cv
-
Upload
khaled-ibrahim -
Category
Documents
-
view
78 -
download
1
Transcript of cv
1
KHALED MOHAMED IBRAHIM
Mob No.:+966-549922984
Nationality: Egyptian
DOB: 03.July.1967
Mechanical Engineer
Professional Mechanical Engineer, Over 17 Year Experience in Oil and gas, Petrochemical,
Industrial, as well as Water Treatment for the Following Area Of expertise,
Project Management Construction management
Material Control Design
Inspection Cost Estimation &Tender Pricing
Quantity Surveying invoicing
Procurement Shutdown
Shop Drawing Inspection
Instillation and Commissioning Presentation
Education
• Bachelor of Mechanical Power Engineering
, 1996, Alexandria University, Egypt
Technical skills
AutoCAD -2D,2007 MS Office
Primavera P6 Training Course ASME 31.3
Experience
► Jan. 2012- Till Date Sr. Mechanical Design Engineer for Arab Steel Company
(ALTUWARIQI), Dammam, KSA
Perform engineering Stress calculations for pipelines According To International Codes and
standards
Perform engineering for procurement, including preparing material specifications, material
and purchase requisitions
Produce in house Detail Design Document, General Arrangement DWGs ,Piping Plan ,Piping
Isometric, Equipment Selection, Equipment and Piping Material Data Sheet, Piping Class
Generate Concept Design , Identified Problem & Solution
Support The Construction Field Requirements
Prepare / Review Cooling Water And Media Demand And Hydraulic Calculation
Prepare / Review PFD ,P&ID
Provide Heat Balance and Mass Balance Calculation and Propose Design Modification
To Optimized Existing System Operation and Running Cost
Perform Design Calculation For Degusting System Along With Equipment Selection And
2
Supported DWGs
Produce/ check material quantity take-offs
Review Vendor Print and Design Calculation
► Aug. 2011-Jan.2012 Project manager, ITS Group Egypt
Project Description, EPC Contract for Fountains and Swimming Pools
Carry out Site Mobilization ,Organization and Resource Utilization
Attending Progress , Safety Meeting With Client
Carry Out Correspondence ,Communication With Client and Supplier
Coordination of Technical Submittal and Drawing Approval
Prepare Various Documentation Including, Project Schedule, Method of statement, Reports,
Cost Estimation, etc.
Ensuring all materials used and work performed are as per Contract specifications
Overseeing the selection and requisition of materials
Overseeing quality control, health and safety matters on site
Produce and Follow up Invoices , Payment and Variation Order
Monitor ,Review the work progress
- Project Name: Sharm El Sheikh Resort Client: MEP Contractor Drake & Scull, Main Contractor: CCC, Owner: Qatari Diar
► Aug. 2009-Aug.2010, Sr. Project Engineer, AES Arabia, RIYADH, KSA
Project Description, Chemical Injection Skid, RO &Sewage Treatment Plant Fountains and
Swimming Pools
Handle the Kick off Meeting for All Project
Produce Project Schedule
Review Engineering Document and Drawing
Manage Engineering Activity
Prepare Technical Submittal and Get Client Approval
Manage Procurement Activity
Manage QC Activity and Coordinate PIM (Pre Inspection Meeting)
Manage Installation and Commissioning Activity
Communication with Client and Inside Company
Cost Control and Prepare Invoice
Prepare Project Final Dossiers
Prepare Material Data Sheet and Guide Material Selection
Communicate With Supplier for Local and Off Shore Material
- Project Name - Chemical Injection System (Manifa Gas Facilities), Saudi Aramco
- Acid Neutralization System (Corporate Data Center), Saudi Aramco
- Demulisifier Injection Skids (Manifa Upstream Offshore Pipe Line), Saudi Aramco
- Scale Inhibitor and Corrosion Inhibitor dosing skids, Saudi Aramco
- STP (Sewage Treatment Plant (MBR)) & RO Plants (GOSI Office Park),GOSI
- STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger
3
- STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger
- Fountain and Swimming Pool (Ayhar Villa), Saudi Oger.
- Fountain and Swimming Pool (Yamama Family Villas), Saudi Oger.
► Aug. 2004-July 2009, Site Manager, Trading and Agency Services LTD. (Trags),
Doha, Qatar
Managed a team of 150 people, and assigning them task
Liaised and assist contract manager in order to ascertain the cost for the construction
work
Quantity surveying for (Piping, Steel Structure, Equipment, Painting, Scaffolding,
Insulation, RT, PWHT, PMI,)
Dealing with day to day contract and site issue for construction
Plan, control and monitor the work progress, quantity and quality of the construction
work to ensure Compliance to design specification
Identified necessary corrective action and prepare the technical query
Check all of construction work package drawings (P&ID, Piping Plan, ISO DWG,
Others)
Prepared reports for project manager
Prepared the costing sheet for all constriction activity (piping, equipment, scaffolding,
and Steel Structure)
Prepared the costing of material and equipment related to the construction work
Performed Site Supervision for new modification (Equipment erection, piping
modification, Instrument and electrical Modification)
Quantity surveying, Material Take off and cost estimation
Measuring actual work and Produce as built drawing
Carried out preparation of lifting plan (LP), method statement (MS) and job safety
analysis (JSA) for Equipment Installation and Piping Fabrication and Erection
Dealing with subcontractor and supplier
Check subcontractor invoice and submitting CWR invoices to client
Prepare bill of material (piping, structure, instrument and electrical)
Manage, coordinated and follow up all material controlling at site
- Project Name -5 year unit rate maintenance contract at Qatar petrochemical Company (QAPCO)
- Replacement of ESD Generator & installation of plate exchanger during QAPCO GSD
- Replacement of quench water new air Cooler in Ethylene plant lactated at QAPCO
- July-Aug., 2005 Equipment engineer for Pul Hanin (PS 3) offshore shutdown
- May-June, 2005 Equipment engineer for Maydan Mahzan (PS 2) offshore shutdown
- Feb.-Mar., 2005 Engineer In-Charge for Boiler and gas turbine shutdown at Ras GAS -
Nov., 2004, Mechanical supervisor for train 3 shutdown at RAS GAS
- Shutdown engineer for exchangers cleaning (Hydro jetting) in Qatar Vinyl Company
(QVC)
- Piping engineer for construction of New Caustic Soda line in (QVC)
4
► Oct. 2003-july 2004, Mechanical Engineer, Porcelain International, Alexandria,
Egypt
Provided site supervision for equipment erection (Static, Machinery, Tunnel Kiln)
Provide site supervision for piping fabrication and erection
Produce fabrication Procedure for Tanks, Silo
Provided Installation supervision for piping fabrication and erection
Maintained of fluid power system
Planed and identified lubrication schedule
Prepare bill of material and purchase request
► June, 2001-Nov., 2002 Project Material Controller Manager, Samsung Engineering
CO., LTD. Tabriz, Iran (ABS Plant)
Monitor, coordinate and report on material related activities from estimates
through preparation of bill of materials, ordering, transportation, receiving,
installation and surplus disposition. Responsible for logistics, warehousing and
facility
Verifies that the documentation on each order matches the freight description
Maintain auditable records of receiving and issuance data, non-conformances,
shortage material and warranty necessary for documenting the material control
and warehousing processes.
Receive all incoming shipments. Make arrangements for and oversees unloading
and handling of goods. Prepare warehouse requests; removes goods from storage for authorized
consumption and utilization; bags, tags, and otherwise prepares goods for
issuance; and makes the goods available at the point and time of need.
Control issuance of equipment and goods to subcontractors.
Identify, receive approval for, and disposes excess materials. Prepares close-out
documents at the end of projects.
► Sep. - 2000-April-2001, Equipment Engineer , Daelim Industrial CO., LTD. at El-
Ameriya, free zone, Alexandria, Egypt
Performed Site supervision for equipment erection (Static Equipment & Machinery)
Carried out mechanical inspection for equipment installation (Static Equipment &
Machinery)
Implemented Mechanical Supervisor for pre-commissioning and commissioning
Mechanical Inspector for compressor ,Turbine and pump alignment, performed the
performance test of centrifugal Pump
Engineer in-Charge for refinery catalyst loading, and installation of structure packing
Working with vendors supervisor During Commissioning
- Project Name Middle East oil refinery, Midor Co., LTD.
5
► Sep., 1999-Aug., 2001, Mechanical engineer, Samsung Engineering CO., LTD. at El-
Ameriya, free zone, Alexandria, Egypt
Unpacking inspector (inspection of construction material, equipment and spare parts)
Material expeditor
Prepare martial issuing plan according to site demand
Mechanical Supervision for equipment erection
Jointed pre-commissioning and commissioning for mechanical supervision
Coordinate with vendor for equipment installation
Preparation of inspection document and close out document
- Project Name
Sidi Kerir Petrochemical CO., LTD., 200,000 MT/Y polyethylene
► March, 1998-June1999, Egyptian Air Force
• Maintenance of Diesel Generator
• Maintenance of electrical distribution Panel