EDWIN S. FERNANDO Blk 226, Lorong 8 Toa Payoh #11-112 Singapore 310226 Email address: [email protected] [email protected] Telephone Number: +6590694296 (Singapore) Bachelor of Science in Mechanical Engineering – Northwestern University, Philippines Registered Mechanical Engineer/Board Passer- Professional Regulation Commission, Philippines Permanent Resident Status – Singapore SUMMARY OF EXPERIENCE: Twenty (20) years of experience in Pre-FEED, FEED, Detail Engineering & Design, Construction, Revamp and Turn-arounds of LNG Plants, Oil and Gas Industry, Petrochemical Plant, Pharmaceutical, Power and Offshore Facility. Lead and manage piping engineering and design activities, conduct planning, coordination, review ITB, basis of design, execution plan and prepare man-hour estimates, control quality, establish/update document control list, prepare weekly status report and attend Hazop review. Lead office representative overseeing piping design and engineering activities, planning and scheduling, coordination, technical advisor, reviewing stress result and make recommendations, approval and quality assurance of all piping engineering drawings and review/approve all Potential change notice. Organize and manage construction site piping operations. coordinate and solve site related technical matters and request for information, review and approve design changes, test package preparation and review, line checking, as built drawings, Turn-arounds/Revamps, system walk thru and turn over. Good working knowledge in piping engineering and installation practices including application of Industrial Practices (i.e. ASME, API, ANSI, NFPA, Aramco Standards, Japanese Standards) Extensive knowledge in P&ID’s, Equipment Lay-out and nozzle orientation, Plot Plans, Piping Plans and details, Isometric, Pipe support design, Material take offs. Check and approval of design drawings in conformance with project specifications, design parameters, codes and industry practices. Squad check P & ID’s and Data Sheets. Review vendor data/drawings. Review project specifications and standards, technical practices and Design Instructions.

Transcript of CV_Edwin_Fernando_lead piping design

Page 1: CV_Edwin_Fernando_lead piping design

EDWIN S. FERNANDOBlk 226, Lorong 8 Toa Payoh #11-112Singapore 310226Email address: [email protected]

[email protected] Telephone Number: +6590694296 (Singapore)Bachelor of Science in Mechanical Engineering – Northwestern University, PhilippinesRegistered Mechanical Engineer/Board Passer- Professional Regulation Commission,

PhilippinesPermanent Resident Status – Singapore

SUMMARY OF EXPERIENCE: Twenty (20) years of experience in Pre-FEED, FEED, Detail Engineering & Design, Construction,

Revamp and Turn-arounds of LNG Plants, Oil and Gas Industry, Petrochemical Plant, Pharmaceutical, Power and Offshore Facility.

Lead and manage piping engineering and design activities, conduct planning, coordination, review ITB, basis of design, execution plan and prepare man-hour estimates, control quality, establish/update document control list, prepare weekly status report and attend Hazop review.

Lead office representative overseeing piping design and engineering activities, planning and scheduling, coordination, technical advisor, reviewing stress result and make recommendations, approval and quality assurance of all piping engineering drawings and review/approve all Potential change notice.

Organize and manage construction site piping operations. coordinate and solve site related technical matters and request for information, review and approve design changes, test package preparation and review, line checking, as built drawings, Turn-arounds/Revamps, system walk thru and turn over.

Good working knowledge in piping engineering and installation practices including application of Industrial Practices (i.e. ASME, API, ANSI, NFPA, Aramco Standards, Japanese Standards)

Extensive knowledge in P&ID’s, Equipment Lay-out and nozzle orientation, Plot Plans, Piping Plans and details, Isometric, Pipe support design, Material take offs.

Check and approval of design drawings in conformance with project specifications, design parameters, codes and industry practices. Squad check P & ID’s and Data Sheets. Review vendor data/drawings.

Review project specifications and standards, technical practices and Design Instructions. Well-versed in the operation of 2D/3D cad system using PDS Intergraph, PDMS, SP3D, Bentley

AutoPlant system, Smart Plant Review, Microstation, AutoCadd, I-P&ID as well as MS office.

SOFTWARE PROFICIENCY :PDS – Intergraph 10 years

PDMS 3 year

SP3D 1 year

SmartPlant Review 16 years

AutoPlant Design System 2 years

Intelligent P&ID 1 year

Microstation 95/SE/J 10 years

Autocadd R12, R13, R14, 2000 10 years

Autoplant Designer (Rebis R12, R13) 2 years

Autoplant Isometric (Rebis R12, R13) 2 years

Autoplant Drawpipe (Rebis R12, R13) 2 years

Microsoft Word and Excel 20 years

Page 2: CV_Edwin_Fernando_lead piping design

WORK EXPERIENCE:

SENIOR PIPING DESIGNER II July 15, 2013 – July 5, 2016CB&I SINGAPORE Pte. Ltd. 3A International Business Park, #12-01/05 ICON@IBPSingapore 609935Project: Longford Gas Conditioning Plant (GCP1-Project) - EPCM

Longford, AustraliaQCLNG PHASE II- Charlie Field Compression station. - FEEDQueensland, AustraliaCameron LNG – Hackberry, Louisiana USA. - EPCM

a. Cameron LNG (Train 1 – 3 ) Project

Job Description: Lead office representative as piping coordinator at support office overseeing piping design and

engineering activities, planning and scheduling, coordination, approval and quality assurance of all piping engineering drawings.

Technical advisor, solving request for information and design issues, coordination to other disciplines, reviewing stress result and make recommendations with minimal cost, and review/approval of all potential change notice.

Monitoring progress, planning and scheduling of piping activities and mitigate issues to meet planned schedule.

b. Longford Gas Conditioning Plant (GCP1-Project)

Job Description: Check and approve overall plot plan, Equipment location plan, Piping Plans and Piping isometric

drawings. Check equipment vendor drawings, nozzle orientation, platform and ladder details for vertical vessels,

monitor vendor status making sure it is fully aligned with schedule. Attend coordination meeting and site inspection of all vessels and towers at vendor fabrication site. Check module drawings, civil foundations and pipe supports including steel support for equipment. Squad check and red line all other discipline drawings. Check 3D model of equipment and piping isometrics using PDMS and Navizworks make sure that it is

updated as per latest vendor drawings. Performs piping detailed design, pipe support design and 3d modeling of Piping, Pipe Supports and

Equipment, Isometric extraction using PDMS modules. Supercheck P&ID and yellow off ensuring issued isometrics are fully aligned with the latest P&ID

revision. Responsible for follow-on design matters, technical construction support for all site queries.

b. QCLNG PHASE II- Charlie Field Compression station. Job Description:

Develop a high level of construction strategy thru modularization to support constructability and minimize cost.

c. Santos Sole_Orbost Gas Plant Bid Job Description:

Review ITB, project specifications and prepare deliverable list and man-hour estimate for Piping Design and engineering in execution of FEED Phase of the project.

Develop work procedure and Piping design and engineering execution methodology.

Page 3: CV_Edwin_Fernando_lead piping design

SENIOR DESIGNER /LEAD , PIPING March 1, 2011 – July 12, 2013WorleyParsons Resources and Energy Pte. Ltd. 111 Somerset Road, #12-05 TripleOne SomersetSingapore 238164Project: Singapor LNG Plant Phase 3 (FEED), Singapore

BASF Chemicals (EPCM), Jurong Singapore.Black Point Gas Supply Project (EPCM), Castle Peak Power, HongkongClariant Depal Chemical Plant (FEED), Jurong, SingaporeTank store expansion project (FEED), Pulau Bukum, Singapore.

Job Description: Responsible for coordination and monitoring of engineering activities, review ITB and basis of design,

review project and client specifications, prepare man-hour estimate, manpower planning, scheduling and establish/update weekly status report and document control list.

Organize and manage piping design and engineering activities, monitor quality, suggest and plan design approach.

Check and approve all piping deliverables such as piping isometrics, piping standard drawings, pipe support drawings piping General Arrangement Drawings, key plans, equipment and foundation location plans ensuring that they are properly coordinated.

Review piping stress analysis result making recommendations to minimize loads with minimal cost. Prepare nozzle orientation, tie in location details and equipment location as per relevant codes and site

existing conditions. Performs piping layout and detail design, support details and location and 3D modeling using

(PDS/PDMS/SP3D) and 3D model review and design checking using Smart Plant Review. Performs squad check, coordination and prepare detailed information to other disciplines and ensuring all

the latest data are properly coordinated. Attend 3D model Review and Design Coordination with Client.

SENIOR PIPING FIELD ENGINEER April 2010- October 2010Hyundai Heavy Industries Project: Escravos Gas Plant expansion 3 (EGP3 project)Escravos, NigeriaJob Description:

Organize and manage construction site piping operations. Act as technical support, coordinate and solve site related technical matters and request for information

Review and approve all potential change notice. Review and approval of vendor data and drawings for needed materials and coordinates to vendors for the

schedule of delivery of materials. Check and approve isometric and construction drawings ensuring relevant standards are met and all data

are available as per construction standards and procedures. Manage and scrutinize As-built mark up drawings and data sheets ensuring all site modifications are

incorporated.

Page 4: CV_Edwin_Fernando_lead piping design

Piping Field Engineer April 2007- November 2009International Plant Services – 1602 Old Underwood Road, La Porte, Texas USAProject: Engineering/Routine Maintenance and Turn-Around GroupCitgo Petroleum CorporationLake Charles, Louisiana, USA 70601Job Description:

Work closely with planning and engineering to determine scope of work for executing piping design from fabrication to installation.

Gather all site information needed in preparation of piping detailed design and fabrication drawings for Turn-around, revamps and maintenance of various units.

Supervise construction, ensure that proper material and construction procedures are implemented. Verify and responsible for answering technical site queries as per project, site and relevant standards

requirements. Update of existing P & ID’s as per site modifications and Design.

Senior Piping Design Engineer September 2005- February 2007Jacobs Engineering Pte. Ltd.#29 International Business Park, #03-01Acer Building Tower ASingapore 609923Project: Lonza Biologics Singapore Pte. Ltd. Expansion project - Tuas South Ave. 9, Singapore

R & D – Chemdev Pharmaceutical Pilot Plant Project – Glaxo Smithkline Manufacturing, Singapore

Job Description:

Performs piping detailed design, pipe support design and 3d modeling of Piping, Pipe Supports and Equipments, Isometric extraction using Bentley AutoPlant Design-2004 and PDS Intergraph.

Responsible for evaluating and checking of equipment vendor drawings, nozzle orientations, equipment location information and 3D modeling of Equipment.

Develop piping plans, Equipment layouts, and material take-off of Piping. Check Piping Isometric drawings in conformity of P&ID, project specifications and Standards of all

drawings before issuing for construction.

Senior Piping Designer May 2005- September 2005Keppel Fels Singapore Pte. Ltd.#50 Tuas Road, Jurong IslandSingaporeProject: Maersk Jack-up Drilling Rig ( Class B Drilling Rigs B273-B276)

Job Description:

Develop Piping and Instrument diagram of Systems needed in operation for drilling as per design scope and project standard requirements.

Develop over all plans, Equipment layouts, Detail design and layout of piping needed by PDMS operators for 3D modeling.

Checking of Piping lay-out and Isometrics extracted from 3D model and ensure quality of drawings for construction.

Page 5: CV_Edwin_Fernando_lead piping design

Piping Designer December 2004- May 2005Sime Sembcorp Engineering Sdn. Bhd.Plo 336, Jalan Suasa, P.O. Box 5581707, Pasir Gudang, JohorMalaysiaProject: Elf Nigeria Offshore FPSO Platform Amenam II Project - Malaysia

Job Description:

Checking conformity of Isometric drawings with P&ID, Materials, Standards and as per Project specifications.

Prepares Isometric spooling and incorporations of the latest revisions and field design changes to be issued for construction.

Performs piping lay-out, detailed design and PDMS modeling of small bore lines and modification of large bore lines as per site requirements.

Verify and responsible for answering technical site queries as per project, site and relevant standards requirements.

Mechanical/Piping Design Engineer April 2003- December 2004Worleyparsons-Petrocon Arabia Ltd.P.O. Box 30481Yanbu, Al-Sinaiyah 51888Kingdom of Saudi ArabiaProject: CCR Platformer & Isomerization Project-Saudi AramCo. Yanbu Refinery, K.S.A.

Sales Gas and Ethane Supply Modification Project – Marafiq Power Plant, Yanbu, K.S.AShip Slop Oil Reception and Facility – Saudi Aramco, Yanbu RefineryArab Tank Terminal Expansion Project – Arab Tank Terminal, Yanbu K.S.AYanbu Petroleum Sales Gas Supply Expansion – Yanbu Petroleum, Yanbu K.S.A.

Job Description:

Prepare conceptual and detailed design of Piping in accordance with Saudi-Aramco project specifications and standards and as per ASME Codes.

Field verification and site inspection for the feasibility of piping layout and tie-in connections related to actual site conditions.

Prepare hot-tap calculations and procedures in accordance with ASME codes, Saudi Aramco Standards and as per site requirements.

Prepare Project proposal and man-hour estimates needed in bidding new projects. Develop Process Flow Diagram and P&ID, calculation of pipe size, minimum wall thickness of pipes and

minimum rating of flanges and materials to be used as per ASME codes and Saudi Aramco Standards. Duties involved in the preparation of new piping layout drawings generated from the PDS model to be

merged on the existing plant drawings using MicroStation IRAS-B. Modification of isometric drawings in accordance with P&ID and in actual site conditions.

Preparation of tie-in location map for effective work execution during the limited time schedule of the refinery shutdown. Review and check tie-in packages prepared by the contractor in accordance with the P&ID, hydro-test diagrams and client material specifications.

Prepare material take-of for specifications of all pipes and piping components needed in construction. Act as construction technical support and construction supervisor.

Page 6: CV_Edwin_Fernando_lead piping design

Piping Design Engineer April 1997- April 2003Chiyoda and EEI CorporationMeralco Ave. cor. Gen. Araneta Sts.Pasig City, PhilippinesClient Assigned: CHIYODA Corporation, Yokohama, JapanProject: QAFAC-Methanol/MTBE Facility Project (QMM) – Mesaieed, Qatar

Ras Gas Train 3 Expansion Project (RGX-3) – Ras Laffan QatarSingapore Olefins Project (SOP) – Jurong Island, SingaporeSakhalin LNG Project (SEG) – Sakhalin, RussiaSaudi Chevron Petrochemicals Project (SCP) – Al-Jubail, K.S.A.Qatargas II LNG Plant Feed Project (QGX) – Ras Laffan, Qatar

Job Description:

Responsible for the development of piping engineering design from estimation to detailed design in accordance with the client engineering procedure and specification, operating and maintenance accessibility of piping system relevant to international codes and standard practices.

Preparation of pipe routing study/sketches, loading data calculation and information drawings for pipe rack/sleepers, piping layout, pipe support and foundation, equipment nozzle orientation, and piping isometric drawings with corresponding bill of materials and material take off.

Supervise construction, prepare and review test package and responsible for line checking, re-instatement of test package and system turnover.

Ensure compliance with company’s ISO quality procedures, coordinate internal and client audit, provide corrective action if necessary.

Preparation of 3d modeling works for framework plus, equipment modeling, piping designer and isometric manager. Extraction of general arrangement (GA) drawings, isometrics, and conversion to design review integration using Plant Design System (PDS) Intergraph and Rebis AutoPlant Designer.

Prepare information drawings for Pipe Rack, Piping Arrangement, Pipe Support Foundation, Equipment Nozzle Orientation, and Loading Data Calculations using Microstation (Bentley) and AutoCadd.

Checking of Piping General Arrangement drawings as per Project Specifications, P&ID/UHD, Equipment/Vendor Data and Piping Material Specifications.

Checking of final isometric drawing and materials take-off as per standard and codes. Field inspection of piping routes in accordance with latest Plot Plan, P&ID/UHD, Equipment/Vendor

Data and Isometric Drawings. Ensure compliance with company’s ISO quality procedures, coordinate internal and client audit, provide

corrective action if necessary. Compliance with safety codes and practices.

Maintenance Supervisor May 1996- March 1997Foundation Specialist Inc.29 Sampaguita st., Paranaque, Philippines

Job Description:

Preparation of work and manning schedule of all Equipment mechanics and responsible for their jobs performances.

Mechanical parts requisition and monitoring personnel performances and coordinates with construction personnel for scheduling of preventive maintenance of all equipment in construction site.

Responsible for the over all safety of the team and reports directly to the maintenance manager.

Page 7: CV_Edwin_Fernando_lead piping design

Taxmapper/Draftsman January 1995- March 1996Municipal Assessor’s officeDingras, Ilocos Norte, Philippines

Job Description:

Responsible for work scheduling and work distribution of all members of the surveying team. Undertakes surveying activities of land and assessment of all real property for the purpose of tax

computation. Responsible for drafting the surveyed lot and computing areas of lots. Report directly to the Municipal Assessor and responsible for teams job performance.

TRAININGS/SEMINARS ATTENDED:

1. PDS Intergraph System Modules Chiyoda Corporation, Philippines2. Intergraph Smart Plant Review Chiyoda Corporation, Philippines3. Piping Engineering and Design Association for Overseas Technical Scholarship,

Chiyoda Corporation, Philippines

4. Rebis AutoPlant Design and Modules – 1997 Chiyoda Corporation, Philippines5. Smart Plant P & ID Chiyoda Corporation, Philippines6. Microstation 95 Chiyoda Corporation, Philippines7. AutoCadd R12, R13, R14 Chiyoda Corporation, Philippines8. Professionalism at work Chiyoda Corporation, Philippines9. Microstation SE/J Worley Parsons – Petrocon, Kingdom of Saudi

Arabia10. Bentley AutoPlant Design and Modules - 2004 Jacobs Engineering, Singapore11. AutoCadd 2000 Jacobs Engineering, Singapore12. PDMS 3D Worley Parsons, Singapore13. SP3D modules Worley Parsons, Singapore