CV-Muhamad Husen

15
Muhamad Husen +62 85215599216 CURICULUM VITAE I. Personal Data Name : Muhamad Husen Place/Date of Birth : Jakarta/April 6, 1977 Passport No : B 0462585 Date of Expiry : 03 February 2020 Address : Kp. Dua, Jl. Nurul Iman 6 No.31 Rt.06/01 Bekasi Barat 17145 Nationality : Indonesia Religion : Moslem Marital Status : Married Mobile : +62 85215599216 E-Mail : [email protected] II. Education 1. Formal Education 1996 – 1999 : Polytechnic University of Indonesia, Depok 1993 - 1996 : High School SMAN 15, Jakarta 1990 - 1993 : Secondary School SMPN 129, Jakarta 1984 - 1990 : Primary School Papanggo 02, Jakarta 2. Courses and Training 2014 T-BOSIET (Tropic - Basic Offshore Safety Induction and Emergency Training) – OPITO by Samson Tiara, Certificate 2012 Magnetic Particle & Penetrant Testing Training By SAR NDT SERVICES (Outside Training Services), Certificate

Transcript of CV-Muhamad Husen

Page 1: CV-Muhamad Husen

Muhamad Husen+62 85215599216

CURICULUM VITAE

I. Personal Data

Name : Muhamad Husen

Place/Date of Birth : Jakarta/April 6, 1977

Passport No : B 0462585

Date of Expiry : 03 February 2020

Address : Kp. Dua, Jl. Nurul Iman 6 No.31 Rt.06/01

Bekasi Barat 17145

Nationality : Indonesia

Religion : Moslem

Marital Status : Married

Mobile : +62 85215599216

E-Mail : [email protected]

II. Education

1. Formal Education

1996 – 1999 : Polytechnic University of Indonesia, Depok

1993 - 1996 : High School SMAN 15, Jakarta

1990 - 1993 : Secondary School SMPN 129, Jakarta

1984 - 1990 : Primary School Papanggo 02, Jakarta

2. Courses and Training

2014 T-BOSIET (Tropic - Basic Offshore Safety Induction and Emergency

Training) – OPITO by Samson Tiara, Certificate

2012 Magnetic Particle & Penetrant Testing Training

By SAR NDT SERVICES (Outside Training Services), Certificate

2012 Hydrogen Sulfide Safety Awareness Level II Trained

By Pandu Selamat Utama

2011 Level Two First Aid Training

By SOS International on AEA Company, Certificate

2008 Wellhead Training at PT. Wood Group Pressure Control

2000 5R (Ringkas, Rapi, Resik, Rawat, Rajin) Training at PT. Sinar Antjol,

Certificate

Page 2: CV-Muhamad Husen

Muhamad Husen+62 85215599216

III. Skill

Wellhead Service Technician: Running of the RB2 (BPV) Lubricator, Install

Conventional Wellhead, Split Speed Whead and SH2, Setting of Slip & Seal

Assy’s and Landing Tubing Hanger’s. Servicing Gate Valve Manual &

Hydrolic Type: RA Brand Wood Group, FMC and Barber, Cameron and

Pressure Testing.

Inspect Dimension and Witness Test Wellhead & Valve API Spec 6A PSL

1,2 and 3 G or ASME B16.5

Visual Inspect Wellhead and Valve on Yard or Inventory stock for Refurbish

Inspection thread API Spec 5 B, 5 CT and Spec 7-1

NDT with Methode MT & PT level-2

Calibration Measuring Instruments

Operate Computer Ms Office, Adobe Photoshope 7.0 and Internet

IV. Experience Record

2013 – Present Wellhead Service Engineer at PT. Aker Solution/KOP Surface

Products

2011 – 2013 Ass. Manager Wellhead Engineer at PT. Mulia Graha Abadi

2008 – 2011 QA and Surface Well Head Service Technician at PT. Wood Group

Pressure Control / GE PC – Cibitung Indonesia

2001 – 2008 QC & Gages Room Inspector at PT. Wood Group Pressure Control

2001 – 2001 Quality Control at PT. BMIM-TNG

2000 – 2001 Foreman Engineering at PT. Sinar Antjol

2000 – 2000 Maintenance at PT. Cakra Tunggal Steel.

Field Experience Period Nature of Work Location in 2008

June - Chevron Bula Seram Land RIG on Shore. Co Man: Laster

Scope of Services: Running SH3 Well Head and Complation,

Running X-Mas Tree.

Period Nature of Work Location in 2009

March - Schlumberger – Badak & Balikpapan

Inspection NDT Metode: PT & MT & than Wall Thickness for Re-

Certification for Segmen ( Wire Line).

July - Medco Energy Indonesia – Singa 3 & 4 Lematang Land RIG On-Shore

Scope of Services: R/U Well Head, Complation & X- Mas Tree.

Page 3: CV-Muhamad Husen

Muhamad Husen+62 85215599216

Period Nature of Work Location in 2010

March - ConocoPhillips Palembang (Dayung 5A & 7 ); Jambi ( Teluk Rendah 2 )

Scope of Services: Inspection Integrity & Diagnostcs Wellhead & Repair

Seal kit Hydrolic Actuator Type: RA & Valve.

April - Medco Energy Indonesia – Singa 3 Lematang Land RIG On-Shore

Scope of Services: Replacement Autoclave to DHCV control line &

Operated Adjustable Chuke to Open & Closed.

June - ConocoPhillips Palembang (Rawa 47, 18, South Rawa 1), Durian Mabuk 2;

Jambi (Teluk Rendah 2).

Scope of Services: Down Hole Plug & BPV Instalation & Repair Seal kit

Hydrolic Actuator Type: RA & Valve.

September - ConocoPhillips Palembang (South Rawa 1), (Letang 1, 2, 4) & Dayung 4.

Scope of Services: Down Hole Plug & BPV Instalation & Integrity Well Head -

X Mass Tree & than Repair Seal kit Hydrolic Actuator Type: RA + Valve.

October - ConocoPhillips Palembang (Sumpal-1B)

Scope of Services: Repair Seal kit Hydrolic Actuator Type: RA & Stop Leaking

on Lock Screw area on Section-C.

November - ConocoPhillips Palembang (Rawa-18), (Letang 1, 2, 4) & Keri-2

Scope of Services: Stop Leaking on Valve Stem Bonnet Area & Integrity Well

Head - X Mass Tree & than Check Lower Master Valve 2 9/16 – 2000 on Keri-2.

December - ConocoPhillips Palembang

Scope of Services: Retrieve & Install Plug BPV 4” on Dayung-03, RIH

2 ½” BPV lubricator on Rawa-39.

Period Nature of Work Location in 2011

January - ConocoPhillips Palembang

Scope of Services: RIH & POOH 2 ½ “ BPV Lubricator on Suban Baru A-1

RIG-5.

March - Triangle Pase Inc. On Shore ( Supervise: Jayant Kamarrupchand )

Scope of Service: Inspect Casing & Casing Spool 13 5/8-5M x 11 – 5M

(Cameron) after Rig Down Casing Spool 13 5/8-5M x 11-5M on

Well- A1 Pase.

April - Medco Palembang

Scope of Service: Istall 4 1/16-10M Flow Line to Wing Valve – FMC

Page 4: CV-Muhamad Husen

Muhamad Husen+62 85215599216

And witness Press Tested Body X-Mas Tree 10.000 Psi on Well - Singa 2

May - ConocoPhillips Palembang

Scope of Service: Visual Inspection Well Head and Change Flange

Companion on Annulus B in Well – Gelam 2

May - June - ConocoPhillips Palembang ( Supervise: Judge Septopanduvyatmo )

Scope of Service: Well Head and X-Mas Tree Inventory Review on Dayung

Warehouse and Rawa Warehouse.

July - ConocoPhillips Palembang

Scope of Service: Running Conventional Well Head, Complation &

X-Mas Tree. On RIG # 15 Apexindo Well – Suban 7 WDW.

Co Man: LLOYD MC FAUL.

And Job Work Over on RIG # 5 COPI Well – Suban 5 ( Cameron )

Co Man: Garry White.

August - Triangle Pase Inc

Scope of Service: Job Work Over on RIG # 88 Mutiara Biru Perkasa

Well A-1 ( Cameron ) Co Man: Tony Anson

September - Quad Energy – Vietnam (Drilling Manager: Daniel Kirisits )

Scope of Service: Job Inspection Well Head SH2 (Speed WHead)& X-Mas

Tree for Prepare drilling on Offshore.

Oct - Nov - ConocoPhillips Palembang

Scope of Service: N/U DSA, Well Head, Complation &

X-Mas Tree. On RIG # 5 ConocoPhillips Well – Gelam 2 WDW.

Co Man: Liston Sembiring & Gary White.

December - Pertamina Bentayan – Palembang

Scope of service: QC Field for Job Weld Casing 11”-2M x 9 5/8” SOW

Well BN-AA05 Well No.100

Period Nature of Work Location in 2012

January - MEDCO E & P Indonesia

Scope of service: Well Service Engineer for Install Casing Hanger,

Completion & N/U X-Mass Tree.

Well: Sida-1 ( Palembang )

January - Pertamina – Ramba

Scope of service: QC Field for Job Weld Casing 11”-2M x 9 5/8” SOW

Page 5: CV-Muhamad Husen

Muhamad Husen+62 85215599216

Well: RB-AA-02 Well No. RB-139

February - MEDCO E & P Ind

Scope of service:Well Service Engineer for Install Casing Hanger, Completion

and N/U X-Mass Tree.

Well: Fariz ( Palembang )

February - Pertamina – Sangasanga ( Kalimantan ); RIG: NOV.D-700 No.6

Scope of service: QC Field for Job Weld Casing 13 5/8”-2M x 13 3/8” SOW

Well: NKL-P12.4 Well No. NKL-1025

March - Pertamina – Tambun ( Jawa Barat )

Scope of service: QC Field for Job Weld Casing 13 5/8”-3M x 13 3/8” SOW

Well: RDL-D1 Well No. RDL-07

- VICO – Pamaguan # 201 ( Kalimantan )

Scope of service: Install Frac Head 7 1/16 – 5M x 3 1/8 – 5M

April - Pertamina – Pegaden ( Jawa )

Scope of service: QC Field for Job Weld Casing 13 5/8”-2M x 13 3/8” SOW

Well: PGD 13 Well No. PGD G/2

May - Pertamina – Sangasanga ( Kalimantan ); RIG: NOV.D-700 No.6

Scope of service: QC Field for Job Weld Casing 13 5/8”-2M x 13 3/8” SOW

Well: NKL-P12.5 EXT Well No. NKL-1028

June - Pertamina – Talang Jimar dan Tasim ( Palembang ); LTO: 650#35 /

N80B1/27.

Scope of service: QC Field for Job Weld Casing 13 5/8”-3M x 13 3/8” SOW

Well: TLJ 237 Well No. TLJ 157 TW and Well: TSM 5X Well No. TSM 05

- Pertamina – Karang Baru ( Subang ); RIG: MSH 2000/30

Scope of service: QC Field for Job Weld Casing 13 5/8”-5M x 13 3/8” SOW

Well: KRB D3 EXT Well No. KRB 08

July - Pertamina – Sangasanga ( Kalimantan ); RIG: NOV.D-700 No.6 / RIG: OW-

700/39.

Scope of service: QC Field for Job Weld Casing 13 5/8”-3M x 13 3/8” SOW

Well: NKL-P12.1 EXT Well No. NKL-1029 and NKL-P12.8

Well No. NKL-1030

August - Pertamina – Randegan (Java); RIG: OW-700/40

Page 6: CV-Muhamad Husen

Muhamad Husen+62 85215599216

Scope of service: QC Field for Job Weld Casing 13 5/8”-3M x 13 3/8” SOW

Well: RDU-A4 Well No. RDG-54

- Pertamina – Sangasanga (Kalimantan); RIG: OW-700/39

Scope of service: QC Field for Job Weld Casing 13 5/8”-3M x 13 3/8” SOW

Well: NKL-P.12.4 Well No. NKL-1032

-Pertamina – Sangasanga (Kalimantan); RIG: NYT#05

Scope of service: QC Field for Job Weld Casing 13 5/8”-3M x 13 3/8” SOW

Well: NNY-P.11.6 Well No. NNY-1031

September - Pertamina – Tempino ( Jambi )

Scope of service: QC Field for Job Weld Casing 11”-2M x 9 5/8” SOW

Well: TPN-111TW Well No. TPN-216

- Pertamina – Sungai Gelam ( Jambi )

Scope of service: QC Field for Job Weld Casing 13 5/8”-3M x 13 3/8” SOW

Well: SGC-27X Well No. SGC-19

October - Pertamina – Sangasanga (Kalimantan); RIG: OW-700/39

Scope of service: QC Field for Job Weld Casing 13 5/8”-3M x 13 3/8” SOW

Well: NKL-P.13.3 Well No. NKL-1035

- Pertamina – Bunyu (Kalimantan); RIG: N80 UE/22

Scope of service: QC Field for Job Weld Casing 13 5/8”-3M x 13 3/8” SOW

Well: NKL-P.13.3 Well No. NKL-1035

November - Pertamina – Gunung Kemala (Java); RIG: TMMJ-05

Scope of service: QC Field for Job Weld Casing 13 5/8”-3M x 13 3/8” SOW

Well: GNK-37 Well No. GNK-37 TW

Desember - Pertamina – North Kedung Tuban - Cepu ( Java ); RIG: D1500/55

Scope of service: QC Field for Job Weld Casing 13 5/8”-5M x 13 3/8” SOW

Well: NKT-B Well No. NKT-2

- Pertamina – Cemara ( Java ); RIG: N80 B2/01

Scope of service: QC Field for Job Weld Casing 13 5/8”-5M x 13 3/8” SOW

Well: CMB-D3 Well No. CMB-26

- Pertamina – Karang Baru ( Java ); RIG: N110 M2/31

Scope of service: QC Field for Job Weld Casing 13 5/8”-5M x 13 3/8” SOW

Well: KRB-A3 Well No. KRB-10

Period Nature of Work Location in 2013

Page 7: CV-Muhamad Husen

Muhamad Husen+62 85215599216

January - Pertamina – Karang Baru ( Java ); RIG: OW-700/40

Scope of service: QC Field for Job Weld Casing 13 5/8”-5M x 13 3/8” SOW

Well: PGD-A3 Well No. PGD-15

-Pertamina – Adenium ( Medan ); RIG: PURI#01 XJ 750 HP

Scope of service: QC Field for Job Weld Casing 13 5/8”-5M x 13 3/8” SOW

Well: ADM-A Well No. ADM-01

February - Pertamina – Tambun ( Java ); D1500/53

Scope of service: QC Field for Job Weld Casing 13 5/8”-5M x 13 3/8” SOW

Well: TBD-01 Well No. TBD-01

July - Pertamina – Melandong ( Java ); RIG: MSH 200/30

Scope of service: QC Field for Job Weld Casing 13 5/8”-5M x 13 3/8” SOW

Well: MLD-A3 Well No. MLD-07

- Pertamina – Karang Baru ( Java ); RIG: N110 M2/31

Scope of service: QC Field for Job Weld Casing 13 5/8”-5M x 13 3/8” SOW

Well: KRB-A5 Well No. KRB-12

November - Mubadala Petroleum – Trilobi - 01 (Natuna Island) - Offshore

RIG # Randolph Yosh OIM: Martin Smile, Co Man: Graham Morgan

Scope o service: N/U Casing Head 13 5/8-2M x 13 3/8” SOW, R/U and R/D

Test Plug 13 5/8” and Wear Bushing 13 5/8”, Install Casing Hanger

13 5/8”x 9 5/8”, N/U Tubing Spool 13 5/8”-2M (btm) x 11”-3M (top), R/U

and R/D Test Plug 11” and Wear Bushing and than R/D TBG SPL 13 5/8” –

2M (btm)x 11”-3M (top) after set Bridge Plug, R/D Casing Hanger 13 5/8” x

9 5/8”, R/D Casing Head 13 5/8” - 2M x 13 3/8” SOW

Desember - Pertamina – Jati Ibon ( Jawa )

Scope of service: QC Field for Job Weld Casing 13 5/8”-5M x 13 3/8” SOW

Well: JIB-A Well No. JIB-01

Period Nature of Work Location in 2014

March – April - ConocoPhillips – North Belut (WHP-C) ( Natuna Sea )

RIG: SKD Berani/West Berani. Co Man: Peter Wolf

Scope of service: Install for 13 5/8”-5M Splitter Single Wellhead System.

Well No. NB-C 26

May - Premier Oil – Platform Gajah Baru & Platform West Lobe ( Natuna Sea )

Page 8: CV-Muhamad Husen

Muhamad Husen+62 85215599216

Supv: Anugrah S.W

Scope of service: Integrity, Monitoring Pressure Cavity and Bleed Off

Pressure and Greasing All Vave.

Well No. Gajah Baru-1,-2,-3,-4,-5 and West Lobe-1,-2,-3,-4,-5,-6,-7

June – July - Premier Oil Natuna Sea BV – Ratu Gajah and Naga WP ( Natuna Sea )

RIG: Hakuryu-11. Co Man: Philippe Milot/Graham Pomstra

Scope of service: Install for 13 5/8”-10M SES Single Wellhead System w/

20” Single Starting Wellhead on Ratu Gajah and Install for 13 5/8”-5M

Splitter Wellhead System w/ 36” Dual Starting Wellhead on Well: Naga-1,

Naga-2 and Naga-3.

September - Pertamina Medco E&P Tomori Sulawesi – Senoro-1 (ONShore Sulawesi)

RIG: PDSI N1500/60. Co Man: Achmad Islah

Scope of service: Install for 13 5/8”-3M Conventional Wellhead on Well:

Senoro-17.

October – Dec - JOB Pertamina Medco Tomory Sulawesi – Central Sulawesi

RIG: Rowan Gorilla II. Co Man: Basuki Rachmad

Scope of service: Install for 13 5/8”-10M SES Single Wellhead System w/

20” Single Starting Wellhead on Well no: Grupa-1

December - Conoco Phillips Indonesia – North Belut (Natuna Sea)

Scope of service: Drill and Install Check Valve on Platform: WHPC.

Period Nature of Work Location in 2015

January - Conoco Phillips Indonesia – North Belut (Natuna Sea)

Scope of service: Drill and Install Check Valve on Platform: WHPC.

March – April - Premier Oil Natuna Sea BV – Gajah Baru ( Natuna Sea )

RIG: Hakuryu-11. Co Man: Graham Pomstra

Scope of service: Install for 13 5/8”-5M Splitter W/ 36” Dual Starting

Wellhead on Well: GBA-6 and GBA-7

May - Premier Oil Natuna West Lobe – Anoa West ( Natuna Sea )

RIG: Hakuryu -11. Co Man: Philippe Millot

Scope of service: Install for 13 5/8”-5M Dual Splitter Single Wellhead

System.Well No: Anoa West – 1

June - Premier Oil Natuna – Matak Base On Shore

Scope of service: Inventory Running tools and Equipment Wellhead.

July – December - Kris Energy Thailand, Golf of Thailand (Platform Wassana)

Page 9: CV-Muhamad Husen

Muhamad Husen+62 85215599216

RIG: Key Gibrartar (KGB). Co Man: Graham Morgan/ Joe Ernst/ Jim Heraco

Scope of service: Install for 13 5/8”-5M Triple Spliter Wellhead.

Well No: 5 Slot and 15 Well.

Name of Operation Companies (Reference for Service Work Experience) On/Off – Shore :

MEDCO E & P - Indonesia

CITIC CERAM ENERGY LIMITED (CSEL) - Indonesia

CONOCOPHILLIPS - Indonesia

TRIANGLE PASE - Indonesia

SCLUMBERGER - BADAK FIELD - Indonesia

QUAD ENERGY - VIETNAM

PERTAMINA EP Region Jawa, Sumatera, and KTI

JOB ( Job Operation Body) PERTAMINA – MEDCO SIMENGGARIS

(Location Bajul Besar 1 – Tarakan)

MUBADALA PETROLEUM

(Location: Trilobi – 01 - NATUNA ISLAND) – Indonesia

PREMIER OIL NATUNA SEA BV – Indonesia

RANHIL JAMBI – Indonesia

KRIS ENERGY - Thailand