CV _Rajasekhar- Project Management

21
1 / 21 CURRICULUM VITAE Name : P S RAJASEKHAR / PASUMARTHI SUDARSAN RAJASEKHAR Date of Birth : April 26, 1965 Nationality : Indian CONTACT NO. : +971557908957 / +919967890178 E Mail ID : [email protected] QUALIFICATIONS Academic: Bachelor Degree in Mechanical Engineering. Professional: International Chemical Engineer (IChemE) seminar attended at World Trade Centre, Mumbai. Project Management Course on Petroleum Refinery Processes from IIT, Mumbai in 2011Refinery Process from IIT, Mumbai in 2011. CAREER SUMMARY : Total 25 years of experience in Project management, Project Engineering and Project Planning / Monitoring and Controlling of Oil and Gas and Petro Chemical Projects (PMC/EPC/EPCM/FEED Projects) Involved in phases of Planning, initiating, executing and monitoring projects related to EPC, EPCM, PMC framed structures along time, cost and quality including technical and techno-commercial coordination with all stakeholders; EPC Project Engineering, Project Management, and commissioning of the various Oil & Gas onshore Refinery Projects (DHDT/HGU, MSQ, Utilities & Off sites, ISOM, SRU Units) Petrochemical, Nirma Soda Ash Plant, Alumina for Up-gradation of Digestion Unit 1 & 2 (6.6 million tons per year),GAIL Project,IGPL Petro Chemicals Unit. Ability to perform multi-disciplinary task and performing management, coordination of the projects Preparation and coordination of proposals, technical and commercial bid, reviewing man-hours and quantity estimate, reviewing schedule, Rajasekhar , Project Management

Transcript of CV _Rajasekhar- Project Management

Page 1: CV _Rajasekhar- Project Management

1 / 16

CURRICULUM VITAE

Name : P S RAJASEKHAR / PASUMARTHI SUDARSAN RAJASEKHAR

Date of Birth : April 26, 1965

Nationality : Indian

CONTACT NO. : +971557908957 / +919967890178

E Mail ID : [email protected]

QUALIFICATIONS

Academic: Bachelor Degree in Mechanical Engineering.

Professional:

International Chemical Engineer (IChemE) seminar attended at World Trade Centre, Mumbai.

Project Management Course on Petroleum Refinery Processes from IIT, Mumbai in 2011Refinery Process from IIT, Mumbai in 2011.

CAREER SUMMARY:

Total 25 years of experience in Project management, Project Engineering and Project Planning / Monitoring and Controlling of Oil and Gas and Petro Chemical Projects (PMC/EPC/EPCM/FEED Projects)

Involved in phases of Planning, initiating, executing and monitoring projects related to EPC, EPCM, PMC framed structures along time, cost and quality including technical and techno-commercial coordination with all stakeholders; EPC Project Engineering, Project Management, and commissioning of the various Oil & Gas onshore Refinery Projects (DHDT/HGU, MSQ, Utilities & Off sites, ISOM, SRU Units) Petrochemical, Nirma Soda Ash Plant, Alumina for Up-gradation of Digestion Unit 1 & 2 (6.6 million tons per year),GAIL Project,IGPL Petro Chemicals Unit.

Ability to perform multi-disciplinary task and performing management, coordination of the projects

Preparation and coordination of proposals, technical and commercial bid, reviewing man-hours and quantity estimate, reviewing schedule, handling technical & client queries / clarifications, proposal presentations, business development, inputs for Business Risk Assessment and strategies.

Preparation of scope of work for EPC &Construction scope of work, project management, Conceptual Block Diagram for Project definition, Project planning & scheduling, Interface Management, TBE for equipment &package units, Correspondence, interaction with client, vendors etc. Convening / participation design reviews, maintainability reviews, 3D model reviews, Hazop & Hazid reviews, Constructability Reviews, Risk assessment and conducting Joint site visits.

Rajasekhar , Project Management

Page 2: CV _Rajasekhar- Project Management

2 / 16

Coordination with Consultants, Client, and Licensor & Sub Contractors for changes as per their requirements and conducting value engineering / value addition analysis, etc.

Preparation of minutes of meeting, client correspondence, coordination, preparation of project procedures, project design basis, project execution plan, review of manpower and manpower mobilization plan, planning of deliverables and activities, participating in Risk Assessment Workshops, Reviewing Engineering Execution Plan, Interface Management Plan, Proposal Reviews etc.

Supervising all construction activities including providing technical inputs for methodologies of engineering & construction coordinating site management activities. Study analysis and execution of manufacturing/installation drawings pertaining to pressure vessels, Columns, Reactors, Heat Exchangers, Air Fin Coolers, Waste Heat Boilers, Compressors, Pumps oil & gas, pipe lines etc. and thus reviewing the same as-built drawings

Ensuring materials received are in accordance with the quantity & quality, Supervising all construction activities including providing technical inputs for methodologies of construction & coordination with site management activities, Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output, Generating periodic status & cost reports for apprising management of project progress.

Experienced in developing, implementing and maintaining ISO9001 Quality Management system and Project Quality Management system during execution of Projects

CERTIFICATIONS

Presently undergoing PMP course Primavera P3 Certificate Project Management Professional training by Toyo Engineering India Ltd KRA/KPI Training session attended ISO9001-2015 – IRCA Certified QMS Lead Auditor ISO 9001:2008 QMS (Sponsored) - Quality Systems (Requirements for Projects

under execution) from Toyo Engineering India Ltd, Mumbai in 2010.

IT SKILLS

PRIMAVERA P3, ERP Software MS Ofiice

TRAINING ATTENDED

Leadership Development Program Communication & Technical writing HSEQ Training- Customer Satisfaction Orientation Program KRA & KPA Training ISO 9001:2008

Rajasekhar , Project Management

Page 3: CV _Rajasekhar- Project Management

3 / 16

Project Engineering Interface Program ISO 9001-2015 – Internal Auditor Training – Provided by Neste Jacobs

CAREER HISTORY

NESTE JACOBS , Abu Dhabi, UAE ( July 14,2014 – Till Date)

Current Designation: Project Manager, July ’14–Till Date

Project 1:

Name: FEED Study of Energy Improvement Works (Phase 1) i.e.Installation of Air Preheater Crude Distillation Unit, Recovery of LPG from Hydrocracker off gases and H2 from PSA Units by Membrane Technology - Ruwais Refinery (East), Takreer located in Abu Dubai City.Project Designation: Senior Quality Engineer

Duration of Project: 01st Feb’2016 to 5th Oct’2016

Key elements of the Project:

o Project involves FEED Design, coordination with OEM Vendors.It consists of two (2) parts i.e. Installation of Air Preheater Crude Distillation Unit & Recovery of LPG from Hydrocracker off gases and H2 from PSA Units by Membrane Technology.

Responsibility :

o Preparation of Project Quality Plan and Quality Procedureso Development of Project Templates and Drawing Templateso Review of Project Documents issued for IDCo Planning and conducting project Internal Quality Audits to ensure implementation

of Project Procedures by various functions in the Project.o Active participation in maintaining quality records during execution of FEED

projecto Preparing Quality Audit Reports, Corrective Action Records (CARs), Maintaining

Logs and coordinating with discipline team for closure of CARs.

Achievements:

o Completed Internal Quality audits as per schedule.o Maintained good relation with Sub-contractors, Filed Engineers.

Project 2 :

Name: Feasibility Study of Energy Frame Works, Feasibility Study for Energy Improvement Works, Feasibility study for supply of LPG transport from Ruwais Refinery to Mussafah Depot - Shipping Option, Client – Takreer.

Rajasekhar , Project Management

Page 4: CV _Rajasekhar- Project Management

4 / 16

Project Designation: Project Manager Duration: 30th July 2014 to 30th March 2015

Key elements of the Project:

Project involves Feasibility Study, Collection of data from client, site visits, interviews with operational team and Technical team to collect the data and developing Draft and Final Reports, Preparation of SOR, Cost Estimation

Responsibility :

o Define scopeo Optimizing resource utilization as per the client specifications, drawings and

project quality documentation.o Perform scope, cost and schedule control o Active participation in Site Visits, Data Collection o Liaising with client and Data Collection and Site Visits and team building for

effective operationso Monitor progress periodically and compare with baselineo Preparation of Project Quality Plan its implementationo Preparing Bi Weekly and Monthly progress reportso Managing risk, TQ and deviation log registers at various phases of worko Interface Management and interdepartmental Coordinationo Cost Estimationo Preparation of Draft, Final Report, SOR for FEED and presentation to Client

Achievements:

o Successfully completed the Feasibity Study within the scheduleo Handover the Final reports and SOR for FEED in totality to satisfaction of

Customer

Project 3:

Name: FEED services for Single Site Catalyst(Client – Borouge), Study involves Installation of new equipment in PE2 plant, review of existing equipment and replacement of few equipment with newProject Designation: Senior Mechanical Coordinator Duration in Project: 01st April’2015 to 01st Feb’2016

Key elements of the Project:o Project involves Feasibility Study, FEED Design, coordination with OEM Vendors,

Constructability Review, ITT package

Responsibility :

Rajasekhar , Project Management

Page 5: CV _Rajasekhar- Project Management

5 / 16

o Define scopeo Optimizing resource utilization as per the client specifications, drawings and

project quality documentation.o Perform scope, cost and schedule control o Active participation in Site Visits, Data Collection o Liaising with client and Data Collection and Site Visits and team building for

effective operations, preparation of site visit reportso Preparation of Deliverable list for Mechanical Equipmento Active participation in Hazop study and 3D Model Reviewso Monitor progress periodically and compare with baselineo Preparing Bi Weekly and Monthly progress reportso Interface Management and interdepartmental Coordination with Finland officeo Cost Estimationo Preparation of Technical Bid Evaluation and recommendation to Cliento Preparation of Equipment Listo Managing risk, TQ and deviation log registers at various phases of worko Conducted Constructability Review Workshop

Achievements:

o Developed and Submitted all Mechanical Engineering deliverables, ITT Package as per schedule

o Successfully completed Constructability Review Workshop and got appreciation from client

Project 4:

Name: Proposal Projects

o FEED services for Single Site Catalyst(Client – Borouge), o FEED for Energy Improvement works (Client – Takreer) o FEED for Safe routing of PSVs in AD & RR (Client – Takreer) o FEED for Safe routing of PSVs in AD & RR, FEED for IRP –III( Client- Takreer),o FEED & Detailed Engineering Services for N2 Lineo FEED & Detailed Engineering Services for Filtration system (Client- Takreer).

Project Designation: Proposal Manager

Key elements of the Project:Review of Enquiry documents, making site visits to collect the data, understanding the scope requirements and sharing the data with discipline team members

Rajasekhar , Project Management

Page 6: CV _Rajasekhar- Project Management

6 / 16

Responsibility :

o Define scope and scope estimationo Estimation of Man hourso Preparation of Execution Methodology for submitting Technical proposalo Preparation of Deliverable list, FEED Milestone List, FEED project scheduleo Development of Manpower estimation histogram o Raising TQ’s to Client and updating of Clarifications, maintaining TQ logo Review of Pre bid and Post bid clarificationso Attending Technical clarification meetings and post bid tender clarification

meetingso Submission of Technical proposal to Client

Achievements: o Successfully executed the proposal work and bid submission done as per

scheduleo Our Company got 3 FEED projects, wherein I was instrumental and one of the

team member in bid preparation

Pyramid E &C, Dubai, UAE ( 01st Jan 14 – 12th July 14)

Pyramid E & C is a leading Engineering Services, Project Management and Lump Sum Turnkey solutions provider for Oil & Gas, Energy and Chemical Industries. It also undertakes EPC contracts.

Project: Petroleum Regeneration and Processing Facility Project - Engineering, Procurement & Construction Works (EPC Job) - Fujairah located in Dubai City. EPC Project (downstream) - Petroleum Regeneration & Processing Facility, Project Value: 200 Million USD, Client: ECOMAR FZC, Fujairah Free Zone, Country: UAE, (Jan 01st 2014 – July 12th, 2014).

Designation: Project Manager

Key elements of the Project:

o EPC Project for setting up a 7500 BPSD crude refinery with a storage facility of 80,000 m3. Engineering for the Project was done by Pyramid E & C in Thane Office, India and Equipment for the refinery procured from Indian Vendors and Site Construction activity has been subcontracted to various UAE Sub-contractors. PMC – MUC from Fujiraih,UAE

Responsibility :

o Define scope, Work Breakdown Structureo Encompassing planning, monitoring ,inter-discipline co-ordination, o Bid Evaluations,

Rajasekhar , Project Management

Page 7: CV _Rajasekhar- Project Management

7 / 16

o Preparing engineering drawing register and monthly progress reports, o Liaising with client, o Expediting of VENDOR Drawings and Manufacturing progress, o Coordination with Sub Contractors, o Updating of TQ and deviation log registers at various phases of work of o Optimizing resource utilization as per the customer specifications, drawings and

project quality documentation.o Coordinates establishment of policies and procedures in consultation with all

stakeholderso Perform scope, cost and schedule control o Preparation of Project Execution Plano Monitor progress periodically and compare with baselineo Preparing engineering drawing register and monthly progress reportso Liaising with client and construction team for effective operationso Managing risk, TQ and deviation log registers at various phases of worko Active participation in Vendor Meetings and replies to Bidders

Queries/Clarificationso Interface Management o Updating of Vendors Logs ( updating status on receipt of offers from vendors and

clarifications to vendors) Achievements:

Succefully completed Detailed Engineering works and was appreciated by the Client

Qatar Kentz WLL, Doha, Qatar ( Feb’13 - July’13 )

Designation: Project Engineering Coordinator

Project 1 : TCO Ph2 - Future Growth Proposal Project, Khazkhistan

Key elements of the Project:

o The project focused on tendering work for New Camp ( For 5000 Persons) at Oil Fields

Responsibility:

o Ensured project coordination with all Engineering Team members in estimating qty’s and preparing

o Design Drawings for submission to Client, o Review of Technical Specification and TCO Standardso Raising TQ’s to Client and updating of Clarificationso Deviation Logs,Preperation of RFQ’s

Rajasekhar , Project Management

Page 8: CV _Rajasekhar- Project Management

8 / 16

o Active participation in Vendor Meetings and replies to Bidders Queries/Clarifications

o Interface Management o Updating of Vendors Logs ( updating status on receipt of offers from vendors and

clarifications to vendors) o Define scope, Work Breakdown Structure, initial Engineering budget estimation

and allocate resourceso Ensure completion of project within time and budget, optimizing resource

utilization as per the customer specifications, drawings and project quality documentation.

o Monitor progress periodically and compare with baselineo Track project milestones & deliverables and assess & mitigate riskso Communicate the plans, reports , changes and necessary info to all stakeholderso Accumulate, collect and analyze data and information required for planning

departmento Contract study and finalize necessary products or services for procuremento Assist in initiation, negotiation, execution and closure of contract procuremento Assist PMO in dealing contractual issues

Achievements:

o Successfully executed the proposal work and bid submission done as per schedule

Project 2 : GRVE Integrity Improvement Program Project - Engineering, Procurement Services & Construction Management (EPCM Job) - Shell GTL Project - World’s largest GTL plant located in RasLaffan Industrial City

Key elements of the Project:

o Project dealt with substitution of pipe lines in FGP Unit (Sour & Stripper Water Lines) & Utility Unit (HCL & Hypo Lines) with pipe sizes of 15 km varies from 1” diameter - 12” diameter - Shell GTL Project - World’s largest GTL plant located in RasLaffan Industrial City

o Initial job awarded was preparation of BFD

Responsibility:

o Facilitate Project kickoff, define processes and flow charting, presentation of the project

o Define scope, Work Breakdown Structure, initial budget estimation and allocate resources

o Planning, monitoring, resource planning, delivery coordination, inter-discipline co-ordination,

Rajasekhar , Project Management

Page 9: CV _Rajasekhar- Project Management

9 / 16

o BFD,Preparing engineering drawing register and monthly progress reports, o Analyzing & evaluating Shell DEMs and DEPs,o Liaising with client and construction team for effective operations, Managing risko Ensure completion of project within time and budget, optimizing resource

utilization as per the customer specifications, drawings and project quality documentation.

o Coordinates establishment of policies and procedures in consultation with all stakeholders

o Perform scope, cost and schedule control o Monitor progress periodically and compare with baselineo Preparing engineering drawing register and monthly progress reportso Analyzing & evaluating Shell DEMs and DEPso Liaising with client and construction team for effective operationso Managing risk, TQ and deviation log registers at various phases of work Achievements:

o Submitted BFD package within schedule and to the complete satisfaction

Toyo Engineering India Ltd., Mumbai, INDIA (July’2007-Feb’2013)

Designation: Deputy Project Manager

Project 1:

HPCL, Vizag, Refinery - DHT Project, Sulphur Recovery Unit (300 TPD) (Project Cost –USD 40 Million)

Key elements of the Project:

The task involved working on SRU Unit Consists of 2 Blocks- Block A -SRU, TGT (Licensor Worley Parsons)- Block B-ARU/FGATU (Licensor-Toyo Engineering India Ltd) 

Project 2:

ISOM Unit - MS/HSD Quality Improvement & Residue Up-gradation Project (Project Cost – USD 40 Million)

Key elements of the Project:

ISOM Unit Consists of NHT/NSU & PENEX Units of capacity 300 TPD.

Rajasekhar , Project Management

Page 10: CV _Rajasekhar- Project Management

10 / 16

The task entailed Residual Engineering, Procurement, Supply, Fabrication, Construction, Erection, Installation, and Testing& Commissioning.

Responsibility:

o Planning, initiating, executing and monitoring project along time, cost and quality in coordination with all stakeholders

o Facilitate Project kickoff, define processes and flow charting, presentation of the project

o Define scope, Work Breakdown Structure, initial budget estimation and allocate resources

o Ensure completion of project within time and budget, optimizing resource utilization as per the customer specifications, drawings and project quality documentation.

o Review and Approval of Engineering Master Drawing Register in consultation with Client

o Coordination with Engineering Team members and release of Drawings / Documents/ Procedures within the stipulated schedule ( Normal cycle is 14 days) to get more work fronts at site

o Updating of Engineering Master Drawing Register and highlighting the Drawings status planned vs. Actual submitted

o Review and approval of Billing Schedule in consultation with Cliento Raising TQ’s to Client and updating of Clarificationso Deviation Logs updatingo Review of Change Notices and recommendations to Client o Participating in project meetings for evaluating project progress and providing

technical inputso Active participation in Engineering Review Meetings, Hazop Study,30%,60%,90%

Model Reviews and resolve the clashes/interface issues between team members and ensuring that reviews are carried as per Approved procedures, Standards and specifications are being followed as per Contract

o Engaging in detailed discussion with Process Data sheets, Equipment List, Vendor drawings with Client and Contractor to ensure that Equipment / Instrument manufacturing were being met as Licensors Specifications and approved Process, Instrument Data Sheets & as per Approved Vendor drawings

o Coordinates establishment of policies and procedures in consultation with all stakeholders

o Perform scope, cost and schedule control o Track project milestones & deliverables and assess & mitigate riskso Communicate the plans, reports , changes and necessary info to all stakeholderso Accumulate, collect and analyze data and information required for planning

departmento Contract study and finalize necessary products or services for procurement

Rajasekhar , Project Management

Page 11: CV _Rajasekhar- Project Management

11 / 16

o Assist in initiation, negotiation, execution and closure of contract procuremento Engaged Monitor progress periodically and compare with baselineo in proactive discussions with Engineering and Construction Head as well as

tracked Engineering man hours and Mobilization of Construction team as per the overall schedule

o Participating in Construction Audits and ensuring that vendor meets the specification requirements given by Licensor and the client and as per Approved for Construction Drawings (AFC)

o Resolved the issue caused due to delay in equipment and bulk material deliverieso Undertaking frequent visits to vendor works along with Engineering Team like

ISGEC (for Columns), Thermax (Boilers), Fabtech Engineers and across the table cleared Vendor drawings in Code B i.e. released for Manufacturing stage; instilled confidence in vendors and ultimately led to equipment delivery with minimum delay in delivery of Equipment at site.

o Assist PMO in dealing contractual issues and ensure cash flowo Expediting with Vendors for early delivery of Equipment’s (Columns of 65 Mtr/56

Mtr, Incinerator Package, Reaction Furnace package, Waste Heat Boiler Package, Blowers, Pumps etc.) and Bulk materials, Review of Equipment Manufacturing Progress and Logistics etc.

o Handling of packages like Amine package; glycol package; tail gas cleaning unit; incinerator package; flare package; utilities; effluent treatment

o Liaised with Licensor, Client, Site and Sub-Contractor for smooth functioningo Hazop participation, Review and release of Engineering, Vendor drawings

/documents in time, support in start-up/commissioning, final acceptance and handover of plant.  

o Close coordination with Construction team members till Mechanical Completion, Commissioning of Unit, handing over of Final Drawings/Documents to Client, preparation of Project Close out report

Achievements:

o Successfully handed over the Project to Client to their satisfaction and submitted the Final Drawings/Documents to client within the schedule

Jacobs Engineering India Pvt. Ltd., Mumbai, INDIA ( Nov’1995 – June’2007 )

Designation: Principal Engineer –Projects

Project 1:

IOCL, Matura Refinery for DHDT/ MSQ Project, Mathura, UP (Consists of DHDT/HGU

HGU/ Licensors from Axens and UOP respectively in 2005 for production of Euro-III grade HSD & MS MSQ/ Cooling Tower/ DM Plant/ Utilities & Offsite Units) - ( 2002 – 2005)

Rajasekhar , Project Management

Page 12: CV _Rajasekhar- Project Management

12 / 16

Key elements of the Project:The project dealt with the 1st PMC job handled by Jacobs.

Successfully involved in completing the prestigious DHDT/HGU/MSQ Project. Carried out the installation of Diesel Hydro-Treating Unit (DHDT) & MS Quality Up-gradation Unit (MSQU) with world class technology w.e.f. 1st April 2005 as per Auto Fuel Policy of Govt. of India.

(a)DHDT/HGU Scope details: DHDT – HGU- N2- , Licensor:Axens and UOP,

Mode of Execution: EPC, LSTK- Daelim, Job details – RCC- 17500M3, Structural works - 2600MT, Piping – 200000ID, 3000000IM, Equipment ERECTION – 285 Nos.(2850 MT) (Total Project Cost –USD 149 Million)

(b)MSQ unit Scope details:Isomerisation: 440 TMTPA, Reformat Splitter : 480 TMTPA, FCC Gasoline Splitter: 480 TMTPA, TGT: 180 TPD, SWS: 25 TPH, Licensor: UOP / Technip KTI,

Mode of Execution: EPC, LSTK- L&T, Job details – RCC- 11700M3, Structural works- 2340MT, Piping - 190000ID,237000IM,EquipmentEerection – 146 Nos.(2755 MT) ( Total Project Cost - USD 90 Million.)

Project 2: IOCL, Panipat Refinery for GT / HRSG – 3 Unit and BHEL Project ) – 2005-2007

(Project Cost: USD 25 Million)

Key elements of the Project:

Three Gas Turbines (GT) and Heat Recovery Steam Generator (HRSG) in phases using Natural Gas (NG) as fuel to take care of environment

Designation: Project Coordinator

Project 3 Other Projects Handled between the periods (1995 – 2005)

- Alumina for Up-gradation of Digestion Unit 1 & 2 (6.6 million tons per year) Hindalco Project at Renukoot

- GSEG, Compressor station, Hazira, Surat, and GACL, Compressor Station Project at Bharuch

- Nirma Ltd., 1200 TPD Soda Ash Project at Bhavnagar- Gas Authority of India Ltd., Alibag- IG Petro Chemicals Ltd., Taloja, Mumbai -

Designation::Planning Engineer, Project Engineer, Senior Project Engineer

Responsibility:

Rajasekhar , Project Management

Page 13: CV _Rajasekhar- Project Management

13 / 16

o Planning, initiating, executing and monitoring project along time, cost and quality in coordination with all stakeholders

o Define scope, Work Breakdown Structure, initial budget estimation and allocate resources

o Ensure completion of project within time and budget, optimizing resource utilization as per the customer specifications, drawings and project quality documentation.

o Review and Approval of Engineering Master Drawing Register in consultation with Client

o Coordination with Engineering Team members and release of Drawings / Documents/ Procedures within the stipulated schedule ( Normal cycle is 14 days) to get more work fronts at site

o Updating of Engineering Master Drawing Register and highlighting the Drawings status planned vs. Actual submitted

o Review and approval of Billing Schedule in consultation with Cliento Raising TQ’s to Client and updating of Clarificationso Deviation Logs updatingo Review of Change Notices and recommendations to Client o Preparation of Monthly/Weekly/Daily Progress Reports and MIS Reportso Participating in project meetings for evaluating project progress and providing

technical inputso Active participation in Engineering Review Meetings, Hazop Study,30%,60%,90%

Model Reviews and resolve the clashes/interface issues between team members and ensuring that reviews are carried as per Approved procedures, Standards and specifications are being followed as per Contract

o Engaging in detailed discussion with Process Data sheets, Equipment List, Vendor drawings with Client and Contractor to ensure that Equipment / Instrument manufacturing were being met as Licensors Specifications and approved Process, Instrument Data Sheets & as per Approved Vendor drawings

o Coordinates establishment of policies and procedures in consultation with all stakeholders

o Perform scope, cost and schedule control o Monitor progress periodically and compare with baselineo Track project milestones & deliverables and assess & mitigate riskso Communicate the plans, reports , changes and necessary info to all stakeholderso Accumulate, collect and analyze data and information required for planning

departmento Engaged in proactive discussions with Engineering and Construction Head as well

as tracked Engineering man hours and Mobilization of Construction team as per the overall schedule

o Participating in Construction Audits and ensuring that vendor meets the specification requirements given by Licensor and the client and as per Approved

Rajasekhar , Project Management

Page 14: CV _Rajasekhar- Project Management

14 / 16

for Construction Drawings (AFC)o Resolved the issue caused due to delay in equipment and bulk material deliverieso Assist PMO in dealing contractual issues and ensure cash flowo Liaised with Licensor, Client, Site and Sub-Contractor for smooth functioningo Close coordination with Construction team members till Mechanical Completion,

Commissioning of Unit, handing over of Final Drawings/Documents to Client, preparation of Project Close out report

Achievements:

o Successfully handed over the Project to Client to their satisfaction and submitted the Final Drawings/Documents to client within the schedule

UB Engineering Ltd., Pune, INDIA(1994 – 1995)

Designation: Field Engineer / Assistant Engineer

Project 1: Reliance Industries Ltd., Hazira Site, Project – Naphtha Cracker and Aromatics (Project Cost – 25 Crores)

Key elements of the Project:1st Naphtha Cracker Project

Responsibility:

o Planning, initiating, executing and monitoring project along time, cost and quality in coordination with all stakeholders

o Submission of Daily/Weekly /Monthly Progress reports o Raising invoices for the jobs carried out and certification from PMC/Cliento Supervision of Aerometric Piping Fabrication/Erection and Hydro Testing works o Site supervision and provide technical support to the sub-contractorso Supervising all construction activities including providing technical inputs for

methodologies of engineering & construction coordinating site management activities

o Responsible for site coordination and supervision work to ensure that relevant operations are executed in the highest work quality & safety standards while meeting customers' contractual expectation, specification and budget.

o Work closely with all team members and departments to ensure deliverableso Report on work progress, material status, and performance tracking.o Identification of test loops, preparation of test packages and coordinating for

Hydro test

PES Engineers Pvt. Ltd., Hyderabad, INDIA( 1992 – 1994 )

Project : Nuclear Power Corporation, Kaiga Site, Project – Nuclear Reactor Piping

Rajasekhar , Project Management

Page 15: CV _Rajasekhar- Project Management

15 / 16

(Project Cost – 12 Crores)

Designation: Assistant Engineer

Responsibility:

o Planning, initiating, executing and monitoring project along time, cost and quality in coordination with all stakeholders ( PMC - NPCL/Client)

o Submission of Daily/Weekly /Monthly Progress reports o Raising invoices for the jobs carried out and certification from PMC/Cliento Supervision of Reactor Piping Fabrication works o Site supervision and provide technical support to the sub-contractorso Supervising all construction activities including providing technical inputs for

methodologies of engineering & construction coordinating site management activities

o Responsible for site coordination and supervision work to ensure that relevant operations are executed in the highest work quality & safety standards while meeting customers' contractual expectation, specification and budget.

o Work closely with all team members and departments to ensure deliverableso Report on work progress, material status, and performance tracking.o Identification of test loops, preparation of test packages and coordinating for

Hydro test. o Supervision of Chemical cleaning and passivation of Pipes

Rockwool (I) Ltd., Madras, INDIA ( 1991 – 1992 ) Project - Kothari Sugars & Chemicals Ltd., Karailkal and Hindustan Photo Films

Ltd., Ooty Site (Project Cost – 2Crores)

Designation: Site Engineer

Responsibility:

o Planning, initiating, executing and monitoring project along time, cost and quality in coordination with all stakeholders ( PMC/Client)

o Supervision of Hot and Cold Insulations works ( Lagging and Cladding works)o on Equipment, Tanks and Pipe Line workso Submission of Daily/Weekly /Monthly Progress reports o Raising invoices for the job carried out and certification from PMC/Cliento Site supervision and provide technical support to the sub-contractorso Supervising all construction activities including providing technical inputs for

methodologies of engineering & construction coordinating site management activities

o Responsible for site coordination and supervision work to ensure that relevant

Rajasekhar , Project Management

Page 16: CV _Rajasekhar- Project Management

16 / 16

operations are executed in the highest work quality & safety standards while meeting customers' contractual expectation, specification and budget.

o Work closely with all team members and departments to ensure deliverableso Report on work progress, material status, and performance tracking.

Mechanical Engineering Research & Development Organization,

CSIR Madras, INDIA (1990 - 1991)

Designation: Project Assistant

Project: Shallow Well Hand Pump Project

Responsibility:

o Installation of Shallow well hand pumps, Measurement of Volume of Water per stroke, taking measurements of wear and tear of inner parts of Pumps at regular intervals etc.

Rajasekhar , Project Management