CYLINDER 5" B/3-1/2"R/15" STROKE 04761290-011-06/B

1
Product Lead Times Updated: 11/3/2014 Note: Lead Times are estimated shipping times from receipt of customer order and are shown in number of business days. Business days include normal factory operating days, typically Monday thru Friday and does not include weekends, holidays and other possible shut down days. These estimates are based on standard catalog product with typical order quantities. Special design products or large order quantities will require quoted lead times. For specific order details please contact your Inside Sales Coordinator at 502.969.8000. Valvetop 10 Business Days DXP/DXR 30 Business Days DXS 15 Business Days TVA ,TXP, TXS 10 Business Days LPS 20 Business Days 4310 Wireless GO Switch 10 Business Days 10-20 Series 15 Business Days 31 Series & 35 Series 10 Business Days 80 Series 10 Business Days 70 Series 10 Business Days 7G-7I Series (DPDT only) 10 Business Days Stroke-to-GO (probes in stock) 30 Business Days Stroke-to-GO (probes not in stock) 10 Business Days 7A Pneumatic Nuclear Consult Factory Mounting Kits 10 Business Days TopWorx VIP Brackets (standard) 35 Business Days TopWorx VIP Brackets (new design) Accessories 5 Business Days

description

CYLINDER 5" B/3-1/2"R/15" STROKE 04761290-011-06/B

Transcript of CYLINDER 5" B/3-1/2"R/15" STROKE 04761290-011-06/B

Page 1: CYLINDER 5" B/3-1/2"R/15" STROKE 04761290-011-06/B

Product Lead Times Updated: 11/3/2014

Note: Lead Times are estimated shipping times from receipt of customer order and are shown in number of business days. Business days

include normal factory operating days, typically Monday thru Friday and does not include weekends, holidays and other possible shut down

days. These estimates are based on standard catalog product with typical order quantities. Special design products or large order quantities

will require quoted lead times. For specific order details please contact your Inside Sales Coordinator at 502.969.8000.

Valvetop10 Business DaysDXP/DXR

30 Business DaysDXS

15 Business DaysTVA ,TXP, TXS

10 Business DaysLPS

20 Business Days4310 Wireless

GO Switch10 Business Days10-20 Series

15 Business Days31 Series & 35 Series

10 Business Days80 Series

10 Business Days70 Series

10 Business Days7G-7I Series (DPDT only)

10 Business DaysStroke-to-GO (probes in stock)

30 Business DaysStroke-to-GO (probes not in stock)

10 Business Days7A Pneumatic

NuclearConsult Factory

Mounting Kits10 Business DaysTopWorx VIP Brackets (standard)

35 Business DaysTopWorx VIP Brackets (new design)

Accessories5 Business Days