CURRICULUM VITAE
Ms PHUNG, TRAN TIEU Page 1/6
Full Name: Ms PHUNG, TRAN TIEU Proposed Position: Environmental Engineer/ ISO 14001 Manager Date of Birth: 1981 Nationality: Vietnamese Years of Experience: 9 years Status: married Place of birth: Binh Thuan province, Vietnam Place of living: An Lac ward, Binh Tan district, HCM city Contact: [email protected] – HP: 0903 867 545
Capabilities:
Over 9 experienced years in environmental design and management field at the main duties such as: a main design engineer, an environmental management supervisor and an Environmental Management Representative (EMR) of ISO 14001. - Technological design, detail design for water treatment plant (WTP);
- Technological design, detail design for waste water treatment plant (WWTP);
- Control of executing the work, supervising and commissioning WWTP and WTP;
- An EMR for ISO14001 system;
- A Coordinator and a member of ISO 9001, HACCP, and OSHAS 18001 team;
- Supervise the operation of WWTP and WTP;
- Skill of composing and formatting document, operation guide;
- Skill of work management, microsoft office & autocad.
Education:
Training place : Institute of Environment and Resources - Period : 2006-2009 - Diploma : Master of Environmental Engineering Training place : University of Technology - Period : 1999 - 2005 - Diploma : Bachelor of Environmental Engineering Other trainings:
- Comprehension on “Hazardous Area”, “Fire Fighting”, “HAZOP Study”, “HAZID Study” (training courses at HSE department, PVE (2013);
- Certificate of permit of Environmental Treatment Design (2012);
CURRICULUM VITAE
Ms PHUNG, TRAN TIEU Page 2/6
- Certificate of finish of Cleaner Production course issued by Center of Cleaner Production;
- Certificate of finish of financial analysis skill course issued by HCM city Agency of Environmental Protection;
- Certificate of finish of ISO 14001 awareness and internal audit course issued by Vietnam Productivity Center;
- Certificate of finish of ISO 9001 awareness course issued by HCM city Agency of Quality Measurement Standard, 2008;
- Certificate of finish of ISO 9001 internal audit course issued by HCM city Agency of Quality Measurement Standard;
- Certificate of finish of ISO 14001 awareness course issued by HCM city Agency of Quality Measurement Standard.
Foreign Language:
- English (communication and engineering) Skill:
- Microsoft office: Word, Excel, Power Point; - Internet Explorer, Email, Computer, Scanner, Photocopier, Printer; - Autocad 2D; - Compose & format document for report; - Meeting, Schedule Employment record:
Duration Company Position
10/2011 - Now PV Engineering Joint Stock Company Senior Environment Engineer
04/2011 – 10/2011
IDRO Vietnam company Process Engineer
09/2008 - 07/2009
Khi Thuy company Process Engineer
09/2006 - 09/2008
Kido Corporation Environmental engineer
03/2004 – 09/2006
CENSI Environmental engineer
CURRICULUM VITAE
Ms PHUNG, TRAN TIEU Page 3/6
Detail tasks:
From October, 2011 to present: PVENGINEERING JOINT STOCK COMPANY Some of main projects
ARMOURED TANK FACTORY
Client: Head Department of Ministry of Defense
Scope of work: Design as-built drawings for WWTP
Responsibilities: take part in the verify meeting, site survey for inout data requested by Client; adjust technical proposal, as-built drawing, Process datasheet & MTO for waste water treatment plant.
CA MAU GPP
Client: Pvgas Ca Mau Gas Processing Plant Management Board
Scope of work: 1. GPP, Terminal, Export Facilities.
2. Design, Purchase, Installation, Construction & Test Run the Compressor number 2 (EPC3)
Responsibilities: write philosophy, input data for waste water treatment system for quotation duty.
CAMP FOR PVE’S WORKERS & OFFICIALS FOR NGHI SON PROJECT
Client: PVE
Scope of work: EIA for project
Responsibilities: compose EIA report
DUNG QUAT WASTE WATER TREATMENT PLANT
Client: SBR-BF
Scope of work: add the Biological Ponds for the WWTP for BSF-BF and propose the environmental issued methods.
Responsibilities:
- Check and calculate the new machines investment which will be connected to the available items of WWTP
- Do the PFD, smell reducing solutions and the general explanation.
SOUTHERN AIR PETROL STORAGE
Client: Southern Air Petrol Logistics Joint Stock Company (SAPL.JSC)
Scope of work: WWTP
Responsibility: check process design at phase construction and response comment for domestic waste water system; oily water system.
CURRICULUM VITAE
Ms PHUNG, TRAN TIEU Page 4/6
April, 2011 – October, 2011: IDRO Vietnam Some of main projects
2280 CMD WASTE WATER TREATMENT PLANT, PHASE 2, NHUT CHANH IP, LONG AN PROVINCE
Client: Olam Café Outspan Company
Responsibilities:
- Design and do the list of materials and the drawings of WWTP
- Support the Project Manager technological works.
- Coordinate and be charge of survey, check technological design and related duties
385 CMD WASTE WATER TREATMENT PLANT
Client: URC Beverage Factory Binh Duong
Design phase: proposal for bid. (2011)
Responsibilities:
- Design and do the list of materials and the drawings of WWTP
- Support the Project Manager technological works.
- Coordinate and be charge of survey, check technological design and related duties
Sep., 2008 – Jul., 2009: Khi Thuy Company (AWC) Some of main projects
55 CMD WASTE WATER TREATMENT PLANT, VISIP 1, BINH DUONG PROVINCE
Client: Falton Tranet Factory
Design phase: construction and installation. (2008)
Responsibilities:
- Support the Project Manager technological works.
- Coordinate and be charge of survey, check technological design and related duties
10 CMD WASTE WATER TREATMENT PLANT, DAT CUOC IP, BINH DUONG PROVINCE
Client: Lama Color Tile Factory
Design phase: proposal for bid. (2009)
Responsibilities:
- Support the Project Manager technological works.
- Survey; do the PFD, the layout, detail designs, and proposal
- Do the quotation; Order, purchase and gather
- Survey the executed work
- Training, hand over and be charge of related duties
CURRICULUM VITAE
Ms PHUNG, TRAN TIEU Page 5/6
Sep., 2006 – Sep., 2008: Kido Corporation AN ISO 14001 SYSTEM MANAGEMENT AT KIDO FACTORY, TAY BAC
CU CHI INDUSTRIAL PARK Position: Environmental Management Representative Responsibilities: - Maintain ISO 14001 system; - Update the legal code & standard; - Plan & accomplishment internal and external audit; - Do the periodical environmental reports (waste water monitoring environmental supervising report); - Do the hazardous waste register; - Do the periodical underground water usage report; - Extend the validity date of ISO 14001; - Do the monthly reports for using electricity, supply water and waste; - Set the environmental objective and target; - Make the periodical training ISO 14001 awareness to the workers; - Do the emergency plan about leaking ammonia; - Compose procedures; - Prepare document to “Green Company” prize which is recognized by HCM Environment & Resource Department.
AN ISO 9001, OHSAS 18001 & HACCP COORDINATOR AT THE UTILITY ROOM Position: Environmental Engineer Responsibilities - A coordinator of maintaining ISO 14001, ISO 9001, OHSAS 18001, HACCP at the Utility Room; - A coordinator of doing internal and external audit for ISO 14001, ISO 9001, OHSAS 18001, HACCP system.
A WWTP, WTP SUPERVISOR Position: Environmental Engineer Responsibilities: - A supervisor of water quality of WWTP, WTP, boiler and condenser; - A member of issues analysis and solutions team; - Manage a 3 worker team at Utility Site.
CURRICULUM VITAE
Ms PHUNG, TRAN TIEU Page 6/6
Mar., 2004 – Sep., 2006: CENSI Some of main projects
2000 CMD WASTE WATER TREATMENT PLANT AT AN PHU AN KHANH RESIDENTIAL QUARTER, DIST. 2, HCMC
Client: Sai Gon Building Company
Position: Environmental Engineer
Responsibilities: Survey, do the technology and detail design
300 CMD WASTE WATER TREATMENT PLANT AT THUAN KIEU TEXTILE MILL, LONG AN POVINCE
Client: Thuan Kieu Company
Position: Environmental Engineer
Responsibilities: do the technology and detail design; the quotation and the proposal
Certification:
The undersigned certifies the above information is true and correct and will be responsible for any false statement discovered.
HCM city, Date 02 Month 07 Year 2015
Prepared by
PHUNG, TRAN TIEU