Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility...
Transcript of Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility...
Current Status of HibikiCurrent Status of HibikiCurrent Status of HibikiCurrent Status of HibikiCurrent Status of HibikiCurrent Status of HibikiCurrent Status of HibikiCurrent Status of Hibiki--------nada nada nada nada nada nada nada nada
Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project
Kyuden Mirai Energy Co., Inc.
J u l y 8 , 2 0 1 9
table of contentstable of contentstable of contentstable of contents
1111 Project OverviewProject OverviewProject OverviewProject Overview
2222 Project StrengthProject StrengthProject StrengthProject Strength
(1)Project Structure
(2)NEDO Demonstration
(3)Base Port for Offshore Wind
3333 Main Process of the ProjectMain Process of the ProjectMain Process of the ProjectMain Process of the Project
4444 Main Events of the Feasibility StudyMain Events of the Feasibility StudyMain Events of the Feasibility StudyMain Events of the Feasibility Study
5555 ResearchResearchResearchResearch
(1) Environmental Impact Assessment
(2) Wind Measurement
(3) Sea Area Survey
6666 Facility DesignFacility DesignFacility DesignFacility Design
7777 Promotion ofPromotion ofPromotion ofPromotion of HibikiHibikiHibikiHibiki----nada project and Understanding ofnada project and Understanding ofnada project and Understanding ofnada project and Understanding of Local Local Local Local
ResidentsResidentsResidentsResidents
8888 SummarySummarySummarySummary
1
9
Hibiki Wind Energy (HWE)
・selected as a priority negotiator in February 2017 to the operator of the
offshore wind power generation that Kitakyushu City has
publicly solicited as the first project at the revised Port Act
・concluded a basic agreement with Kitakyushu City in January 2018
・conducting feasibility study aiming to start construction in FY2022
1111 Project OverviewProject OverviewProject OverviewProject Overview 2
Source: “Guidebook for Green Energy Port Hibiki” published by the City of Kitakyushu
with some modification and addition ©2019 Kyuden Mirai Energy Co., Inc.
Date of Date of Date of Date of
establishmentestablishmentestablishmentestablishment
April 17, 2017April 17, 2017April 17, 2017April 17, 2017
Shareholders
& ratio of
capital
contribution
Kyuden Mirai Energy 30%
Electric Power
Development (J-POWER)
40%
Hokutaku Renewable Energy
Service
10%
Saibu Gas 10%
Kyudenko 10%
2222 Project Strength Project Strength Project Strength Project Strength (1)Project Structure3
HWE consist of the five investment companies, they can proceed with the feasibility
study with the same sense of values with the following characteristics;
・Companies with a wealth of experience in wind power
・Companies that has a local office and is rooted in the area
©2019 Kyuden Mirai Energy Co., Inc.
2222 Project Strength Project Strength Project Strength Project Strength (2)NEDO Demonstration4
Observation tower
(Tower top: 85 m)
Wind Power (Japan Steel Works)
Output: 2 MW Rotor diameter: 83 m
Foundation weight : 4,100t
・The offshore wind observation tower (currently owned by J-Power) installed in NEDO
demonstration can be used to measure the wind conditions of this project.
・The experience of NEDO demonstration can be utilized for this feasibility study.
Offshore Kitakyushu(2013)
Distance from the coast :1.4km
Water Depth 14m
Source: “Reference for Summary report by Study group concerning the procurement price
of offshore wind power “ (METI 2014) ©2019 Kyuden Mirai Energy Co., Inc.
Storage Site for Wind Storage Site for Wind Storage Site for Wind Storage Site for Wind
Turbine ComponentsTurbine ComponentsTurbine ComponentsTurbine Components
-Temporary storage of
components and turbine
assembly
-Pre-shipping inspection
Offshore wind farmOffshore wind farmOffshore wind farmOffshore wind farm
-Site investigation
-Construction, Operation,
Maintenance and
Decommissioning
Quay side for wind turbine Quay side for wind turbine Quay side for wind turbine Quay side for wind turbine
installation vesselsinstallation vesselsinstallation vesselsinstallation vessels
-Receiving and loading of
turbine components
-Loading of turbine
foundations
Back yardBack yardBack yardBack yard
-Base for operation and
maintenance
-Manufacturing of
turbine foundations
2222 Project Strength Project Strength Project Strength Project Strength (3)Base Port for Offshore Wind5
Source : “Guidebook for Green Energy Port Hibiki” published by the City of Kitakyushu
with some modification and addition
・Kitakyushu City is considering to develop a base port that is essential for offshore wind
power construction.
・The construction plan of this project can be optimized near the base port.
©2019 Kyuden Mirai Energy Co., Inc.
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Sea Area Survey
Environmental Impact
Assessment
Wind Measurement
Facility Design, etc
Construction Works
※ It is planned at the present time, and there is a possibility of change by result of future investigation and related party discussion
Submarine boring
Submarine boring
Marine topography survey / Submarine geological survey
Basic design Detailed design
Making document and report
・Wind measurement is started in June 2017, Sea Area Survey in July, and EIA in August.
・After EIA, a business plan will be compiled in FY 2021.
・Target year to start construction is FY 2022.
ConsiderationMethod
Pre-construction works (obtaining of permissions, etc.)
Field survey
Commencement of construction works and sequential start of operation
3333 Main Process of the ProjectMain Process of the ProjectMain Process of the ProjectMain Process of the Project6
©2019 Kyuden Mirai Energy Co., Inc.
74444 Main Events of the Feasibility StudyMain Events of the Feasibility StudyMain Events of the Feasibility StudyMain Events of the Feasibility Study
<<<<FY 2017FY 2017FY 2017FY 2017>>>>
2017, April Hibiki Wind Energy Co., Ltd. was established
June Wind condition observation was started
July Sea area survey (FY2017) was started
August Consideration documentation of EIA was submitted
November Minister’s Opinion to Consideration of EIA was received
2018, January Basic agreement "Installation and operation of the Hibiki-nada
Offshore Wind Farm Project“ was concluded with Kitakyushu City
March Method documentation of EIA was submitted
<<<<FY 2018FY 2018FY 2018FY 2018>>>>
2018, April Field survey of EIA was started
April Sea area survey (FY2018) was started
July Kitakyushu Mayor’s Opinion to Method of EIA was received
September Minister’s Advice to Method of EIA was received
November Grant of NEDO subsidy to Hibiki-nada Project was decided
<<<<FYFYFYFY 2019201920192019>>>>
2019, May Sea area survey (FY2019) was started
June Submarine cable survey (FY2019) was started
©2019 Kyuden Mirai Energy Co., Inc.
5555 ResearchResearchResearchResearch (1) Environmental Impact Assessment
Primary Environmental
Impact Consideration
Minister’s Advice to Assessment Method of EIA was received in FY 2018,
Field Survey is conducted.
Noise measurement
Bird survey
Survey of the landscape
8
Planning of Project
Assessment Method
Environmental Impact
Statement
Implementation of Project
Field Survey,
Forecast, Evaluation
EIA
©2019 Kyuden Mirai Energy Co., Inc.
95555 ResearchResearchResearchResearch (2) Wind Measurement
In addition to wind observation at the offshore observation tower, a Doppler Lidar was
installed at the offshore observation tower and horizontal wind conditions was observed.
・ Offshore Observation Tower :Vertical observation
・ Doppler Lidar : Horizontal observation
Doppler Lidar
【 Observation Image】
Offshore
observation tower
currently owned
by J-Power
【 Observation point 】
Source : “Guidebook for Green Energy Port Hibiki” published
by the City of Kitakyushu
©2019 Kyuden Mirai Energy Co., Inc.
Laser
tower
Doppler
Lidar
・ The boring survey is underway to obtain submarine geology data necessary for
foundation design.
・ In addition, in order to make the wind turbine arrangement for excluding the habitat of
seaweed, the seaweed survey is also carried out.
5555 ResearchResearchResearchResearch (3) Sea area Survey 10
A
B
C
D
Source of information: “Guidebook for Green Energy Port Hibiki” published by the City of
Kitakyushu
Image of boring survey
©2019 Kyuden Mirai Energy Co., Inc.
Selecting a wind turbine in consideration of Hitachi's production withdrawal and global
wind turbine production and development trends
【 Hitachi's production withdrawal 】
・Press release on production
withdrawal in January 2019
・In response to this, Hitachi was
excluded from candidates
【 Global trend 】
・Three years ago, the line-up of
wind turbine mainly consisted of
4 or 5 MW
・Since then, with the expansion of
offshore wind power development
plans in Europe, the size of wind
turbines has rapidly increased
・In recent years, each wind turbine
maker has announced production
of turbines for Japan (class T)
【 Wind Turbine Development Trends 】
6666 Facility Facility Facility Facility DesignDesignDesignDesign (1)Wind turbine 11
©2019 Kyuden Mirai Energy Co., Inc.
6666 Facility Facility Facility Facility DesignDesignDesignDesign (2) Foundation
Planning to select a foundation type based on the results of the sea area surveys and
the results of reviews on European consultants, etc.
TypeTypeTypeTypeMonopile Jacket Gravity-based Structure
FoundationFoundationFoundationFoundation
ImageImageImageImage
Source:NEDO Renewable energy technology Report (2th edition)
12
©2019 Kyuden Mirai Energy Co., Inc.
137777 Promotion ofPromotion ofPromotion ofPromotion of HibikiHibikiHibikiHibiki----nada project and Understanding of Local Residentsnada project and Understanding of Local Residentsnada project and Understanding of Local Residentsnada project and Understanding of Local Residents
Seminars and briefing sessions were held to promote Hibiki-nada project and
understanding of local residents
■■■■ promotion of Hibiki-nada project
ooooECOECOECOECO----TECHNOLOGY EXHIBITION 2018TECHNOLOGY EXHIBITION 2018TECHNOLOGY EXHIBITION 2018TECHNOLOGY EXHIBITION 2018
Period:10th
-12th
, October 2018
Venue :West Japan General Exhibition Center (in Kitakyushu)
Date Contents
10th
-12th
Exhibition Booth
10th
Offshore Wind Basics Seminar
11th
-12th
Consultation meeting between wind turbine
manufacturers and Local companies
Photo of Seminar and Consultation meeting
in ECO-TECHNOLOGY EXHIBITION
Photo of Exhibition Booth in WIND EXPO 2019
ooooWINDWINDWINDWIND EXPOEXPOEXPOEXPO 2019201920192019
Period:27th
February – 1th
March 2019
Venue : Tokyo Big Site (in Tokyo)
Contents:Exhibition Booth
■■■■ promotion of understanding of local residents
ooooGlobal Wind Day Global Wind Day Global Wind Day Global Wind Day ((((SponsoredSponsoredSponsoredSponsored bybybyby KitakyushuKitakyushuKitakyushuKitakyushu CityCityCityCity))))
Period:29th
July 2018
Venue : Nippon Roballo Hibiki factory(at Wakamatsu)
Contents: Briefings on business plans for children and parents
Photo of Global Wind Day
©2019 Kyuden Mirai Energy Co., Inc.
148888 SummarySummarySummarySummary
oooo Environmental Impact AssessmentEnvironmental Impact AssessmentEnvironmental Impact AssessmentEnvironmental Impact Assessment
The procedure of Assessment Method is completed, and field survey is
conducted.
oooo Wind MeasurementWind MeasurementWind MeasurementWind Measurement
Wind condition data for 2 years are obtained from offshore observation towers,
and the way to apply data from Doppler Lidar is considered.
oooo Sea Area SurveySea Area SurveySea Area SurveySea Area Survey
Seaweed survey is conducted for determining the placement of wind turbines,
and boring survey is carried out for determining the foundation type.
oooo Facility DesignFacility DesignFacility DesignFacility Design
Wind turbine models and foundation type will be selected based on each
survey result etc.
o Promotion ofPromotion ofPromotion ofPromotion of HibikiHibikiHibikiHibiki----nada project and Understanding ofnada project and Understanding ofnada project and Understanding ofnada project and Understanding of Local ResidentsLocal ResidentsLocal ResidentsLocal Residents
The contents of the previous year is continued.
©2019 Kyuden Mirai Energy Co., Inc.