CV-CM-310 - NZ Transport Agency · CV-CM-310 0 KAPITI RD INTERCHANGE STAGE 2 BB 16-05-13 ATwo lanes...

7
No. Appd Revision Chk.V Date DO NOT SCALE * Refer to Revision 1 for Original Signature Scale (A1) Scale (A3) Reduced Dwg Check Dsg Verifier Drawn Original Design Date Approved For Project: IF IN DOUBT ASK. Title: Drawing No: Document No. Rev. Drawing Plotted: 17 May 2013 01:21 a.m. TRAFFIC STAGING DRAWINGS - UPDATE.DWG SH1 MACKAYS TO PEKA PEKA RP 1012/0.00 TO 1023/5.00 Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON Construction* By Chk EXPRESSWAY FOR TOC NOT FOR CONSTRUCTION CV-CM-310 0 KAPITI RD INTERCHANGE STAGE 2 BB 16-05-13 A Two lanes shifted south onto the completed widening from Arawhata Road to Milne Drive to provide space for pedestrians and cyclists and allowing for truck movements into and out of site access points. B North abutment works, bridge beams on the north side to be completed along with the northern half of the Kapiti Rd reconstruction to be carried out behind TL-2 barriers Details: - Pedestrians and cyclists will be provided for in TMP layouts with dedicated paths through the work area - All TM at this work site will be undertake to COPTTM Level 2 requirements. A TRAFFIC STAGING FOR TOC PHASE BB 16-05-13 0 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

Transcript of CV-CM-310 - NZ Transport Agency · CV-CM-310 0 KAPITI RD INTERCHANGE STAGE 2 BB 16-05-13 ATwo lanes...

Page 1: CV-CM-310 - NZ Transport Agency · CV-CM-310 0 KAPITI RD INTERCHANGE STAGE 2 BB 16-05-13 ATwo lanes shifted south onto the completed widening from Arawhata Road to Milne Drive to

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 17 May 2013 01:21 a.m.

TRAF

FIC

STAG

ING

DRAW

INGS

- UP

DATE

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

Construction*

By Chk

EXPRESSWAY

FOR TOC

NOT FOR CONSTRUCTION

CV-CM-310 0KAPITI RD INTERCHANGE

STAGE 2BB 16-05-13

A Two lanes shifted south onto the completed widening from Arawhata Road to Milne Drive toprovide space for pedestrians and cyclists and allowing for truck movements into and out of siteaccess points.

B North abutment works, bridge beams on the north side to be completed along with the northernhalf of the Kapiti Rd reconstruction to be carried out behind TL-2 barriers

Details:

- Pedestrians and cyclists will be provided for in TMP layouts with dedicated paths through the work area- All TM at this work site will be undertake to COPTTM Level 2 requirements.

A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

Page 2: CV-CM-310 - NZ Transport Agency · CV-CM-310 0 KAPITI RD INTERCHANGE STAGE 2 BB 16-05-13 ATwo lanes shifted south onto the completed widening from Arawhata Road to Milne Drive to

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 17 May 2013 01:21 a.m.

TRAF

FIC

STAG

ING

DRAW

INGS

- UP

DATE

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

Construction*

By Chk

EXPRESSWAY

FOR TOC

NOT FOR CONSTRUCTION

CV-CM-311 0KAPITI RD INTERCHANGE

DETOUR ROUTEBB 16-05-13

A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

Page 3: CV-CM-310 - NZ Transport Agency · CV-CM-310 0 KAPITI RD INTERCHANGE STAGE 2 BB 16-05-13 ATwo lanes shifted south onto the completed widening from Arawhata Road to Milne Drive to

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 17 May 2013 01:21 a.m.

TRAF

FIC

STAG

ING

DRAW

INGS

- UP

DATE

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

Construction*

By Chk

EXPRESSWAY

FOR TOC

NOT FOR CONSTRUCTION

CV-CM-312 0MAZENGARB ROAD CROSSING

STAGE 1BB 16-05-15

A TRAFFIC STAGING FOR TOC PHASE BB 16-05-150 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

A Alternating flow system controlled by temporary traffic signals.

B Construct MSE wall on north side of Mazengarb Road

Details:

- Pedestrians and cyclists will be provided for in TMP layouts with dedicated paths through the work area- All TM at this work site will be undertake to COPTTM Level 1 requirements.- Work area to be separated from live lanes by TL-2 barriers

A

A

B

STOP

HERE

ON RED

SIGNAL

STOP

HERE

ON RED

SIGNAL

STOP

HERE

ON RED

SIGNAL

Page 4: CV-CM-310 - NZ Transport Agency · CV-CM-310 0 KAPITI RD INTERCHANGE STAGE 2 BB 16-05-13 ATwo lanes shifted south onto the completed widening from Arawhata Road to Milne Drive to

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 17 May 2013 01:21 a.m.

TRAF

FIC

STAG

ING

DRAW

INGS

- UP

DATE

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

Construction*

By Chk

EXPRESSWAY

FOR TOC

NOT FOR CONSTRUCTION

CV-CM-313 0MAZENGARB ROAD CROSSING

STAGE 2BB 16-05-13

A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

Details:

- Pedestrians and cyclists will be provided for in TMP layouts with dedicated paths through the work area- All TM at this work site will be undertake to COPTTM Level 1 requirements.- Work area to be separated from live lanes by TL-2 barriers

STOP

HERE

ON RED

SIGNAL

STOP

HERE

ON RED

SIGNAL

A Alternating flow system controlled by temporary traffic signals.

B Install temporary staging for Stage 3 on the north side of Mazengarb Rd

A

A

A

B

Page 5: CV-CM-310 - NZ Transport Agency · CV-CM-310 0 KAPITI RD INTERCHANGE STAGE 2 BB 16-05-13 ATwo lanes shifted south onto the completed widening from Arawhata Road to Milne Drive to

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 17 May 2013 01:22 a.m.

TRAF

FIC

STAG

ING

DRAW

INGS

- UP

DATE

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

Construction*

By Chk

EXPRESSWAY

FOR TOC

NOT FOR CONSTRUCTION

CV-CM-314 0MAZENGARB ROAD CROSSING

STAGE 3BB 16-05-13

A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

Details:- Pedestrians and cyclists will be provided for in TMP layouts with dedicated paths through the work area- All TM at this work site will be undertake to COPTTM Level 1 requirements.- Work area to be separated from live lanes by TL-2 barriers- Guardrail to be installed to protect the traffic lane on the temporary staging

STOP

HERE

ON RED

SIGNAL

A Alternating flow system controlled by temporary traffic signals.

B Traffic running on temporary staging through work area.

A

B

A

E

STOP

HERE

ON RED

SIGNAL

C

C Pedestrians and cyclists provided with separate path over staging.

D Temporary pavement ramps to connect staging deck to road.

BCCross section of temporary staging

D

D

E Construct retaining walls, bridge structure and pavement around temporary staging.

Page 6: CV-CM-310 - NZ Transport Agency · CV-CM-310 0 KAPITI RD INTERCHANGE STAGE 2 BB 16-05-13 ATwo lanes shifted south onto the completed widening from Arawhata Road to Milne Drive to

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 17 May 2013 01:22 a.m.

TRAF

FIC

STAG

ING

DRAW

INGS

- UP

DATE

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

Construction*

By Chk

EXPRESSWAY

FOR TOC

NOT FOR CONSTRUCTION

CV-CM-315 0MAZENGARB ROAD CROSSING

STAGE 2BB 16-05-13

A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12

Details:

- Pedestrians and cyclists will be provided for in TMP layouts with dedicated paths through the work area- All TM at this work site will be undertake to COPTTM Level 1 requirements.- Work area to be separated from live lanes by TL-2 barriers

STOP

HERE

ON RED

SIGNAL

STOP

HERE

ON RED

SIGNAL

A Alternating flow system controlled by temporary traffic signals.

B Remove temporary staging and complete pavement on Mazengbarb Road

A

A

A

B

Page 7: CV-CM-310 - NZ Transport Agency · CV-CM-310 0 KAPITI RD INTERCHANGE STAGE 2 BB 16-05-13 ATwo lanes shifted south onto the completed widening from Arawhata Road to Milne Drive to

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 17 May 2013 01:22 a.m.

TRAF

FIC

STAG

ING

DRAW

INGS

- UP

DATE

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

Construction*

By Chk

EXPRESSWAY

FOR TOC

NOT FOR CONSTRUCTION

CV-CM-316 0MAZENGARB RD CROSSING

DETOUR ROUTEBB 16-05-13

A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12