Custody of the underground bunker Richard-Wagner-Platz Leipzig, Germany Contract Value (net): 0.112 million EURO Construction Period: 03/2010 - 04/2010 Client: mfi Höfe am Brühl GmbH & Co.KG Bamlerstr. 1 45141 Essen Sevices: Cavity grouting Bunker Execution: Implenia Spezialtiefbau GmbH Infrastructure - Central Branch Erfurt Office Alfred Ley Straße 3 D-99310 Arnstadt GERMANY T +49 3628 6121-40 F +49 3628 6121-55 [email protected] www.spezialtiefabu.implenia.com In the course of the new development of the "Höfe am Brühl" in Leipzig by mfi Projektmanagement AG, Richard-Wagner- Platz adjacent to the west of the actual construction site was to be used as a construction site equipment area. A part of this square is underlain by an approx. 1,000 m² large, former underground bunker. This underground bunker was detonated in 1946 by the Soviet army. As a result of the destruction of a supporting middle wall and the associated lowering of the cover plate, an unstable condition accompanied by the entry of groundwater set in, leading to a load limit for a partial area of the square. Implenia Spezialtiefbau GmbH was contracted to ensure the stability of the affected public area. To do this the bunker facility needed to be secured by means of primary filling with hydraulically hardening binder with a minimum compressive strength of up to 5 N/mm². By means of a secondary filling / post grouting residual cavities were sealed and the form-fitting connection to the cover plate was ensured. Quantities: 2,000 m³ hydraulic binder

Transcript of Custody of the underground bunker Richard-Wagner-Platz · underground bunker. This underground...

Page 1: Custody of the underground bunker Richard-Wagner-Platz · underground bunker. This underground bunker was detonated in 1946 by the Soviet army. As a result of the destruction of a

Custody of theunderground bunkerRichard-Wagner-Platz

Leipzig, Germany

Contract Value (net):

0.112 million EURO

Construction Period:

03/2010 - 04/2010

Client:

mfi Höfe am Brühl GmbH & Co.KG

Bamlerstr. 1

45141 Essen

Sevices:

Cavity grouting Bunker

Execution:

Implenia Spezialtiefbau GmbHInfrastructure - Central BranchErfurt OfficeAlfred Ley Straße 3D-99310 ArnstadtGERMANY

T +49 3628 6121-40F +49 3628 6121-55

[email protected]

www.spezialtiefabu.implenia.com

In the course of the new development of the "Höfe am Brühl"in Leipzig by mfi Projektmanagement AG, Richard-Wagner-Platz adjacent to the west of the actual construction site was tobe used as a construction site equipment area. A part of thissquare is underlain by an approx. 1,000 m² large, formerunderground bunker. This underground bunker was detonatedin 1946 by the Soviet army. As a result of the destruction of asupporting middle wall and the associated lowering of thecover plate, an unstable condition accompanied by the entry ofgroundwater set in, leading to a load limit for a partial area ofthe square.

Implenia Spezialtiefbau GmbH was contracted to ensure thestability of the affected public area. To do this the bunkerfacility needed to be secured by means of primary filling withhydraulically hardening binder with a minimum compressivestrength of up to 5 N/mm². By means of a secondary filling /post grouting residual cavities were sealed and the form-fittingconnection to the cover plate was ensured.

Quantities:

2,000 m³ hydraulic binder