Customer Satisfaction & Quality (CS&Q) › 2016 › 06 › csq... · 2016-06-15 · - Adopting...
Transcript of Customer Satisfaction & Quality (CS&Q) › 2016 › 06 › csq... · 2016-06-15 · - Adopting...
-
Customer Satisfaction & Quality (CS&Q)
Course #5
Jérôme Firmin
2015
-
Tools / methods - for non Quality Solving & Continuous Improvement
5 Whys
5 S
Fishbone diagram
PDCA – Deming wheel
Failure Mode and Effects Analysis (FMEA)
Eight disciplines (8D)
Six Sigma
Statistic Process Control (SPC)
-
5 Whys is an iterative interrogative technique used to explore the cause-and-
effect relationships underlying a particular problem. The primary goal of the technique is to determine the root cause of a defect or problem by repeating the question "Why?" Each question forms the basis of the next question. The "5" in the
name derives from an empirical observation on the number of iterations typically required to resolve the problem.
5S is the name of a workplace organization method that uses a list describing how to
organize a work space for efficiency and effectiveness by identifying and storing the items used, maintaining the area and items, and sustaining the new order - "sort", "straighten", "shine", "standardize", and "sustain“.
Ishikawa diagrams (also called fishbone diagrams) are causal diagrams created by Kaoru
Ishikawa (1968) that show the causes of a specific event. Common uses of the Ishikawa diagram are product design and quality defect prevention, to identify potential factors causing an overall effect.
PDCA, also known as Deming wheel, is an iterative four-step management method used in
business for the control and continuous improvement of processes and products. PDCA was made popular by Dr W. Edwards Deming, who is considered by many to be the father of modern quality control
-
Failure Mode and Effects Analysis (FMEA) is a systematic techniques for failure analysis. It is often the first step of a system reliability study. It involves reviewing as many components, assemblies, and subsystems as possible to
identify potential failures, their effects, causes and control. Probability for Effect / Cause / Control results in Risk Priority Number.
Eight Disciplines (8Ds) Problem Solving is a method developed at Ford Motor Company to
identify, correct, and eliminate recurring problems. It is focused on product and process improvement.
Six Sigma seeks to improve the quality output of process by identifying and removing the
causes of defects and minimizing variability in manufacturing and business processes. It uses a set of quality management methods, mainly empirical, statistical methods, and creates a special infrastructure of people within the
organization ("Champions", "Black Belts", "Green Belts", "Yellow Belts", etc.) who are experts in these methods. It was introduced by
Motorola in 1986.
Statistical process control (SPC) is a method of quality control which uses statistical methods. SPC is applied in order to monitor and control a process.
-
© 2015 CS Odessa Corp.
-
Deming Wheel PLAN
Establish the objectives and processes necessary to
deliver results in accordance with the expected output (the
target or goals).
DO
Implement the plan, execute the process, make the
product.
CHECK
Study the actual results (measured and collected in "DO"
above) and compare against the expected results (targets
or goals from the "PLAN") to ascertain any differences.
ACT
If the CHECK showed something different than expected
(whether better or worse), then there is some more
learning to be done... and that will suggest potential future
PDCA cycles and change of baseline
-
Mission of Problem to Prevention process
For some issues, resolution is not enough:
● Safety Issues
● Business Risk Escalations
● Other severe issues (Industrial, Supplier,….)
For both Quality and Supply Chain
● Recurrent issues (Industrial, Supplier,….)
For both Quality and Supply Chain
In I2P terminology, these issues are referred to as Problems.
Additional action is
needed in order to:
● Limit the immediate impact
on customers
● Identify and correct the
root causes
● Apply lessons learnt to prevent future
problems
The purpose of the Problem to Prevention process is to contain Problems, identify their root
causes, correct them to avoid recurrence, and apply lessons learnt to prevent future
problems.
Confidential Property of Schneider Electric
-
Process context
Problem to Prevention is a key building block of Issue to Prevention
Issue to Resolution Warm Loop
Issue to Problem Analysis Loop
issue
resolution prevention systemic problem recurrent issue
severe issue immediate prevention needed
Problem to Prevention Cold Loop
Confidential Property of Schneider Electric
-
Problem to Prevention:
A problem solving approach
When you have a problem:
1. Describe the problem
● Clearly state the Problem
2. Isolate it & PROTECT your customer
● This is containment action
3. Understand & Fix it once and for all
● This is corrective action
4. Don’t let it happen elsewhere and in the future
● This is preventive action
Problem
Containment
Correction
Prevention
Confidential Property of Schneider Electric
-
Problem to Prevention:
Four block 8D Structure
D1 Problem
Containment
Correction
Prevention
D2
D3
D4
D5
D6
D7
D8
Develop & Implement
Containment Actions
Assemble a
Cross-Functional Team
Describe the Problem
Identify & Verify Root Causes
Develop & Validate
Corrective Action Plan
Implement & Check
Corrective Actions
Develop and Implement
Preventive Actions
Communicate Results,
Recognize the Team, and Close 8D
Confidential Property of Schneider Electric
-
8D – the disciplines (1/2)
D1: Assemble a team - Establish a team of people with product/process knowledge.
D2: Define and describe the problem - Specify the problem by identifying in quantifiable terms
the who, what, where, when, why, how, and how many (5W2H) for the problem.
D3: Develop interim containment plan - Implement and verify interim actions, define and
implement containment actions to isolate the problem from any customer.
problem
containment
Confidential Property of Schneider Electric
-
8D – the disciplines (2/2)
D4: Determine, identify, and verify root causes and escape points - Identify all applicable
causes that could explain why the problem occurred. Also identify why the problem was not noticed
at the time it occurred. All causes shall be verified or proved, not determined by fuzzy
brainstorming. One can use 5 Whys and cause and effect diagrams to map causes against the
effect or problem identified.
D5: Choose and verify permanent corrections for problem/nonconformity - Through
preproduction programs, quantitatively confirm that the selected correction will resolve the problem
for the customer.
D6: Implement and validate corrective actions - Define & implement the best corrective actions.
D7: Take preventive measures - Modify the management systems, operation systems, practices,
and procedures to prevent recurrence of this and all similar problems.
D8: Congratulate your team - Recognize the collective efforts of the team. The team needs to be
formally thanked by the organization.
correction
prevention
Confidential Property of Schneider Electric
-
Problem to Prevention process overview
Issue to Problem
prioritized
problem
existing problem
new problem Report and Qualify
Problem
Prioritize
Problem problem . . .
Problem to Prevention
correction
prevention
D1
Select
Team
containment failure mode
D2
Describe
Problem
D3
Contain
Problem
operational root causes
systemic root causes
D4
Identify Root
Causes
D5
Define Problem
Correction
D6
Implement & Check
Problem Correction
D7
Prevent
Problem
D8
Close
Problem
Confidential Property of Schneider Electric
-
Key business rules
● A Problem may be reported by anyone in various situations:
Safety risk identified internally or based on customer report
Business Risk Escalation – as a mandatory requirement
Other severe issue identified (Industrial, Supplier,….)
Recurrent issues (Industrial, Supplier,….) identified in the Analysis loop
● Each Problem requires an 8D project
The 8D project is initiated immediately for Problems:
With safety impact
Related to Business Risk Escalations
Related to a Customer shortage
For other Problems, the Prioritize Problem process determines when to launch the 8D.
Confidential Property of Schneider Electric
-
Problem to Prevention: Executive Summary
First 8D workflow tool
for most businesses Supporting prevention of product-
related issues
Traceability from complaints, issues
to root causes and prevention
Complaints, issues can be linked to underlying 8D
projects for traceability. Visibility of “known
problems” in country front offices, in plants.
Addressing recurrent customer complaints,
Safety Risks, Business Risk Escalations,
Industrial and Supplier issues (Quality and
Supply Chain), etc. Used by plants and offer
creation centers.
Evolution from a broad variety of
MS Office templates and in-house built tools.
Key benefits
From:
To:
Excel and Word templates, Lotus
Notes
Fully fledged workflow tool and ability to share
with suppliers
Front office and back office systems disconnected
Front office complaints linked to back office
problems
Open loop field recovery notices to countries (QI)
Assignment and tracking of field action by country
Inconsistent 8D management practices
Consistent definitions for consistent results
Manual reporting as a bureaucratic burden
Reporting embedded into workflow tool
Key changes in a nutshell
Confidential Property of Schneider Electric
-
16 Confidential Property of Schneider Electric
g2G: Objectives & Definition
Scope All kind of good practices that help us improve, especially Customer experience
Definition Good Practice: is a method or technique that has shown superior results that can be used as a
good example or benchmark.
Great Practice: is a Good Practice adopted by at least 3 other entities, supported by the
originating entity.
• Gold Certificate (Adoption by 10 or more entities)
• Silver Certificate (Adoption by 6 or more entities)
• Bronze Certificate (Adoption by 3 or more entities)
> Encourage collaboration in order to leverage good practices
> Involve and recognize the original entity to promote excellence
> Drive fast adoption to maximise return on time and resource
-
17 Confidential Property of Schneider Electric 17
Responsibility
Global CS&Q > Help collect & share potential g2G practices
> Validate & register ‘good practices’ (monthly)
> Promote & share ‘good practices’
> Validate ‘Great practices’ (quarterly) award certificates
based on adoption outside of the originating entity
> Publicize & share ‘Great practices’
Global CS&Q
Main responsibilities:
• Animate the process
• Identify and collect candidates for
good practices
• Assess and validate the good
practices
• Certify the Great Practices
• Publicize and promote the Great
Practices
Originating Entity Main responsibilities:
• Submit the candidate for good
practices
• Promote and explain the good
practice
• Identify potential entities to adopt
• Support the adoption of good
practice by potential entities
• Apply for great practice awards
Originating Entity > Complete deployment & deliver results
> Submit the candidate for good practices (template1)
> Identify potential entities to adopt the practice
> Coach & support the adoption of good practice by
other entities
> Submit as a Great practice (template 2)
START
Complete deployment & deliver results Submit as
a “good Practice”
(Temp 1)
Validate “good
Practice”
Promote “good
Practice”
Identify potential entities to
adopt
Coach & Support entities
identified
Submit as “Great
Practice”
(Temp 2)
Recognize original
entity with certificate
good
2
Great
Process
Template
attached
-
18 Confidential Property of Schneider Electric
Title : Please enter the title here Good Practice
Describe the problem with clear numbers, pain points, etc. Especially related to
customer experience... Prefer with photo.
List major root causes based on 5-Why, Fishbone analysis, etc.
Describe the improvement done, prefer with photos (before vs. after), etc.
Prefer with photo.
List the business benefits and impacts for customers (internal or/and external
customers).
Originating Entity: Ref. #: by CS&Q Date: YYYY/MM/DD
- Orientating entity’s story board for submitting this good practice
- Evidence of promoting, training and coaching other entities by originating entity
- Adopting entities’ story boards as evidence of adaptation outside originating entity
Improvement Done & Description Problem seen & Description
Root Cause Results / Gain
Comments/Attached Files or Links)
Contacts: Name1 ([email protected]) (+Phone Number1)
Name2 ([email protected]) (+Phone Number2)
Template
1
-
19 Confidential Property of Schneider Electric
Title : Please enter the title here Great Practice
Application
Describe the problem with clear numbers, pain points, etc. Especially related to
customer experience... Prefer with photo.
Describe the improvement done, prefer with photos (before vs. after), etc.
Originating Entity: Ref. #: by CS&Q Date: YYYY/MM/DD
- Orientating entity’s story board for submitting this good practice
- Evidence of promoting, training and coaching other entities by originating entity
- Adopting entities’ story boards as evidence of adaptation outside originating entity
Problem seen & Description
Improvement Done & Description
Comments/Attached Files or Links
Contacts: Name1 ([email protected]) (+Phone Number1)
Name2 ([email protected]) (+Phone Number2)
Location Stage (WIP or complete)
Results
B
B
B
S
S
S
G
G
G
G
Template
2
-
20 Confidential Property of Schneider Electric
List of Job in CS&Q (1/2)
Sub-function job code Short title
QMG6 Customer Satisfaction & Quality Manager / Unit
QMG7 Customer Satisfaction & Quality Manager / Country
QMG8 Customer Satisfaction & Quality Manager / Multi-Country
QMG9 Customer Satisfaction & Quality Manager / Global
QMP6 Customer Satisfaction & Quality Project Manager / Unit
QMP7 Customer Satisfaction & Quality Project Manager / Country
QMP8 Customer Satisfaction & Quality Project Manager / Multi-Country
QMP9 Customer Satisfaction & Quality Project Manager / Global
QMS2 Quality Department Assistant
QAT4 Manufacturing Quality Assurance Engineer
QAT5 Manufacturing Quality Assurance Senior Engineer
QBF7 Customer Satisfaction & Loyalty Development (CSLD) Manager / Country
QBF8 Customer Satisfaction & Loyalty Development Manager / Multi-Country
QBF9 Customer Satisfaction & Loyalty Development Manager / Global
QBT5 Customer Complaint Management Engineer
QBT7 Customer Complaint Management Manager / Country
QCS1 Quality Control Operator
QCS2 Quality Control Multi Skilled
QCT3 Quality control inspector
QCT4 Quality Control Engineer
QM - Customer
Satisfaction & Quality
Management
QA - Manufacturing
Quality
QB - Customer
Experience
QC - Quality Control
-
21 Confidential Property of Schneider Electric
List of Job in CS&Q (2/2) QDT4 Design / Industrialisation Quality Engineer
QDT5 Design / Industrialisation Quality Senior Engineer
QDT6 Design / Industrialisation Quality Manager
QDP7 Offer Project Quality Leader
QDP8 Senior Offer Project Quality Leader
QDG6 Offer Quality Engineer
QDG7 Offer Quality Manager
QET4 Supply Quality Engineer
QET5 Supply Quality Senior Engineer
QEF8 Supplier Quality Manager / Multi-Country
QEF9 Supplier Quality Manager / Global
QFF2 Primary Customer Care Agent
QFF3 Primary Customer Care Team Leader
QFF4 Primary Customer Care Specialist
QFF5 Primary Customer Care Supervisor
QFT2 Primary Technical Customer Care Agent
QFT3 Primary Technical Customer Care Team Leader
QFT4 Technical Service Center Specialist
QFT5 Advanced Technical Customer Care Supervisor
QFT6 Expert Technical Support
QFG6 Customer Care Manager / Unit
QFG7 Customer Care Manager / Country
QSF6 Quality System Engineer / Unit
QSF7 Quality System Engineer / Country
QSF8 Quality System Manager / Multi-Country
QSF9 Quality System Manager / Global
QS - Quality System
QD - Offer Quality
QF - Customer Care
QE - Supply & Supplier
Quality