Lead from the frontTexas Nodalhttp://nodal.ercot.com 1
Current Telemetry Dashboards
NDSWG
June 16, 2009
Lead from the frontTexas Nodalhttp://nodal.ercot.com 2
QSE Telemetry (as of 06/08/09)
Lead from the frontTexas Nodalhttp://nodal.ercot.com 3
TDSP Telemetry (as of 06/08/09)
Lead from the frontTexas Nodalhttp://nodal.ercot.com 4
Load Observability (as of 06/08/09)
Lead from the frontTexas Nodal
State Estimator Daily Convergence Rates – May 2009
http://nodal.ercot.com 5
2009 Monthly Convergence %
Jan 2009: 80% Feb 2009: 70% Mar 2009: 90% Apr 2009: 86% May: 77%
Lead from the frontTexas Nodalhttp://nodal.ercot.com 6
State Estimator Monthly Convergence Rates – March 2009 – May 2009
2009 Monthly Convergence %
Jan 2009: 80% Feb 2009: 70% Mar 2009: 90% Apr 2009: 86% May: 77%
Lead from the frontTexas Nodal
Key Numbers 97.07% Test Average Convergence/ 100% for 18 of 26 Test Hours. On Day One, zonal-nodal mismatches caused convergence to dip
below to 87% for Hour Ending (HE) 1300 and 85% for HE 1400. A convergence of 100% was achieved during 7 of 9 test hours.
On Day Two, zonal-nodal mismatches caused convergence to hover at 92% for the morning hours, followed by a convergence rate of 100% for each of the six consecutive hours remaining in the test day.
On Day Three, a failover of the Energy Management System (EMS) was required during HE 1100 to accommodate a database load to bring new model updates online. As a result, one test hour was excluded from the test results, and the average convergence rate for the overall test was calculated over 26 test hours rather than the 27 hours originally scheduled.
The convergence percentages for FIT III Wk 7 were the highest yet recorded for the FIT III series, with the rounded daily percentages all hitting the 97% Stated Estimator performance standard.
http://nodal.ercot.com 7
FIT III Assessment reports will be posted at: http://nodal.ercot.com/readiness/eds3/documents/index.html
FIT III, Week 7 – State Estimator
Lead from the frontTexas Nodal
Key Numbers 88.62% Test Average Convergence; 100% for 10 of 27 Test Hours; majority
of issues attributed to zonal-nodal mismatches. On Day One, the convergence rate for Hour Ending (HE) 0900 dipped to 55%
owing to one ICCP link being down. Multiple manual replacements were made during HE 1000 and HE 1400 to address a disconnect issue and generation units coming online—convergence rates during these hours dipped to 85% and 71% respectively. Convergence rates achieved 92% or higher for the remaining six test hours for the day.
On Day Two, the convergence rate for HE 1400 dipped to 54% owing to two ICCP links being down. Multiple manual replacements were made during HE 1500 to address a disconnect issue and zonal-nodal mismatches. Convergence rates achieved 92% or higher for the remaining seven test hours for the day.
On Day Three, the convergence rate for HE 1500 dipped to 80% owing to multiple manual replacements being made to address zonal-nodal mismatches. Convergence rates achieved 92% or higher for the remaining eight test hours for the day.
http://nodal.ercot.com 8
FIT III Assessment reports will be posted at: http://nodal.ercot.com/readiness/eds3/documents/index.html
FIT III, Week 8 – State Estimator
Lead from the frontTexas NodalLFC04/20/23
FIT Series
Week Date Day 1 Day 2 Day 3 Average Convergence % for all Test
Hours
100% Convergence Achieved
FIT II Week 1 Oct 21 – 23, 2008 90.18 74.16 91.83 85.39 12 of 27 hrs
Week 2 Nov 04 – 06, 2008 88.17 96.58 97.11 93.95 18 of 27 hrs
Week 3 Nov 18 – 20, 2008 87.17 84.19 82.91 84.76 12 of 27 hrs
Week 4 Dec 02 – 04, 2008 96.04 93.33 93.44 94.27 14 of 27 hrs
Week 5 Dec 16 – 18, 2008 94.74 97.49 96.30 96.18 19 of 27 hrs
Week 6 Jan 13 – 15, 2009 96.00 94.12 95.78 95.30 15 of 27 hrs
Week 7 Jan 27 – 29, 2009 94.07 90.13 93.29 92.49 14 of 27 hrs
FIT III
Week 1 Feb 24 – 26, 2009 75.45 78.86 92.85 82.39 09 of 27 hrs
Week 2 Mar 10 – 12, 2009 96.82 92.97 98.41 96.07 20 of 27 hrs
Week 3 Mar 24 - 26, 2009 85.45 94.98 94.70 91.71 14 of 27 hrs
Week 4 Apr 07 - 09, 2009 97.13 92.60 97.44 95.72 21 of 27 hrs
Week 5 Apr 21 – 23, 2009 87.47 89.87 95.65 91.00 8 of 27 hrs
Week 6 May 05 – 07, 2009 94.34 94.47 91.87 93.56 13 of 27 hrs
Week 7 May 19 – 21, 2009 96.81 97.36 97.04 97.07 18 of 26 hrs
Week 8 Jun 02 – 04, 2009 88.47 84.09 93.29 88.62 10 of 27 hrs
Trends – FIT II & FIT III
9
One hour was removed from the Wk 7 test results to accommodate a nodal database load.
Lead from the frontTexas Nodalhttp://nodal.ercot.com 10
Appendix: Telemetry & State Estimator
Overview of Reports, Processes, and Data
Lead from the frontTexas Nodalhttp://nodal.ercot.com 11
ICCP
• Telemetry Support• Telemetry Reporting• State Estimator Tuning• New Telemetry Point Addition Process• Telemetry Issue Process• Current Telemetry Status• Telemetry Status Whereabouts
Lead from the frontTexas Nodalhttp://nodal.ercot.com 12
Telemetry Support
• ERCOT Full Time Staff ICCP Support– Advanced Network Applications Support 2 Engineers– Control Room 1 Operations Analyst & 1 Shift Engineer– IT 2 System Analysts– Additional Staff on a part time basis
• Market Participants– Contact for Nodal Issues– Timely Response on detected issues
Lead from the frontTexas Nodalhttp://nodal.ercot.com 13
Telemetry Dashboards
FIT II & FIT III Assessment reports are posted at: http://nodal.ercot.com/readiness/eds3/documents/index.html
• The following Telemetry Dashboards are being posted on the Readiness Center:– Observability– QSER & TDSP Telemetry
• The link for these dashboards is:
http://nodal.ercot.com/readiness/eds1/documents/index.html
• These dashboards are currently being posted monthly following each mid-month Nodal database update.
• Report questions can be sent to [email protected]
Lead from the frontTexas Nodalhttp://nodal.ercot.com 14
Telemetry Dashboards
TelemetryDashboards
}
Lead from the frontTexas Nodalhttp://nodal.ercot.com 15
Telemetry Reporting – QSER/TDSP Dashboard
QSER & TDSP Dashboard
Questions may be sent to: [email protected]
Lead from the frontTexas Nodalhttp://nodal.ercot.com 16
Telemetry Reporting – Observability Dashboard
The number of unobservable buses in the system with all pseudo measurement removed.
The number of current unobservable buses in the system that have a load at the station where
telemetry is required to make the bus observable.
Buses that are unobservable due to a PUN load at the station.
If a number other then 0 is in column B, then there is missing telemetry which requires Market Participant Corrective Action.
Questions may be sent to: [email protected]
Lead from the frontTexas Nodalhttp://nodal.ercot.com 17
Telemetry Reporting
State Estimator (SE) Convergence
• SE & Supporting Telemetry Information is posted on EDW MIS The link is: https://nodaleds.ercot.com/pps/tibco/mis/Pages/Market+Information/
Real+Time+Market • Advanced Network Applications
provides analysis assistance and be reached at the EDS2 email: [email protected]
Lead from the frontTexas Nodalhttp://nodal.ercot.com 18
SE Convergence Supporting Information on EDW MIS
Click on More State Estimator
Reports and Extracts
Lead from the frontTexas Nodalhttp://nodal.ercot.com 19
SE Convergence Supporting Information on EDW MIS
Click on More State
Estimator Convergence Rate Reports
Lead from the frontTexas Nodalhttp://nodal.ercot.com 20
State Estimator Tuning
• FIT– Monitors Telemetry– Compares Generation between Zonal & Nodal
• ICCP Support Team– Analysis Support of FIT Issues– ICCP Issue Resolution Support– Produce FIT Report
Lead from the frontTexas Nodalhttp://nodal.ercot.com 21
FIT Telemetry Reporting
FIT Report• Log of Events & Observations
– The daily logs published in the bi-weekly FIT Reports provide a window into the types of issues that affect convergence during FIT testing hours.
• FIT Reports are posted at: http://nodal.ercot.com/readiness/eds3/documents/index.html
Questions can be sent to [email protected]
Lead from the frontTexas Nodalhttp://nodal.ercot.com 22
New Telemetry Point Addition Process
MP (QSER or TSP) has new ICCP point to
activate
MP Consults ICCP Handbook to
determine data point names
MP fills out ICCP Change Request Form
MP creates a Service Request via the Texas
Market Link on ERCOT.com
MP attaches completed ICCP
Change Request form to Service Request
ERCOT ICCP Team receives and
processes each Service Request
No
ERCOT ICCP Team contacts MP to confirm the changes
ERCOT ICCP Team notifies the MP
upon completion of the Service Request
Service Request Issues?
Yes
ERCOT ICCP Team makes changes to
ICCP
No
MP has submitted & completed
Model Change
ICCP Standards Questions?
Yes
Lead from the frontTexas Nodalhttp://nodal.ercot.com 23
Current Telemetry Issue Process
ERCOT or Market Participant detects Telemetry, ICCP or other System Issue
Market Participant investigates to
determine correct ability
Requires ERCOT assistance to
resolve?
Contact ERCOT ANA by email
[email protected] for assistance
Yes
No
ERCOT Analyzes Issue and determines
corrective action
ERCOT Contacts MP to Affect Correction
Issue Resolved?
Done
Yes
NoMP Corrects Issue
During FIT? No
Yes
Contact ERCOT Shift Engineer @
512-248-6345