CUSTOM MADE LIGHTING PROJECT U53 PROJECTOR · Polígono Industrial El Regás, C/ dels Oficis, 25 B...

8
grupo-mci.com CUSTOM MADE LIGHTING PROJECT U53 PROJECTOR for Makkah Haram Expansion Makkah, Saudi Arabia. FECHA /DATE: 2013-2014 VERSIÓN/VERSION: 2.0 HEADQUARTERS Polígono Industrial El Regás, C/ dels Oficis, 25 B 08850 Gavà BARCELONA · SPAIN Tel. (+34) 93 630 28 00 Fax. (+34) 93 630 29 66 Mail. [email protected] 40

Transcript of CUSTOM MADE LIGHTING PROJECT U53 PROJECTOR · Polígono Industrial El Regás, C/ dels Oficis, 25 B...

grupo-mci.com

CUSTOM MADE LIGHTING PROJECT

U53 PROJECTOR for Makkah Haram Expansion

Makkah, Saudi Arabia.

FECHA/DATE: 2013-2014 VERSIÓN/VERSION: 2.0

HEADQUARTERS Polígono Industrial El Regás, C/ dels Oficis, 25 B 08850 Gavà BARCELONA · SPAIN

Tel. (+34) 93 630 28 00 Fax. (+34) 93 630 29 66 Mail. [email protected]

40

2 GRUPO MCI

En 2008 se planteó al equipo del Grupo MCI un reto muy especial para la realización de un proyecto luminotécnico, hasta el momento, sin prece-dentes a nivel mundial. El proyecto consistía en diseñar una luminaria que utilizara tecnología LED para iluminar una de las plazas más im-portantes de Oriente Medio, la Piazza Prophet’s Mosque en Medina.

La Piazza Prophet’s Mosque, es un lugar de peregrinación por exce-lencia donde millones de musulmanes se reúnen cada año en época del Hej y Ramadán.

El arquitecto del proyecto se puso en contacto con MCI para diseñar una luminaria capaz de sustituir a una lámpara de descarga de halo-genuros metálicos de 1.065 W, por una luminaria que utilizara tec-nología LED y que tuviera 540 LEDs conducidos a 500 mA. Todo ello sin alterar o modificar la estética actual de la luminaria.

Los motivos principales por los que el cliente quería sustituir la lám-para de descarga de halogenuros por una lámpara basada en tecno-logía LED eran:

1. Reproducción Cromática: Las lámparas convencionales de halo-genuros metálicos a lo largo del tiempo cambian la tonalidad del índice de reproducción cromática (IRC), por lo que la calidad de la iluminación de la luminaria se ve afectada.

2. Mantenimiento: las lámparas de halogenuros metálicos tiene 12.000 horas/vida, frente a las 50.000 horas/vida de los LEDs. Utili-zando nuestro programa Saving Calculator demostramos al cliente un retorno de la inversión al cabo de, aproximadamente, dos años.

In 2008, MCI Group has achieved an unprecedented lighting project, which is to design a luminary with LED Technology to illuminate the Piazza Prophet’s Mosque in Madinah, Saudi Arabia.

The Piazza Phophet’s Mosque is a world renowned place for pilgrims, where millions of Muslims go every year during Hej and Ramadan.

The architect of this project requested us to retrofit luminaire of the existing 1200W metal halide lamp with LED technology with 540 High Power LEDs running at constant current of 500mA, without changing or modifying the outer look of the luminaire.

Two main reasons motivate the client to change to LED technology:

1. Chromatic Reproduction: The conventional metal halide lamps will change its Colour Rendering Index (CRI) gradually with time, and it will affect the aesthetics of the luminaire while LED technology main-tains a steady CRI over time.

2. Maintenance: The metal-halide lamps have a product life of only 12000 hours compared to 50000 Hours of the LEDs. Using our pro-gram Saving Calculator we were able to demonstrate that the initial investment will won back with the maintenance saving in approxima-tely only two years.

Background: Piazza Prophet’s Mosque. Madinah. Antecedentes: Piazza Prophet’s Mosque. Medina

U53 PROJECTOR for Makkah Haram Expansion

En total se realizaron 8 prototipos, que se instalaron en la Piazza Pro-phet’s Mosque en Medina.

Gracias al éxito del proyecto de Maddinah, en 2012 se inició la parti-cipación en el proyecto Makkah Haram Expansion con la fabricación de unos proyectores LED para la U53 (a la que seguirán U28 y U20).

De la mano de Liebherr y Bartenbach GmbH, Grupo MCI ha fabri-cado 8 prototipos que formaran parte de una de las 8 sombrillas gigantes (U53) que se instalaran en Makkah.

Cada una de las sombrillas U53 tiene un peso total de 600 toneladas y mide 53 metros. Su membrana (a 30 metros de altura) proyecta una sombra de 2.400 m2. Las U53 estan ubicadas a 17 m de altura.

Finally, in 2011 eight mockups were installed at the Piazza Prophet’s Mosque in Madinah, and still shinning like the first day.

Thanks to this project and the experience, in 2012 we started to par-ticipate in a new and very exciting project: U53 Projector for Makkah Haram Expansión.

Together with the companies Liebherr (Switzerland) and Bartenbach GmbH (Austria), our R&D department has designed and produced 8 new LED lighting fixtures to be integrated into a large umbrella (U53) ensuring a uniform light and high performance.

Each umbrella U53 (in total 8) has a total weight of 600 tones and a high of 53 meters, and consists of a telescopic mast, folding steel fra-me and a Teflon fabric capable of handling high wind speeds in open and closed positions. The umbrellas will react automatically to chan-ging weather conditions, and will provide protection from the sun and the rain.

3GRUPO MCI

CUSTOM MADE PROJECTS

Liebherr facilities (Ehingen, Alemania) 23.03.2014

U53 drawing

Total consumption 1500W

Control type Dimmable DMX / RDM x LED carrier

Total of LEDs 1.148 Lumileds Luxeon A

Color Neutral White 4000K

Housing • Stainless Steel / Aluminium • Natural air convection (without fans)

Glass Cover • Curved 10 mm glass with especial V-cut • Low iron glass

Lense • Complex surface lense made of glass • Accurate and polished surface

LED-Carrier • Aluminium extrusion profile

• Covered by protective layer (perforated co-ver plates) to be designed according to ar-chitects requirement (color, surface finish) to offer a deep effect

• Material: aluminium anodized

When the projector is at 17 m height Average illuminance: 200 lux Iluminated area: 2.400 m2

4 GRUPO MCI

U53 PROJECTOR

17.10.2013.

5GRUPO MCI

CUSTOM MADE PROJECTS

19.08.2013.

6 GRUPO MCI

U53 PROJECTOR

28.02.2014. Ehingen, GERMANY.

7GRUPO MCI

CUSTOM MADE PROJECTS

04.06.2014. Ehingen, GERMANY.

HEADQUARTERS Polígono Industrial El Regás, C/ dels Oficis, 25 B 08850 Gavà BARCELONA · SPAIN

Tel. (+34) 93 630 28 00 Fax. (+34) 93 630 29 66 Mail. [email protected]

grupo-mci.com

Made in Barcelona.

SEITE 8

Liebherr-Werk Ehingen comunica que desarrollará y fabricará para la GRAN MEZQUITA en la Meca enormes som-brillas con un mecanismo de plegado y con un sistema de control. Cada una de las mega-pantallas planifi-cada tiene un peso total de 600 tonela-das. Su membrana en una altura de 30

metros tendrá una envergadura de 53 metros, una superficie para dar sombra a alrededor de 2.400 m2. El prototipo será enviado dentro de los próximos dos años a Arabia Saudita, y otros más seguirán. Parte del pedido es también una se-rie de pantallas más pequeñas - setas

equivalentes a las 250 membranas en Medina, las cuales ya desde el año 2010 protegían a los peregrinos del sol.Información más detallada sobre canti-dades, tiempos de entrega y volumen de pedidos no ha sido indicada por la empresa.

LIEBHERR DESARROLLA MEGA-SOMBRILLAS EN MECA TRADUCCIÓN AL ESPAÑOL

PÁGINA 8

According to own data Liebherr-Werk Ehingen will develop and manufactu-re huge umbrellas including folding mechanism and control for the “Grand Mosque” in Mecca.

Each of the planned mega-shades has a total weight of 600 tons. Its open mem-brane at a height of 30 meters with a

span of 53 meters will shade an area of about 2400 square meters. The com-pany wants to deliver the prototype wi-thin the next two years in Saudi Arabia, more will follow.

Part of the order is also a number of smaller shades - equivalent to the 250 umbrellas that already protect the pil-

grims from the sun in the Piazza of the Prophet’s Mosque in Medina the since 2010. The company doesn’t hive more detailed information of the number, de-livery times and order volumes.

TRADUCCIÓN AL INGLÉSLIEBHERR DEVELOPED MEGA SCREEN FOR MECCA

PAGE 8