into the renewable energy sector. We have
transformed the restored landfill in Pajam, Negeri Sembilan into an integrated renewable energy park,
an Entry Point Project under the nation’s Economic Transformation Programme. Such a project unlocks the
economic potential of landfills, employing landfill by-products like biomass and biogas as well as sunlight
to create renewable energy, which will undoubtedly help meet the countr y’s growing demand for energy.
Leveraging the synergy from restoring landfil ls to the creation of renewal energy has placed Cypark at the
forefront of sustainable development and green energy generation. We are proud to note that the Pajam
Solar Park has been awarded by the Malaysian Book of Records as the largest grid connected solar park in
Malaysia.
At Cypark, we recognise that a balanced enduring
approach is needed to ensure sustainability in
economic activity, environmental responsibility and
social progress. Our commitment to sustainable
development is evidenced by what we do. We help
to preserve our environment, preventing further
degradation to land, water and air with a strong
aspiration to help create a sustainable, healthy and
economically stable environment for our children
and future generations.
INTEGRATED RENEWABLEENERGY PARKBUKIT PALONG, NEGERISEMBILAN
ENVIRONMENTALTRANSFORMATION
2
8/19/2019 Cypark Brochure
http://slidepdf.com/reader/full/cypark-brochure 3/6
Engineering, Procurement, Construction (EPC)solar plant contract is a complex undertakingthat involves various agencies and many integralcomponents.
As owner, developer and power producer ofMalaysia’s first and largest grid-connectedIntegrated Renewable Energy Park (IREP),Cypark is now pleased to offer our EPC servicesto organisations looking to develop sustainableenergy generation.
Cypark far outshines other solar plant EPCcontractors for one simple fact --- Cypark hasproven its capabili ty, efficiency and effectivenessthrough the timely completion and launch ofMalaysia’s first fully operational 8 MW solar park
(first phase) in Pajam, Negeri Sembilan, Malaysia.Backed by robust technical experience andvast network of contacts, Cypark’s totalsolution, one-stop EPC service encompassesan integrated conception-to-maintenancecycle of a solar farm. From viability studiesand project development, to financing and
obtaining the necessary administrative permits,to engineering, procurement, construction,testing, commissioning, monitoring, operationsand maintenance -- Cypark does it all.
Through a team of young and energeticskilled professionals, with a strong sense ofteamwork, and a clear commitment towardsgreen sustainable energy, Cypark is able to offersolutions that are reliable, cost effective andsustainable for our clients; providing client withsimple EPC contract where there is:
o Complete Scope of Work
o Minimum Owner Effort
o One Point of Contact (Simple, Uncomplicated
to Monitor and Coordinate)
o Straight-Forward Post-Commissioning Serviceso Quality Assurance
o Investment Figure Known from Inception
o Project Duration and Expectat ions
o Quali ty Products and Workmanship
o Cost and ROI Projections
Our Services
INTEGRATED RENEWABLE ENERGY PARKPAJAM, NEGERI SEMBILAN
Integrated Renewable Energy Parks
ECONOMIC TRANSFORMATION
PRE-CLOSURE POST-CLOSURE
ENVIRONMENTAL TRANSFORMATION
3
8/19/2019 Cypark Brochure
http://slidepdf.com/reader/full/cypark-brochure 4/6
COLARIS
An internally developed comprehensive remediation
and treatment system that provides assessment and
remediation service related to contaminat ions that arise
from mining, industrial, as well as landfill and dumpsite
activi ties. It can be divided into two components: -
s Contaminated Land Site Assessment
Conducted to determine the condition of the site and its
surroundings before any remediation activities can be
designed and implemented, this process involves preliminar y
assessment as well protrusive assessment which requires
development of monitoring wells, soil investigations,
monitoring works, lab test and so for th.
s Remediation
Cypark’s remediation services could be divided into
three components
o on-site remediation (in situ zone remediation,containment, protection, pathway prediction and
fate of offsite receptors)
o off-site remediation (zone remediation, containment
and protection)
o special collection and disposal services (on-site
and off-site soil treatment).
Environmental Remediation
Environmental remediation is a complex, scientific,
engineering rehabilitation process that not only
brings about environmental but also economic
transformation. Through our extensive environmental
engineering expertise and experience, coupled
with a broad spectrum of innovative technologies,degraded contaminated areas such as unsightly
and hazardous dump sites would be restored and
transformed into green lungs with economic and
social value.
Environmental Management & Monitoring
Services
Once a contaminated land or environmental
facility project has been completed, the site must
undergo systematic management and monitoring.
Environmental management is a key process
requirement to ensure that completed works are
maintained and not damaged either by external
elements or due to natural occurrences such as land
settlement. Continuous periodic monitoring of water,
air and soil quality within or surrounding the project
boundary of a project is essential. Information
collected over a period of time, through Cypark’s
environmental management and monitoring services
could be used to assess the trends of contamination
levels and alert relevant parties.
PRE-CLOSURE
POST-CLOSURE
ECONOMIC TRANSFORMATION
RENEWABLE ENERGY PARKRIMBA TERJUN, JOHOR
ENVIRONMENTAL TRANSFORMATION
4
8/19/2019 Cypark Brochure
http://slidepdf.com/reader/full/cypark-brochure 5/6
Integrated Waste Management
(incorporating Waste-to-Energy plant)
Environmentally unfriendly waste management
practices have been attributed globally as one of the
major causes of pollution. Urbanisation and population
growth have made proper waste management to
be very critical to ensure the sustainability of our
environment.
Cypark has the experience, expertise and resources
to facilitate government initiatives in implementing
sustainable integrated waste management facility that
encompasses the following areas:-
o Transfer Station
o Collection and Disposal
o Waste Receiving Facility (WRF)
o Waste Segregation Facility (WSF) with material
recovery/recycling facilityo Fuel Derivation Facility which includes Fully
Anaerobic Bioreactor System (FABIOS) Plant and
Refused-Derived Fuel (RDF)Plant
o Power Generation Facility which includes Biogas
Power Plant and Waste-to-Energy Plant
o Sanitary Landfill for commingled, inert solid waste
and processed waste residuals
o Environmental Treatment Systems including
Leachate Treatment Facility and Passive Landfill
Gas Venting System
o Salvaging Yard for combustible solid
waste and recyclable
o Administration and Support Facilities
o Operations & Maintenance of Waste
Facility Infrastructural and
Ancillary Works
Waste Water Treatment
ECONOMIC TRANSFORMATION
PRE-CLOSURE POST-CLOSURERENEWABLE ENERGY PARKKUALA PERLIS, PERLIS
ENVIRONMENTAL TRANSFORMATION
Developed to support landfill owners manage the leachate
associated with landfill and dumpsites, Cypark’s Leachate
Treatment Plant (LTP) can be divided into two
o On-site Leachate Treatment Plant
A large scale comprehensive leachate management system
designed and developed as a long term solution for either anew sanitary or a closed landfill.
o Mobile Leachate Treatment Plant (MLTP).
Typically used in cases where site size is restricted and the
volume of leachate is not large, this facility allows leachate
treatment process to continue to be part of an integral
component of any waste management facili ty. MLTP could also
be deployed as an emergency response treatment system, for
both planned or unplanned plant shutdown.
Ground Water Assessment, Remediation, And
Information System (GARIS)
An in-house developed process in which detailed assessmentand testing are carried out on the impact of pollution to thegroundwater system. Remediation work would be implementedbased on design developed using the assessment. Uponcompletion, continuous monitoring work and relevant informationsystem would be carried out and managed for referencerespectively.
GARIS would provide critical environmental assessment andmitigation process to help protect groundwater resource from
contamination.
5
8/19/2019 Cypark Brochure
http://slidepdf.com/reader/full/cypark-brochure 6/6
Contact Information
Cypark endeavours to build customer loyalty by doingwhat we say we will do every time and on time. We
believe the satisfaction of our customers is the best
measure of our success.
For more information on our services, please contact
us at:
Cypark Resources Berhad
13A-09 Block A, Phileo Damansara II
No. 15 Jalan 16/11,
46350 Petaling Jaya Selangor,
Malaysia.
Tel: +6 03 7660 6170 Fax: +6 03 7660 6169
Email:
o General Information: info@ crbenv.com
o Investor Relations: [email protected]
o Media Contact: [email protected]
Website: www.crbenv.com
* Some of the fonts used is an ECO FONT, meaning less ink is used during printing.
Cypark Resources Berhad is a leading public listed
company on the Main Board of KLSE. Cypark specialises in
providing integrated renewable energy and environment
engineering services, focusing on
o integrated renewable energy generation (solar,
biogas, biomass, waste-to-energy)
o waste management
o environmental remediation (i.e. landfil l restoration)
o scientific closure and remediation of contaminated land
through internally developed technology (COLARIS)
o ground water assessment, remediation and informationsystem (GARIS)
o environmental monitoring and management, as well as
o wastewater treatment
Cypark : At a Glance
6