DN 59 m² Refuse Area 6825 150 6445 230 1015 3500 1930 115 115 9510 230 9060 220 CARBIS ROAD ROSEVEARE ROAD New Student Housing Development N ROSEVEARE ROAD SCHEDULE OF RIGHTS PROPERTY DESCRIPTION ERF 498 PIETERMARITZBURG TOTAL SITE AREA: 5147m² ZONING INFORMATION TOWN PLANNING SCHEME: PIETERMARITZBURG TOWN PLANNING SCHEME AMMENDMENT SCHEME: USE ZONE: STUDENT VILLAGE ANNEXURE NO.: DEVELOPMENT CONTROL MEASURES HEIGHT: Permissible: No restriction Actual: 4 Storeys COVERAGE: Permissible: 70% Actual: 63% (3243m²) FAR: Permissible: 1.0 Actual: 1,4 GBA: 10 589m² PARKING SCHEDULE PARKING 42 Bays including 1 disabled @ 1/15.83 beds 5 Motorbike bays @ 1/42 Beds BED COUNT BEDS PROVIDED 450 ROOMS SINGLE ROOMS 115 DOUBLE ROOMS 335 TOTAL ROOM COUNT 450 PODS (UNITS) 8 BED PODS 55 5 BED PODS 1 TOTAL NUMBER OF PODS 56 NEW SEWER PIPE LEGEND NEW WATER PIPE Assumed Connection Point CARBIS ROAD ROSEVEARE ROAD Assumed Connection Point N EXISTING HERITAGE HOUSE BLOCK D BLOCK A BLOCK B BLOCK C BLOCK E VEHICULAR ENTRANCE/EXIT NEW CLEARVU FENCE NEW CLEARVU FENCE 60.82 m SITE BOUNDARY 84.53 m SITE BOUNDARY NEW CLEARVU FENCE 60.97 m SITE BOUNDARY EXISTING TREE NEIGHBOURING PLOT Ptn 51(of 30) NEIGHBOURING PLOT Ptn 34 (of 5) NEIGHBOURING PLOT Ptn 49 (of 24) Rem of Ptn 3 (of 1) Rem of Ptn 4 (of 1) Erf 498 Ptn 68 EXISTING TREE EXISTING TREE EXISTING TREE EXISTING TREE EXISTING TREE EXISTING TREE EXISTING TREE EXISTING TREE EXISTING TREE EXISTING TREE EXISTING TREE EXISTING TREE 60.82 m SITE BOUNDARY P1 P2 P3 P4 P5 P6 P8 P9 P10 P12 P11 P13 P14 P15 P16 P17 P19 P18 P20 P21 P22 P24 P26 P23 P27 P28 P29 P30 P31 P32 P33 P40 P41 P42 3115 3000 2000 EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING 2000 3160 3030 1615 Project No. Scale Drawing Drawing No. Revision No. Size Drawn Project Client Landscape Architect Interior Designer Electrical Engineer Civil Engineer Mechanical Engineer Quantity Surveyor Structural Engineer Project Manager Consultants NOTES REVISIONS Date & Time printed: Key Plan Signatures: Engineer: Wet & Fire Services Engineer Lighting Specialist Signatures: Architect: GENERAL: 1.ALL WORK TO BE DONE IN ACCORDANCE WITH SANS 10400 2.SANS 10400 TO BE SATISFIED PER MEANS SPECIFIED IN SCHEDULE A AND B, SANS 10400 - A: FORM 1. 3.DO NOT SCALE, REFER ONLY TO FIGURED DIMENSIONS. 4.ALL LEVELS, DIMENSIONS, GRADIENTS AND STEPS TO BE CHECKED ON SITE PRIOR TO CONSTRUCTION AND ANY DISCREPANCIES TO BE REPORTED TO THE ARCHITECT IMMEDIATELY. STRUCTURAL DESIGN: 1.STRUCTURAL SYSTEM ACCORDING TO STRUCTURAL ENGINEER S DESIGN UNLESS OTHERWISE SPECIFIED IN FORM 1 2.ALL CONCRETE COLUMNS, FOUNDATIONS, BEAMS, LINTELS, WALLS, FLAT - , COFFERED, OR POST - TENSIONED SLABS, STRUCTURAL STEEL AND/OR TIMBER STRUCTURE, AND ALL SUSPENDED STAIRWAYS WHICHEVER MAY BE APPLICABLE, ACCORDING TO STRUCTURAL ENGINEER S DESIGN. 3.IF NO STRUCTURAL ENGINEER HAS BEEN APPOINTED ACCORDING TO FORM 1 THE STRUCTURAL SYSTEM TO COMPLY WITH THE DETAIL REQUIREMENTS OF SANS 10400 PARTS H,J,K,L,M or N AND IN THE CASE OF TIMBER BUILDINGS WITH SANS 10082. SITE OPERATIONS: 1.PROVISION OF SANITARY FACILITIES DURING CONSTRUCTION TO COMPLY WITH THE DETAIL REQUIREMENTS OF SANS 10400 - D. SUBMIT PROPOSAL TO THE ARCHITECT FOR APPROVAL. FOUNDATIONS: ALL FOUNDATIONS ACCORDING TO STRUCTURAL ENGINEER S DESIGN UNLESS OTHERWISE SPECIFIED IN FORM 1. ALL DEEP FOOTINGS, SOIL RAFTS COMPACTION AND SUB - SURFACE DRAINAGE ACCORDING TO CIVIL ENGINEER S DETAILS UNLESS OTHERWISE SPECIFIED IN FORM 1. FLOORS: 1.FLOORS TO COMPLY WITH SANS 10400 - J UNLESS OTHERWISE SPECIFIED IN FORM 1. 2.SLABS AND FLOORS IN STRUCTURAL CONCRETE (min 75mm DEEP) UNLESS OTHERWISE SPECIFIED ON THE DRAWINGS 3. DAMP PROOF MEMBRANES OF 250 MICRON UNDER ALL EARTH - SUPPORTED FLOORS UNLESS OTHERWISE SPECIFIED ELSEWHERE. WALLS: 1.STRUCTURAL STRENGTH AND STABILITY OF WALLS TO STRUCTURAL ENGINEER S APPROVAL UNLESS OTHERWISE SPECIFIED IN FORM 1 2.ALL CLAY MASONRY OR CONCRETE BLOCK WALLS TO BE CONSTRUCTED IN STANDARD SIZE CLAY BRICKS OR STANDARD SIZE CONCRETE BLOCKS. 3.WATER PENETRATION THROUGH WALLS TO COMPLY WITH SANS THE DETAIL REQUIREMENTS OF 10400 - K. DPC'S, VERTICAL AND HORIZONTAL, TO ALL OPENINGS. 4.WALL THICKNESS OF 110mm INTERNALLY OR 280mm EXTERNALLY UNLESS OTHERWISE FIGURED. ROOFS: 1.ROOF COVERINGS,WATERPROOFING SYSTEMS, AND FLAT ROOFS,GUTTERS AND DOWN PIPES TO COMPLY WITH THE DETAIL REQUIREMENTS OF SANS 10400 - L AND SANS 10400 - R UNLESS OTHERWISE SPECIFIED FORM 1 2.FIRE RESISTANCE AND COMBUSTIBILITY OF ROOF AND CEILING ASSEMBLY TO COMPLY WITH FIRE ENGINEER S REQUIREMENTS UNLESS OTHERWISE SPECIFIED IN FORM 1. GLAZING: 1. GLAZING TO COMPLY WITH SANS 10400 - N. 2. GLAZING TO DOORS AND WINDOWS IN EXCESS OF 1 METER SQUARE OR LESS THAN 500mm ABOVE FFL TO BE SAFETY GLAZING IN ACCORDANCE WITH BUILDING REGULATIONS HEALTH & PUBLIC SAFETY: 1.CHANGES IN LEVEL, RAMPS AND DRIVEWAYS, AND ACCESS TO SWIMMING POOLS TO COMPLY WITH SANS THE DETAIL REQUIREMENTS OF SANS 10400 - D UNLESS OTHERWISE SPECIFIED IN FORM 1 2.STOREROOMS & DISCONNECTING LOBBIES TO ALL TOILETS TO BE INDEPENDENTLY AND ADEQUATELY LIT & VENTILATED IN COMPLIANCE WITH SANS 10400 - O. 3.THE MEANS FOR PROVIDING FACILITIES FOR PEOPLE WITH DISABILITIES IS IN ACCORDANCE WITH SANS 10400 - S UNLESS OTHERWISE SPECIFIED IN FORM 1 DRAINAGE & STORMWATER: 1.DRAINAGE SYSTEM TO COMPLY WITH THE DETAIL REQUIREMENTS OF SANS 10400 - P UNLESS OTHERWISE SPECIFIED IN FORM 1. 2.STORMWATER DISPOSAL TO COMPLY WITH THE DETAIL REQUIREMENTS OF SANS 10400 - R UNLESS OTHERWISE SPECIFIED IN FORM 1. FIRE PROTECTION: 1.ALL FIRE EQUIPMENT, POSITIONING AND PROTECTION TO BE IN ACCORDANCE WITH THE FIRE ENGINEER's DESIGN UNLESS OTHERWISE SPECIFIED IN FORM 1. 2.ACCESS AND ESCAPE DOORS ON ANY EMERGENCY ROUTE MAY ONLY BE FITTED WITH LOCKING DEVICES APPROVED BY LOCAL AUTHORITY. 3.STRUCTURAL ELEMENTS & COMPONENTS TO COMPLY WITH T4.7 MATERIALS AND FINISHES: 1.MATERIALS AND FINISHES AS INDICATED ON THE DRAWINGS, MATERIAL NOTES AND/OR FINISHES SCHEDULES 2.MASONARY WALLS TO BE PLASTERED AND PAINTED UNLESS OTHERWISE SPECIFIED ON THE DRAWINGS. 1. The design on this drawing is copyright and remains the property of SVA International (Pty) Ltd. Reg. No 2011/137280/07 2. All work to be carried out in strict accordance with local authority requirements, National Building Regulations, and the S.A.B.S.standards. 3. This drawing may not be scaled. Only figured dimensions and levels may be used. 4. All relevant details, levels, and dimensions must be checked on site before commencement of work. Any discrepancies to be reported to the Architects office immediately SDP Date As indicated 2020/10/05 16:11:19 A BIM 360://Roseveare Student Village/2020-09-15 Roseveare 5F .rvt 50759 - 00 A - LU(02)1000 TM SDP - Site Plan Roseveare Student Village Owner 71 Waterkant St, 2nd Floor Cape Waters Building, Cape Town, 8001 P.O. Box 1738, Cape Town, 8000 Tel +27 21 4214276 | Fax +27 21 425 1119 | email: [email protected] 07/09/13 A0 1 : 100 Refuse Area - SDP 2 1 : 1000 Micro Site Plan - SDP 3 CIRCULATION Johannesburg Roads Agency (JRA) Johannesburg Water (Pty) Ltd City Parks & Urban Conservation City Power Fire Department Land Use Management Date: ...../...../.......... Date: ...../...../.......... Date: ...../...../.......... Date: ...../...../.......... Date: ...../...../.......... Date: ...../...../.......... Pikitup Environmental Management Transportation Environmental Health Other (if required) Building Control Date: ...../...../.......... Date: ...../...../.......... Date: ...../...../.......... Date: ...../...../.......... Date: ...../...../.......... Date: ...../...../.......... Refuse Volume = f(g) x FA/100m²= m³/week F(g)= (generation factor for Shops - m³/100m²/Week) FA = Floor Area Refuse Volume= x /100m² = x 4 240 litre bins = 1m³ RCR=240 Ltr wheeled bins =0.24m³ /week x 4 bins/m³ = Bins/Week Area required for refuse (Bins only) = Provision of Refuse Compactor - Disposal cost factor - 17% ( 1/6= 0.166666) Bins/Week x 17%= Area required for refuse Area required for refuse (With compactor) = Area provided for refuse = REFUSE AREA CALCULATION / Flats 10.355475 10.355475m³ 41 41 m² 7 m² 0.1425m³ 7267 m² 59 m² 1 : 200 Site Plan - SDP 1 Rev Date Issued by Description A 2020-10-05 TM Issued for SDP Information Area Schedule (FLOOR AREA RATIO (FAR)) Level Name Area Not Placed HW Tank Room 0 m² 00 Ground Level DB 11 m² 00 Ground Level Duct 33 m² 00 Ground Level Electrical room 54 m² 00 Ground Level Ground Floor 1771 m² 00 Ground Level HW Tank Room 100 m² 00 Ground Level Lift Lobby 19 m² 00 Ground Level Lifts 14 m² 00 Ground Level Stairs 108 m² 01 First Level DB 11 m² 01 First Level Duct 13 m² 01 First Level First Floor 1857 m² 01 First Level Lift Lobby 21 m² 02 Second Level DB 11 m² 02 Second Level Duct 15 m² 02 Second Level Lift Lobby 21 m² 02 Second Level Second Floor 2034 m² 03 Third Level DB 11 m² 03 Third Level Duct 16 m² 03 Third Level Lift Lobby 21 m² 03 Third Level Third Floor 1933 m² Grand total 8074 m² NOTE : BUILDING LINES TO BE CONFIRMED BY LAND SURVEYOR NOTE : Total FAR = Total Floor Area subtract 10% (for service areas) = 7267m 2

Transcript of C:Users errenceDocumentsXrev Transmit 0-09-15 Roseveare 5F ...

DN

59 m²Refuse Area

6825

150 6445 230

1015 3500 1930 115 115

9510

230

9060

220

CARBIS ROAD

ROSEVEARE ROAD

New Student HousingDevelopment

N

RO

SE

VE

AR

E R

OA

D

SCHEDULE OF RIGHTS

PROPERTY DESCRIPTION

ERF 498 PIETERMARITZBURGTOTAL SITE AREA: 5147m²

ZONING INFORMATION

TOWN PLANNING SCHEME: PIETERMARITZBURG TOWN PLANNING SCHEMEAMMENDMENT SCHEME:USE ZONE: STUDENT VILLAGEANNEXURE NO.:

DEVELOPMENT CONTROL MEASURES

HEIGHT: Permissible: No restrictionActual: 4 Storeys

COVERAGE: Permissible: 70%Actual: 63% (3243m²)

FAR: Permissible: 1.0Actual: 1,4

GBA: 10 589m²

PARKING SCHEDULE

PARKING 42 Bays including 1 disabled @ 1/15.83 beds 5 Motorbike bays @ 1/42 Beds

BED COUNT

BEDS PROVIDED 450

ROOMS

SINGLE ROOMS 115DOUBLE ROOMS 335TOTAL ROOM COUNT 450

PODS (UNITS)

8 BED PODS 555 BED PODS 1TOTAL NUMBER OF PODS 56

NEW SEWER PIPE

LEGEND

NEW WATER PIPE

Assumed Connection Point

CARBIS ROAD

ROSEVEARE ROAD

Assumed Connection Point

N

EXISTING HERITAGE HOUSE

BLOCK D

BLOCK A

BLOCK B

BLOCK C BLOCK E

VEHICULAR ENTRANCE/EXIT

NEW CLEARVU FENCE NEW CLEARVU FENCE

60

.82

m

SIT

E B

OU

ND

AR

Y

84.53 m

SITE BOUNDARY NEW CLEARVU FENCE

60

.97

m

SIT

E B

OU

ND

AR

Y

EXISTING TREE

NEIGHBOURING PLOTPtn 51(of 30)

NEIGHBOURING PLOTPtn 34 (of 5)

NEIGHBOURING PLOTPtn 49 (of 24)

Rem of Ptn 3 (of 1)

Rem ofPtn 4 (of 1)

Erf 498Ptn 68

EXISTING TREEEXISTING TREE

EXISTING TREEEXISTING TREE

EXISTING TREE

EXISTING TREE

EXISTING TREE

EXISTING TREE

EXISTING TREE EXISTING TREE EXISTING TREE EXISTING TREE

60

.82

m

SIT

E B

OU

ND

AR

Y

P1

P2

P3

P4P5P6P8P9P10P12 P11P13P14

P15

P16

P17

P19P18 P20 P21 P22 P24 P26P23 P27 P28 P29 P30 P31 P32 P33 P40 P41 P42

3115

3000

2000

EX

IST

ING

BU

ILD

ING

EXISTING BUILDING

EXISTING BUILDING

EXISTING BUILDING

EXISTING BUILDINGEXISTING BUILDINGEXISTING BUILDINGEXISTING BUILDING

EXISTING BUILDING

EXISTING BUILDING

2000

3160

3030

1615

Project No.

Scale

Drawing

Drawing No. Revision No.

Size Drawn

Project

Client

Landscape Architect

Interior Designer

Electrical Engineer

Civil Engineer

Mechanical Engineer

Quantity Surveyor

Structural Engineer

Project Manager

Consultants

NOTES

REVISIONS

Dat

e &

Tim

e pr

inte

d:

Key Plan

Signatures:

Engineer:

Wet & Fire Services Engineer

Lighting Specialist

Signatures:

Architect:

GENERAL:1.ALL WORK TO BE DONE IN ACCORDANCE WITH SANS 10400 2.SANS 10400 TO BE SATISFIED PER MEANS SPECIFIED IN SCHEDULE A AND B, SANS 10400-A: FORM 1. 3.DO NOT SCALE, REFER ONLY TO FIGURED DIMENSIONS. 4.ALL LEVELS, DIMENSIONS, GRADIENTS AND STEPS TO BE CHECKED ON SITE PRIOR TO CONSTRUCTION AND ANY DISCREPANCIES TO BE REPORTED TO THE ARCHITECT IMMEDIATELY.STRUCTURAL DESIGN:1.STRUCTURAL SYSTEM ACCORDING TO STRUCTURAL ENGINEER’S DESIGN UNLESS OTHERWISE SPECIFIED IN FORM 12.ALL CONCRETE COLUMNS, FOUNDATIONS, BEAMS, LINTELS, WALLS, FLAT -, COFFERED, OR POST-TENSIONED SLABS, STRUCTURAL STEEL AND/OR TIMBER STRUCTURE, AND ALL SUSPENDED STAIRWAYS WHICHEVER MAY BE APPLICABLE, ACCORDING TO STRUCTURAL ENGINEER’S DESIGN.3.IF NO STRUCTURAL ENGINEER HAS BEEN APPOINTED ACCORDING TO FORM 1 THE STRUCTURAL SYSTEM TO COMPLY WITH THE DETAIL REQUIREMENTS OF SANS 10400 PARTS H,J,K,L,M or N AND IN THE CASE OF TIMBER BUILDINGS WITH SANS 10082.SITE OPERATIONS:1.PROVISION OF SANITARY FACILITIES DURING CONSTRUCTION TO COMPLY WITH THE DETAIL REQUIREMENTS OF SANS 10400-D. SUBMIT PROPOSAL TO THE ARCHITECT FOR APPROVAL.FOUNDATIONS:ALL FOUNDATIONS ACCORDING TO STRUCTURAL ENGINEER’S DESIGN UNLESS OTHERWISE SPECIFIED IN FORM 1. ALL DEEP FOOTINGS, SOIL RAFTS COMPACTION AND SUB-SURFACE DRAINAGE ACCORDING TO CIVIL ENGINEER’S DETAILS UNLESS OTHERWISE SPECIFIED IN FORM 1.FLOORS:1.FLOORS TO COMPLY WITH SANS 10400-J UNLESS OTHERWISE SPECIFIED IN FORM 1.2.SLABS AND FLOORS IN STRUCTURAL CONCRETE (min 75mm DEEP) UNLESS OTHERWISE SPECIFIED ON THE DRAWINGS3. DAMP PROOF MEMBRANES OF 250 MICRON UNDER ALL EARTH-SUPPORTED FLOORS UNLESS OTHERWISE SPECIFIED ELSEWHERE.WALLS: 1.STRUCTURAL STRENGTH AND STABILITY OF WALLS TO STRUCTURAL ENGINEER’S APPROVAL UNLESS OTHERWISE SPECIFIED IN FORM 1 2.ALL CLAY MASONRY OR CONCRETE BLOCK WALLS TO BE CONSTRUCTED IN STANDARD SIZE CLAY BRICKS OR STANDARD SIZE CONCRETE BLOCKS. 3.WATER PENETRATION THROUGH WALLS TO COMPLY WITH SANS THE DETAIL REQUIREMENTS OF 10400-K. DPC'S, VERTICAL AND HORIZONTAL, TO ALL OPENINGS.4.WALL THICKNESS OF 110mm INTERNALLY OR 280mm EXTERNALLY UNLESS OTHERWISE FIGURED.ROOFS:1.ROOF COVERINGS,WATERPROOFING SYSTEMS, AND FLAT ROOFS,GUTTERS AND DOWN PIPES TO COMPLY WITH THE DETAIL REQUIREMENTS OF SANS 10400-L AND SANS 10400-R UNLESS OTHERWISE SPECIFIED FORM 12.FIRE RESISTANCE AND COMBUSTIBILITY OF ROOF AND CEILING ASSEMBLY TO COMPLY WITH FIRE ENGINEER’S REQUIREMENTS UNLESS OTHERWISE SPECIFIED IN FORM 1.GLAZING:1. GLAZING TO COMPLY WITH SANS 10400-N. 2. GLAZING TO DOORS AND WINDOWS IN EXCESS OF 1 METER SQUARE OR LESS THAN 500mm ABOVE FFL TO BE SAFETY GLAZING IN ACCORDANCE WITH BUILDING REGULATIONSHEALTH & PUBLIC SAFETY:1.CHANGES IN LEVEL, RAMPS AND DRIVEWAYS, AND ACCESS TO SWIMMING POOLS TO COMPLY WITH SANS THE DETAIL REQUIREMENTS OF SANS 10400-D UNLESS OTHERWISE SPECIFIED IN FORM 12.STOREROOMS & DISCONNECTING LOBBIES TO ALL TOILETS TO BE INDEPENDENTLY AND ADEQUATELY LIT & VENTILATED IN COMPLIANCE WITH SANS 10400-O.3.THE MEANS FOR PROVIDING FACILITIES FOR PEOPLE WITH DISABILITIES IS IN ACCORDANCE WITH SANS 10400-S UNLESS OTHERWISE SPECIFIED IN FORM 1DRAINAGE & STORMWATER:1.DRAINAGE SYSTEM TO COMPLY WITH THE DETAIL REQUIREMENTS OF SANS 10400-P UNLESS OTHERWISE SPECIFIED IN FORM 1.2.STORMWATER DISPOSAL TO COMPLY WITH THE DETAIL REQUIREMENTS OF SANS 10400-R UNLESS OTHERWISE SPECIFIED IN FORM 1.FIRE PROTECTION:1.ALL FIRE EQUIPMENT, POSITIONING AND PROTECTION TO BE IN ACCORDANCE WITH THE FIRE ENGINEER's DESIGN UNLESS OTHERWISE SPECIFIED IN FORM 1.2.ACCESS AND ESCAPE DOORS ON ANY EMERGENCY ROUTE MAY ONLY BE FITTED WITH LOCKING DEVICES APPROVED BY LOCAL AUTHORITY.3.STRUCTURAL ELEMENTS & COMPONENTS TO COMPLY WITH T4.7MATERIALS AND FINISHES:1.MATERIALS AND FINISHES AS INDICATED ON THE DRAWINGS, MATERIAL NOTES AND/OR FINISHES SCHEDULES2.MASONARY WALLS TO BE PLASTERED AND PAINTED UNLESS OTHERWISE SPECIFIED ON THE DRAWINGS.

1. The design on this drawing is copyright and remains the property of SVA International (Pty) Ltd. Reg. No 2011/137280/07

2. All work to be carried out in strict accordance with local authority requirements, National Building Regulations, and the S.A.B.S.standards.

3. This drawing may not be scaled. Only figured dimensions and levels may be used.4. All relevant details, levels, and dimensions must be checked on site before

commencement of work. Any discrepancies to be reported to the Architects office immediately

SDP

Date

As indicated

2020

/10/0

5 1

6:1

1:1

9

A

BIM 360://Roseveare Student Village/2020-09-15 Roseveare 5F .rvt

50759-00 A-LU(02)1000

TM

SDP - Site Plan

Roseveare Student Village

Owner

71 Waterkant St,2nd Floor Cape Waters Building, Cape Town, 8001

P.O. Box 1738, Cape Town, 8000Tel +27 21 4214276 | Fax +27 21 425 1119 |

email: [email protected]

07/09/13A0

1 : 100

Refuse Area - SDP2

1 : 1000

Micro Site Plan - SDP3

CIRCULATION

Joh

an

ne

sbu

rg R

oa

ds

Ag

en

cy (

JRA

)Jo

ha

nn

esb

urg

Wa

ter

(Pty

) L

tdC

ity P

ark

s &

Urb

an

Co

nse

rva

tion

City

Po

we

rF

ire

De

pa

rtm

en

tL

an

d U

se

Ma

na

ge

me

nt

Date: ...../...../..........

Date: ...../...../..........

Date: ...../...../..........

Date: ...../...../..........

Date: ...../...../..........

Date: ...../...../..........

Pik

itup

En

viro

nm

en

tal

Ma

na

ge

me

nt

Tra

nsp

ort

atio

nE

nvi

ron

me

nta

lH

ea

lthO

the

r (i

f re

qu

ire

d)

Bu

ildin

g C

on

tro

l

Date: ...../...../..........

Date: ...../...../..........

Date: ...../...../..........

Date: ...../...../..........

Date: ...../...../..........

Date: ...../...../..........

Refuse Volume = f(g) x FA/100m²= m³/weekF(g)= (generation factor for Shops-m³/100m²/Week)FA = Floor Area

Refuse Volume= x /100m² = x 4 240 litre bins = 1m³RCR=240 Ltr wheeled bins =0.24m³ /week x 4 bins/m³ = Bins/Week

Area required for refuse (Bins only) =

Provision of Refuse Compactor-Disposal cost factor-17% ( 1/6= 0.166666)

Bins/Week x 17%= Area required for refuse

Area required for refuse (With compactor) =

Area provided for refuse =

REFUSE AREA CALCULATION / Flats

10.355475

10.355475m³

41

41 m²

7 m²

0.1425m³ 7267 m²

59 m²

1 : 200

Site Plan - SDP1

Rev Date Issued by Description

A 2020-10-05 TM Issued for SDP Information

Area Schedule (FLOOR AREA RATIO (FAR))

Level Name Area

Not Placed HW Tank Room 0 m²

00 Ground Level DB 11 m²

00 Ground Level Duct 33 m²

00 Ground Level Electrical room 54 m²

00 Ground Level Ground Floor 1771 m²

00 Ground Level HW Tank Room 100 m²

00 Ground Level Lift Lobby 19 m²

00 Ground Level Lifts 14 m²

00 Ground Level Stairs 108 m²

01 First Level DB 11 m²

01 First Level Duct 13 m²

01 First Level First Floor 1857 m²

01 First Level Lift Lobby 21 m²

02 Second Level DB 11 m²

02 Second Level Duct 15 m²

02 Second Level Lift Lobby 21 m²

02 Second Level Second Floor 2034 m²

03 Third Level DB 11 m²

03 Third Level Duct 16 m²

03 Third Level Lift Lobby 21 m²

03 Third Level Third Floor 1933 m²

Grand total 8074 m²

NOTE : BUILDING LINES TO BE CONFIRMED BY LAND SURVEYOR

NOTE : Total FAR = Total Floor Area subtract 10% (for service areas) = 7267m2