CURRENT SITUATION AND
UPGRADING PLAN FOR MYANMAR POWER SYSTEM
MR MAUNG MAUNG ( Chief Engineer)Myanma Electric Power Enterprise
Ministry of Electric Power
Contents Geography of Myanmar
Existing Power Industry of Myanmar
Upgrading options for the Grid (Short Term Reinforcement Plan of
Transmission Lines & Substations)
Conclusion
2
Geography of Myanmar
3
Kachin
Sagaing
Shan
Mandalay
Magway
Chin
Rakhaing
Bago Kayar
YangonAyeyarwaddyKayin
Mon
Tanintharyi
Area of Country 261, 229.73 sq-mile(677,000 km2)
Population around 59.78 million(as of 2011)
The country consists ofStates
(1) Kachin
(2) Kayah
(3) Kayin
(4) Chin
(5) Mon
(6) Rakhaing
(7) Shan
Regions
(1) Sagaing
(2)
Tanintharyi
(3) Bago
(4) Magway
(5) Mandalay
(6) Yangon
(7)
Ayeyarwaddy
Brief Introduction to The Republic of Union of Myanmar4
5
China – 2185km
Lao – 238km
Thailand- 1799km
India- 1462 km
Bangladesh-72km
Total Perimeter with International Borders 5756 km
GEOGRAPHY OF MYANMAR(Location)
Coast-2308km
Geography of Myanmar(Topography)
6
Shan Plateaus
Kachin Mountains
YakhineMauntains
AyeyarwaddyDelta
India China
Thailand
Bangladesh
Bay of Bengal
7Geography of Myanmar(Major Rivers)
Ayeyarwaddy2,063 km
Chindwin1,151 km
Thanlwin1,660 km
Sittaung310 km
Population Distribution of Myanmar 8
POPULATION ESTIMATES OF MYANMAR
(AS OF OCTOBER 1 - 2010)
Population (Million)
Annual Growth
Rate
S.N. Year Total Male Female (Percentage)
1 1990 - 1991 40.78 20.21 20.57 1.88
2 1995 - 1996 44.74 22.22 22.52 1.87
3 2000 - 2001 50.13 24.91 25.22 2.02
4 2003 - 2004 53.22 26.47 26.75 2.02
5 2004 - 2005 54.30 27.00 27.30 2.02
6 2005 - 2006 55.40 27.54 27.86 2.02
7 2006 - 2007 56.52 28.10 28.42 2.02
8 2007 - 2008 57.50 28.58 28.92 1.75
9 2008 - 2009 58.38 29.03 29.35 1.52
10 2009 - 2010 59.13 29.40 29.73 1.29
9
Mandalay
Yangon
Naypyitaw
Main facts abstract from Geography of Myanmar
1} According to the land form and climate of Myanmar, there are rich hydro power resources in Northern and Eastern Regions of Myanmar. There are more than 15 Hydro Power Resources which were the capacity >1000MW in that regions.
2) Myanmar have the border with the China, India and Thailand. Therefore the power trade to these country can be achieved. 3) Yangon is the most populated region and it has about 7 millions peoples. Yangon has the main sea port and Industry Zones. Therefore, Yangon is the biggest load center of Myanmar. Mandalay, Naypyitaw and Ayeyarwaddy regions are also have the high population density and the power demand is increasing rapidly.
10
Current Power Industry of
Myanmar
• The electricity demand in Myanmar has doubled in last decade. The development of the electric power sector has become one of the top priorities of the Government of the Republic of Union of Myanmar.
11
Background History• The voltage levels of the Myanmar electrical power system are
– 230 kV– 132 kV– 66 kV– 33 kV – 11 kV.
• The national grid has no direct connections to other grids of neighboring countries.• The network comprises
- 42 overhead lines at 230 kV with a total length of 3015 km- 35 overhead lines at 132 kV with a total length of 2058 km- 16 overhead lines at 66 kV with a total length of 587 km - 11 overhead lines at 33 kV having a total length of 27 km.
• The 230 kV and 132 kV overhead lines are interconnecting approximately 50 substations.
• The above details are valid for the transmission system only and do not include the distribution network.
12
Hydropower Output (MW)
1 Baluchaung -1 28
2 Baluchaung -2 168
3 Yeywa 790
4 Kinda 56
5 Sedawgyi 25
6 Zawgyi -1 18
7 Zawgyi -2 12
8 Thapanzeik 30
9 Mone 75
10 Paunglaung 280
11 Kabaung 30
12 Yenwe 25
13 Zaungtu 20
14 Shweli -1 600(300)
15 Keng taung 54
16 Shwegyin 75
17 Kun 60
18 Kyeeon Kyeewa 74
19 Dapein-1 240(60)
Subtotal 2660(2180)
Gas-fired Output (MW)
1 Kyungchaung 54.3
2 Mann 36.9
3 Shwedaung 55.35
4 Mawlamyaing 12
5 Myanaung 34.7
6 Hlawga 154.2
7 Ywama 70.3
8 Ahlone 154.2
9 Thaketa 92
10 Thaton 50.95
Subtotal 714.9
Coal-fired Output (MW)
1 Tigyit 120
Existing Power Station ( Hydro, Gas-fired and Coal-fired Thermal )
Existing Power System Total = 3,490.9(2950.9)MW
Power Stations in Myanmar (as of Dec’ 2012 )
Note: Output in parentheses is power supply to Myanmar from JV Projects.
13
India China
ラオス
Thailand
ベトナム
Bangladesh
Bay of Bengal
Thanlwing River
Myanmar
シャム湾
7
8
9
1811
15
13
14
17
12
14
2
3
65
10
16
19
Existing Power Station Output (MW) COD
Hydro
1 Baluchaung -2 168 1960/19742 Kinda 56 19853 Sedawgyi 25 19894 Baluchaung – 1 28 19925 Zawgyi -1 18 19956 Zawgyi -2 12 19987 Zaungtu 20 20008 Thapanzeik 30 20029 Mone 75 2004
10 Paunglaung 280 200511 Yenwe 25 200712 Kabaung 30 200813 Kengtawng 54 200914 Shweli -1 600 (300) 200915 Yeywa 790 201016 Dapein-1 240 (60) 201117 Shwegyin 75 201118 Kun 60 201219 Kyeeon Kyeewa 74 2012
Gas-fired
A Kyungchaung 54.3 1974B Mann 36.9 1980C Shwedaung 55.35 1984D Mawlamyaing 12 1980E Myanaung 34.7 1975/1984F Hlawga 154.2 1996/1999G Ywama 70.3 1980/2004H Ahlone 154.2 1995/1999I Thaketa 92 1990/1997J Thaton 50.95 1985/2001
Coal-fired α Tigyit 120 2004
A
B
C
D
E
F G H I
J
α
Mandalay
Nay Pyi Taw
YangonAyeyawaddy River
Sittaung River
Note: Output in parentheses is power supply to Myanmar from JV Projects.
Location of Existing Power Stations ( as of Dec’ 2012 ) 14
Dry season : May 18, 2012 1,298 MW (10:00)
Rainy season: October 18, 2012 1796 MW (20:00) (Maximum power supply as of December 31, 2012 )
Power Supply Status of Myanmar in 2012 ( Dry and Rainy Season )
15
Power Plants Under Construction and Planning(up to 2016)
Gas-fired Output (MW) COD
1 Hlawga(Gas Engine) 52 2013
Hlawga (3 Units)
543
123 2014
246 2015
174 2016
2 Thaketa(Gas Engines) 53.6 2013
Thaketa (3Units)
500
166 2014
166 2015
168 2016
3 Ahlone 100 2014
4 Ywa Ma 292 2013
Subtotal 1540.6
Hydropower Output (MW) COD
1 Upper Paunglaung 140 2014
2 Nancho 40 2014
3 Phyu 40 2014
9 Chipwenge 99 2012
10 Baluchaung-3 52 2013
11 Thaukyegat 120 2013
12 Upper Baluchaung 29 2015
Subtotal 520
Total Install Capacity = 2060.6 MW
16
India China
ラオス
Thailand
ベトナム
Bangladesh
Bay of Bengal
Thanlwing River
Myanmar
シャム湾
7
8
9
1811
15
13
14
17
12
14
2
3
65
10
16
19
A
B
C
D
E
F G H I
J
Mandalay
Nay Pyi Taw
YangonAyeyawaddy River
Sittaung River
Location of Power Stations under Construction and Planning ( as of December’ 2012 )
ラオス ベトナムシャム湾
Hydropower (existing)
Gas-fired (existing)
Coal-fired (existing)
α
bad
h
gp
ce
i
f
j
k
mn
o
l
Ⅰ Ⅱ Ⅲ (Yangon Region )
Power Station
Power Station under construction and planning Output (MW) COD
a Upper Paunglaung 140 2014b Nancho 40 2014c Phyu 40 2014d Middle Paunglaung 100 2018e Tha-htay 111 2018f Upper Keng Tawng 51 2018
Hydro-power g Upper Yeywa 280 2019
h Shweli -3 1050 2020i Ann 10 -
j Bawgata 168 -
k Upper Bu 150 -l Chipwinge 99 2012
m Baluchaung-3 52 2013n Thaukyegat 120 2013o Upper Baluchaung 29 2015p Manipur 380 -
Gas-Fired
Ⅰ Hlawga 543
52 2013123 2014246 2015174 2016
Ⅱ Taketa 500
52 2013166 2014166 2015168 2016
Ⅲ Ahlone 100 2013IV Ywama 292 2013
IV
17
18
Month 2009 2010 2011 2012Janurary 509 520 771 856Februrary 471 485 722 840
March 528 568 819 910Apri 508 562 795 824May 516 538 824 792Jun 522 568 829 843July 607 723 888 945
August 672 767 892 950Setember 651 767 860 950October 672 774 892 981
November 601 773 869 974December 573 765 873 939
Total 6830 7810 10034 10804
Monthly Generation in GWh (2009 to 2012)
19
Janu
rary
Febr
urar
y
Mar
ch
Apri
May Jun
July
Augu
st
Sete
mbe
r
Oct
ober
Nov
embe
r
Dece
mbe
r0
100000
200000
300000
400000
500000
600000
700000
800000
900000
100000050
8534
4711
78
5280
13
5079
92
5162
22
5223
42 6069
79
6720
52
6510
17
6720
92
6005
12
5729
30
5197
66
4845
35 5684
13
5620
32
5379
91
5683
02
7234
34
7672
88
7668
16
7738
44
7730
74
7652
82
7710
26
7219
56 8193
87
7950
69
8238
37
8289
40
8882
76
8918
95
8598
54
8917
51
8688
96
8726
66
8559
03
8403
68
9096
67
8238
97
7918
08
8431
68 9454
21
9495
83
9498
15
9812
08
9744
61
9387
09
Monthly Generation in GWh (2009 to 2012)
2009 2010 2011 2012
20
Monthly Power Generation (2007.01 - 2012.08)
0
100
200
300
400
500
600
700
800
900
1,000
Jan-
07
Apr-
07
Jul-0
7
Oct-
07
Jan-
08
Apr-
08
Jul-0
8
Oct-
08
Jan-
09
Apr-
09
Jul-0
9
Oct-
09
Jan-
10
Apr-
10
Jul-1
0
Oct-
10
Jan-
11
Apr-
11
Jul-1
1
Oct-
11
Jan-
12
Apr-
12
Jul-1
2
Pow
er G
ener
atio
n (G
Wh/
mon
th)
MOEP1 MEPE
Others Total
Shwegyin (75 MW) COD: Oct. 2011
Kun (60MW)COD: Jul. 2012
Kyeeon Kyeewa (74 MW) COD: Aug. 2012
Yeywa (790MW )COD: Dec. 2010
Monthly Power Generation ( by Power Producer ) ( 2007 to 2012)
Yenwe ( 25MW ) COD: Feb. 2007Kabaung (30MW )COD: Mar. 2008
Kengtawng ( 54MW )COD: Mar. 2009
Shweli -1 ( 600MW )COD: May. 2009
HPGE
21
Monthly Net System Energy Demand ( by Supplier ) ( 2007 to 2012)
0
100
200
300
400
500
600
700
800
900
1,000
Jan-
07
Apr-
07
Jul-0
7
Oct-
07
Jan-
08
Apr-
08
Jul-0
8
Oct-
08
Jan-
09
Apr-
09
Jul-0
9
Oct-
09
Jan-
10
Apr-
10
Jul-1
0
Oct-
10
Jan-
11
Apr-
11
Jul-1
1
Oct-
11
Jan-
12
Apr-
12
Jul-1
2
Month
Ene
rgy
Con
sum
ptio
n (G
Wh/
mon
th) ESE YESB Total
Shwegyin (75 MW) COD: Oct. 2011
Kun (60MW)COD: Jul. 2012
Kyeeon Kyeewa (74 MW) COD: Aug. 2012
Yeywa (790MW )COD: Dec. 2010Yenwe ( 25MW ) COD: Feb. 2007
Kabaung (30MW )COD: Mar. 2008
Kengtawng ( 54MW )COD: Mar. 2009
Shweli -1 ( 600MW )COD: May. 2009
22
-
1,000
2,000
3,000
4,000
5,000
6,000
1990 1995 2000 2003 2004 2005 2006 2007 2008 2009
一般、家庭用 工業用 商業用 その他(外灯等)
-
1,000
2,000
3,000
4,000
5,000
6,000
1990 1995 2000 2003 2004 2005 2006 2007 2008 2009
Fisical year
Pow
er G
ener
atio
n (G
Mh)
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
1990 1995 2000 2003 2004 2005 2006 2007 2008 2009
Fisical year
0
1,000
2,000
3,000
4,000
5,000
Consumers Consumption per consumers (KWh/consumer)
Power Consumption ( by Use )(FY 2009 )Power Consumption ( by Use )
商業用,1,071GWh,
21%
その他(外灯等), 57GWh,
1% 一般、家庭用,
2,015GWh,41%
工業用,1,850GWh,
37%
Power Consumption per Consumer
Since 2006, the number of consumer has increased, however, power consumption per consumer has decreased.
→ Restriction of power consumption (ex. planned outage) is thought to be one of the reasons of the reduction above.
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
1990 1995 2000 2003 2004 2005 2006 2007 2008 2009
Num
ber o
f Con
sum
ers
(No.
)
0
1,000
2,000
3,000
4,000
5,000
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
1990 1995 2000 2003 2004 2005 2006 2007 2008 20090
1,000
2,000
3,000
4,000
5,000
Com
sum
ed E
nerg
y pe
r Con
sum
er(k
wh/
Con
sum
er)
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
1990 1995 2000 2003 2004 2005 2006 2007 2008 20090
1,000
2,000
3,000
4,000
5,000
Consumers Consumption per consumers (KWh/consumer)
Power Consumption (1990 to 2009 )Household Industrial Commercial Others (lighting)
Household
Industrial
Commercial Others (lighting),57 GWh, 1%
23
5033600.63
74%
1578856.03
23%217406.3
3%
Energy Mix (MWh)( by Power Producer ) 2009
Hydro Station(MWh)
Gas-FiredStation (MWh)
Coal-FiredThermalStation (MWh)
717789972%
2476327.2725%
379327.914%
Energy Mix (MWh)( by Power Producer ) 2011
Hydro Station(MWh)
Gas-FiredStation (MWh)
Coal-FiredThermalStation (MWh)
7722779.9171%
2845575.1626%
266222.752%
Energy Mix (MWh)( by Power Producer ) 2012
Hydro Station(MWh)
Gas-FiredStation (MWh)
Coal-FiredThermalStation (MWh)
5656508.7672%
1802754.2923%
351514.995%
Energy Mix (MWh)( by Power Producer ) 2010
Hydro Station(MWh)
Gas-FiredStation (MWh)
Coal-FiredThermalStation (MWh)
24
Maximum Demand
Installed Capacity
60
504
109
1151
508
24076
265125
63 50
471
892
35 63
3194MW
1913MW
Legend
Tota
l Ins
talle
d Ge
nera
tion
Capa
city
Tota
l Dem
and
(*)
Current Installed Generation Capacity and Maximum Demand
⇒Generation gap between supply and demand (approx 400MW) is supplied through 230kV bulk TL
Demand of Yangon Region occupies 50% of Myanmar’s demand.
Some large hydropower plants in northern area
Power flow
90
Unit[MW]
(*)Summation of maximum load of each 230 and 132kV substation
(Demand data in Kachin, Chin, Rakhaing, Kayah, Kayin and Tanintharyi is not obtained.)
25
Electrification Ratio
No Description Quantity
1 Population 59.78 million
2 Numbers of Household 8.92 million
3 Electrified Household 2.575 million
4 Percentage 28.86 %
1 % increment in electrified household covers 89,200 households and is
expected to be consumed 18187 MWh/yr.
26
Demand Forecast for Myanmar
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2019-
2020
2020-21
2021-22
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
1806 2155 2426 2732 30783477
39294442
50245686
64167243
8167
9213
10400
11746
13274
15008
16978
19215
(YEAR)
(MW)
27
Upgrading options for the Grid (Short Term Reinforcement Plan of
Transmission Lines & Substations)
29
Transmission Lines Under ConstructionEstimated target period of completion - 2013
No From To kV Length(km)
Region/State Objective
1 ThaHton Maw la Myaing 230 80.50 MonTo Supply Mon State & strengthen National Grid
2 Thar ke ta East – Dagon 230 16.09 Yangon To supply Yangon Grid
3 Balu chaung-2 Shwe myo 230 193.12 Kayar To strengthen National Grid
4 Upper Yeywa Shwe sar yan 230 128.75 Mandalay To connect upper Yeywa HPP
5 Balu chaung-3 Balu chaung-2 132 5.79 Kayar To connect Balu chaung-3 HPP
6 Wah-Shaung Winemaw 132 17.3 Kachin To connect Chi-bwe-nge HPP
30
TAPEIN(240 MW)
SHWELI(600 MW)
TAGAUNG
MANSAN
SHWESARYAN
NYAUNGBINGYI
OHNTAW
ဘလငး
BHAMO
NABAR
SHWEKU
KYAUKPAHTO
THAPHANSEIK(30 MW)
NGAPYADAING
MUSE
NAMKHAN
THEINNI
LASHIO
HSIBAW
NANSANYADANARPON
PYINOOLWIN
SEDAWGYI(25 MW)
LETPANHLA
MYAUKPYIN
INDUSTRIAL ZONE
MOHNYIN
AUNGPINLE
MOGOK
PAKHANGE
ပခကက
MONYWAKYAW
(Ka.Pa.Sa)
CHAUNGKU
CHIBWENGE(99 MW/2012)
MOGAUNG
HPAKANWAINGMAW(MYITKYINA)
MYITKYINA(1,2,3)
WASHAUNG
DAWPONYAN
MYITTHA40 MW
GANGAW
ဟားခါးဖလမး
သငးငငကလေလး
KALEWA
Sr. Project Name2012-2013 Project Plan
1. Winemaw-Myintkyina 66kV Transmission Line (1)(2)(3) (30)mile
2. Mogaung- Myitkyina 66kV Transmission Line (42)miles2013-2014 Project Plan
1. 66/11kV, 10MVA Myintkyina (1) (2)(3)Substation
2. Bhamo-Nabar-Ngapyawdaing-Ohntaw 230kV Transmission Line (285) miles & Substations
3. Bhamo-Myothit-Dawponyan 66kV Transmission Line (34)miles & Substations
2014-2015 Project Plan
1. Mogaung-Hpakan 66kV Transmission Line (55)miles & Substations
KACHIN STATE 31
NAMSAN
KENGTAUNG54 MW
KALAWTHAZI
THAPYAYWA(MEIKHTILA)
SHWEMYO
PINLAUNG
BALUCHAUNG(1)(28 MW)PYINMANA
NAYPYITAW
TAUNGDWINGYI
MAGWAY
မနး
THEPHYU
TAUNGOO
PHYU(40 MW/2013)0
KUN(60 MW)
SHWEKYIN(75 MW)
THARYARGONE
KAMARNAT
MYAUNG TAGAR
SHEWDAUNG(3 x 18.45 MW)
လေခ�ာက
တလေ�ာင
TIKYIT
AUNGPANG
PINPET
MOENAL
LINKHAE
ဟသ�ာတ
MYANAUNG(1X 16.25 MW)(1X 18.45 MW)
ပြပ�
ကြကခငး
NAYPYITAW(2)
YEPAUNGSON
YINMARBIN
LOILEM
PAUK KAUNG
KHAPAUNG(30 MW)
YENWE(25 MW)
ZAUNGTU(20 MW)
SONSAE
KALAMAဆငလေပါငဝလေ�ာငလ
လေက�ာစာ KYAUKSWEKYO
လေ�ာငလေပြခလေ"ာက
ဆငတ
KAYAR STATE
AUNGTHAPYE
Sr. Project Name2012-2013 Project Plan
1. Baluchaung(3)- Baluchaung(2)132kV Transmission Line (4) miles & Substations
2. Baluchaung(2)-ShweMyo 230kV Line (120)miles & Substation
2014-2015 Project Plan
1. Loikaw-ShreTaw 66 kV Transmission Line (45)Miles & Substations
2. Loikaw- Bawlakhe 66 kV Transmission Line (60)Miles & Substations
3. Bawlakhe - PharSong 66 kV Transmission Line (40)Miles & Substations
4. Baluchaung(2)- Loikaw 132kV Transmission Line (12) miles & Substation
BALUCHAUNG(3)( 52 MW/2013)
BALUCHAUNG(2)(168 MW)
LOIKAW
SHARTAW
PHARSONG
3
သာယာကနး
ကမာနတ
THATON(2 x 16.25 MW)(1 x 18.45 MW)
MAWLAMYINE(12 MW)
သနလျင
သာလေကတPAAN
MYAINGGALAY
�လေ%& 'ဒဂ
MYAWADDY
KAWKAREIK
YE
DAWEI
CHAUNGSONE
KAYIN STATE
PHAYARGONE
INDUSTRIAL ZONE
Sr. Project Name2012-2013 Project Plan
1. PaAn-Industrial Zone 66 kV Transmission Line (17) miles & Substation
2013-2014 Project Plan
1. PaAn-Phayangone(Zartapyin) 66/11kV, 5MVA Substation2014-2015 Project Plan
1. Mawlamyine-Kawkareik-Myawaddy 230kV Transmission Line (80) miles & Substations
2. PaAn - Hlaningbwe 66kV Transmission Line (27)miles & Substations
HLANINGBWE
33
TAGAUNG
လေ*+စာ*
BELIN **ာ
THAPYAYWA(MEIKHTILA)
MYINGYAN(INDUSTRY)
MANN(MINBU)2 X 18.45 MW
CHAUK
TANYAUNG
MONE75 MW
SAYTOTETAYAR
KYUNGCHAUNG(3 x 18.1 MW)
တက�စ
ဗနးလေမာSHWEKU
လေ�ာငပနး
*တနာပ
ပြပငဦးလင
KYEEON KYEEWA70 MW
မးကတ
MYINGYAN
PAKHANGE
PAKKHOKKUPAUK
Project(L)
Project(P)
Project(N)
NGAPHE
လေဒါဖနးယန
HAKHA
FALAM
THINEGIN
KALE
SAW(KA.PA.SA)
CHIN STATE
KYAUKTAW
PONNAGYUN
SITTWE
MINBYA
MRAUK-U
ANN
MINDAT
NABAR
KYAUKPAHTO
KYAW
CHAUNGKUMYITTHA40 MW
GANGAW NYAUNGBINGYI
THAPHANSEIK(30 MW)
MONYWA
KALEWA
THAZI
NAYPYITAW(2)
YINMARBIN
SONSAE
MAGWAY
YEPAUNGSON
SHWEMYO
PINLAUNG
MYAUKPYIN
INDUSTRIAL ZONE
OHNTAW
AUNGPINLE
SEDAWGYI(25 MW)
NGAPYADAING LETPANHLA
Sr. Project Name2012-2013 Project Plan
1. Kyaw-Gangaw-Haka 66kV Transmission Line (89) miles & Substation 2013-2014 Project Plan
1. Hakha-Falam-Thinegin 66kV Transmission Line (50) miles& Substation
2. Pauk-Mindat 66kV Transmission Line (35) miles & Substation
34
လေတာငင
လေ*+က�ငသာယာကနး
ကမာနတ
သနလျင
သာလေကတ
သတာ
�လေ%& 'ဒဂ
ဘလးလေခ�ာငး(၃)(၅၂မဂဂါဝပ)
MON STATE
THATON(2 x 16.25 MW)(1 x 18.45 MW)
MAWLAMYINE(12 MW)
PHAAN
MYAINGGALAY MYAWADDY
KAWKAREIK
YE
CHAUNGSONE
PHAYARGONE
INDUSTRIAL ZONE
HLANINGBWE
Sr. Project Name2012-2013 Project Plan
1. Thaton-Mawlamying 230kV Transmission Line (50) miles & Substation2013-2014 Project Plan
1. 66/11kV, 20MVA & 66/33kV, 20MVA Mawlamyine Substation
2014-2015 Project Plan
1. Mawlamyine-Chaungsone 66kV Transmission Line (18) miles & Substations
2. Mawlamyine- Thanbyuzayat 66kV Transmission Line (35) miles & Substations
SHWEKYIN(75 MW)
THANBYUZAYAT
35
သာစ�သလေပြပဝ
(မတထ လာ)
လေနပြပ�လေတာ
TAUNGTWINGYI
MAGWAYMANN
လေလ&ာကား
ATHOKE
လေပြမာငးတကာ
OAKSHITPIN
CHAUK
TANYAUNG
MONE (75 MW)
SAYTOTETAYAR
ကျနးလေခ�ာငး
THABAUNG
YEKYI
HINTHADA
MYANAUNG
KYEEON KYEEWA70 MW
PYAE
KYANKIN
MANTHONE
လေနပြပ�လေတာ(၂)
Project(L)Project(P)
Project(N)
လေပါကလေခါငး
ခလေပါငး(၃၀မဂဂါဝပ)
*နယ(၂၅မဂဂါဝပ)လေ9ာငးတ
(၂၅မဂဂါဝပ)
ဘ*ငလေနာင
*ာမ
စနဆ�
ကလားမSINPAUNGWE
AUNGLANProject(C)
KYAWSYA လေက�ာကစယက� း
လေ�ာငလေပြခလေ"ာက
SANTE
NGEPHAE
SAWRAKHINE STATEKYAUKTAW
PONNAGYUN
SITTWE
MINBYA
MYAUK-U
ANN
BUTHIDAUNG
KYAUKPHYU
THANTWE
MAEI
KYEINTALI
GWA
TAUNGUP
RAMREE
THAHTAY111 MW
Sr. Project Name2012-2013 Project Plan
1. Ann-Ponnagyun 230 kV Transmission Line (120) miles & Substations
2. Oakshitpin-Taungup-Maei-Ann 230 kV Line (139) miles & Substations
3. Mann-Ann 230 kV Transmission Line (80) miles & Substations2013-2014 Project Plan
1. Maei-Kyaukphyu 230 kV Transmission Line (65) miles
2. Kyaukphyu 230 kV Substation-Kyaukphyu 66 kV Line (5) miles & Substations
3. Ponnagyun-Sittwe 66 kV Line (22) miles & Substations
4. Ponnagyun-MyukOo 66 kV Line (35) miles & Substations
5. Ponnagyun-Kyauktaw 66 kV Transmission Line (40) miles & Substations
6. Kyaukphyu-Ramree 6 6 kV Transmission Line (41) miles & Substations
7. Taungup-Thandwe 66 kV Transmission Line (30) miles & Substations2014-2015 Project Plan
1. Kyauktaw-Buthidaung 66 kV Transmission Line (35) miles & Substations
2. Maruk U-Minbya 66 kV Transmission Line (20) miles & Substations
3. Thandwe-Kyeintali-Gwa 66 kV Line (84) miles & Substations
4. Athoke-Gwa 66 kV Transmission Line (62) miles & Substations
36
TAPEIN
SHWELI-1
TAGAUNG TAUNG
MANSAN
SHWESARYAN�နးလေတာ
BELIN YEYWA
NANSAN
KENGTAUNGKALA
W
သလေပြပဝ(မတထ လာ)
SHWEMYO
PAUNG LAUNG
ဘလးလေခ�ာငး(၁)(၂၈မဂဂါဝပ)
လေနပြပ�လေတာ
လေတာငတငးကြကး
TIKYIT
BAMAW
NABAR
SHWEKU
င&ကလေပ�ာဒငး
MUSE
NANKHAN
LASHIO
HSIBAW
NANSAN
WANSIN
KHOLANPINDAYA
AUNGTHAPYE
PINPAT
MOENAL
LINKHAE
YADANARBON
PYINOOLWIN
SEDAWGYI60 MW
LATPANHLA
MYAUKPYIN
INDUSTRIAL ZONE
MONG-NAUNG
လေနပြပ�လေတာ(၂)
YEPAUNGSON
YINMARBIN
LOILEN
ZAWGYI (2)12 MW
ZAWGYI (1)18 MW
AUNGPINLE
MOGOK
ပြမငးပြခ
မ*ာ(လေ�ာငခ�မးသာ)
DAWPHONEYAN SHAN STATE
TAUNGYI
UPPER BALUCHAUNG
105 MILE
MONGHSU
THEINNI
TARMONYE
MINEYAL
TANTYAN
KONHEIN
KYETHI
KUTKAI
LAUKKAING
HIS-HSENG
Sr. Project Name2012-2013 Project Plan
1 Kalaw-Pindaya 66 kV Transmission Line (22) miles & Substations
2 Kholan-Konhein 66 kV Line (33) miles & Substations
3 Lashio-Mineyal-Tantyan 66 kV Line (87) miles & Substations
4 Theinni-Tarmonye-Laukkaing 66 kV Line (75) miles & Substations
5 Aungthapye-Naungka 66kV Line (17) miles & Substations2013-2014 Project Plan
1 132/66 kV, 100 MVA Taungyi Substation
2 66/11 kV, 5 MVA Laihka Substation
3 Mong Naung-Mongshu 66 kV Line (33) miles & Substations
4 Upper Baluchaung-Kalaw 66 kV Transmission Line (20) miles2014-2015 Project Plan
1 Mansan-Theinni 230 kV Line (60) miles & Substations
2 Theinni-Kutkai-105 mile(Muse) 66kV Transmission Line (60) miles & Substations
3 Taungyi-Hsihseng 66kV Line (44) miles & Substations
4 Mong Naung-Kyethi 66 kV Line (30) miles & Substations
MONGKUNG
LAIHKA
PYINMANA
37
တာပန
လေ*+လ(၁)
မနစ
လေ*+စာ*
NYAUNGBINGYIOHNTAW
BELIN
နမစ
က� ငးလေတာငးTHAZI
THAPYIWA
MYINGYAN(STEEL MILL)
လေ*+မြမ
CHAUK
TANYAUNG
MONE (75 MW)
SAETOTETAYAR
KYUNGCHAUNG
NABAR
KYAUKPAHTO
THAPHANSEIK30 MW
NGEPYAWDAING
မဆယ
နမခမး
သနန
လားရCး
သလေပါ
နမစန
ဝမဆငး
ခလန
လခ�ား
လေ�ာငသလေပြပ
ပငးပကမးန
ပြပငဦးလင
SEDAWGYI25 MW
LATPANHLA
MYAUKPYIN
INDUSTRIAL
MOHNYIN
MOGAUNG
မငးလေနာင
YEPAUNGSON
YINMARBIN
လငလင
လေ9ာဂ�(၂)(၁၂မဂဂါဝပ)
လေ9ာဂ�(၁)(၁၈မဂဂါဝပ)
AUNGPINLE
မးကတ
MYINGYAN
PAKHANGE
PAKHOKKU
MONYWA(AUNGCHANTHAR)
KYAW
PAUK
CHAUNGKU
Project(L)
Project(P)
Project(N)SAW
လေက�ာကလေတာ
၆၀
တာမး�
လေလာကကင
၂၃
၅၂
မငး*ယ
တန ယနး၄၈ ၃၉
ကနဟနး၃၃
၁၀၅ မင၁၀
၅၀
၃၀လေက�းသး မငးရCး
၃၃
လေတာငကြကး
၄၄၂၀
SAGAING DIVISION
MOGOK
Sr.
Project Name
2013-2014 Project Plan
1 132/33 kV, 2 x 50 MVA Monywa Substation
2 Gangaw-Kale 230 kV Transmission Line (80) miles & Substation
3 132/66kV, 100MVA Extension at Kyaukpahto Substation2014-2015 Project Plan
1 Thinegin-Kale-Kalewa 66 kV Transmission Line (30) miles
KALAYWA
38
THINEGINKALE
GANGAW
SHWESATYAN
NYAUNGBINGYI
OHNTAW
BELIN YEYWA
နမစ
က� ငးလေတာငးKALAW
THAZI
THAPYAWA
MYINGYAN(STEEL MILL)
SHWEMYO
PAUNGLAUNG
BALUCHAUNG(1)28 MW
BALUCHAUNG(2)160 MW
PYINMANA
NAYPYITAW
TAUNGTWINGYI
MAGWAY
MANN
THEPHYU
TAUNGOO
ပြဖး
CHAUK
တလေ�ာင
ကျနးလေခ�ာငး
TIKYIT
HSIBAW
ဝမဆငး
ခလနLAIHKA
AUNGPANAUNGTHAPYAE
PINPET
LINKHAE
PYINOOLWINMYAUKPYIN
PYAE
INDUSTRIAL ZONE
မငးလေနာင
NAYPYITAW(2)
YEPONSONE
YINMARBIN
LOILEN
ZAWGYI(1) 12 MW
ZAWGYI(2)18 MW
လေ�ာငပငလယ
MYINGYAN
PAKHANGYI
PAKOKEKU
MONYWAလေက�ာ(ကပစ)
လေပါက
လေခ�ာငးကး
Project(N)
KAPAUNG30 MW
SONSE
KALAMA
SINPAUNGWE
AUNGLAN
Project(C)
KYAWSWAKYAUKSWEKYO
SINTE
BALUCHAUNG(3)52 MW
UPPER YEYWA
INGONE
KINDA
TAUNG_T KWN
NGAZON
TAGuNTAING
MYOGYI
Sr. Project Name2012-2013 Project Plan
1. Upper Yeywa- Shwesaryan 230kV Line (80) miles
2. 230/33 kV,100MVA Naypyitaw(2) Substation
3. Meikhtila-Taungoo 500 kV Transmission Line (146) miles
4. Myogyi-Taungtawkwn 33kV Transmission Line (10) miles
2013-2014 Project Plan
1. 132/33 kV, 100 MVA Taguntaing Substation
2. 132/33 kV, 100 MVA Industrial Zone Substation
3. 132/66 kV, 60 MVA Letpanhla Substation
4. 66/33 kV, 30 MVA Mogok Substation
2014-2015 Project Plan
1. 132/33 kV, 2 x 50 MVA Thazi Substation
2. Chauk-Nyaungoo 66 kV Line (28) miles & Substation
3. MyinChan-NgaZon 66kV Line (10)Miles & Substations
4. ThapyaWa 500/230kV Substation
5. AungPinlae 132/33kV, (20)MVA Substation
2015-2016 Project Plan
1 230 /33kV, 100 MVA Thapyaywa(Meikhtila) Substation
MANDALAY DIVITION 39
လေ*+စာ*
NYAUNGBINGYI
OHNTAW
ဘလငး **ာ
နမစ
က� ငးလေတာငးကလေလာ
THAZI
THAPYAYWA(MEIKHTILA)
MYINGYAN
(NGAZON)
SHWEMYO
လေပါငးလေလာငးဘလးလေခ�ာငး(၁)(၂၈မဂဂါဝပ)
ဘလးလေခ�ာငး(၂)(၁၆၀မဂဂါဝပ)
PYINMANA
NAYPYITAW
TAUNGDWINGYI
MAGWAY
MANN(MINBU)
2 X 18.45 MW
THEPHYU
TaungooPHYU(40
MW/2013)KUN(60
MW)
SHEWDAUNGOAKSHITPIN
CHAUK
TANYAUNG
MONE75 MW
SAYTOTETAYAR
KYUNGCHAUNG
တက�စ
သလေပါ
ဝမဆငး
ခလနလခ�ား
လေ�ာငပနးလေ�ာငသလေပြပ
ပငးပက
မးန
လငးလေခး
ပြပငဦးလငMYAUKPYIN
KYEEON KYEEWA70 MW
PYAY
INDUSTRIAL ZONE
မငးလေနာင
NAYPYITAW(2)
YEPAUNGSON
YINMARBIN
လငလင
လေ9ာဂ�(၂)(၁၂မဂဂါဝပ)
လေ9ာဂ�(၁)(၁၈မဂဂါဝပ)MYINGYAN
PAKHAGYI
PAKKHOKKU
KYAW(KA.PA.SA)
PAUK
CHAUNGKU
PROJECT-L
PROJECT-P
PROJECT-N
PAUK KAUNG
KHAPAUNG(30 MW)
SONSAE
KALAMA
SINPAUNGWE
AUNGLAN
PROJECT-C
KYAWSWA
KYAUKSWEKYO
လေ�ာငလေပြခလေ"ာက
SINDE
NGAPHE
ဘလးလေခ�ာငး(၃)(၅၂မဂဂါဝပ)
MINDAT
MYITTHA40 MW
GANGAW
SAW(KA.PA.SA
)
လေက�ာကလေတာ
�"က**ာ၈၀
INGONE
KINDA56 MW
KANMA
MAGWAY DIVISIONSr Project s Name
2012-2013 Project Plan
1 230 /66 kV, 100 MVA Taungdwingyi Substation.2013-2014 Project Plan
1 Mann-Taungdwingyi 230 kV Line (85) miles & Substations.
2 Tanyaung-Saw 66 kV Transmission Line (45) miles & Substations.
3 230/66 kV, 100 MVA Chaungku & 66/35 kV, 60 MVA Pauk Subsations.
2014-2015 Project Plan
1 Gangaw-Chaungku 230 kV Line (60) miles & Substations.
2 Myittha-Gangaw 66 kV Transmission Line (25) miles
3 Thapyaywa-Chauk-Minbu 230 kV Line (145) miles & Substations.
4 Kyungchaung-Mann 230 kV Line (90) miles & Substations.
5 Taungdwingyi-Aunglan 132 kV Line (66) miles & Subsations.
6 Aunglan-Thayet 66 kV Line (10) miles & Substations.
7 Oakshitpin-Kanma 66 kV Line (30) miles & Substations.
2015-2016 Project Plans
1 132/66 kV, 60 MVA Pakkhokku(Budhakone) Substation
THAYET
40
NAMSAN
PINPET
THAZI
THAPYAYWA(MEIKHTILA)
ပြမငးပြခ(သမဏ)
SHWEMYO
PAUNGLAUNG
BALUCHAUNG(1)(28 MW)
BALUCHAUNG(2)(168 MW)
PYINMANA
NAYPYITAW
TAUNGDWINGYI
MAGWAY
မနး
THEPHYU
TAUNGOOPHYU
KUN(60
MW)SHWEKYIN
THARYARGONE
KAMARNATMYAUNG TAGAR
SHEWDAUNG
လေခ�ာက
တလေ�ာင
TIKYIT
AUNGPANGAUNGTHAPYE
PINPET
EAST DAGON
လေ*ကြက�HINTHAD
A
MYANAUNG
PYAY
ကြကခငး
NAYPYITAW(2)
YEPAUNGSON
YINMARBIN
LOILEM
PAUK KAUNG
KHAPAUNG(30 MW)
YENWE(25
MW) ZAUNGTU(20 MW)
SONSAE
KALAMA
SINPAUNGWE
AUNGLAN
KYAWSWA KYAUKSWEKYO
လေ�ာငလေပြခလေ"ာက
ဆငတ
BALUCHAUNG(3)( 52 MW)
THAUK-YE-KHAT(120 MW /2013)
BAGO DIVISION
MINHLA
SITTAUNG
Sr Project Name2012-2013 Project Plan
1 Shwedaung-Myaungtagar 230kV Transmission Line (130) miles
2 230/33 kV, 100 MVA Kamarnat Substation3 230/33 kV, 100 MVA Minhla Substation4 230/33 kV, 100 MVA Sittaung Substation
2013-2014 Project Plan
1 Taungoo-Kamarnat 500 kV Transmission Line (117) miles
2 Karmanat-Myaungtagar 500 kV Transmission Line (50) miles
3 Thaukyekhat(2)-Taungoo 230 kV Transmission Line (13) miles
4 Taungdwingyi-Shwedaung 230kV Transmission Line (100) miles & Substations
2014-2015 Project Plan
1 Taungoo-Shwedaung 230 kV Line (110) miles & Substations
2 Baluchaung(2)-Taungoo 230kV Line (96) miles & Substations
3 500/230 kV, 500 MVA Kamarnat Substation
4 500/230 kV, 500 MVA Taungoo Substation
2015-2016 Project Plan
1 Minhla-Hinthada 230 kV Line (60) miles & Substations
41
ပြဖး
ကနး
သာယာကနး
ကမာနတ
သာလေကတ
HLAWGA
AHLON
ATHOKE
HLAINGTHARYAR
MYAUNG TAGAR
SHEWDAUNGOAKSHITPIN
သတာစနပနးမြမင
�လေ%& 'ဒဂ
PATHEIN
MYAUNGMYA
LAPUTTA
KANGYIDAUNT
THARBAUNG
YEGYI
HINTHADA
MYANAUNGKYANKIN
MATHONE
*နယ(၂၅မဂဂါဝပ)
လေ9ာငးတ(၂၅မဂဂါဝပ)
BAYINTNAUNG
YWAMA
NYAUNGCHEDAUUK
KYAIKLAT
MINHLA
AYEYARWADDY DIVISION
NGWESAUNG
CHAUNGTHAR
KANNI
Sr Project Name2012-2013 Project Plan
1 Athoke-Pathein 230kV Line (40) miles & Substations.
2013-2014 Project Plan
1 Pathein-Chaungthar 66kV Line (35) miles & Substations.
2 Pathein-Ngwesaung 66kV Line (30) miles & Substations.
3 Pathein-Kanni 66kV Line (7) miles & Substations.
4 Hlaingtharyar-Kyaiklat 230kV Line (30) miles & Substations.
2014-2015 Project Plan
1 Hinthada-Athoke 230 kV Line (80) miles
2 Oakshitpin-Hinthada 230kV Line (95) miles & Substations.
3 Hlaingthayar-Kyaiklat 66kV Line (30) miles & Substations.
4 Kyaiklat-Pyapon 66 kV Line (15) miles & Substations.
5 Kyaiklat-Bokalay 66kV Line (35) miles & Substations.
6 Hinthada - Laymyatnar 66kV Line (15) miles & Substations.
7 Hinthada - Danubyu 66kV Line (35) miles & Substations.
8 66/11kV, 2 x 10 MVA Hinthada Substaion
PYAPONBOKALAY
LAYMYATNAR
DANUBYU
42
PHYU
KUN(60 MW)
SHWEKYIN
THARYARGONE
KAMARNAT
သ"
လေမာလမြမင
THANLYIN
THAKETA
HLAWGA
AHLON
ATHOKE
HLAINGTHARYAR
MYAUNG TAGAR
SHEWDAUNG
OAKSHITPIN
ဘား�
မြမငကလေလး
THIDA
SEINPANMYAING
ပသမ
MYAUNGMYA
BAYINTNAUNG
KANGYIDAUNT
သာလေပါငး
YEGYI
HINTHADA
MYANAUNG
KYANKIN
MATHONE
YENWE
(25 MW)
ZAUNGT
U(25 MW)
ဘ*ငလေနာင
YWAMA
NYAUNGCHEDAUUK
ပြမဝတ
လေကာက*တ
ဘ*ားကန
လေခ�ာငးဆ
EAST DAGON
THILAWA
SHWELINPAN
Sr. Project Name2012-2013 Project Plan
1 Thaketa- East Dagon 230kV Line (10) miles & Substations.
2 230/33 kV, 100 MVA Myaungtagar Substation
3 230/33 kV, 2 x 100 MVA Hlawga Substation
4 230/33 kV, 100 MVA Hlaingtharyar Substation
2013-2014 Project Plan
1 Ywama-Hlaingtharyae 230kV Line (7)miles & Substations
2014-2015 Project Plan
1 Shwelinpan (In/Out )Line (6) miles & Substations.
2 230/66kV, 100MVA Ywama Substation
3 Myaungdagar-Hlaingtaryar 230kV Transmission Line (28) miles
4 Thaketa- Ahlone 230kV Line (11) miles & Substation
2015-2016 Project Plan
1 Hlawga-Ywrma 230kV line(10)miles & Substations
2 KamarNut-EastDagon 230kV Line,(40)miles & Substations
3 ThanLynn-Thilawa 230kV Line (15)miles & Substations
4 Hlawga-Thakata 230kV Line (5)miles & Substations
5 Ahlone-Dala 230kV Line (8)miles & Substations
6 Thida GIS 230/66/11kV, 2x200 MVA Substations
YANGON DIVISION
KYAIKASAN
43
သာယာကနး
ကမာနတ
THATON
MAWLAMYINE
သနလျင
သာလေကတPHAAN
MYAINGGALAY
�လေ%& 'ဒဂ
MYAWADDY
KAWKAREIK
YE
DAWEI
CHAUNGSONE
Sr Project Name2013-2014 Project Plan
1 Mawlamyine-Ye-Dawei 230 kV Tranmsission Line (132) miles & Substations.
TANINTHARYI DIVISION
PHAYARGONE
INDUSTRIAL ZONE
44
Sr.
Project NameEstimated Project Cost
RemarksMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)Kachin State
1. Waingmaw-Myitkyina(1)(2)(3) 66 kV Transmisson Line (30) mile
4,261(4.734) 664.5(.738) Completed
2. Myitkyina-Mogaung66 kV Transmisson Line (42) mile
1,754(1.949) 930.5(1.034) Completed
3. Myitkyina(1),Myitkyina(2) & Myitkyina(3) 66 kV Substation
16,160(17.956) 1,314(1.460) Completed
4. Bhamo-Nabar, Ngapawdine-Ohntaw 230 kV Transmisson Lines (285) mile & Substations
89,786(99.762) 42,602(47.336) 2013-2014 Financial year
5. Bhamo-Myotit-Dawponyan 66 kV Transmisson Line (34) mile & Substations
2,800(3.111) 2,657(2.952) 2013-2014 Financial year
6. Waingmaw-Mogaung 132 kV Transmisson Line (60) mile & Substations
11,880(13.200) 2,642(2.936) 2014-2015 Financial year
7. Mogaung- Hpakant 66 kV Transmisson Line (55) mile & Substations
4,225(4.694) 2,350(2.611) 2014-2015 Financial year
Sub Total 130,866(145.407)
53,160(59.067)
Current Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Completed During Financial Years of (2012-2013) To (2015-2016)
45
Exchange Rate : 1 USD = 900 Ks.
Sr.
Project NameEstimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Kayar State (Contd;)
1. Baluchaung(2)-Shwemyo 230 kV Transmisson Line (120) mile & Substations
19,500(21.667) 7,699(8.554)2012-2013
Financial year
2. Baluchaung(2)-Baluchaung(3) 132 kV Transmisson Line (4) mile & Substation Extension
2012-2013 Financial year
3. Baluchaung(2)-Loikaw 132 kV Transmisson Line (12) mile & Substations
14,709(16.343) 3,222(3.580) 2014-2015 Financial year
4. Loikaw-Shadaw 66 kV Transmisson Line (45) mile & Substations
2,375(2.639) 1,979(2.199) 2014-2015 Financial year
5. Loikaw-Bawlakhe 66 kV Transmisson Line (60) mile & Substations
4,200(4.667) 2,491(2.768) 2014-2015 Financial year
6. Bawlakhe-Hpasawng 66 kV Transmisson Line (40) mile & Substations
5,400(6.000) 1,807(2.008) 2014-2015 Financial year
Total for Kachin State 46,184(51.316) 17,198(19.109)
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
46
Sr.
Project NameEstimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Kayin State
1. Hpa-an-Industrial Zone 66 kV Transmisson Line (17) mile & Substations
- 1,020(1.133) On-Going
2. Hpa-an-Phayarkone(Zartabyin) 66 /11kV, 5 MVA Substation
2,250(2.500) 879(0.977) 2013-2014 Financial year
3. Mawlamyine-Kawkareit-Myawadi 230 kV Transmission Line (80) mile & Substations
27,900(31.000) 8,675(9.639) 2014-2015 Financial year
4. Hpa-an-Hlinebwe 66 kV Transmisson Line (27) mile & Substations
2,860(3.178) 1,392(1.547) 2014-2015 Financial year
Total for Kayar State 33,010(36.678) 11,966(13.296)
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
47
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Sr.
Project NameEstimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Chin State1. Kyaw-Gangaw-Harkhar 66 kV
Transmisson Line (89) mile & Substations
11,531(12.812) 2,010(2.233) On-Going
2. Harkhar-Phalam-Taingin 66 kV Transmisson Line (50) mile & Substations
5,600(6.222) 3,820(4.244) 2013-2014 Financial year
3. Pauk-Minthet 66 kV Transmisson Line (35) mile & Substations
2,880(3.200) 2,295(2.550) 2013-2014 Financial year
Total for Chin State 22,011(22.234) 8,125(9.028)
Mon State
1. Thaton-Mawlamyine 230 kV Transmisson Line (50) mile & Substations
11,106(12.340) 6,990(7.767) On-Going
2. Mawlamyine-Chaungzon 66 kV Transmisson Line (18) mile & Substations
3,618(4.020) 5,084(5.649) 2013-2014 Financial year
3. Mawlamyine-Thanbuzayat 66 kV Transmisson Line (35) mile & Substations
3,600(4.000) 1,665(1.850) 2013-2014 Financial year
4. 66/11 kV, 20 MVA & 66/33 kV, 20 MVA Mawlamyine Substation
4,050(4.500) 438(0.487) 2014-2015 Financial year
5. Thaton-Bilin 66 kV Transmission Line (38) mile & Substations
3,368(3.742) 1,768(1.964) 2015-2016 Financial year
Total for Mon State 25,742(28.602) 15,945(17.717)
48
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Sr.
Project NameEstimated Project Cost
NoteMaterial Cost
Mil:Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Rakhine State
1. Mann-Ann-Ponnagyun 230 kV Transmission Line (200) mile & Substations 68,741(76.379) 21,699(24.110)
On-Going
2. Oakshitbyin-Toungup-Ma-ei 230 kV Transmission Line (139) mile & Substations
On-Going
3. Ma-ei-Kyaukphyu 230 kV Transmisson Line (65) mile
14,040(15.600) 2,224(2.471) 2013-2014 Financial year
4. Kyaukphyu 230 kV Substation-Kyaukphyu 66 kV Transmission Line (5) mile & Substations
2,025(2.250) 569(0.632) 2013-2014 Financial year
5. Mrauk-u-Ponnagyun-Sittwe 66 kV Transmission Line (57) mile & Substations
6,660(7.400) 2,856(3.173) 2013-2014 Financial year
6. Ponnagyun-Kyauktaw 66 kV Transmission Line (40) mile & Substations
2,520(2.800) 1,807(2.008) 2013-2014 Financial year
7. Kyaukphyu-Ramree 66 kV Transmission Line (41) mile & Substations
3,645(4.050) 1,870(2.078) 2013-2014 Financial year
Sub Total
49
Sr. Project NameEstimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Yakhine State (cont;)
8. Toungup-Thandwe 66 kV Transmission Line (30) mile & Substations
4,000(4.444) 1,465(1.628) 2013-2014 Financial year
9. Kyauktaw-Buthitaung 66 kV Transmission Line (35) mile & Substations
3,183(3.537) 1,665(1.850) 2014-2015 Financial year
10 Mrauk-u-Minbya 66 kV Transmission Line (20) mile & Substations
2,250(2.500) 1,152(1.280) 2014-2015 Financial year
11. Thandwe-Kyeintali 66 kV Transmission Line (84) mile & Substations
6,480(7.200) 3,342(3.713) 2014-2015 Financial year
12. Athoke- Gwa 66 kV Transmission Line (62) mile & Substations
4,320(4.800) 2,589(2.877) 2014-2015 Financial year
Total for Yakhine State 117,864(130.960)
41,238 ( 45.820)
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
50
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Sr. Project NameEstimated Project Cost
NoteMaterial Cost
Mil:Kyats(Mil:USD)
Construction Cost
Mil:Kyats(Mil:USD)
Shan State1. Kalaw-Pindaya 66 kV Transmission Line
(22) mile & Substations1,889(2.099) 800(0.889) Completion
2. Aungthapyay-Naungkar 66 kV Transmission Line (17) mile & Substations
1,389(1.543) 1,050(1.167) Completion
3. Khainglon-Konhein 66 kV Transmission Line (33) mile & Substations
3,272(3.636) 2,499(2.777) On-Going
4. Lashio-Mineyal- Tantyan 66 kV Transmission Line (87) mile & Substations
3,931(4.368) 3,882(4.313) On-Going
5. Teinni-Tarmoenye-Launktai 66 kV Transmission Line (75) mile & Substations
7,171(7.968) 3,471(3.857) On-Going
6. Taunggyi 132/66 kV, 100 MVA Substation
5,400(6.000) 450(0.500) 2013-2014 Financial year
7. Lecha 66/11 kV, 5 MVA Substation 2,000(2.222) 438(0.487) 2013-2014 Financial year
8. Minenaung- Mineshoe 66 kV Transmission Line (33) mile & Substations
3,200(3.556) 2,297(2.552) 2013-2014 Financial year
Sub Total
51
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Sr. Project NameEstimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Shan State ( Contd)9. Upper Baluchaung- Kalaw 66 kV
Transmission Line (20) mile & Substations
- 684(0.760) 2013-2014 Financial year
10. Mansan-Teinni 230 kV Transmission Line (60) mile & Substations
24,390(27.100) 6,163(6.848) 2014-2015 Financial year
11. Teinni- Kutkhaing-105 mile (Musal) 66 kV Transmission Line (60) mile & Substations
5,940(6.600) 2,550(2.833) 2014-2015 Financial year
12. Taunggyi- Sesai 66 kV Transmission Line (44) mile & Substations
3,150(3.500) 1,535(1.706) 2014-2015 Financial year
13. Minenaung- Gyithe 66 kV Transmission Line (30) mile & Substations
3,150(3.500) 1,494(1.660) 2014-2015 Financial year
14. Mansan- Lashio 66 kV Transmission Line (26) mile & Substations
3,622(4.024) 2,207(2.452) 2014-2015 Financial year
Total for Shan State 68,504(76.116) 29,520(32.800)
52
Sr. Project NameEstimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil: Kyats (Mil:USD)
Sagaing Region
1. Nyaungbingyi- Latpandaung 230 kV Transmission Line (3.5) mile & Substations
- 2,270(2.522) 2013-2014 Financial year
2. Gangaw- Kalay 230 kV Transmission Line (80) mile & Substations
28,512(31.680) 7,249(8.054) 2013-2014 Financial year
3. Kyaukpahtoe 132/66 kV, 100MVA Substation Extension
6,300(7.000) 450(0.500) 2013-2014 Financial year
4. Monywa 132/33 kV, 2x50 MVA Substation Extension
8,380(9.311) 1,890(2.100) 2014-2015 Financial year
5. Taingin- Kalay-Kalaywa 66 kV Transmission Line (30) mile & Substations
4,5005.000) 1,902(2.113) 2014-2015 Financial year
Total for Sagaing Region 47,692(52.991) 13,761(15.290)
Tanintharyi Region
1. Mawlamyine- Ye-Dawei 230 kV Transmission Line (132) mile & Substations
50,373(55.970) 22,023(24.470) 2013-2014 Financial year
Total for Tanintharyi Region 50,373(55.970) 22,023(24.470)
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
53
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Sr. Project NameEstimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Bago Region1. Sittaung 230/33 kV, 100MVA
Substation 3,413(3.792) 1,910(2.122) Completion
2. Kamarnat 230/33 kV, 100MVA Substation Extension
3,758(4.176) 250(0.278) On-Going
3. Minhla 230/33 kV, 100MVA Substation
3,753(4.170) 1,910(2.122) On-Going
4. Shwetaung- Myaungtagar 230 kV Transmission Line (130) mile & Substations
11,628(12.920) 10,273(11.414) On-Going
5. Thautyekhat(2)- Taungoo 230 kV Transmission Line (13) mile & Substations
- 826(0.918) On-Going
6. Chaungkuu 230 /66 kV, 100 MVA Substation Extension
78,975(87.750) 17,316(19.240) 2013-2014 Financial year
7. Taungdwingyi- Shwetaung 230 kV Transmission Line (100) mile & Substations
18,100(20.111) 7,944(8.827) 2013-2014 Financial year
8. Kamarnat-Myauntagar 500 kV Transmission Line (50) mile
37,800(42.000) 7,400(8.222) 2014-2015 Financial year
9. Taungoo- Shwetaung 230 kV Transmission Line (100) mile
26,640(29.600) 8,720(9.689) 2014-2015 Financial year
54
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Sr. Project NameEstimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Bago Region10. Baluchaung(2)- Taungoo 230 kV
Transmission Line (96) mile 16,992(18.880) 5,864(6.516) 2014-2015
Financial year
11. Kamarnat 500/230 kV, 500 MVA 23,400(26.000) 1,000(1.111) 2014-2015 Financial year
12. Taungoo 500/230 kV, 500 MVA 23,400(26.000) 1,000(1.111) 2014-2015 Financial year
13. Minhla- Hinthada 230 kV Transmission Line (60) mile & Substations
12,510(13.900) 4,838(5.376) 2015-2016 Financial year
260,369(289.299)
69,251(76.946)
55
Sr. Project NameEstimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Magway Region
1. Mann- Taungdwingyi 230 kV Transmission Line (85) mile & Substations
22,324(24.804) 13,028(14.476) 2013-2014 Financial year
2. Oakshitpin- Kanma 66 kV Transmission Line (30) mile & Substations
3,600(4.000) 1,494(1.660) 2013-2014 Financial year
3.Thapyaewa-Chauk-Minbu 230 kV Transmission Line (145) mile & Substations
33,852(37.613) 10,765(11.961) 2014-2015 Financial year
4. Kyunchaung-Mann 230 kV Transmission Line (90) mile & Substations
21,780(24.200) 7,367(8.186) 2014-2015 Financial year
5. Chaungkuu 230 /66 kV, 100 MVA Substation Extension
11,072(12.302) 400(0.444) 2014-2015 Financial year
6. Taungdwingyi- Aunglan 132 kV Transmission Line (66) mile & Substations
13,487(14.986) 2,792(3.102) 2014-2015 Financial year
7. Taungdwingyi 132/66 kV, 100 MVA Substation Extension
4,161(4.623) 350(0.389) 2014-2015 Financial year
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
56
Sr. Project NameEstimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Magway Region
8. Gangaw-Chaungkuu 230 kV Transmission Line (60) mile, Myittar- Gangaw 66 kV Transmission Line (25) mile & Substations
22,500(25.000) 6,418(7.131) 2014-2015 Financial year
9. Aunglan- Thayet 66 kV Transmission Line (10) mile & Substations
2,307(2.563) 492(0.547) 2014-2015 Financial year
10. Tanyaung- Saw 66 kV Transmission Line (45) mile & Substations 8,640(9.600) 2,008(2.231)
2014-2015 Financial year
11. Pakokku(Buddha Kone) 132/66 kV, 60 MVA Substation Extension 5,535(6.150) 1,492(1.658) 2015-2016
Financial year
149,258(165.842) 46,606(51.784)
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
57
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Sr. Project Name
Estimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Mandalay Region1. Naypyitaw 230 /33 kV, 100 MVA
Substation 4,446(4.940) 1,910(2.122) On-Going
2. Meikhtila-Taungoo 500 kV Transmission Line (146) mile
100,529(111.699)
21,608(24.009) 2012-2013 Financial year
3. Upper Yeywar-Shwesaryan 230 kV Transmission Line (80) mile & Substation Extension
15,498(17.220) 4,857(5.397) 2012-2013 Financial year
4. Myogyi-Taungtawkwin 33 kV Transmission Line (10) mile & Substation Extension
1,594(1.771) 612(0.680) 2012-2013 Financial year
5. Tagontaing 132/33 kV, 100 MVA Substation Extension
6,300(7.000) 250(0.278) 2013-2014 Financial year
6. Latpanhla 132/66 kV, 60 MVA Substation Extension
8,978(9.976) 300(0.333)
2013-2014 Financial year
7. Moegote 66/33 kV, 30 MVA Substation Extension
2013-2014 Financial year
8. Thapyaewa(Meikhtila) 500/230 kV, 500 MVA Substation
23,400(26.000) 1,000(1.111) 2014-2015 Financial year
58
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Sr. Project Name
Estimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Mandalay Region9. Industrial Zone 132/33 kV, 100 MVA
Substation 10,773(11.970) 438(0.487) 2014-2015
Financial year10. Tharzi 132/33 kV, 2x50 MVA Substation
Extension6,300(7.000) 450(0.500) 2014-2015
Financial year11. Aungpinlal 132/33 kV, 2x50 MVA
Substation Extension 4,500(5.000) 258(0.287) 2014-2015 Financial year
12. Chauk- Nyaung Oo 66 kV Transmission Line (28) mile & Substations
2,722(3.024) 1,396(1.551) 2014-2015 Financial year
13. Myingyan- Ngazon 66 kV Transmission Line (10) mile & Substations 2,250(2.500) 780(0.867) 2014-2015
Financial year
14. Bellin 230/33 kV, 100 MVA Substation Extension 7,380(8.200) 350(0.389) 2015-2016
Financial year
15. Thapyaewa(Meikhtila) 230/33kV, 100 MVA Substation Extension 7,380(8.200) 350(0.389) 2015-2016
Financial yearTotal Mandalay Region
202,050(224.500) 34,559(38.399)
59
Sr. Project Name
Estimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Ayeyarwaddy Region1. Athoke-Pathein 230 kV Transmission
Line (40) mile & Substations18,000(20.000) 4,360(4.844) 2012-2013
Financial year2. Hlaingtharyar-Kyeiklat 230 kV
Transmission Line (30) mile & Substations
13,547(15.052) 4,329(4.810) 2013-2014 Financial year
3. Pathein-Chaungthar 66 kV Transmission Line (35) mile & Substations
2,925(3.250) 1,665(1.850) 2013-2014 Financial year
4. Pathein-Ngwesaung 66 kV Transmission Line (30) mile & Substations
2,700(3.00) 1,495(1.661) 2013-2014 Financial year
5. Pathein-Pathein(Kyotadar) 66 kV Transmission Line (7) mile & Substations
3,857(4.286) 708(0.787) 2013-2014 Financial year
6. Hinthada-Athoke 230 kV Transmission Line (80) mile & Substation Extension
20,160(22.400) 6,391(7.101) 2014-2015 Financial year
7. Oakshitpin-Hinthada 230 kV Transmission Line (95) mile & Substations
23,310(25.900) 9,375(10.417) 2014-2015 Financial year
8. Hlaintharyar-Kyeiklat 66 kV Transmission Line (30) mile & Substation Extension
3,600(4.000) 1814(2.016) 2014-2015 Financial year
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
60
Sr. Project Name
Estimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Ayeyarwaddy Region (Contd;)9. Kyeiklat –Phyarpone 66 kV
Transmission Line (15) mile & Substations
2,307(2.563) 951(1.057) 2014-2015 Financial year
10. Kyeiklat –Bokalay 66 kV Transmission Line (35) mile & Substations
3,229(3.588) 1,635(1.817) 2014-2015 Financial year
11. Hinthada 66/11 kV, 2x10 MVA Substation Extension
3,690(4.100) 4,38(0.487) 2014-2015 Financial year
12. Hinthada-Laymyatnar 66 kV Transmission Line (15) mile & Substation Extension
1,845(2.050) 951(1.057) 2014-2015 Financial year
13. Hinthada-Danuphyu 66 kV Transmission Line (35) mile & Substation Extension
2,768(3.076) 1,635(1.817) 2014-2015 Financial year
Total (Ayeyarwaddy Region ) 101,938(113.264) 35,747(39.719)
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
61
စဉ Project Name
Estimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Yangon Region (Contd;)1. Myaungtagar 230/33 kV, 100 MVA
Substation Extension3,301(3.668) 250(0.278) On-Going
2. Hlawgar 230/33 kV, 2x100 MVA Substation Extension
7,050(7.833) 350(0.389) On-Going
3. Hlaintharyar 230/33 kV, 100 MVA Substation Extension
3,557(3.952) 250(0.278) On-Going
4. Thaketa-East Dagon 230 kV Transmission Line (10) mile & Substations
17,370(19.300) 2,778(3.087) 2012-2013 Financial year
5. Ywarma-Hlaimgtharyar 230 kV Double Circuit Transmission Line (7) mile & Substations
4,212(4.680) 5,719(6.354) 2013-2014 Financial year
6. Ywarma230/66 kV, 100 MVA Substation Extension
7,200(8.000) 450(0.500) 2014-2015 Financial year
7. Shwelinpanm In/Out 230 kV Transmission Line (6) mile & Substations
9,612(10.680) 2,376(2.640) 2014-2015 Financial year
8. Myaungtagar-Hlaingtharyar 230 kV Transmission Line (28) mile & Substations
9,696(10.773) 1,774(1.971) 2014-2015 Financial year
Sub Total
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
62
Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
စဉ Project Name
Estimated Project Cost
NoteMaterial Cost
Mil: Kyats(Mil:USD)
Construction CostMil:
Kyats(Mil:USD)
Yangon Region (Contd;)9. Thaketa-Ahlone 230 kV Transmission Line
(11) mile & Substations2,700(3.000) 752(0.836) 2014-2015
Financial year10. North Oakkala-(Hlawgar-Thaketa) 230 kV
Double Circuit Transmission Line (5) mile & Substations
14,580(16.200) 2,789(3.099) 2015-2016 Financial year
11. Hlawgar-Ywarma 230 kV Double Circuit Transmission Line (10) mile & Substations
4,860(5.400) 956(1.062) 2015-2016 Financial year
12. Thida GIS 230/66/11 kV, 2x200 MVA Substations
25,200(28.000) 2,800(3.111) 2015-2016 Financial year
13. Kamarnat-East Dagon 230 kV Double Circuit Transmission Line (40) mile & Substations
11,340(12.600) 3,285(3.650) 2015-2016 Financial year
14. Thanlyin-Thilawa 230 kV Double Circuit Transmission Line (15) mile & Substations
9,990(11.100) 5,255(5.839) 2015-2016 Financial year
15. Ahlone-Dala 230 kV Transmission Line (8) mile & Substations
8,100(9.000) 2,481(2.757) 2015-2016 Financial year
Total for Yangon Region 138,768(154.187) 32,265(35.850)
63
FOR ALL STATE & REGION TOTAL 1,392,629(1,547.366) 431,364(479.293)
1,823,993 ( 2,026.659)
ShweLi(3)1050MW
ThaPyaWa
MongTon7000MW
KarmarNut
MyaungTagar
500kV ShweLi(3)- ThaPyaWa (Proposal Stage) Double Circuit Line (250)miles
500kV MongTon-Taungoo (Proposal Stage) Double Circuit Line (230)miles
500kV ThaPyaWa – Taungoo (Contracted Stage) Double Circuit Line (153.3)miles
500kV Taungoo-KamarNat (Proposal Stage) Double Circuit Line (117 )miles
500 KV Power Transmission Plan In Myanmar
500kV KamarNat-MyaungTagar (Proposal Stage) Double Circuit Line (50)miles
Taungoo
64
List of Project To be Implemented by Myanma Electric Power Enterprise, Ministry of Electric Power Under (5)
Years Plan (2012-2013) To (2015-2016)
Voltage(kV)
No of Line
Line Length(km)
500 3 521
230 37 4280
132 4 237
66 51 3047
33 1 17Total 96 8102
Transmission LinesVolta
ge(kV)
No of Substati
on
Installed Capacity
(MVA)500 3 1500
230 38 4486
132 17 1370
66 66 857.5
33 - -Total 124 8213.5
Substations
65
Sr. Name of Lines Length of Lines(km)
1 Myaukpyin- Shwesaryan 26
2 Yaeywar-Thapaywa 112
3 Yaeywar-Belin 39
4 Belin-Thapaywa 88
5 Hlaingthayar - Ahlone 23
288Total
The Existing High Voltage Transmission Lines with OPGW Cable
66
Sr. Name of Lines Length of Lines(km)
1 Thapaywa - Thazi 27
2 Thazi - Shwemyo 121
3 Shwemyo - Pyinmana 40
4 Pyinmana - Naypyitaw 26
5 Belin - Shwesaryan 32
6 Taungdwingyi - Magwe 76
7 Magwe - Chauk 117
8 Chauk - Kyunchaung 45
9 Kyunchaung - Naungpingyi 163
10 Naungpingyi - Ohmtaw 92
11 Naungpingyi - Chaungu 108
12 Ohntaw - Belin 64
911Toatal
High Voltage Transmission Lines which were planned to replaced the existing Galvanized Steel
Earth Wire with OPGW (Upper Ring)
67
Sr. Name of Lines Length of Lines(km)
1 NCC - Naypyitaw(1) 41
2 Naypyitaw(1) - Taungdwingyi 75
3 Taungdwingyi - Shwetaung 143
4 Myaungtagar - Hlaingtharyar 36
5 Myaungtagar - Hlawga 31
6 Tharyargone - Hlawga 151
7 Pyinmana - Thephyu 36
8 Thephyu - Taungoo 65
9 Taungoo - Tharyargone 97
10 Tharyargone - Khamarnet 93
11 Khamarnet - Thanlyin 98
12 Thanlyin - Tharketa 12
878Toatal
High Voltage Transmission Lines which were planned to replaced the existing Galvanized Steel Earth
Wire with OPGW (Lower Ring)
68
OPGW NETWORK OF MYANMAR POWER SYSTEM69
THANK YOU FOR YOUR KIND ATTENTION
U Aung Kyaw OoDeputy Chief EngineerPower Transmission Project Department (PTP)Myanmar Electric Power Enterprise (MEPE)Ministry of Electric Power(MOEP)
70
Q & A