CV-English_Bartilotti-08-05-2016

7
1 CURRICULUM VITAE NAME: MANUEL RAMOS DE CAMPOS ABREU BARTILOTTI ADDRESS: Rua S. Miguel Nascente 6, 2ºC 2805-024 Pragal Almada PORTUGAL TELEPHONES: MOBILE. (+351 96 383 46 71) HOME. (+351 21 295 74 39) E MAIL: [email protected] SKYPE: mannybarti113 NATIONALITY: Portuguese. CIVIL STAUS: Divorced. DATE OF BIRTH: 13/09/1952 LANGUAGES: Portuguese (Mother Tong), English & French (Spoken & Written), Spanish (Spoken) Italien. (Spoken). ACADEMIC BACKGROUND: Technical high industrial school, with two years of the Preparatory Sections for engineering institutes. PROFESSIONAL TRAINING: - Technical Drawing Course. Rigger Course. Piping and Equipment Lifting By Mammoet Holland SPECIAL FLANGES ERECTION COURSE (Male anda Female, Tong and Groove, Ring Joint) HOLLAND SAFETY CERTIFICATE: VOL-VCA Safety for Operational Supervisors SCC EXECUTIVE SUMARY: I have more than 30 years experience in the field of piping and steel structures in the following areas for Construction of the: Petrochemical’s, Refineries, Gas Plants, Water Treatment Centers, Incinerator’s, Cellulose factories, Chemicals plants, Crackers Factories and Mill factories. After serving my time as a pipe fitter I subsequently moved into piping and steel structures Foreman and Supervisor alternating as Construction Superintendent, QC Supervisor and Piping Field Engineer. Computer literate such as: Windows and Office (EXCEL and WORD). I have gained a widened knowledge of production assemblies of piping and structure, maintenance of machines, work preparation, materials, welding sequence and systems such as: (SMAW, GTAW, SAW, and Plasma.) and co-ordination of workforce. I consider my main attributes to be a self-motivated team player who works well under pressure to meet project requirements and time schedules. PROFESSIONAL EXPERIÊNCE: 10/04/2016 to date: SONIM Technologies in the OPTARA PROJECT at TOTAL Refinery in Antwerp, Belgium. POSITION: PIPING SUPERVISOR RESPONSIBILITIES: Activities as Piping Supervisor as such. Control and Supervision as well as the Planning of the Elevation sequence and Technical Resources Needed for the allocation of several Tie-Ins to be carried out in ovens Nº. 160, Nº. 170 and Nº. 180, before the Shut Down of the "Area-S", which I am a Supervisor. After the Shut Down of "Area- S" Supervise to and Control the assembly of new lines of Piping in both Carbon Steel and Stainless Steel that will continue for a new Pipe-Rack, which is already being built out of "Area- S".

Transcript of CV-English_Bartilotti-08-05-2016

Page 1: CV-English_Bartilotti-08-05-2016

1

CURRICULUM VITAE NAME: MANUEL RAMOS DE CAMPOS ABREU BARTILOTTI

ADDRESS: Rua S. Miguel Nascente 6, 2ºC 2805-024 Pragal – Almada PORTUGAL

TELEPHONES: MOBILE. (+351 96 383 46 71) HOME. (+351 21 295 74 39)

E –MAIL: [email protected] SKYPE: mannybarti113 NATIONALITY: Portuguese. CIVIL STAUS: Divorced. DATE OF BIRTH: 13/09/1952

LANGUAGES: Portuguese (Mother Tong), English & French (Spoken & Written), Spanish (Spoken)

Italien. (Spoken).

ACADEMIC BACKGROUND: Technical high industrial school, with two years of the Preparatory Sections

for engineering institutes.

PROFESSIONAL TRAINING: -

Technical Drawing Course.

Rigger Course. Piping and Equipment Lifting – By Mammoet – Holland

SPECIAL FLANGES ERECTION COURSE (Male anda Female, Tong and Groove, Ring Joint) –

HOLLAND

SAFETY CERTIFICATE: VOL-VCA – Safety for Operational Supervisors SCC

EXECUTIVE SUMARY:

I have more than 30 years experience in the field of piping and steel structures in the following areas for

Construction of the: Petrochemical’s, Refineries, Gas Plants, Water Treatment Centers, Incinerator’s, Cellulose

factories, Chemicals plants, Crackers Factories and Mill factories.

After serving my time as a pipe fitter I subsequently moved into piping and steel structures Foreman and

Supervisor alternating as Construction Superintendent, QC Supervisor and Piping Field Engineer. Computer

literate such as: Windows and Office – (EXCEL and WORD).

I have gained a widened knowledge of production assemblies of piping and structure, maintenance of machines,

work preparation, materials, welding sequence and systems such as: (SMAW, GTAW, SAW, and Plasma.) and

co-ordination of workforce.

I consider my main attributes to be a self-motivated team player who works well under pressure to meet project

requirements and time schedules.

PROFESSIONAL EXPERIÊNCE:

10/04/2016 to date: SONIM Technologies in the OPTARA PROJECT at TOTAL Refinery in Antwerp,

Belgium.

POSITION: PIPING SUPERVISOR

RESPONSIBILITIES: Activities as Piping Supervisor as such.

Control and Supervision as well as the Planning of the Elevation sequence and Technical Resources Needed for

the allocation of several Tie-Ins to be carried out in ovens Nº. 160, Nº. 170 and Nº. 180, before the Shut Down of

the "Area-S", which I am a Supervisor.

After the Shut Down of "Area- S" Supervise to and Control the assembly of new lines of Piping in both Carbon

Steel and Stainless Steel that will continue for a new Pipe-Rack, which is already being built out of "Area- S".

Page 2: CV-English_Bartilotti-08-05-2016

2

04/ 2012 till 12/ 2015: SITUBEL

POSITION: PIPING SUPERVISOR

RESPONSIBILITIES: Activities as a Piping Supervisor such as.

Responsible for the supervision of prefabrication and assembly of pipes in various companies for short-term

projects in SITUBEL - PORTUGAL.

04/2010 till 31/12/2011: THYSSENKRUPP

POSITION: PIPING SUPERVISOR

RESPONSIBILITIES: Activities as a piping supervisor such as.

Responsible for Supervision and Inspection the Subcontractor Company in Prefabrication and assembly of the

entire piping on "FGD_Bateria-A ', B and C. Who is the {Flue Gas Desulfurization System of the Coking Plant}.

Modify and rerouting on site, the majority of the pipe work spools, and supports.

Coordinating the daily report and weekly progress. Member of the pre-commissioning and the commissioning

Team on “FGD_Battery-A”, “FGD_Battery-B” and “FGD_Battery-C”.

PROJECT: THYSSENKRUPP / CSA, New Steel Industry of Atlântic - “BRAZIL”

06/2008 till 09/2009: THYSSENKRUPP

POSITION: CONSTRUCTION SUPERVISOR

RESPONSIBILITIES: Activities as piping and structural construction Supervisor Such as.

Supervising and Inspection of Subcontractors Companies in the work of assembling the Steel Structures and

The Ducts belonging to Dedusting System of the Blast Furnaces inside and outside the Stock House and Cast

House.

Resolve the Subcontractors problems in Assembly and erection of steel structures and the ducts according to the

norms on Site.

Coordination of the weekly progress. Cooperation and help the logistic Department.

Supervision and Inspection in the assembly of the Pressure Equalizing System of the Blast Furnace 01.

Responsible for the daily inspection of a Brazilian Company named "EBSE", situated about at 25 km from the

Permises of the Steel Plant, which was hired by ThyssenKrupp for make the Pre-fabrication of a large part of the

Piping Spools for Erection of the two Blast Furnaces.

Supervising and Inspection the Erection of piping utilities on Stock house and Cast House.

PROJECT: THYSSENKRUPP/CSA, New Steel Industry of Atlântic - “BRAZIL”

01/05/2008 till 01/06/2008: ABB S.p.A Italy

POSITION: PIPING SUPERVISOR

RESPONSIBILITIES: Activities as a piping supervisor such as.

When I started my work in Algeria, I was placed in the Piping Superintendent office next to Camp where we all

live it was also the place where was situated the workshop prefabrication of piping for various units of Natural

Gas who were to be Remodeled.

After a few days, I was requested by the Site Manager to work together studying what types of welding

procedures that we had on our hands to weld the tie-ins at several refineries Renewal of Natural Gas that could

not stop the refining the Natural Gas.

During the time I was working in conjunction with the Site Manager, he asked me to perform all the calculations

necessary to make Water hydraulic testing for a Refinery Gas Renewal that was within the board of Hassi R’mel.

The volume of Water Calculated by me, would be transported to the refinery by a Sisterna Truck.

Supervise several workers and instruct them the method for opening the flanges of gas pipelines that were already

empty and no traces of gas to be able to take with proper security the Scratched Ring Joint, and then they could

insert the new Ring Joint without any problem in one of the areas of the refinery that was already stopped and

prepared to conduct this kind of work, knowing that the refinery has always been in continuous process of

Refining the Natural Gas.

PROJECT: BOOSTING Ph2 Hassi R’mel on Several Natural Gas Refineries – ALGERIA.

Page 3: CV-English_Bartilotti-08-05-2016

3

09/2007 till 30/04/2008: TECHNIP ITALY S.p.A.

POSITION: PIPING FIELD ENGINEER

RESPONSIBILITIES: Activities of Piping Field Engineer such as.

Preparation of isometrics and piping layouts, for emission to the field for pre-fabrication and erection.

Troubleshooting with the pipe through the existing Technical Queries on Work Site.

Small bore Piping Special Supports Designer.

Preparation of Test Folders, and Punch Lists of erected piping.

I was one of the Team Members for Verification and Approval well as the signature of the

Signing of Documents Required for delivery to the Client the Reinstallation of piping after the execution of the

tests.

PROJECT: Canadian Natural Resources Oil Sands (C.N.R.L.) HORIZON PLANT - CANADA.

01/2007 till 08/2007: Consolidated Contractors International Company (S.A.L.)

POSITION: SITE SUPERINTENDENT - PIPING

RESPONSIBILITIES: Activities as a Site Superintendent – Piping such as.

Coordination of the Piping Survey on Pipe Racks, supervise and plan the erection sequence.

Coordination of the Piping Flushing works.

Assistance to the Engineering Department, control and verification that the individual isometrics each reel, were

in agreement with the original isometric in measurements, rotations, Angles and so on.

Coordination of the progress of sub-contractor’s works and weekly planning.

Resolve of projects deviations.

PROJECT: Expansion of Gas Plant in the department of Quality Control Section whose acronym is (Q.C.S.) in

Ras Laffan Industrial City – QATAR.

06/2006 till 12/2006: ALLSEAS – ENGINEERING BV

POSITION: PIPING SUPERVISOR

RESPONSIBILITIES: Piping Supervisor works such as.

Supervision of pre-fabrication works in the workshop.

Supervision and plan the erection of piping spools on board the ship was converted from cargo ship to lay

pipeline on sea ship.

Planning of the erection work sequence and necessary resources allocation.

Co-ordination and supervision of both labour and materials.

Resolve of project deviations by means of Site Technical Queries.

The Conversion of the Cargo Ship to Ship for laying pipelines on the bottom of the sea belonging to Allseas was

completed in the shipyards of Keppel Verolme in the NETHERLANDS.

PROJECT: AUDACIA OF ALLSEAS / KEPPEL VEROLME – THE NETHERLANDS

08/2004 till 03/2006: FABRICOM – GTI – SUEZ

POSITION: PIPING FOREMAN

RESPONSIBILITIES: Activities of Piping Foreman such as.

Coordination of prefabrication of spools in carbon steel and stainless steel with different schedules of piping.

Responsible for daily progress of piping spools already tacked weld.

Planning the prefabricated piping spools for be welded on the workshop welding area.

Assistance to hand-over.

Co-ordination the Prefabrication of spools of piping for be installed in the modules in the area where they were

being manufactured and assembled modules that after being with all pipe

spools mounted properly, and be accepted by the Quality Control these same modules were

loaded on ships able to transport the modules to build a new refinery in NORWAY.

PROJECT: WORKSHOP OF FABRICOM-GTI-SUEZ IN HOBOKEN – BÉLGIUM

Page 4: CV-English_Bartilotti-08-05-2016

4

08/2002 till 07/2004; ABB LUMMUS GLOBAL

POSITION: PIPING and STRUCTURES SUPERVISOR

RESPONSIBILITIES: Responsible for the erection of the pipe and structure works, including.

Co-ordination and supervision of both labour and materials.

Resolve of project deviations by means of Technical Queries.

Planning of the erection work sequence and necessary resources allocation.

PROJECT: PO11 Project – Lyondell, Maasvlakte – NETHERLANDS

06/2002 till 08/2002: GENIUS VOS

POSITION: PIPING FOREMAN

RESPONSIBILITIES: Activities as a Piping Foreman such as.

Receipt the Isometrics by the Workshop Supervisor who were sent from several Petroleum Prospecting platforms

anchored in the North Sea to the workshop facilities of Genius Vos, for fabrication of the new piping spools in

Carbon Steel, Stainless Steel, Duplex and Super Duplex, to replace the piping spools that were already in process

of corrosion and wear of the several platforms, which the Genius Vos provided consumables for the maintenance

of anchored Platforms on the Sea as well as a Technical Support.

Planning the implementation of piping spools of small and large bore in Carbon Steel, Stainless Steel, Duplex

and Super Duplex.

Planning the execution of the tests required of new piping spools in Carbon Steel, Stainless Steel, Duplex and

Super Duplex.

Repairs onshore of small Petroleum Prospecting Platforms that were transported from the North Sea to a land

adjacent to the Genius Vos Workshop.

PROJECT: Piping Fabrication in Carbon Steel, Stainless Steel, Duplex and Super Duplex - GENIUS VOS

WORKSHOP in IJMUDEN - NETHERLANDS.

04/2002 till 05/2002: STORK INDUSTRY SERVICES BV

POSITION: PIPING FOREMAN

RESPONSIBILITIES: Responsibilities of Piping Foreman were.

Planning the execution of piping spool’s (small bore and large bore).

Planning the execution of piping spools and implementation of the necessary tests.

Planning the execution of construction the piping supports.

Planning the Erection of Piping Spools.

Supervising the Erection of Piping Spools.

Coordination the Fabrication the Spools of Piping..

PROJECT: SHELL PERNIS OIL REFINERY IN ROTTERDAM – NETHERLANDS

01/2001 till 31/12/2001: OELE-HIDRAUVIANENSE Lda,

POSITION: CONSTRUCTION SUPERVISOR / ENGINEER

RESPONSIBILITES: Responsible for the construction of the piping and structural works including.

Planning the erection work sequence and necessary resources allocation for Installation the New HVAC

Machines, and new Heaters, who will be installed on the same Foundations of the Hold HVAC Machines and the

Heaters was installed.

Supervising the Installation of new Chillers, and all Piping connections to the Chillers.

Co-ordination and supervision of both labour and materials.

In this project, I was the one who drew all new piping isometrics that was prefabricated and assembled in

brackets also designed by me that were installed next to the existing piping.

PROJECT: Installation of new HVAC equipment in one of the networks operators of National Mobil

Phones named TMN in Main Headquarters in LISBON – PORTUGAL

Page 5: CV-English_Bartilotti-08-05-2016

5

06/1999 till 09/2000: PONTICELLI Frères.

POSITION: WORK PREPARATOR

RESPONSIBILITIES: Activities of technical office related with Work Preparation

and Construction Engineering, such as.

Preparation the isometrics and piping layouts, for emission to the field, for pre-fabrication and erection.

Preparation and release Piping Supports construction work-packages. Resolve of piping Technical Queries.

Monitoring of Pipe Assemblies and monitoring of pipe materials, as well as giving technical support in the field

of Construction.

Preparation the “As Builts”, Test Packs and Punch List’s.

PROJECT: SOLVAY PETROCHEMICAL in MARTOREL – SPAIN.

1998 till 1999: SICOM BV

POSITION: PIPING SUPERVISOR

RESPONSIBILITIES: Main technical activities were as follows.

Supervision of Spool’s Fabrication and Erection.

Resolution of Project Modifications through Technical Consultations to the Engineering Department.

Planning of the erection work sequence and necessary resources allocation.

PROJECT: CONSTRUCTION OF A NEW PHASE IN SHELL PERNIS REFINERY – HOLLAND

1997 till 1998: DUMEZ COPISA

POSITION: QUALITY CONTROL SUPERVISOR

RESPONSIBILITIES: Activities of Quality Control Supervisor such as.

Daily inspection of joints to be welded in Carbon Steel and Stainless Steel pipes such as 304L, 316L and Duplex.

Daily inspection of the welders portable stoves in order to confirm that those same stoves were connected to the

electrical current in order to maintain a temperature between 80°C and 150°C, and if not contained Carbon Steel

Electrodes mixed with Stainless Steel Electrodes.

Visual inspection of welds on Carbon steel pipes, stainless steel pipes and Duplex.

Verification of welding procedures, and providing the documentation necessary for different types of welding in

the work, such as welding in Carbon Steel Pipes, Stainless Steel Pipes 304L, 316L and Duplex.

Preparation the Documentation and monitoring the release of the Ppiping Spools for Abrasive Sand Blasting and

Painting of the respective Piping Spools.

Pipe circuits checking and punch lists.

PROJECT: PETROCHEMICAL INDUSTRY (IN CARTAGENA) – SPAIN

1996 till 1997: SICOM BV

POSITION: PIPING SUPERVISOR

RESPONSIBILITIES: Main technical activities were.

Supervising the manufacturing of piping spools.

Resolution of the changes made in isometrics through technical consultations to the Engineering Workshop.

Planning of prefabrication of the sequence of piping spools and forward these same piping spools to the

Department of Welding Workshop of SICOM BV in Vlissingen.

PROJECT: Prefabrication for the construction of a new phase in the Shell Refinery in Moerdjike -

NETHERLANDS.

Page 6: CV-English_Bartilotti-08-05-2016

6

04/1995 till 03/1996 GENIUS VOS

POSITION: PIPING FOREMAN

RESPONSIBILITIES: Activities as a Piping Foreman such as.

Receipt the Isometrics by the Workshop Supervisor who were sent from several Petroleum Prospecting platforms

anchored in the North Sea to the workshop facilities of Genius Vos, for fabrication of the new piping spools in

Carbon Steel, Stainless Steel, Duplex and Super Duplex, to replace the piping spools that were already in process

of corrosion and wear of the several platforms, which the Genius Vos provided consumables for the maintenance

of anchored Platforms on the Sea as well as a Technical Support.

Planning the implementation of piping spools of small and large bore in Carbon Steel, Stainless Steel, Duplex

and Super Duplex.

Planning the execution of the tests required of new piping spools in Carbon Steel, Stainless Steel, Duplex and

Super Duplex.

Repairs onshore of small Petroleum Prospecting Platforms that were transported from the North Sea to a land

adjacent to the Genius Vos Workshop.

PROJECT: Piping Fabrication in Carbon Steel, Stainless Steel, Duplex and Super Duplex - GENIUS VOS

WORKSHOP in IJMUDEN - NETHERLANDS.

06/1994 till 12/1994: EUROTUNNELS

POSITION: PIPING FOREMAN

RESPONSIBILITIES: These activities are.

Coordination the Erection of the Equipments and piping spoos.

Resolve the project modifications on field.

Planning the Erection work sequence and the necessary resources for piping allocation.

Assistance to hand-over

PROJECT: MEDICAL FACTORY in FRIBOURG - SWITZERLAND

01/1990 till 05/1994: AALBORG CISERVE Lda,

POSITION: FOREMAN COORDINATOR

RESPONSIBILITIES: Main technical activities were.

Coordination of the all piping jobs, between the vessel & the piping Department including,distribution the

manpower and man-hours.

Planning and analise all documents presented by the owners of the Ships for do the piping jobs on different

vessels like VLCCs, Tankers, LPGs, Gas Carriers, Rigs and etc…

PROJECTS: Repair & Maintenance of Boilers on Board the Ships and in Shipyards in PORTUGAL and

AROUND THE WORLD.

10/1987 till 11/1989: FKI - BABCOCK ENGINEERING CONTRACTORS (Pty)

POSITION: PIPING SUPERVISOR

RESPONSIBILITIES: Main technical activities were.

Supervision of Spool’s Fabrication and Erection.

Resolve of project modifications by means of Site Technical Queries.

Planning the Elevation sequence and the resources required for the allocation of Piping Spools and Equipments.

PROJECT: J.C.I.- (Saref Project-Platinum Refinery in RUSTEMBURG – SOUTH AFRICA

Page 7: CV-English_Bartilotti-08-05-2016

7

01/01/1985 till 31/12/1987: N-REN ITERNATIONAL

POSITION: PIPE FITTER

RESPONSIBILITIES: Main technical activities were.

Execution of pre-fabrication and erection of piping spools in Carbon Steel and Stainless Steel.

Execution of piping supports.

Execution the steam tracing with ½” stainless steel pipe in one of the areas of the Complex, were almost the

piping was stainless steel.

PROJECT: CHEMICAL FERTILIZER COMPLEX at TAMATAVE – MADAGASCAR

10/1981 till 03/1983: BABCOCK ENGINEERING CONTRACTORS

POSITION: PIPE FITTER & BOILERMAKER

RESPOSIBILITIES: Main technical activities were.

Execution of pre-fabrication and erection of piping spools in Carbon Steel and Stainless Steel.

Execution of piping support’s.

Execution the fabrication and erection of Steel Structures.

Most of the work I did there, was in stops of several Power Stations in South Africa.

PROJECTS: SHUT DOWNS IN SEVERAL POWER STATIONS – REPUBLIC OF SOUTH AFRICA

04/1979 até 09/1981: A. SOUSA & SOUSA. Lda,

POSITION: PIPE FITTER

RESPONSIBILITIES: Main technical activities were.

Prefabrication and assembly the jacketed pipes in a new National factory for manufacturing the salt and water

crackers and Waffles.

Prefabrication and assembly of supports, where they would be installed the jacketed pipes.

PROJECT: NEW NATIONAL FACTORY OF SALT and WATER CRACKERS & WAFFLES IN MEM-

MARTINS – PORTUGAL.

01/05/1977 till 31/12/1977: MOMPOR / METALTORRE. Lda,

POSITON: PIPE FITTER

RESPONSIBILITIES: Main technical activities were.

I started my career as a Pipefitter in Hydro Tests of a large part of the Crude Pipelines in Petrogal refinery in

Sines.

I was hired by Metaltorre it was one of the companies who hired hand labor to MOMPOR that was one

of several companies that also rented their work to Mompor, for EX :. The Portuguese Nervion,

Gremetal, and many more companies. All these companies were hired by Technip France, to carry out

the construction and completion of the new refinery belonging to the Consortium of Petrogal, which

was the Sines Refinery.

PROJECT: COMPLETE THE CONSTRUCTION OF THE PETROGAL REFINERY in SINES –

PORTUGAL.