BILL OF QUANTITIES E/Cost = 4.904 NAME OF WORK: E/Money = 0.098 Improvement/Rehabilation & Upgradation of 300 Km road in Khyber PakhtunKhawa ADP 356/130574/2013 -14 Sub Head:- PCC Road Poland Union Council Malak Pur (A) EARTH WORK S.N Descripti Quantit Unit Rates offered by Amount In In Words 1 Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in Hard Soil 499.60 M3 2 Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m lead : Dry 749.40 M3 4 Formation of Embankment from Roadway Excavation in Common Material including compaction by 180.00 M3 Total (B) STRUCTURE WORK S.No Descripti Quantit Unit 1 Excavation in foundation of building, bridges etc complete : in 132.72 M3 2 Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:4:8) 29.13 M3 3 Random rubble masonry in foundn. & plinth Dry masonry. 39.13 M3 4 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:6 13.05 M3 5 PCC 1:3:6 in mass concrete less formwork using 50% 80.04 M3 6 Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:3:6) 18.92 M3 7 Structural backfill using Common Material available at 71.19 M3 8 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:6) 38.50 M3 9 Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 610mm 14.00 RM Total (C) ROAD WORK S.No Descripti Quantit Unit 1 Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:4:8) 238.50 M3 2 Plain Cement Concrete including placing, compacting, finishing & 357.75 M3 Grand Total Total Amount in Words SINGATURE OF CONTRACTOR SUB ENGINEER SUB DIVISIONAL OFFICER HIGH WAY DIVISIONAL HEAD DRAFTSMAN BUNER

description

boq

Transcript of C&W

Page 1: C&W

BILL OF QUANTITIES E/Cost = 4.904NAME OF WORK: E/Money = 0.098

Improvement/Rehabilation & Upgradation of 300 Km road in Khyber PakhtunKhawa ADP356/130574/2013-14

Sub Head:-PCC Road Poland Union Council Malak Pur

(A) EARTH WORK

S.No Description QuantityUnit Rates offered by Contractor/Firms Amount (Rs)

In Figures In Words

1Earth excavation in irrigation channels/drains & disposal

upto 25m. & dressing : in Hard Soil 499.60 M3

2Excavation in shingle or gravel formation & rock not

requiring blast, undressed, 50m lead : Dry 749.40 M3

4Formation of Embankment from Roadway Excavation inCommon Material including compaction by power roller. 180.00 M3

Total(B) STRUCTURE WORKS.No Description Quantity Unit

1Excavation in foundation of building, bridges etc complete

: in shingle/gravel132.72 M3

2Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth

(Ratio 1:4:8)29.13 M3

3 Random rubble masonry in foundn. & plinth Dry masonry. 39.13 M3

4Random rubble masonry in foundn. & plinth in cement,

sand mortar : Ratio 1:613.05 M3

5PCC 1:3:6 in mass concrete less formwork using 50%

boulders80.04 M3

6Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth

(Ratio 1:3:6)18.92 M3

7Structural backfill using Common Material available at

site.71.19 M3

8Plain Cement Concrete including placing, compacting,

finishing & curing (Ratio 1:3:6)38.50 M3

9Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia:

610mm14.00 RM

Total(C) ROAD WORKS.No Description Quantity Unit

1Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:4:8)

238.50 M3

2 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:4)

357.75 M3

Grand Total

Total Amount in Words

SINGATURE OF CONTRACTOR SUB ENGINEER

SUB DIVISIONAL OFFICER HIGH WAY DIVISIONAL HEAD DRAFTSMAN BUNER