Cut and Slip Drilling Line

download Cut and Slip Drilling Line

of 32

Transcript of Cut and Slip Drilling Line

  • 8/10/2019 Cut and Slip Drilling Line

    1/32

    Romfor International Ltd.

    CUT AND SLIP

    DRILLING LINE

    CUT AND SLIP

    DRILLING LINECUT

    AND

    SLIP

    D

    RILLING

    LINE

    Backup HandBackup Hand

  • 8/10/2019 Cut and Slip Drilling Line

    2/32

    Romfor International Ltd.

    CUT AND SLIP

    DRILLING LINE

    CUT AND SLIP

    DRILLING LINE

    Backup HandBackup Hand

  • 8/10/2019 Cut and Slip Drilling Line

    3/32

    Romfor International Ltd. Backup Hand

    STEP SUB PROCEDURE REMARKS

    BACKUP HAND DRILLING LINE

    CUT AND SLIP DRILLING LINE

    1

    PPE Requirements - Hardhat, Safety Glasses, Full

    Face Shield, Work Gloves, Steel Toe Shoes, Back

    Support and Fall Protection.

    Review rig specific JSAs on cutting and slipping

    drilling line and hoisting personnel.

    Inspect Equipment:Anti-Fall equipment, block hanging line, bosuns

    chair, shackles ,block slings, line cutter and hand

    tools used for the job.

    READY TO HANG BLOCKS

    (Assuming drill pipe is in rotary table)

    Drill String should be positioned at bottom of last

    casing string and well secured.

    Ensure that well bore is static.

    Assist in setting slips (with drill string at proper height).

    After blocks are lowered, stand clear while elevators

    are unlatched.

    Assist as directed in inspecting drilling line, while

    Driller is raising blocks.

    After blocks are raised to proper position, assist in

    using air / hydraulic hoist for installing safety valve.

    Assist as directed in tightening drill pipe safety valveto the proper make up torque (do not put tongs on

    open / close area of drill pipe safety valve).

    Stand clear while blocks are moved to the proper

    position for installation of block hanging line.

    Assist Derrickman, in attaching harness / bosuns

    chair to air / hydraulic hoist.

    JSAs should be rig specific.

    Rig manager is required on the

    floor when using bosuns chair.

    Use fall protection, 100% tie offand avoid pinch points.

    Operational issues may

    change position of drill string.

    Ensure that proper lifting

    techniques are used.

    Avoid pinch points and stay out

    of Drillers view.

    Keep hands clear while line is

    spooling on drum.

    Use full open lifting eye for

    hoisting safety valve.

    Avoid pinch points and ensurefloor is clear of trip hazards.

    Ensure safety valve is in the

    open position. Stay out of the

    red zone (between rig tongs).

    Ensure brake handle is locked

    down after positioning blocks.

    Attach directly to shackle.

    1

    2

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

  • 8/10/2019 Cut and Slip Drilling Line

    4/32

    STEP SUB PROCEDURE REMARKS

    Backup Hand

    BACKUP HAND DRILLING LINE

    CUT AND SLIP DRILLING LINE

    Romfor International Ltd.

    2

    Ensure tag line is attached to bosuns chair.

    While Derrickman is lifted, use tag line to position

    Derrickman properly.

    While Derrickman is lowered, use tag line to position

    Derrickman properly.

    Assist in removing air / hydraulic winch from harness

    / bosuns chair and store for later use.

    Assist with removal of guards from front of

    drawworks.

    Assist with removal of automatic driller / weight

    indicator load cells off dead line.

    Assist with removal of secondary safety clamp and

    drilling line anchor clamp.

    Assist in securing tag line to drilling line, use tag line

    to pull initial drilling line from drum.

    Assist in taping drilling line area being cut.

    Assist in placing drilling line in line cutter properly.

    Ensure drilling line is secured prior to cutting, to

    avoid any recoil in line.

    READY TO CUT DRILLING LINE

    Assist in cutting drilling line, operate cutter from the

    proper side (closed/pump side).

    Assist in storing cutter properly.

    Assist in pulling drilling line off drum and guide line

    out V-door / beaver slide.

    Ensure tag line is manned by

    qualified person.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Avoid pinch points and store

    guards in safe position.

    Avoid pinch points; ensure

    100% tie off. Use proper hand

    tools.

    Avoid pinch points; ensure

    100% tie off. Use proper handtools.

    Avoid pinch points.

    Watch for burs / wickers.

    Watch for burs / wickers, cover

    line cutter.

    Use proper PPE, Full-face

    shield and avoid pinch points.

    Avoid pinch points.

    Watch for burs / wickers and

    avoid pinch points. Do not let

    drilling line slide through hands.

    1

    2

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

  • 8/10/2019 Cut and Slip Drilling Line

    5/32

    Romfor International Ltd. Backup Hand

    STEP SUB PROCEDURE REMARKS

    BACKUP HAND DRILLING LINE

    CUT AND SLIP DRILLING LINE

    3

    Assist in attaching air/hydraulic hoist to drilling line

    when there is three wraps left on drum.

    Assist in pulling remaining drilling line off drum with

    air / hydraulic hoist.

    Assist with proper removal of drilling line clamp and

    inspect for wear.

    Assist in removing the remainder of drilling line from

    drum using air/hydraulic hoist.

    Assist in lowering cut off drilling line down beaver-

    slide / Vdoor and store properly for disposal.

    Assist in Installation of drilling line in drum.

    Stand clear while drum rotates forward to proper

    position for installation of drilling line clamp.

    Assist in installation of drilling line clamp.

    Assist in attaching snatch block to fast line and raise

    with air / hydraulic hoist to keep proper tension on

    drilling line while spooling drilling line on drum.

    Assist with removal of snatch block and air / hydrau-

    lic hoist.

    Ensure line is slipping through anchor properly.

    Have adequate communications from rig floor to

    drilling line stand / anchor area (use mechanical

    assist to feed line off of drilling line spool).

    Watch for burs / wickers and

    avoid pinch points.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for burs / wickers and

    avoid pinch points. Use proper

    hand tools to remove clamp.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points. Use tag line.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points. Use tag line.

    Avoid pinch points and use

    proper tools.

    Ensure brake handle is locked

    down. Watch for burs / wickers

    and avoid pinch points. Use

    proper hand tools to install

    clamp.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points.

    1

    2

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

  • 8/10/2019 Cut and Slip Drilling Line

    6/32

    STEP SUB PROCEDURE REMARKS

    Backup Hand

    BACKUP HAND DRILLING LINE

    CUT AND SLIP DRILLING LINE

    Romfor International Ltd.

    4

    33

    34

    35

    36

    37

    38

    39

    40

    41

    42

    Assist in installing drilling line anchor clamp and

    secondary anchor safety clamp.

    Stand clear while blocks are raised to proper heightfor removal of block hanging line.

    Assist Derrickman, in attaching harness / bosuns

    chair to air/hydraulic hoist.

    Ensure tag line is attached to bosuns chair.

    While Derrickman is being lifted to proper position,

    pay attention to hand signals and verbal direction

    from the Derrickman.

    Ensure block hanging line is disconnected from top

    of the blocks and placed in stored position.

    Assist in lowering Derrickman to proper position,

    paying attention to hand signals and verbal direction.

    Assist in removing air / hydraulic winch from harness

    / bosuns chair and store properly.

    Assist with removal of drill pipe safety valve. Lift drill

    pipe safety valve with air / hydraulic hoist.

    Assist Driller in checking crown-o-matic for proper

    setting on first stand of tubulars.

    END OF PROCEDURE

    Inspect all clamping devices on

    anchor (brass inserts, anchor

    bolts and nuts) tighten to

    proper torque in sequence (use

    torque wrench). After initial trip

    in re-torque anchor clamping

    device.

    Attach directly to shackle.

    Ensure tag line is manned by

    qualified personnel.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Spool line on air / hydraulic

    winch properly to prevent

    fouling.

    Use verbal communication.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Store under Rig Managers

    control.

    Avoid pinch points and ensure

    floor is clear of trip hazards.Ensure safety valve is in the

    open position. Stay out of the

    red zone (between rig tongs).

    Use full open lifting eye for

    hoisting safety valve.

  • 8/10/2019 Cut and Slip Drilling Line

    7/32

    Romfor International Ltd.

    CUT AND SLIP

    DRILLING LINE

    CUT AND SLIP

    DRILLING LINECUT

    AND

    SLIP

    D

    RILLING

    LINE

    DerrickmanDerrickman

  • 8/10/2019 Cut and Slip Drilling Line

    8/32

    Romfor International Ltd.

    CUT AND SLIP

    DRILLING LINE

    CUT AND SLIP

    DRILLING LINE

    DerrickmanDerrickman

  • 8/10/2019 Cut and Slip Drilling Line

    9/32

    Romfor Internatinal Ltd. Derrickman

    STEP SUB PROCEDURE REMARKS

    DERRICKMAN DRILLING LINE

    CUT AND SLIP DRILLING LINE

    . 1

    PPE Requirements Hardhat, Safety Glasses, Full

    Face Shield, Work Gloves, Steel Toe Shoes, Back

    Support and Fall Protection.

    Review rig specific JSAs on cutting and slipping

    drilling line and hoisting personnel.

    Inspect Equipment:Anti-Fall equipment, block hanging line, bosuns

    chair, shackles ,block slings, line cutter and hand

    tools used for the job.

    READY TO HANG BLOCKS

    (Assuming drill pipe is in rotary table)

    Drill String should be positioned at bottom of last

    casing string and well secured.

    Assist Driller to ensure that well bore is static.

    Assist as directed in inspecting drilling line, while

    Driller is raising blocks.

    Prepare to secure hanging line to top of blocks.

    Locate proper tools for job.

    Inspect and put on proper size lifting harness /

    bosuns chair.

    Attach harness / bosuns chair to air/hydraulic hoist.

    Ensure tag line is attached to bosuns chair.

    Direct hoist operator to lift to proper position, use

    hand signals and verbal direction.

    Disconnect block hanging line from stored position.

    JSAs should be rig specific.

    Rig manager is required on the

    floor when using bosuns chair.

    Use fall protection, 100% tie offand avoid pinch points.

    Notify Rig Manager that

    personnel will be lifted by air/

    hydraulic hoist and that drill

    line is ready to be cut.

    Operational issues may

    change position of drill string.

    Keep hands clear while line is

    spooling on drum.

    Tools should be 100% tied off.

    Use proper lifting device. Use

    100% tie off (refer to JSA on

    lifting personnel with air/

    hydraulic hoist).

    Attach directly to shackle.

    Ensure tag line is manned by

    qualified person.

    Keep feet and hands clear of

    catch points.

    1

    2

    1

    2

    3

    4

    0

    1

    2

    3

    4

    5

    6

    7

  • 8/10/2019 Cut and Slip Drilling Line

    10/32

    STEP SUB PROCEDURE REMARKS

    Derrickman

    DERRICKMAN DRILLING LINE

    CUT AND SLIP DRILLING LINE

    Romfor International Ltd.

    2

    Attach block-hanging line to top of blocks.

    Direct hoist operator to lower to proper position, use

    hand signals and verbal direction.

    Remove harness / bosuns chair and store for later

    use.

    Assist with proper removal of guards from front of

    drawworks.

    Assist with proper removal of automatic Driller/

    weight indicator load cells off dead line.

    Stand clear while blocks are lowered slowly (hang-

    ing line takes full weight of blocks).

    Use derrick climber assist to visually inspect the

    blocks to ensure that blocks are hung properly.

    Assist in securing tag line to drilling line, use tag line

    to pull drilling line from drum.

    Assist in taping drilling line area being cut.

    Assist in placing drilling line in line cutter properly.

    Assist in securing drilling line prior to cutting, to

    avoid any recoil in line.

    READY TO CUT DRILLING LINE

    Assist in pulling drilling line off drum and guide line

    out V-door/beaver slide.

    Assist in attaching air/hydraulic hoist to drilling line

    when there is three wraps left on drum.

    Stand clear while remaining drilling line is pulled offdrum with air / hydraulic hoist.

    Block hanging line should be

    attached at the crown. Use

    verbal communication. Do not

    use stationary cable and

    clamps on block hanging eye.

    Keep feet and hands clear of

    catch points.

    Avoid pinch points and store

    guards in safe position.

    Avoid pinch points; ensure

    100% tie off. Use proper hand

    tools.

    Ensure blocks slowly rest on

    backside of derrick.

    Ensure tie off line and shackle

    is properly aligned and secure.

    Use 100% tie off.

    Avoid pinch points.

    Watch for burs / wickers.

    Watch for burs / wickers, cover

    line cutter.

    Watch for burs / wickers and

    avoid pinch points. Do not let

    drilling line slide through hands.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for burs / wickers andavoid pinch points.

    1

    2

    1

    2

    1

    2

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

  • 8/10/2019 Cut and Slip Drilling Line

    11/32

    Romfor International Ltd. Derrickman

    STEP SUB PROCEDURE REMARKS

    DERRICKMAN DRILLING LINE

    CUT AND SLIP DRILLING LINE

    3

    Inform Driller to stop drum when drilling line clamp is

    accessible for removal.

    Assist with proper removal of drilling line clamp and

    inspect for wear.

    Assist in pulling remainder of drilling line from drum

    using air / hydraulic hoist.

    Assist in slowly lowering cut off drilling line down

    beaver-slide / Vdoor and store properly for disposal.

    Assist in positioning drum for drilling line installation.

    Assist in proper Installation of drilling line in drum.

    Inform Driller to rotate drum forward to proper

    position for installation of drilling line clamp.

    Assist with proper installation of drilling line clamp.

    Assist in keeping proper tension on drilling line while

    drill line is spooled on drum (for tension attach

    snatch block to fast line and raise with air/hydraulic

    hoist until proper tension is on line).

    Assist in proper removal of snatch block and air/hydraulic hoist.

    Inform Driller, when proper amount of drilling line is

    on drum according to rig design.

    Ensure brake handle is locked

    down.

    Watch for burs / wickers and

    avoid pinch points. Use proper

    hand tools to remove clamp.

    Watch for overhead loads.

    Watch for burs / wickers andavoid pinch points. Use tag line.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points. Use tag line.

    Ensure brake is locked down.

    Watch for pinch points and

    watch for burs / wickers.

    Ensure brake handle is locked

    down.

    Watch for burs / wickers and

    avoid pinch points. Use proper

    hand tools to install clamp.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for overhead loads.Watch for burs / wickers and

    avoid pinch points.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points. Ensure

    brake is locked down.

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

  • 8/10/2019 Cut and Slip Drilling Line

    12/32

    STEP SUB PROCEDURE REMARKS

    Derrickman

    DERRICKMAN DRILLING LINE

    CUT AND SLIP DRILLING LINE

    Romfor International Ltd.

    4

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    Assist with proper installation of drawworks guards,

    load cells, drilling line anchor clamp and secondary

    anchor safety clamp.

    Stand clear while blocks are raised to proper heightfor removal of block hanging line.

    Inspect and put on proper size lifting harness /

    bosuns chair.

    Attach harness / bosuns chair to air/hydraulic hoist.

    Ensure tag line is attached to bosuns chair.

    Direct hoist operator to lift to proper position, use

    hand signals and verbal direction.

    Disconnect block hanging line from top of blocks.

    Secure block-hanging line in proper position.

    Direct hoist operator to lower to proper position, use

    hand signals and verbal direction.

    Remove harness / bosuns chair and store properly.

    Prepare to finish trip.

    END OF PROCEDURE

    Inspect all clamping devices on

    anchor (brass inserts, anchor

    bolts and nuts) tighten to

    proper torque in sequence (use

    torque wrench). After initial trip

    in re-torque anchor clamping

    device.

    Use proper lifting device. Use

    100% tie off (refer to JSA on

    lifting personnel with air /

    hydraulic hoist).

    Attach directly to shackle.

    Ensure tag line is manned by

    qualified personnel.

    Keep feet and hands clear of

    catch points.

    Keep feet and hands clear of

    catch points.

    Store under Rig Managers

    control.

    Review JSA on 100% tie off.

    Verbally confirm 100% tied off

    with Driller (use radio).

    1

    2

  • 8/10/2019 Cut and Slip Drilling Line

    13/32

    Romfor International Ltd.

    CUT AND SLIP

    DRILLING LINE

    CUT AND SLIP

    DRILLING LINECUT

    AND

    SLIP

    D

    RILLING

    LINE

    DrillerDriller

  • 8/10/2019 Cut and Slip Drilling Line

    14/32

    Romfor International Ltd.

    CUT AND SLIP

    DRILLING LINE

    CUT AND SLIP

    DRILLING LINE

    DrillerDriller

  • 8/10/2019 Cut and Slip Drilling Line

    15/32

    Romfor International Ltd. Driller

    DRILLER DRILLING LINE

    CUT AND SLIP DRILLING LINE

    STEP SUB PROCEDURE REMARKS

    1

    1

    2

    1

    2

    0

    1

    2

    3

    4

    5

    6

    7

    8

    PPE Requirements - Hardhat, Safety Glasses, Full

    Face Shield, Work Gloves, Steel Toe Shoes, Back

    Support and Fall Protection.

    Review rig specific JSAs on cutting and slipping drilling

    line and hoisting personnel. Notify Rig Manager that

    bosuns chair is needed for lifting employees.

    Inspect Equipment:Anti-Fall equipment, block hanging line, bosuns

    chair, shackles, block slings, line cutter and hand

    tools used for the job.

    READY TO HANG BLOCKS

    (Assuming drill pipe is in rotary table)

    Drill String should be positioned at bottom of last

    casing string and well secured.

    Ensure that well bore is static.

    Ensure slips are set (with drill string at proper height).

    Lower blocks for unlatching elevators.

    Ensure that elevators are unlatched using proper

    handles.

    Raise blocks to proper position for installing safety

    valve in drill pipe, using low drum clutch.

    Install safety valve using air/hydraulic lifting hoist.

    Ensure drill pipe safety valve is tightened to proper

    make up torque.

    Raise blocks slowly while inspecting drilling line on

    drum for bad spots in the line.

    JSAs should be rig specific.

    Rig manager is required on the

    floor when using bosuns chair.

    Use fall protection, 100% tie offand avoid pinch points.

    Notify Rig Manager that

    personnel will be lifted by air/

    hydraulic hoist and that drill

    line is ready to be cut.

    Operational issues may

    change position of drill string.

    Ensure that proper lifting

    techniques are used

    Avoid pinch points.

    Use full open lifting eye for

    hoisting safety valve.

    Avoid pinch points and ensure

    floor is clear of trip hazards.

    Ensure safety valve is in the

    open position.

    If line damage is found, slip

    extra line (as required) before

    cutting.

  • 8/10/2019 Cut and Slip Drilling Line

    16/32

    Driller

    DRILLER DRILLING LINE

    CUT AND SLIP DRILLING LINE

    Romfor International Ltd.

    STEP SUB PROCEDURE REMARKS

    2

    Move blocks to proper position for installation of

    block hanging line.

    Ensure that Derrickman is raised to the top of the

    blocks.

    Ensure block-hanging line is properly attached to topof blocks.

    Ensure Derrickman is lowered to floor and is discon-

    nected from hoist line.

    Ensure proper removal of guards from front of

    drawworks.

    Ensure proper removal of automatic driller / weight

    indicator load cells off dead line.

    Unlock brake handle and lower blocks slowly until

    hanging line takes full weight of blocks.

    Instruct Derrickman to use derrick assist to visually

    inspect blocks and ensure that blocks are hung

    properly.

    Visually inspect brake linkages and brake bands.

    Ensure proper removal of secondary safety clamp

    and drilling line anchor clamp.

    Ensure tag line is secured to drilling line, use tag line

    to pull initial drilling line from drum.

    Slowly reverse proper amount of drilling line off the

    drawworks drum according to ton mileage program.

    Ensure brake handle is locked

    down after positioning blocks.

    Use proper lifting device. Use

    100% tie off. (Refer to JSA on

    lifting personnel with air/

    hydraulic hoist).

    Block hanging line should beattached at the crown. Use

    verbal communication with the

    Derrickman. Do not use

    stationary cable and clamps on

    block hanging eye.

    Avoid pinch points and store

    guards in safe position.

    Avoid pinch points; ensure

    100% tie off. Use proper hand

    tools.

    Ensure blocks slowly rest on

    backside of derrick.

    Ensure 100% tie off.

    Avoid pinch points; ensure

    100% tie off. Use proper hand

    tools.

    Avoid pinch points.

    Avoid pinch points. If using

    drawworks to reverse drilling

    line, ensure that drawworks is

    in reverse before clutching.

    1

    2

    1

    2

    1

    2

    3

    4

    1

    2

    9

    10

    11

    12

    13

    14

  • 8/10/2019 Cut and Slip Drilling Line

    17/32

    Romfor International Ltd. Driller

    DRILLER DRILLING LINE

    CUT AND SLIP DRILLING LINE

    STEP SUB PROCEDURE REMARKS

    3

    Tape drilling line area being cut.

    Ensure drilling line is placed in line cutter properly.

    Secure drilling line prior to cutting to avoid any recoil

    in line.

    READY TO CUT DRILLING LINE

    Instruct motorman to cut drilling line, operating from

    the proper side (closed/pump side) of the cutter.

    Ensure line cutter is released and stored properly.

    Reverse drilling line off drum and guide line out V-

    door / beaver slide.

    Ensure air/hydraulic hoist is attached to drilling line

    when there is three wraps left on drum.

    Using air/hydraulic hoist pull remaining drilling line

    off drum.

    Stop drum when drilling line clamp is accessible for

    removal. Lock down brake handle.

    Ensure proper removal of drilling line clamp and

    inspect for wear.

    Ensure that remainder of drilling line is pulled from

    drum using air / hydraulic hoist.

    Slowly lower cut off drilling line down beaver-slide /

    Vdoor and store properly for disposal.

    Unlock brake handle and position drum for drilling

    line installation.

    Ensure proper Installation of drilling line in drum.

    Rotate drum forward to proper position for installa-

    tion of drilling line clamp. Lock down brake handle.

    Watch for burs / wickers.

    Watch for burs / wickers.

    Ensure proper PPE, Full-face

    shield and avoid pinch points.

    Cover line cutter.

    Avoid pinch points.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for burs / wickers and

    avoid pinch points.

    Ensure brake handle is locked

    down.

    Watch for burs / wickers and

    avoid pinch points. Use proper

    hand tools to remove clamp.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for overhead loads.

    Watches for burs / wickers and

    avoid pinch points. Use tag line.

    1

    2

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

  • 8/10/2019 Cut and Slip Drilling Line

    18/32

    Driller

    DRILLER DRILLING LINE

    CUT AND SLIP DRILLING LINE

    Romfor International Ltd.

    STEP SUB PROCEDURE REMARKS

    4

    1

    2

    3

    29

    30

    31

    32

    33

    34

    35

    36

    Ensure proper installation of drilling line clamp.

    Unlock brake handle. Ensure proper tension is kept on

    drilling line while spooling drilling line on drum (for

    tension attach snatch block to fast line and raise withair/hydraulic hoist until proper tension is on line).

    Ensure proper removal of snatch block and air/

    hydraulic hoist.

    Spool proper amount of drilling line on drum accord-

    ing to rig design (use mechanical assist to feed line

    off of drilling line spool). Drilling line spool should be

    equipped with brake.

    Lock brake handle and ensure proper installation of

    drawworks guards, load cells, drilling line anchor

    clamp and secondary anchor safety clamp.

    Unlock brake handle and raise blocks to proper

    height for removal of block hanging line.

    Lock brake handle down. Raise Derrickman to top of

    blocks.

    Ensure block-hanging line is properly removed and

    secured to derrick.

    Ensure Derrickman is lowered to floor and is discon-

    nected from hoist line.

    Unlock brake handle and raise blocks to proper

    position for removal of drill pipe safety valve.

    Ensure drawworks is shut

    down completely. Watch for

    burs / wickers and avoid pinch

    points. Use proper hand tools

    to install clamp.

    Watch for overhead loads.

    Watches for burs / wickers and

    avoid pinch points.

    Watch for overhead loads.

    Watches for burs / wickers and

    avoid pinch points.

    Watch for overhead loads.

    Watches for burs / wickers and

    avoid pinch points.

    Inspect all clamping devices on

    anchor (brass inserts Anchor

    bolts and nuts) tighten to

    proper torque in sequence (use

    torque wrench). After initial trip

    in re-torque anchor clamping

    device.

    Use proper lifting device. Use

    100% tie off (refer to JSA on

    lifting personnel with air /hydraulic hoist).

    Watch for overhead loads.

    Watches for burs / wickers and

    avoid pinch points.

    Ensure weight indicator is

    working properly.

  • 8/10/2019 Cut and Slip Drilling Line

    19/32

    Romfor International Ltd. Driller

    DRILLER DRILLING LINE

    CUT AND SLIP DRILLING LINE

    STEP SUB PROCEDURE REMARKS

    5

    37

    38

    39

    Ensure proper removal of drill pipe safety valve.

    Ensure Derrickman is 100% tied off before raising

    blocks, to run first stand of tubulars.

    Check crown-o-matic for proper setting on first stand

    of tubulars.

    END OF PROCEDURE

    Watch pinch points. Use full

    opening lifting eye and air /

    hydraulic hoist (store in proper

    position).

    Verbally confirm (with radio)

    that Derrickman is 100% tied

    off.

  • 8/10/2019 Cut and Slip Drilling Line

    20/32

    Romfor International Ltd.

    CUT AND SLIP

    DRILLING LINE

    CUT AND SLIP

    DRILLING LINECUT

    AND

    SLIP

    D

    RILLING

    LINE

    Lead TongLead Tong

  • 8/10/2019 Cut and Slip Drilling Line

    21/32

    Romfor International Ltd.

    CUT AND SLIP

    DRILLING LINE

    CUT AND SLIP

    DRILLING LINE

    Lead Tong

    Hand

    Lead Tong

    Hand

  • 8/10/2019 Cut and Slip Drilling Line

    22/32

    omfor International Ltd. Lead Tong Hand

    STEP SUB PROCEDURE REMARKS

    LEAD TONG HAND DRILLING LINE

    CUT AND SLIP DRILLING LINE

    1

    PPE Requirements - Hardhat, Safety Glasses, Full

    Face Shield, Work Gloves, Steel Toe Shoes, Back

    Support and Fall Protection.

    Review rig specific JSAs on cutting and slipping

    drilling line and hoisting personnel.

    Inspect Equipment:Anti-Fall equipment, block hanging line, bosuns

    chair, shackles ,block slings, line cutter and hand

    tools used for the job.

    READY TO HANG BLOCKS

    (Assuming drill pipe is in rotary table)

    Drill String should be positioned at bottom of last

    casing string and well secured.

    Ensure that well bore is static.

    Assist in setting slips (with drill string at proper

    height).

    After blocks are lowered, stand clear while elevators

    are unlatched.

    Assist as directed in inspecting drilling line, while

    Driller is raising blocks.

    After blocks are raised to proper position, assist in

    using air / hydraulic hoist for installing safety valve.

    Assist as directed in tightening drill pipe safety valveto the proper make up torque.

    Stand clear while blocks are moved to the proper

    position for installation of block hanging line.

    Assist Derrickman, in attaching harness / bosuns

    chair to air/hydraulic hoist.

    JSAs should be rig specific.

    Rig manager is required on the

    floor when using bosuns chair.

    Use fall protection, 100% tie offand avoid pinch points.

    Operational issues may

    change position of drill string.

    Ensure that proper lifting

    techniques are used.

    Avoid pinch points and stay out

    of Drillers view.

    Keep hands clear while line is

    spooling on drum.

    Use full open lifting eye for

    hoisting safety valve.

    Avoid pinch points and ensurefloor is clear of trip hazards.

    Ensure safety valve is in the

    open position. Stay out of the

    red zone (between rig tongs).

    Ensure brake handle is locked

    down after positioning blocks.

    Attach directly to shackle.

    1

    2

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

  • 8/10/2019 Cut and Slip Drilling Line

    23/32

    STEP SUB PROCEDURE REMARKS

    Lead Tong Hand

    LEAD TONG HAND DRILLING LINE

    CUT AND SLIP DRILLING LINE

    Romfor International Ltd.

    2

    Ensure tag line is attached to bosuns chair.

    While Derrickman is lifted, use tag line to position

    Derrickman properly.

    While Derrickman is lowered, use tag line to position

    Derrickman properly.

    Assist in removing air / hydraulic winch from harness

    / bosuns chair and store for later use.

    Assist with removal of guards from front of

    drawworks.

    Assist with removal of automatic driller / weight

    indicator load cells off dead line.

    Assist with removal of secondary safety clamp and

    drilling line anchor clamp.

    Assist in securing tag line to drilling line, use tag line

    to pull initial drilling line from drum.

    Assist in taping drilling line area being cut.

    Assist in placing drilling line in line cutter properly.

    Ensure drilling line is secured prior to cutting, to

    avoid any recoil in line.

    READY TO CUT DRILLING LINE

    Assist in cutting drilling line, operate cutter from the

    proper side (closed/pump side).

    Assist in storing cutter properly.

    Assist in pulling drilling line off drum and guide line

    out V-door / beaver slide.

    Ensure tag line is manned by

    qualified person.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Avoid pinch points and store

    guards in safe position.

    Avoid pinch points; ensure

    100% tie off. Use proper hand

    tools.

    Avoid pinch points; ensure

    100% tie off. Use proper handtools.

    Avoid pinch points.

    Watch for burs / wickers.

    Watch for burs / wickers, cover

    line cutter.

    Use proper PPE, Full-face

    shield and avoid pinch points.

    Avoid pinch points.

    Watch for burs / wickers and

    avoid pinch points. Do not let

    drilling line slide through hands.

    1

    2

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

  • 8/10/2019 Cut and Slip Drilling Line

    24/32

    omfor International Ltd. Lead Tong Hand

    STEP SUB PROCEDURE REMARKS

    LEAD TONG HAND DRILLING LINE

    CUT AND SLIP DRILLING LINE

    3

    Assist in attaching air/hydraulic hoist to drilling line

    when there is three wraps left on drum.

    Assist in pulling remaining drilling line off drum with

    air / hydraulic hoist.

    Assist with proper removal of drilling line clamp and

    inspect for wear.

    Assist in removing the remainder of drilling line from

    drum using air/hydraulic hoist.

    Assist in lowering cut off drilling line down beaver-

    slide / Vdoor and store properly for disposal.

    Assist in Installation of drilling line in drum.

    Stand clear while drum rotates forward to proper

    position for installation of drilling line clamp.

    Assist in installation of drilling line clamp.

    Assist in attaching snatch block to fast line and raise

    with air / hydraulic hoist to keep proper tension on

    drilling line while spooling drilling line on drum.

    Assist with removal of snatch block and air / hydraulic

    hoist.

    Ensure line is slipping through anchor properly.

    Have adequate communications from rig floor to

    drilling line stand / anchor area (use mechanical

    assist to feed line off of drilling line spool).

    Watch for burs / wickers and

    avoid pinch points.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for burs / wickers and

    avoid pinch points. Use proper

    hand tools to remove clamp.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points. Use tag line.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points. Use tag line.

    Avoid pinch points and use

    proper tools.

    Ensure brake handle is locked

    down. Watch for burs / wickers

    and avoid pinch points. Use

    proper hand tools to install

    clamp.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points.

    1

    2

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

  • 8/10/2019 Cut and Slip Drilling Line

    25/32

    STEP SUB PROCEDURE REMARKS

    Lead Tong Hand

    LEAD TONG HAND DRILLING LINE

    CUT AND SLIP DRILLING LINE

    Romfor

    4

    33

    34

    35

    36

    37

    38

    39

    40

    41

    42

    Assist in installing drilling line anchor clamp and

    secondary anchor safety clamp.

    Stand clear while blocks are raised to proper heightfor removal of block hanging line.

    Assist Derrickman, in attaching harness / bosuns

    chair to air/hydraulic hoist.

    Ensure tag line is attached to bosuns chair.

    While Derrickman is being lifted to proper position,

    pay attention to hand signals and verbal directionfrom the Derrickman.

    Ensure block hanging line is disconnected from top

    of the blocks and placed in stored position.

    Assist in lowering Derrickman to proper position,

    paying attention to hand signals and verbal direction.

    Assist in removing air / hydraulic winch from harness

    / bosuns chair and store properly.

    Assist with removal of drill pipe safety valve (do not

    put tongs on open / close area of drill pipe safetyvalve). Lift drill pipe safety valve with air / hydraulic

    hoist.

    Assist Driller in checking crown-o-matic for proper

    setting on first stand of tubulars.

    END OF PROCEDURE

    Inspect all clamping devices on

    anchor (brass inserts, anchor

    bolts and nuts) tighten to

    proper torque in sequence (use

    torque wrench). After initial trip

    in re-torque anchor clamping

    device.

    Attach directly to shackle.

    Ensure tag line is manned by

    qualified personnel.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Spool line on air / hydraulic

    winch properly to prevent

    fouling.

    Use verbal communication.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Store under Rig Managers

    control.

    Avoid pinch points and ensure

    floor is clear of trip hazards.Ensure safety valve is in the

    open position. Stay out of the

    red zone (between rig tongs).

    Use full open lifting eye for

    hoisting safety valve.

  • 8/10/2019 Cut and Slip Drilling Line

    26/32

    Romfor International Ltd.

    CUT AND SLIP

    DRILLING LINE

    CUT AND SLIP

    DRILLING LINECUT

    AND

    SLIP

    D

    RILLING

    LINE

    MotormanMotorman

  • 8/10/2019 Cut and Slip Drilling Line

    27/32

    Romfor International Ltd.

    CUT AND SLIP

    DRILLING LINE

    CUT AND SLIP

    DRILLING LINE

    MotormanMotorman

  • 8/10/2019 Cut and Slip Drilling Line

    28/32

    Romfor International Ltd. Motorman

    STEP SUB PROCEDURE REMARKS

    MOTORMAN DRILLING LINE

    CUT AND SLIP DRILLING LINE

    PPE Requirements - Hardhat, Safety Glasses, Full

    Face Shield, Work Gloves, Steel Toe Shoes, Back

    Support and Fall Protection.

    Review rig specific JSAs on cutting and slipping

    drilling line and hoisting personnel.

    Inspect Equipment:Anti-Fall equipment, block hanging line, bosuns

    chair, shackles ,block slings, line cutter and hand

    tools used for the job.

    READY TO HANG BLOCKS

    (Assuming drill pipe is in rotary table)

    Drill String should be positioned at bottom of last

    casing string and well secured.

    Ensure that well bore is static.

    Assist in setting slips (with drill string at proper

    height).

    After blocks are lowered, unlatch elevators using

    proper handles.

    After blocks are raised to proper position, use air /

    hydraulic hoist for installing safety valve.

    Assist as directed in tightening drill pipe safety valve

    to the proper make up torque.

    Assist as directed in inspecting drilling line, while

    Driller is raising blocks.

    Assist Derrickman, in attaching harness / bosuns

    chair to air/hydraulic hoist.

    Ensure tag line is attached to bosuns chair.

    JSAs should be rig specific.

    Rig manager is required on the

    floor when using bosuns chair.

    Use fall protection, 100% tie offand avoid pinch points.

    Operational issues may

    change position of drill string.

    Ensure that proper lifting

    techniques are used.

    Avoid pinch points.

    Use full open lifting eye for

    hoisting safety valve.

    Avoid pinch points and ensure

    floor is clear of trip hazards.

    Ensure safety valve is in the

    open position. Stay out of thered zone (between rig tongs).

    Keep hands clear while line is

    spooling on drum.

    Attach directly to shackle.

    Ensure tag line is manned by

    qualified person.

    1

    2

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

  • 8/10/2019 Cut and Slip Drilling Line

    29/32

    STEP SUB PROCEDURE REMARKS

    Motorman

    MOTORMAN DRILLING LINE

    CUT AND SLIP DRILLING LINE

    Romfor International Ltd.

    2

    Operate hoist to lift Derrickman to proper position,

    pay attention to hand signals and verbal direction

    from the Derrickman.

    Ensure block hanging line is disconnected from

    stored position.

    Ensure block-hanging line is attached to top of the

    blocks.

    Lower Derrickman to proper position, pay attention

    to hand signals and verbal direction.

    Assist in removing air / hydraulic winch from harness

    / bosuns chair and store for later use.

    Assist with removal of guards from front of

    drawworks.

    Assist Driller in visually inspecting brake linkages

    and brake bands.

    Assist with removal of automatic driller / weight

    indicator load cells off dead line.

    Assist with removal of secondary safety clamp and

    drilling line anchor clamp.

    Assist in securing tag line to drilling line, use tag line

    to pull initial drilling line from drum.

    Tape drilling line area being cut.

    Assist in placing drilling line in line cutter properly.

    Ensure drilling line is secured prior to cutting, to

    avoid any recoil in line.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Spool line on air / hydraulic

    winch properly to prevent

    fouling.

    Block hanging line should be

    attached at the crown. Use

    verbal communication. Do not

    use stationary cable and

    clamps on block hanging eye.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Avoid pinch points and store

    guards in safe position.

    Avoid pinch points; ensure

    100% tie off. Use proper hand

    tools.

    Avoid pinch points; ensure

    100% tie off. Use proper hand

    tools.

    Avoid pinch points.

    Watch for burs / wickers.

    Watch for burs / wickers, cover

    line cutter.

    1

    2

    3

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

  • 8/10/2019 Cut and Slip Drilling Line

    30/32

    Romfmor International Ltd. Motorman

    STEP SUB PROCEDURE REMARKS

    MOTORMAN DRILLING LINE

    CUT AND SLIP DRILLING LINE

    3

    READY TO CUT DRILLING LINE

    Cut drilling line, operating from the proper side

    (closed/pump side) of the cutter.

    Release line cutter and store properly.

    Assist in pulling drilling line off drum and guide line

    out V-door / beaver slide.

    Assist in attaching air/hydraulic hoist to drilling line

    when there is three wraps left on drum.

    Operate air / hydraulic hoist to pull remaining drilling

    line off drum.

    Assist with proper removal of drilling line clamp and

    inspect for wear.

    Remove the remainder of drilling line from drum

    using air/hydraulic hoist.

    Slowly lower cut off drilling line down beaver-slide /

    Vdoor and store properly for disposal.

    Assist in Installation of drilling line in drum.

    Stand clear while drum rotates forward to proper

    position for installation of drilling line clamp.

    Assist in installation of drilling line clamp.

    Attach snatch block to fast line and raise with air /

    hydraulic hoist to keep proper tension on drilling line

    while spooling drilling line on drum.

    Use proper PPE, Full-face

    shield and avoid pinch points.

    Avoid pinch points.

    Watch for burs / wickers avoid

    pinch points. Do not let drilling

    line slide through hands.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for burs / wickers avoid

    pinch points.

    Watch for burs / wickers and

    avoid pinch points. Use proper

    hand tools to remove clamp.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points. Use tag line.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points. Use tag line.

    Avoid pinch points and use

    proper tools.

    Ensure brake handle is locked

    down. Watch for burs / wickers

    and avoid pinch points. Use

    proper hand tools to install

    clamp.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points.

    1

    2

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

  • 8/10/2019 Cut and Slip Drilling Line

    31/32

    STEP SUB PROCEDURE REMARKS

    Motorman

    MOTORMAN DRILLING LINE

    CUT AND SLIP DRILLING LINE

    Romfor International Ltd.

    4

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41

    42

    Assist with removal of snatch block and air / hydraulic

    hoist.

    Have enough excess drill line available for slipping

    onto drum according to JSA and rig design.

    Ensure line is slipping through anchor properly.

    Have adequate communications from rig floor todrilling line stand / anchor area (use mechanical

    assist to feed line off of drilling line spool).

    Install drilling line anchor clamp and secondary

    anchor safety clamp.

    Stand clear while blocks are raised to proper height

    for removal of block hanging line.

    Assist Derrickman, in attaching harness / bosuns

    chair to air/hydraulic hoist.

    Ensure tag line is attached to back D ring of

    harness / bosuns chair.

    Operate hoist to lift Derrickman to proper position,

    pay attention to hand signals and verbal direction

    from the Derrickman.

    Ensure block hanging line is disconnected from top

    of the blocks and placed in stored position.

    Lower Derrickman to proper position, pay attention

    to hand signals and verbal direction.

    Assist in removing air / hydraulic winch from harness

    / bosuns chair and store properly.

    Watch for overhead loads.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for burs / wickers and

    avoid pinch points.

    Watch for overhead loads.

    Watch for burs / wickers andavoid pinch points.

    Inspect all clamping devices on

    anchor (brass inserts, anchor

    bolts and nuts) tighten to

    proper torque in sequence (use

    torque wrench). After initial trip

    in re-torque anchor clamping

    device.

    Attach directly to shackle.

    Ensure tag line is manned by

    qualified personnel.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Spool line on air / hydraulic

    winch properly to prevent

    fouling.

    Use verbal communication. Do

    not use stationary cable and

    clamps on block hanging eye.

    Ensure Derrickmans feet and

    hands are clear of catch points.

    Store under Rig Managers

    control.

  • 8/10/2019 Cut and Slip Drilling Line

    32/32

    Romfor International Ltd. Motorman

    STEP SUB PROCEDURE REMARKS

    MOTORMAN DRILLING LINE

    CUT AND SLIP DRILLING LINE

    43

    44

    Assist with removal of drill pipe safety valve. Lift drill

    pipe safety valve with air / hydraulic hoist.

    Assist Driller in checking crown-o-matic for propersetting on first stand of tubulars.

    END OF PROCEDURE

    Avoid pinch points and ensure

    floor is clear of trip hazards.

    Ensure safety valve is in the

    open position. Stay out of the

    red zone (between rig tongs).

    Use full open lifting eye for

    hoisting safety valve.