BILL OF QUANTITIES E/Cost = 4.904NAME OF WORK: E/Money = 0.098
Improvement/Rehabilation & Upgradation of 300 Km road in Khyber PakhtunKhawa ADP356/130574/2013-14
Sub Head:-PCC Road Poland Union Council Malak Pur
(A) EARTH WORK
S.No Description QuantityUnit Rates offered by Contractor/Firms Amount (Rs)
In Figures In Words
1Earth excavation in irrigation channels/drains & disposal
upto 25m. & dressing : in Hard Soil 499.60 M3
2Excavation in shingle or gravel formation & rock not
requiring blast, undressed, 50m lead : Dry 749.40 M3
4Formation of Embankment from Roadway Excavation inCommon Material including compaction by power roller. 180.00 M3
Total(B) STRUCTURE WORKS.No Description Quantity Unit
1Excavation in foundation of building, bridges etc complete
: in shingle/gravel132.72 M3
2Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth
(Ratio 1:4:8)29.13 M3
3 Random rubble masonry in foundn. & plinth Dry masonry. 39.13 M3
4Random rubble masonry in foundn. & plinth in cement,
sand mortar : Ratio 1:613.05 M3
5PCC 1:3:6 in mass concrete less formwork using 50%
boulders80.04 M3
6Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth
(Ratio 1:3:6)18.92 M3
7Structural backfill using Common Material available at
site.71.19 M3
8Plain Cement Concrete including placing, compacting,
finishing & curing (Ratio 1:3:6)38.50 M3
9Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia:
610mm14.00 RM
Total(C) ROAD WORKS.No Description Quantity Unit
1Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:4:8)
238.50 M3
2 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:4)
357.75 M3
Grand Total
Total Amount in Words
SINGATURE OF CONTRACTOR SUB ENGINEER
SUB DIVISIONAL OFFICER HIGH WAY DIVISIONAL HEAD DRAFTSMAN BUNER